Page 1: Planning and Funding Bicycle and Pedestrian Projects Initial planning and feasibility studiesInitial planning and feasibility studies Securing rights-of-waySecuring

Planning and Funding Bicycle and Pedestrian Projects

• Initial planning and feasibility studiesInitial planning and feasibility studies

• Securing rights-of-waySecuring rights-of-way

• DesignDesign

• ConstructionConstruction

• On-road and off-road projectsOn-road and off-road projects

Page 2: Planning and Funding Bicycle and Pedestrian Projects Initial planning and feasibility studiesInitial planning and feasibility studies Securing rights-of-waySecuring

TIP Funding Programs

• Federal and state funds, programmed by the MPOFederal and state funds, programmed by the MPO• STP – Surface Transportation ProgramSTP – Surface Transportation Program• Transportation EnhancementsTransportation Enhancements• CMAQ – Congestion Mitigation and Air QualityCMAQ – Congestion Mitigation and Air Quality

• Require 10% matchRequire 10% match• Projects managed by MassHighwayProjects managed by MassHighway• For final design and construction*For final design and construction*

Page 3: Planning and Funding Bicycle and Pedestrian Projects Initial planning and feasibility studiesInitial planning and feasibility studies Securing rights-of-waySecuring

Ch. 90•Traditionally used to maintain and reconstruct Traditionally used to maintain and reconstruct local roads.local roads.

•100% reimbursable program100% reimbursable program

•Wellesley: $503,511 in FY2007Wellesley: $503,511 in FY2007

•Eligible uses include planning, design, and Eligible uses include planning, design, and construction of on- and off-road bikeway projects construction of on- and off-road bikeway projects (except for feasibility studies).(except for feasibility studies).

•Administered by MassHighway—contact your Administered by MassHighway—contact your district office for information (Walter Kubik, district office for information (Walter Kubik, Manager, District 4)Manager, District 4)

Page 4: Planning and Funding Bicycle and Pedestrian Projects Initial planning and feasibility studiesInitial planning and feasibility studies Securing rights-of-waySecuring

Community Preservation Act

• An elective property tax surcharge up to 3%An elective property tax surcharge up to 3%

• Minimum of 10% each must be used for:Minimum of 10% each must be used for:

– Acquisition and preservation of open space Acquisition and preservation of open space

– Creation and support of affordable housing Creation and support of affordable housing

– Acquisition and preservation of historic buildings Acquisition and preservation of historic buildings and landscapes and landscapes

• State matches 100%State matches 100%

• Flexibility in use of funds, local controlFlexibility in use of funds, local control

Page 5: Planning and Funding Bicycle and Pedestrian Projects Initial planning and feasibility studiesInitial planning and feasibility studies Securing rights-of-waySecuring

DCR Recreational Trails Grants• Due October 2

• Provides funding for a variety of trail protection, construction, and stewardship projects throughout Massachusetts. Funded through the Federal Highway Administration (FHWA)

• 80-20 challenge grants. A cash match; "in-kind match" in the form of materials, labor, and in-kind services; or a combination of both is permitted.

• $2,000 to $50,000. Amounts greater than $50,000 will be considered for larger projects with statewide or regional significance.

• 30% to motorized trail use, 30% for non-motorized projects, and 40% for projects that facilitate diverse trail uses. Projects must be primarily recreation- rather than transportation-oriented.

• Contact Paul Jahnige at DCR.

Page 6: Planning and Funding Bicycle and Pedestrian Projects Initial planning and feasibility studiesInitial planning and feasibility studies Securing rights-of-waySecuring

TOD Infrastructure and Housing Support Program

(“TOD Bond Program”)

• MBTA and the Office of Commonwealth MBTA and the Office of Commonwealth DevelopmentDevelopment

• $30 million total authorization$30 million total authorization

• Up to $500,000 for individual bicycle/pedestrian Up to $500,000 for individual bicycle/pedestrian projects. Funds can be used for planning, design, projects. Funds can be used for planning, design, or construction.or construction.

• $7 million in grants for 2005 ($1 mil for $7 million in grants for 2005 ($1 mil for pedestrian projects)pedestrian projects)

• Contact Jane Healey at OCDContact Jane Healey at OCD

Page 7: Planning and Funding Bicycle and Pedestrian Projects Initial planning and feasibility studiesInitial planning and feasibility studies Securing rights-of-waySecuring

Safe Routes to School

• New federal program in SAFETEA-LUNew federal program in SAFETEA-LU

• Administered through MassRides and EOTAdministered through MassRides and EOT

• 10%-30% for programs, 70%-90% for 10%-30% for programs, 70%-90% for infrastructure projectsinfrastructure projects

• Contact Davida Eisenberg at MassRidesContact Davida Eisenberg at MassRides

Actual Actual Projected Projected Projected

2005 2006 2007 2008 2009 Total

Massachusetts $1,000,000 $1,752,904 $2,353,447 $2,912,568 $3,642,803 $11,661,722

Page 8: Planning and Funding Bicycle and Pedestrian Projects Initial planning and feasibility studiesInitial planning and feasibility studies Securing rights-of-waySecuring