planning engineer.doc

12
CURRICULAM VITAE MD ZAHID ANSARI Jubail, Saudi Arabia (KSA) Email: [email protected] Date of Birth: 08/09/1987 Mobile: 0551014194 CAREER OBJECTIVE: To perform to the best of my abilities and to continually acquire new skill in order to keep abreast with the dynamically changing environment and to dedicate my self to the organisation, I Work for. Job Objective: MECHANICAL ENGINEER/PLANNING ENGINEER PROFESSIONAL QUALIFICATION: Bachelor of Technology (B-TECH) from MDU Rohtak HARYANA ACADEMIC QUALIFICATION: S.N. Qualification 1. Intermediate of Science(10+2) from BIEC, Patna 2. Matriculation from BSEB, Patna Other Qualification(s)/ Certification(s): Primavera (P6) (APEX), 2012 from New Delhi 110025 Auto cad 2d & 3d (APEX), 2009 from new Delhi 110025 NDT level-II (ASNT) in, Radiographic testing, (RT). Liquid penetrant testing, (PT).

Upload: zahid

Post on 13-Jul-2016

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PLANNING ENGINEER.doc

CURRICULAM VITAE

MD ZAHID ANSARI Jubail, Saudi Arabia (KSA)

Email:[email protected] Date of Birth: 08/09/1987 Mobile: 0551014194

CAREER OBJECTIVE:

To perform to the best of my abilities and to continually acquire new skill in order to keep abreast with the dynamically changing environment and to dedicate my self to the organisation, I Work for.

Job Objective: MECHANICAL ENGINEER/PLANNING ENGINEER

PROFESSIONAL QUALIFICATION:

Bachelor of Technology (B-TECH) from MDU Rohtak HARYANA

ACADEMIC QUALIFICATION: S.N. Qualification

1. Intermediate of Science(10+2) from BIEC, Patna2. Matriculation from BSEB, Patna

Other Qualification(s)/ Certification(s):

Primavera (P6) (APEX), 2012 from New Delhi 110025 Auto cad 2d & 3d (APEX), 2009 from new Delhi 110025 NDT level-II (ASNT) in,

Radiographic testing, (RT). Liquid penetrant testing, (PT). Ultrasonic testing, (UT). Magnetic Particle Testing, (MPT). Visual Testing, (VT).

EXPERIENCE:

Aprox 5 years experience in the field of Planning Engineer.

Page 2: PLANNING ENGINEER.doc

TECHNICAL SKILLS:

Operating System: window 98, 2000,2003, XP, 2007/2008 Language: C Ability to fast Learning and effectively to solve problems under pressure. Eager to learn and be trained Highly Motivated, Proactive Providing Quality and delivery driven goals. Willingness to follow instructions and take Responsibility. Commitment to follow HSE regulation.

CARRER HIGHLIGHT :

Project planning, scheduling & control based on master plan using MSP & P6 Planning tools.

Project process tracking and follow up. Highlight the project status using P6. Creating and Updating delay activities. Calculation of risk (Financial, Duration based) to the project in term of claim, liquated

damages and plenty. Generation & finalization of EPC baseline schedule as per client requirements. Generation of resources curve extracted from primavera P6 (S –CURVE) showing the

early start planned percentage, late start planned percentage and the actual complete percentage.

To maintain the client requirements in the update schedule by checking the schedule logic file generate from primavera P6.

Generation of status report of the project highlighting the delayed critical activities impact on the project.

Finalizing the documents formats and billing procedure with the client project control team.

Generating daily progress report and weekly progress report with manpower and equipment status.

Manpower and equipment planning to ensure optimum utilization project resources. Issuance of management control report highlighting the actual progress through S –curve

generation. Preparation of method statement for the equipment, structure, piping etc. Create major project S- curve. Preparation of weld map and joint tracking summary Sub-system mark up and test package preparation.

Draw the as built as per the modification as per the client instruction and update in original drawing.

Preparation of red mark/as built. Fabrication and fit up of piping activities as per ASME B31.3 & work procedures. Able to work under pressure, Meet and complete high deadlines. Work plane as per target given by management and completion of target in minimum man-hours

without any accident and follow up safety rules. Planning and scheduling of work activities in accordance with the work front manpower

allocation tools and tackles/equipments required

Co-ordination with client inspector for final inspection for hold point, and witness point inspection.

Page 3: PLANNING ENGINEER.doc

PLANNING ENGINEER: 01 Dec 2014 to 30 Dec 2015

PROJECT NAME:

SADARA PETROCHEMICAL COMPLEX JUBAIL-2 SAUDI ARABIA (K.S.A). (MARRAFFIQ’S Sea water Reverse osmosis plant- SWRO)

COMPANY NAME :

BONATTI SPA (SAUDI ARABIA)

CLIENT : MURRAFFIQ-VEOLIA-SIDEMSCOPE OF WORK :

Murraffiq Sea water reverse Osmosis plant in SADARA Petrochemical complex, over all capacity = 178,560 Cu.M per day. Piping of different respects, super duplex, and duplex, SS, GRP, HDPE, PVDF, and PVC.

RESPONSIBLITY & ACHIVMENT:

Prepare and manage schedule for tender.

Manpower planning.

Material requirement planning.

Budget allocation.

Create and release work orders..

Produce schedule a looks ahead depending on the project requirements.

Produce measure to support schedule progress.

Support capacity/ resources issues within area of responsibility.

Represent planning at integrated work team meetings.

Update the schedule based on inputs received from project team.

Sets up alerts of all important contractual and millstone dates.

Prepare cash flow chart on planning project.

Verify critical path and interface between design/ engineering/ procurement/ execution.

Monitor progress periodically and compare it with the baseline planning.

Prepare monthly progress report and weekly reports.

Prepare monthly labour histograms.

Accumulates, collect and analyses data information required for planning.

Page 4: PLANNING ENGINEER.doc

Complete resources planning including labour & none labour (machinery) as per project scope using productivity norms.

Review and analysis of contract documents for each construction package and advice the project manager of any planning deficiencies from scheduling point of view.

Prepare of details documents for extension of time (EOT) for the project. Cost loading and monitoring the cash flow and project progress & earned value

analysis. Drawings and coordination and distribution.

Coordination with designer regarding site design issues.

Preparation of weld maps and joint tracking summary.

Material takes off.

Subsystem mark up and test package preparation of different respects.

Preparation of red mark/as built.

Draw the as built as per the modification as per the client instruction and update in original drawing.

Perform pipe line check.

Checking ISO and P&ID Drawing. As per completion of packages

Inspection of different types of pipe supports

To witness the hydro test of the complete piping.

Check if the latest drawings are used.

Fit- up inspection of piping.

Check flow direction arrows on valves; verify that properly identified valves are installed in accordance with the flow diagram

Planning spool length for installation in site. As per site condition.

Verify material combination with the standards.

Weld visual inspection of piping

Documentation & certification on completion of the job as per ISO requirements.

Identification of materials (pipe, flanges, fittings etc.) as per the material takes off list during the fabrication.

Page 5: PLANNING ENGINEER.doc

PLANNING ENGINEER: 05 Oct 2012 to Nov 2014

PROJECT NAME: WASIT GAS PROGRAMME

COMPANY NAME:

L&T.(SKE&C),SAUDI ARAMCO

RESPONSIBLITY & ACHIVMENT:

Prepare and submission of progress report/ chart through project management software primavera P6.

Conducted site progress review meetings for monitoring of project identifying problems related to the work progress & highlighting of the same.

Scheduling development of baseline schedule using with planning software PRIMAVERA (P6).

Preparation on weekly, monthly and three month look ahead schedule.

Updating actual progress and all related information & compression analysis.

Tracking and maintain scope change of mechanical items for piping, structure steel, piping and mechanical equipment and its effect on the overall project schedule.

Material and resources planning for income and retail outlet project.

Preparation of schedule in primavera and monitoring of progress.

Budget monitoring and estimation.

Project time management.

Project scope management.

Provide earned value management (EVM), across the programme, using earned value analysis (EVA) tools and methodology to develop track and interpret earned value metric, perform variance analysis and cost forecasting.

Insure data integrity is maintained through the life cycle of the programme.

Ensure the project control system and tools are properly use across the programme and that project execution requirements are adhered to.

Create and release work order.

Manpower planning.

Material requirement planning.

Represent planning at integrated work team meetings.

Page 6: PLANNING ENGINEER.doc

Maintain quality control procedure for the fabricated items.

Have experience of managing teams, and should be able to demonstrate the ability to provide feedback to individuals and groups.

Preparation of as line history sheet & as built drawings for the loop clearance for the piping system

Fit- up inspection of piping.

Check if the latest drawings are used.

To witness the hydro test of the complete piping.

Inspection of different types of pipe supports.

Review the project specification quality assurance procedure quality manuals and method statements.

Approve of punch listing, reinstatement jobs completion for pre-Commissioning and commissioning.

Review of hydro test package including punch list preparation and feedback inspection.

Coordinating with client inspector for the successful completion of above activates.

Documentation & certification on completion of the job as per ISO requirements.

Updating drawing as per latest revision and modify the lines as per revision as per as modification is the drawings

Verify material combination with the standards.

Well experienced in all the erection activities.

Checking ISO and P&ID Drawing. As per completion of packages.

Material takes off from isometric drawing.

To witness the hydro test of the complete piping.

Verify material combination with the standards.

Responsible for the fabrication and construction of pipes to exact location area as per drawing.

Page 7: PLANNING ENGINEER.doc

PLANNING ENGINEER: 01 March .2011 TO 25 May 2012

PROJECT NAME:

B.P.C.L CHAMBURCOMPANY NAME:

R.B Parshad construction Co. Pvt. Ltd.

RESPONSIBLITY & ACHIVMENT:

Manpower planning.

Material and resources planning for income and retail outlet project.

Preparation of schedule in primavera and monitoring of progress.

Budget monitoring and estimation.

Project time management.

Project scope management.

Sets up alerts of all important contractual and millstone dates.

Prepare cash flow chart on planning project.

Verify critical path and interface between design/ engineering/ procurement/ execution.

Monitor progress periodically and compare it with the baseline planning.

Prepare monthly progress report and weekly reports..

Prepare monthly labour histograms.

Complete resources planning including labour & none labour (machinery) as per project scope using productivity norms.

Review and analysis of contract documents for each construction package and advice the project manager of any planning deficiencies from scheduling point of view.

Prepare of details documents for extension of time (EOT) for the project. Cost loading and monitoring the cash flow and project progress & earned value

analysis. Material requirement planning.

Represent planning at integrated work team meetings.

Prepare and daily and weekly report.

PERSONAL DETAIL:

Page 8: PLANNING ENGINEER.doc

Name: Md. Zahid Ansari

Sex: Male

Material status: UN married

Language known: English, Hindi, Urdu, Arabic.

Date of birth: 08/09/1987

Iqama no: 2369417270

Passport no: J1199356

Passport issue: 19/03/2010

Passport expiry: 18/03/2020

Mob: No: - 0551014194

HOBBIES:

PLAYING CRICKET

EXTRA CURRICULAR ACTIVITIES:

Participated in cricket as a state player for Board of control for cricket in India. (BCCI).

Participate in Indian premier league (IPL).KKR (Kolkata knight rider)

Participate as a national level in shrilanka.

DECLARATION:

I hereby declare that the information provided by me is true to the best of my knowledge and belief.

Date............... Place.... JUBAIL.... MD ZAHID ANSARI

Page 9: PLANNING ENGINEER.doc