Planning and Development Saco City Hall 300 Main Street Saco, Maine 04072-1538 Emily Cole-Prescott City Planner [email protected] Phone: (207) 282-3487 ext.357 Revised Agenda Planning Board Tuesday, April 2, 2019 City Hall Conference Room 5:30 PM Workshop/6:00 PM Regular Meeting 5:30 PM: Workshop 1. Continued Discussion: Private Roads 6:00 PM: Regular Meeting 1. Call to Order 2. Review Minutes of Previous Meeting: March 19, 2019 3. New Business, Tabled Items & Public Hearings – a. 524 Main Street (Map 41 Lot 10-1 & 11): Design Review & Site Plan Amendment – Site & Façade Upgrades to existing drive-through McDonalds restaurant Applicant: McDonalds Corporation Zone: B-2D This item will be on a future agenda. b. Baxter Lane: Request for Recommendation for City Street Acceptance Applicant: Mike Eon c. Eloise’s Place (Map 101 Lot 31-2): Final Subdivision Plan Review Applicant: CVS Foundations LLC Zone: C-1 d. 4 Cascade Road (Map 62 Lot 1-4): Preliminary Plan Review for Re-subdivision to create one lot Applicant: Amari Holdings LLC Zone: MU-3 & Cascade Contract Zone 4. Updates from City Planner 5. Old Business 6. Adjournment No new business will be taken up after 9:00 PM. No business shall be conducted by the Board after 10:00 PM.

Upload: others

Post on 03-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Planning and Development Emily Cole-Prescott Saco City ... Meeting Pac… · 2. Baxter Lane: Street Acceptance Recommendation Request a. Memo from City Planner b. Letter, Warranty

Planning and Development Saco City Hall

300 Main Street

Saco, Maine 04072-1538

Emily Cole-Prescott City Planner

[email protected]

Phone: (207) 282-3487 ext.357

Revised Agenda Planning Board

Tuesday, April 2, 2019 City Hall Conference Room

5:30 PM Workshop/6:00 PM Regular Meeting 5:30 PM: Workshop 1. Continued Discussion: Private Roads 6:00 PM: Regular Meeting 1. Call to Order 2. Review Minutes of Previous Meeting: March 19, 2019 3. New Business, Tabled Items & Public Hearings –

a. 524 Main Street (Map 41 Lot 10-1 & 11): Design Review & Site Plan Amendment – Site & Façade Upgrades to existing drive-through McDonalds restaurant Applicant: McDonalds Corporation Zone: B-2D This item will be on a future agenda.

b. Baxter Lane: Request for Recommendation for City Street Acceptance Applicant: Mike Eon

c. Eloise’s Place (Map 101 Lot 31-2): Final Subdivision Plan Review Applicant: CVS Foundations LLC Zone: C-1

d. 4 Cascade Road (Map 62 Lot 1-4): Preliminary Plan Review for Re-subdivision to create one lot Applicant: Amari Holdings LLC Zone: MU-3 & Cascade Contract Zone

4. Updates from City Planner 5. Old Business 6. Adjournment

No new business will be taken up after 9:00 PM. No business shall be conducted by the Board after 10:00 PM.

Page 2: Planning and Development Emily Cole-Prescott Saco City ... Meeting Pac… · 2. Baxter Lane: Street Acceptance Recommendation Request a. Memo from City Planner b. Letter, Warranty

Planning Board

Meeting Packet – April 2, 2019 Table of Contents

Regular Meeting Items: Page #

3 6 7 13 21 26 30 31 36

38 46 49 67 68 69 70 74

1. Minutes of March 19, 2019 Meeting 2. Baxter Lane: Street Acceptance Recommendation Request

a. Memo from City Planner b. Letter, Warranty Deed & As Built

3. Eloise’s Place: Final Subdivision Review a. Memo from City Planner b. Letters from BH2M & Final Plan Review Application c. Plans revised through 02/06/19

i. Review Memo from City Engineer dated 03/05/19 d. Response letter dated 03/14/19 & Revised plans dated through 03/13/19

i. Review Memo from City Engineer dated 03/27/19 4. 4 Cascade Road: Re-subdivision Application

a. Memo from City Planner b. Letters from BH2M dated 03/27/19 and 03/12/19 c. Application & Supplemental Information d. Soil Map e. Amended Parcel Plan f. Existing Conditions Plan g. Traffic Peer Review h. Comments from City Staff Reviewers

Page 3: Planning and Development Emily Cole-Prescott Saco City ... Meeting Pac… · 2. Baxter Lane: Street Acceptance Recommendation Request a. Memo from City Planner b. Letter, Warranty

Planning and Development Saco City Hall

300 Main Street

Saco, Maine 04072-1538

Emily Cole-Prescott City Planner

[email protected]

Phone: (207) 282-3487 ext.357

Minutes Planning Board

Tuesday, March 19, 2019 5:30 PM Workshop/6:00 PM Regular Meeting

City Hall Conference Room (First Floor)

Present for the Board: Acting Chair Don Girouard; Peter Scontras; Joyce Leary-Clark; Matt Provencal; Jeff Brochu; Alyssa Bouthot Absent for the Board: Chair Neil Shuster Also Present: Roger Gay, City Council Liaison; Joe Laverriere, City Engineer; Dave Pendleton, Deputy Fire Chief; Emily Cole-Prescott, City Planner

Workshop – 5:30 PM

1. Flag Pond Road (Map 92 Lot 19) – Sketch Plan Review of 4 proposed lots: Applicants Chris Hollis and Paul Hollis were present to review the sketch plan with the Planning Board. The Board reviewed the sketch plan and offered general, non-binding feedback to the applicants. The applicants will receive a written report with comments from the PDRC, Planning Board and City Staff.

2. Review of Private Roads: The Board reviewed this matter. E. Cole-Prescott will return to the Board with additional research on this topic.

Note: Regular meeting is audio recorded. These audio records will be posted on the City’s website and available for public review within one week of the meeting.

Regular Meeting – 6:00 PM

1. Minutes of March 5, 2019 Meeting: Peter Scontras moved to approve the minutes of the March 5, 2019 meeting as presented. Joyce Leary-Clark seconded the motion, and it carried unanimously.

2. Public Hearing: 4 Cascade Road (Tax Map 62 Lot 2-1): Continued Site Plan Review of proposed 6,000 square ft. commercial building Applicant: Amari Holdings Zone: MU-3 & Contract Zone E. Cole-Prescott indicated that the request is to table the application until the next meeting, as the applicant has submitted a subdivision amendment application for the Board’s next meeting, to be reviewed in addition to the pending site plan review application. Joyce Leary-Clark moved to table the application for the proposed Amari commercial building to the next meeting on April 2, 2019. Peter Scontras seconded the motion, and it carried unanimously.

3. Public Hearing: Review of proposed amendment to Contract Zone (Contract Zone Agreement by and between Park North Development LLC and Preston Properties LLC and the City of Saco)

Page 4: Planning and Development Emily Cole-Prescott Saco City ... Meeting Pac… · 2. Baxter Lane: Street Acceptance Recommendation Request a. Memo from City Planner b. Letter, Warranty

2

Applicant: Preston Properties, LLC Elliott Chamberlain, representing Preston Properties LLC and Park North was present for this application. Overview: E. Cole-Prescott introduced the contract zone amendment application, indicating that the purpose of the amendment request is to add the uses of “contractors” and “offices of contractors and tradesmen” to parcel 2 of the Park North Contract Zone. E. Cole-Prescott indicated that “offices of contractors and tradesmen” is a permitted use in the underlying MU-3 zoning district. E. Cole-Prescott also shared with the Board a copy of the compliance summary compiled to outline what conditions of approval of the Park North Contract Zone have been completed, in progress, and yet to be done. Discussion: Acting Chair Girouard expressed the differences of the definitions of “contractors” and “offices of contractors and tradesmen” as found in the definitions section of the Zoning Ordinance. He noted future uses on the site could become quite large and disruptive to the residential neighborhood in the mixed-use zone environment, and mentioned this for the Board’s consideration. He noted outside storage is allowed with the contractors use but not with the offices of contractors and tradesmen use. Other Board members discussed the differences of the uses, and how the uses could potentially impact the area. Alyssa Bouthot suggested adding “contractors” as a conditional use, and “offices of contractors and tradesmen” as a permitted use. This would require “contractors” uses to be reviewed per section 230-901 of the Zoning Ordinance, along with any applicable requirements of the site plan review provisions. Public Hearing: Alyssa Bouthot moved to open the public hearing on this contract zone amendment request. Peter Scontras seconded the motion, and it carried unanimously. Roger Gay, City Council Liaison, asked questions about the progress of the trail system, and Elliott Chamberlain replied that the trail system is underway. There was no other public comment. Alyssa Bouthot moved to close the public hearing. Jeff Brochu seconded the motion, and it carried unanimously. Discussion: The Board discussed the proposed amendment, and Jeff Brochu clarified that “contractors” would be considered a conditional use subject to section 230-901 of the Zoning Ordinances and site plan review ordinance standards, and “offices of contractors and tradesmen” would be a permitted use, which would require applicable site plan review standards per the ordinance. Joyce Leary-Clark moved that the Board finds the proposed amendment to the contract zone agreement by and between Park North Development LLC and Preston Properties LLC and the City of Saco to add the use of “offices of contractors and tradesmen” as a permitted use and to add “contractors” as a conditional use to Parcel 2 of the Park North Contract Zone, consistent with findings previously made by the Board in the original contract zone, as amended. Matt Provencal seconded the motion. The Board discussed the motion. Joyce Leary-Clark moved to amend her motion to move that the Board finds the proposed amendment to the contract zone agreement by and between Park North

Page 5: Planning and Development Emily Cole-Prescott Saco City ... Meeting Pac… · 2. Baxter Lane: Street Acceptance Recommendation Request a. Memo from City Planner b. Letter, Warranty

3

Development LLC and Preston Properties LLC and the City of Saco to add the use of “offices of contractors and tradesmen” as a permitted use and the use of “contractors” as a conditional use to Parcel 2 of the Park North Contract Zone Agreement, consistent with findings previously made by the Board in the original contract zone agreement. Additionally, the Board finds that the proposed use of “offices of contractors and tradesmen” is a permitted use in the underlying MU-3 zone of Parcel 2. These uses are intended to follow the definitions as found in the current Zoning Ordinance, on record as of March 19, 2019. Therefore, the Board makes a positive recommendation of this amendment request to the City Council. Matt Provencal seconded the amended motion, and it carried, 5-1, with Jeff Brochu in opposition. 4. Adjournment: Without objection, the Board adjourned at 7:02 PM. Respectfully submitted, Emily L. Cole-Prescott City Planner

Page 6: Planning and Development Emily Cole-Prescott Saco City ... Meeting Pac… · 2. Baxter Lane: Street Acceptance Recommendation Request a. Memo from City Planner b. Letter, Warranty

Planning and Development Saco City Hall

300 Main Street

Saco, Maine 04072-1538

Emily Cole-Prescott City Planner

[email protected]

Phone: (207) 282-3487 ext.357

TO: Planning Board FROM: Emily Cole-Prescott, City Planner CC: Mike Eon, Mike Eon Associates DATE: March 27, 2019 RE: Baxter Lane: Request for Recommendation for Road Acceptance

Overview: Mike Eon, developer of the eleven-lot subdivision at 300 Bradley Street, received subdivision approval on September 6, 2016. On October 15, 2018, Mr. Eon wrote to former Planner Zach Mosher requesting review of street acceptance of Baxter Lane. Since that time, Mr. Eon has worked with City Staff to address any outstanding concerns. There are currently four homes constructed on Baxter Lane. Departmental Reviews: The Public Works Department, Planning & Development Department and City Attorney have reviewed the request with Mr. Eon. The road is built to City Standards, and the accompanying deeds and as-builts have been revised to the satisfaction of the Public Works Department. Other reviewers have responded as follows: Code Enforcement Department: No issues. Police Department: No issues. Parks & Recreation Department: Ryan Sommer, Director, indicated that street trees are not

shown on the as built. Discussion and Action: The Planning Board is asked to make a recommendation to the City Council on the City’s street acceptance of Baxter Lane. This process is outlined in Section 186-37(F): “The City Planner will seek a recommendation from the Planning Board. The Planning Board shall consider the comments of City staff in arriving at a recommendation as to whether or not the street shall be accepted, which shall be forwarded to the City Council. Final action on the street acceptance will be made by the City Council.” The developer has fulfilled the written standards outlined in ordinance, and pending final response from any other Staff reviewers remaining to respond and final review by the City Attorney, a suggested motion is: “Pursuant to Chapter 186 of the City’s ordinances, I move that the Planning Board forward a positive recommendation for Baxter Lane street acceptance to the City Council.”

Page 7: Planning and Development Emily Cole-Prescott Saco City ... Meeting Pac… · 2. Baxter Lane: Street Acceptance Recommendation Request a. Memo from City Planner b. Letter, Warranty
Page 8: Planning and Development Emily Cole-Prescott Saco City ... Meeting Pac… · 2. Baxter Lane: Street Acceptance Recommendation Request a. Memo from City Planner b. Letter, Warranty

1

After Recording Return to: City Administrator City of Saco 300 Main Street Saco, ME 04072 ________________________________________________________________________

(the space above is reserved for recording information)

WARRANTY DEED Maine Statutory Short Form

KNOW ALL MEN BY THESE PRESENTS, That M & B LAND HOLDINGS,

LLC, , a Maine limited liability company with a mailing address of P.O. Box 444, Biddeford, ME 04005, for consideration paid, grants to THE CITY OF SACO, a body politic and corporate, with a mailing address of 300 Main Street, Saco, Maine, 04072, WITH WARRANTY COVENANTS, the land in Saco, York County, Maine, described as follows:

PARCEL ONE A certain strip or parcel of land located on the southwesterly sideline of Bradley

Street, also known as Route 5, in the City of Saco, County of York and State of Maine and shown as Baxter Lane on the plan entitled “Final Plan, 300 Bradley, Bradley Street, Saco, Maine” dated May 2016 as revised through 9/6/16, by Berry Huff McDonald Milligan, Inc. and recorded in the York County Registry of Deeds in Plan Book 386, Page 3 (the “Plan”); said Baxter Lane being more particularly described as follows:

Beginning at a granite monument set on the southwesterly sideline of said Bradley Street at the northwesterly corner of Lot 2 as shown on aforesaid plan;

thence in a general westerly direction along said Lot 2 and along a circular curve to the left, circumscribed by a radius of 20.00 feet, an arc length of 31.42 feet to a granite monument set; said granite monument set being S 81˚-35’-34” W a tie distance of 28.28 feet from said previous granite monument set;

thence S 36˚-35’-34” W along said Lot 2, along Lot 4, along Lot 6, along Lot 8 and along Lot 10 a distance of 406.75 feet to a capped iron rod set in the ground (PLS#2190) and land to be conveyed to the City of Saco;

thence N 53˚-24’-26” W along land to be conveyed to The City of Saco a distance of 50.00 feet to a granite monument set and Lot 11 as shown on aforesaid plan;

thence N 36˚-35’-34” E along said Lot 11 a distance of 45.77 feet to a granite monument set;

thence in a general northerly direction along said Lot 11 and along a circular curve to the left, circumscribed by a radius of 20.00 feet, an arc length, of 31.94 feet to a granite monument set and Lot 9; said granite monument set being N 09˚-09’-24” W a tie distance of 28.65 feet from said previous granite monument set;

Page 9: Planning and Development Emily Cole-Prescott Saco City ... Meeting Pac… · 2. Baxter Lane: Street Acceptance Recommendation Request a. Memo from City Planner b. Letter, Warranty

2

thence N 54˚-54’-23” W along said Lot 9 a distance of 29.49 feet to a granite

monument set;

thence N 36˚-35’-34” E along said Lot 9 a distance of 50.02 feet to a capped iron rod set in the ground (PLS #2190) and Lot 7;

thence S 54˚-54’-23” E along said Lot 7 a distance of 30.53 feet to a granite monument set;

thence in a general easterly direction along said Lot 7 and along a circular curve to the left, circumscribed by a radius of 20.00 feet, an arc length of 30.89 feet to a granite monument set; said granite monument set being N 80˚-50’-35” E a tie distance of 27.91 feet from said previous granite monument set;

thence N 36˚-35’-34” E along said Lot 7, along Lot 5, along Lot 3 and along Lot 1 a distance of 270.96 feet to a granite monument set;

thence in a general northerly direction along said Lot 1 and along a circular curve to the left, circumscribed by a radius of 20.00 feet, an arc length of 31.42 feet to a granite monument set and the southwesterly sideline of said Bradley Street; said granite monument to be set being N 08˚-24’-26” W a tie distance of 28.28 feet from said previous granite monument set;

thence S 53˚-24’-26” E along the southwesterly sideline of said Bradley Street a distance of 90.00 feet to the point of beginning. The above described Baxter Lane is to be used and maintained as a public street and contains 24,182 s.f.. All bearings refer to grid north. PARCEL TWO:

ALSO conveying herewith that certain lot or parcel of land situated generally southwesterly of, but not adjacent to, Bradley Street in said Saco and being that lot shown and depicted as “Land to be Conveyed to the City of Saco, 29,239 S.F.” on the Plan, together with the “10 Access Easement For The City of Saco” running along the southerly boundary of Lot 11 as shown on the Plan said 29,239 S. F. parcel being more particularly bounded and described as follows:

A certain lot or parcel of land located at the terminus of Baxter Lane, so-called, in the City of Saco, County of York and State of Maine and shown on the plan titled “Final Plan, 300 Bradley, Bradley Street, Saco, Maine” for M&B Land Holdings, LLC, dated May 2016 as revised through 9/6/16, by Berry Huff McDonald Milligan, Inc. and recorded in the York County Registry of Deeds in Plan Book 386, Page 3; said parcel being more particularly described as follows:

Page 10: Planning and Development Emily Cole-Prescott Saco City ... Meeting Pac… · 2. Baxter Lane: Street Acceptance Recommendation Request a. Memo from City Planner b. Letter, Warranty

3

Beginning at a capped iron rod set (PLS #2190) at the terminus of the southeasterly sideline of said Baxter Lane at the southwesterly corner of Lot 10 and corner or remaining land of M&B Land Holdings, LLC as shown on aforesaid plan;

thence S 36˚-35’-34” W along the remaining land of M&B Land Holdings, LLC a distance of 275.27 feet to a capped iron rod set (PLS #2190);

thence N 30˚-04’-54” W along the remaining land of M&B Land Holdings, LLC a distance of 197.13 feet to a capped iron rod set (PLS #2190) and land now or formerly of Mark W. Pierson;

thence N 35˚-05’-37” E along the land of said Pierson a distance of 50.00 feet to a capped iron rod set (PLS #2190) and Lot 11 as shown on aforesaid plan;

thence S 86˚-37’-16” E along said Lot 11 a distance of 158.16 feet to a capped iron rod set (PLS #2190);

thence N 36˚-35’-34” E along said Lot 11 a distance of 60.59 feet to a granite monument set and the terminus of the northwesterly sideline of said Baxter Lane;

thence S 53˚-24’-26” E along the terminus of said Baxter Lane a distance of 50.00 feet to the point of beginning. The above described parcel contains 29,239 s.f.. All bearings refer to grid north.

ALSO conveying herewith, subject to the obligation to maintain the same, to be used in common by M & B Land Holdings, LLC, its successors and assigns and all others who may now have or may hereinafter be granted rights to use the same, their respective heirs, successors and assigns all those drainage and utility easements, detention ponds, pipes and appurtenances, all as shown and depicted on said Plans or which may have been physically created or which may have been granted to or created by M & B Land Holdings, LLC by deeds, recorded plans, agreements, conveyances or otherwise and also all the Grantor's right, title and interest in and to any drainage and sewerage pipes, pumping stations, pumps, manholes, covers, catch basins, valves and couplings, wires and appurtenances installed in, on or under the real estate or interest in real estate herein conveyed together with the responsibility to maintain the same with the exception of any portion of the electric distribution system, cable and telephone distribution system and water distribution system, whether encompassed within the bounds of Baxter Lane or not.

The above described premises are hereby conveyed: (1) subject to such utility service

easements or other easements or rights-of-way on, over, under or across said property as may now have any legal existence, including, but not limited to, Easement Dedication and Declaration dated July 2, 2018, and recorded in York Registry of Deeds in Book 17764, page 462, and Easement Dedication and Declaration dated July 2, 2018, and recorded in York Registry of Deeds in Book 17764, page 466; (2) together with the benefit of any appurtenant utility service easements or other easements or rights-of-way; (3) subject to all federal, state

Page 11: Planning and Development Emily Cole-Prescott Saco City ... Meeting Pac… · 2. Baxter Lane: Street Acceptance Recommendation Request a. Memo from City Planner b. Letter, Warranty

4

and local land use statutes, ordinances and regulations; and (4) reserving to M & B Land Holdings, LLC, its successors and assigns and all others who may have heretofore been granted the right to use the same the right to continue to use such roadways, rights of way and easements, and to tie into, connect with, and utilize such drainage or sewerage pipes, pumps, manholes, covers, catch basins, valves couplings, wires or other appurtenances installed in, on or under the conveyed premises for the benefit of its remaining land or land which it may hereinafter acquire, subject, however, to compliance with all applicable local, state and federal laws, ordinances, rules, regulations, permits, and the payment of all then required fees, all to be used in common with the within Grantee, its successors and assigns, and others who may have been or may be granted similar rights.

It is specifically provided that nothing in this deed shall be construed as a transfer of

title to the Grantee or responsibility for the maintenance, repair or replacement of the presently existing and installed community mailbox which lies within the limits of Baxter Lane to the Grantee, it being agreed that the responsibility for the maintenance, repair and replacement shall lie in the Grantor or a duly appointed agent, including a Homeowner’s Association and all appropriate easements and rights to allow the continued maintenance of the same in its present location, and the use, repair and replacement of the same are hereby reserved.

For Grantor’s source of title reference is made to deed of Charles L. Nickerson,

Personal Representative of the Estate of Clifford L. Sawyer to M & B Land Holdings, LLC, dated August 2, 2004, and recorded in York Registry of Deeds in Book 14182, page 991.

IN WITNESS WHEREOF, M & B Land Holdings, LLC, has caused this instrument

to be signed and sealed in its name and behalf by Michael R. Eon, its Member, thereunto duly authorized this ______ day of ________________, 2018. SIGNED, SEALED AND DELIVERED IN PRESENCE OF: M & B Land Holdings, LLC ___________________________ By: ___________________________ Witness Michael R. Eon, Its Member STATE OF MAINE YORK, ss. ________________, 2018

Personally appeared the above named Michael R. Eon, Member of M & B Land Holdings, LLC and acknowledged the foregoing instrument to be his free act and deed in his said capacity, and the free act and deed of said limited liability company.

Before me, ____________________________________ Notary Public/Attorney-At-Law Printed Name: ________________________

l/3519-006/streetdeed/revised 11/05/2018/rev 11/9/2018

Page 12: Planning and Development Emily Cole-Prescott Saco City ... Meeting Pac… · 2. Baxter Lane: Street Acceptance Recommendation Request a. Memo from City Planner b. Letter, Warranty

300

BR

AD

LEY

BA

XTE

R L

AN

E

BR

AD

LEY

STR

EET

SAC

O, M

AIN

E

May 2017

As Noted

16064

3

S. Blake

Dept.

Survey

Gorh

am, M

aine

040

3828

Sta

te S

tree

tFa

x (2

07) 8

39-8

250

Berr

y, H

uff,

McD

onal

d, M

illig

an In

c.

BH

2MEn

gine

ers,

Surv

eyor

s

Tel.

(207

) 839

-277

1

25'0 50'25'

Scale: 1" = 25'

Bid

defo

rd, M

aine

040

05PO

Box

444

M&

B L

and

Hol

ding

s, LL

CFO

R

AutoCAD SHX Text
END STA. 4+28.76, EL. 115.45
AutoCAD SHX Text
PROP. CB#2 STA. 4+23, RIM 115.23
AutoCAD SHX Text
PROP. SMH#3 STA. 4+00, RIM 115.51
AutoCAD SHX Text
PROP. SMH#1 STA.
AutoCAD SHX Text
0+32, RIM 117.28
AutoCAD SHX Text
MATCH E.P. BRADLEY STA.
AutoCAD SHX Text
0+13.12, EL. 117.19
AutoCAD SHX Text
PROP. SMH#2 STA.
AutoCAD SHX Text
2+00, RIM 116.51
AutoCAD SHX Text
INV.
AutoCAD SHX Text
INV.
AutoCAD SHX Text
PROP. 164' OF 8" PVC SDR 35 SAN. SEWER, S=0.004'/FT.
AutoCAD SHX Text
INV.
AutoCAD SHX Text
INV.
AutoCAD SHX Text
PROP. 196' OF 8" PVC SDR 35 SAN. SEWER,
AutoCAD SHX Text
INV.
AutoCAD SHX Text
Ex. Watermain
AutoCAD SHX Text
Ex. 8" Stub
AutoCAD SHX Text
INV.
AutoCAD SHX Text
ACCESS DRIVE
AutoCAD SHX Text
8"x4" REDUCER
AutoCAD SHX Text
WATERMAIN BLOW-OFF
AutoCAD SHX Text
INSULATE AT AREAS W/ COVER
AutoCAD SHX Text
LESS THAN 4', SEE DETAIL
AutoCAD SHX Text
INV.
AutoCAD SHX Text
PROP. 4" D.I. WATERMAIN
AutoCAD SHX Text
5.5' COVER, TYP.
AutoCAD SHX Text
PROP. 30' OF 6" U.D.,
AutoCAD SHX Text
S=0.005'/FT.
AutoCAD SHX Text
C STA. 4+23 EL. 115.39
AutoCAD SHX Text
L
AutoCAD SHX Text
TO SOIL FILTER
AutoCAD SHX Text
PROP. OF 15"
AutoCAD SHX Text
S.D.,
AutoCAD SHX Text
INV. 112.05
AutoCAD SHX Text
109.80
AutoCAD SHX Text
109.06
AutoCAD SHX Text
108.96
AutoCAD SHX Text
108.30
AutoCAD SHX Text
130'
AutoCAD SHX Text
108.20
AutoCAD SHX Text
S=0.0035'/FT.
AutoCAD SHX Text
INT. STA. 3+61.76 EL. 115.70
AutoCAD SHX Text
S=0.038'/FT.
AutoCAD SHX Text
112.16
AutoCAD SHX Text
111.85
AutoCAD SHX Text
115.69
AutoCAD SHX Text
116.03
AutoCAD SHX Text
116.22
AutoCAD SHX Text
116.46
AutoCAD SHX Text
116.78
AutoCAD SHX Text
117.09
AutoCAD SHX Text
117.24
AutoCAD SHX Text
117.50
AutoCAD SHX Text
RIM 115.69
AutoCAD SHX Text
RIM 116.76
AutoCAD SHX Text
115.56
AutoCAD SHX Text
4+30
AutoCAD SHX Text
PROP C GRADE
AutoCAD SHX Text
L
AutoCAD SHX Text
Ex. C Grade
AutoCAD SHX Text
L
AutoCAD SHX Text
H
AutoCAD SHX Text
Y
AutoCAD SHX Text
D
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
116
AutoCAD SHX Text
117
AutoCAD SHX Text
117
AutoCAD SHX Text
117
AutoCAD SHX Text
116
AutoCAD SHX Text
115
AutoCAD SHX Text
114
AutoCAD SHX Text
113
AutoCAD SHX Text
116
AutoCAD SHX Text
117
AutoCAD SHX Text
116
AutoCAD SHX Text
115
AutoCAD SHX Text
114
AutoCAD SHX Text
WV
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
115
AutoCAD SHX Text
110
AutoCAD SHX Text
111
AutoCAD SHX Text
112
AutoCAD SHX Text
113
AutoCAD SHX Text
114
AutoCAD SHX Text
113
AutoCAD SHX Text
112
AutoCAD SHX Text
113
AutoCAD SHX Text
117
AutoCAD SHX Text
111
AutoCAD SHX Text
116
AutoCAD SHX Text
112
AutoCAD SHX Text
111
AutoCAD SHX Text
WV
AutoCAD SHX Text
O
AutoCAD SHX Text
S
AutoCAD SHX Text
W
AutoCAD SHX Text
WV
AutoCAD SHX Text
116x4
AutoCAD SHX Text
DESIGNED
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
CHECKED
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
JOB. NO.
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
NO.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
REPRODUCTION OR REUSE OF THIS
AutoCAD SHX Text
DOCUMENT WITHOUT THE
AutoCAD SHX Text
EXPRESSED WRITTEN CONSENT
AutoCAD SHX Text
OF BH2M INC. IS PROHIBITED
AutoCAD SHX Text
PROFILE
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
VERTICAL: 1" = 5'
AutoCAD SHX Text
HORIZONTAL: 1" = 25'
AutoCAD SHX Text
BAXTER LANE
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
SANITARY SEWER
AutoCAD SHX Text
%%uLEGEND
AutoCAD SHX Text
W
AutoCAD SHX Text
E
AutoCAD SHX Text
160
AutoCAD SHX Text
160
AutoCAD SHX Text
T
AutoCAD SHX Text
CB
AutoCAD SHX Text
WATER SERVICE
AutoCAD SHX Text
UNDERGROUND ELECTRIC
AutoCAD SHX Text
STORM DRAIN
AutoCAD SHX Text
SILT FENCE
AutoCAD SHX Text
EXISTING CONTOUR
AutoCAD SHX Text
PROPOSED CONTOUR
AutoCAD SHX Text
TRANFORMER PAD
AutoCAD SHX Text
UTILITY POLE
AutoCAD SHX Text
SANITARY SEWER MANHOLE
AutoCAD SHX Text
CATCH BASIN
AutoCAD SHX Text
Ex. SMH
AutoCAD SHX Text
Rim 115.23
AutoCAD SHX Text
Inv. In 107.86
AutoCAD SHX Text
Ex. SMH
AutoCAD SHX Text
Ex. CB
AutoCAD SHX Text
Ex. 8" D.I. Water Stub
AutoCAD SHX Text
SMH#1
AutoCAD SHX Text
8" SAN. SEWER,
AutoCAD SHX Text
L=96',
AutoCAD SHX Text
15' UTILITY EASEMENT
AutoCAD SHX Text
STABILIZED
AutoCAD SHX Text
CONSTRUCTION ENTRANCE
AutoCAD SHX Text
Ex. Watermain
AutoCAD SHX Text
4" D.I. WATERMAIN
AutoCAD SHX Text
1" WATER SERVICE &
AutoCAD SHX Text
6" SEWER SERVICE, 10'
AutoCAD SHX Text
MIN. SEPERATION
AutoCAD SHX Text
SMH#2
AutoCAD SHX Text
8" SANITARY SEWER
AutoCAD SHX Text
SMH#3
AutoCAD SHX Text
CB#1
AutoCAD SHX Text
CB#2
AutoCAD SHX Text
65'
AutoCAD SHX Text
Sta. 3+61.76
AutoCAD SHX Text
R=20'
AutoCAD SHX Text
SEDIMENT FOREBAY
AutoCAD SHX Text
RIPRAP OUTLET
AutoCAD SHX Text
INV. 111.44
AutoCAD SHX Text
8" OUTFALL
AutoCAD SHX Text
INV. 108.60
AutoCAD SHX Text
113.5
AutoCAD SHX Text
113.5
AutoCAD SHX Text
24' BIT. ROADWAY W/
AutoCAD SHX Text
CONC. CURB, 5' ESPLANADE
AutoCAD SHX Text
AND 5' BIT. SIDEWALK
AutoCAD SHX Text
BRADLEY STREET
AutoCAD SHX Text
Lot 1
AutoCAD SHX Text
Lot 3
AutoCAD SHX Text
Lot 5
AutoCAD SHX Text
Lot 7
AutoCAD SHX Text
Lot 9
AutoCAD SHX Text
Lot 11
AutoCAD SHX Text
Lot 2
AutoCAD SHX Text
Lot 4
AutoCAD SHX Text
Lot 6
AutoCAD SHX Text
Lot 8
AutoCAD SHX Text
Lot 10
AutoCAD SHX Text
12" S.D., L=128',
AutoCAD SHX Text
S-0.004'/FT.
AutoCAD SHX Text
INV. 109.65
AutoCAD SHX Text
INV. 108.53
AutoCAD SHX Text
15' WIDE ACCESS
AutoCAD SHX Text
ROAD, L=130'
AutoCAD SHX Text
P1
AutoCAD SHX Text
P1 - 15" S.D., L=18',
AutoCAD SHX Text
CB#1
AutoCAD SHX Text
15" INV.
AutoCAD SHX Text
RIM
AutoCAD SHX Text
STORMDRAIN STRUCTURES
AutoCAD SHX Text
STREET LIGHT
AutoCAD SHX Text
SHUTOFF VALVE
AutoCAD SHX Text
REINFORCED
AutoCAD SHX Text
EMERGENCY SPILLWAY
AutoCAD SHX Text
ELEV. 112.80
AutoCAD SHX Text
GRASSED UNDERDRAIN
AutoCAD SHX Text
SOIL FILTER
AutoCAD SHX Text
R=20'
AutoCAD SHX Text
R=20'
AutoCAD SHX Text
STREET/STOP SIGN
AutoCAD SHX Text
5/2/17
AutoCAD SHX Text
As-Built Culvert Location
AutoCAD SHX Text
BLOWOFF & VALVE
AutoCAD SHX Text
DEAD END SIGN
AutoCAD SHX Text
PROPOSED DRIVEWAY
AutoCAD SHX Text
OPENING
AutoCAD SHX Text
10'
AutoCAD SHX Text
10'
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
G
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
N
AutoCAD SHX Text
E
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
T
AutoCAD SHX Text
A
AutoCAD SHX Text
O
AutoCAD SHX Text
F
AutoCAD SHX Text
R
AutoCAD SHX Text
P
AutoCAD SHX Text
STEVEN J.
AutoCAD SHX Text
E
AutoCAD SHX Text
F
AutoCAD SHX Text
I
AutoCAD SHX Text
O
AutoCAD SHX Text
A
AutoCAD SHX Text
M
AutoCAD SHX Text
No. 11695
AutoCAD SHX Text
BLAKE II
AutoCAD SHX Text
D
AutoCAD SHX Text
E
AutoCAD SHX Text
N
AutoCAD SHX Text
S
AutoCAD SHX Text
E
AutoCAD SHX Text
C
AutoCAD SHX Text
I
AutoCAD SHX Text
L
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
S
AutoCAD SHX Text
N
AutoCAD SHX Text
E
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
L
AutoCAD SHX Text
O
AutoCAD SHX Text
S
AutoCAD SHX Text
I
AutoCAD SHX Text
15' DRIVEWAY EASEMENT
AutoCAD SHX Text
FOR LOT 9
AutoCAD SHX Text
RECORD DRAWING
AutoCAD SHX Text
1
AutoCAD SHX Text
6/22/17
AutoCAD SHX Text
As Built, CB's & SMH's
AutoCAD SHX Text
2
AutoCAD SHX Text
S=0.00354'/FT.
AutoCAD SHX Text
7/13/17
AutoCAD SHX Text
As Built, CB's & SMH's
AutoCAD SHX Text
3
AutoCAD SHX Text
Inv. Out 107.76
AutoCAD SHX Text
Rim 116.64
AutoCAD SHX Text
Inv. In 107.60
AutoCAD SHX Text
38'- 8" Sewer
AutoCAD SHX Text
S=0.0421'/FT
AutoCAD SHX Text
7/19/17
AutoCAD SHX Text
As Built, Foundation Drain Lot 11
AutoCAD SHX Text
4
AutoCAD SHX Text
FOUNDATION DRAIN
AutoCAD SHX Text
FROM LOT 11 6" PVC
AutoCAD SHX Text
INV. 108.98
AutoCAD SHX Text
115.25
AutoCAD SHX Text
112.47
AutoCAD SHX Text
S=0.011'/FT
AutoCAD SHX Text
16'
AutoCAD SHX Text
16'
AutoCAD SHX Text
20'
AutoCAD SHX Text
20'
AutoCAD SHX Text
20'
AutoCAD SHX Text
20'
AutoCAD SHX Text
20'
AutoCAD SHX Text
20'
AutoCAD SHX Text
20'
AutoCAD SHX Text
20'
AutoCAD SHX Text
20'
AutoCAD SHX Text
NOTES:
AutoCAD SHX Text
1.
AutoCAD SHX Text
ALL ROADWAY MONUMENTATION HAS BEEN SET AS DEPICTED
AutoCAD SHX Text
ON THIS PLAN IRON RODS WERE SUBSTITUTED FOR TWO
AutoCAD SHX Text
GRANITE MONUMENT LOCATIONS. ONE AT THE RIGHT REAR
AutoCAD SHX Text
CORNER OF THE T-TURN AROUND ALONG LOT 7 AND ONE
AutoCAD SHX Text
AT THE LEFT CORNER OF THE RIGHT OF WAY AT THE
AutoCAD SHX Text
FRONT CORNER OF LOT 10.
AutoCAD SHX Text
ROADWAY AS-BUILT GRADES ARE FINAL PAVING.
AutoCAD SHX Text
SEE CONDUIT AS-BUILT FOR ELECTRICAL PHONE AND
AutoCAD SHX Text
CABLE LOCATIONS.
AutoCAD SHX Text
2.
AutoCAD SHX Text
3.
AutoCAD SHX Text
CAPPED IRON ROD SET PLS #2190
AutoCAD SHX Text
GRANITE MONUMENT SET
AutoCAD SHX Text
INV. 108.64
AutoCAD SHX Text
10/2/18
AutoCAD SHX Text
Final Paving As Builts
AutoCAD SHX Text
5
AutoCAD SHX Text
ADA TACTILE
AutoCAD SHX Text
WARNING PAD
AutoCAD SHX Text
ADA TACTILE
AutoCAD SHX Text
WARNING PAD
AutoCAD SHX Text
CENTRAL MAILBOX
AutoCAD SHX Text
ON CONCRETE PAD
AutoCAD SHX Text
10/10/18
AutoCAD SHX Text
Add ADA Pads & Cluster Mailbox
AutoCAD SHX Text
6
AutoCAD SHX Text
INV. 108.53
AutoCAD SHX Text
INV. 108.53
AutoCAD SHX Text
INV. 111.65
AutoCAD SHX Text
113.7
AutoCAD SHX Text
113.9
AutoCAD SHX Text
111.4
AutoCAD SHX Text
111.4
AutoCAD SHX Text
113.7
AutoCAD SHX Text
112.70
AutoCAD SHX Text
11/1/18
AutoCAD SHX Text
Additional as-built at Soil Filter
AutoCAD SHX Text
7
Page 13: Planning and Development Emily Cole-Prescott Saco City ... Meeting Pac… · 2. Baxter Lane: Street Acceptance Recommendation Request a. Memo from City Planner b. Letter, Warranty

Planning and Development Saco City Hall

300 Main Street

Saco, Maine 04072-1538

Emily Cole-Prescott City Planner

[email protected]

Phone: (207) 282-3487 ext.357

TO: Planning Board CC: Walter Pelkey, BH2M Engineering FROM: Emily Cole-Prescott, City Planner DATE: March 27, 2019 RE: Eloise’s Place (Map 101 Lot 31-2): Final Subdivision Plan Review

Overview: This is a 5-lot subdivision off of Lincoln Road. On February 5, 2019, the Planning Board granted preliminary approval for the subdivision plan. Since that time, Walter Pelkey of BH2M has submitted a final plan application with revised plans and a copy of the Maine DEP Construction General Permit. Application Completeness: Between the documentation submitted for preliminary plan review and the subsequent documentation submitted for final plan review, staff considers the application to be complete. A suggested motion is: “I move to find the application for final plan approval for Eloise’s Place complete.” Public Hearing: The Board should hold a public hearing to receive public input. A suggested motion is: “I move to open the public hearing.” After public comment is received, “I move to close the public hearing.” Departmental Reviews: City Engineer Joe Laverriere has reviewed the plan and provided additional comments to be addressed in his memo dated March 27, 2019. Discussion and Action: The applicant has addressed the following conditions of preliminary plan approval:

• Condition #22: The final plan shall be revised to identify the parcel labeled “Phase 2” on the preliminary plan as “Lot 5.” Phase Two has been renamed Lot 5.

• Condition #23: Existing structures on the Altman and Hottinger parcels shall be shown on the final plan so that a determination can be made as to potential impacts on setbacks due to creation of the proposed new street right of way. Structures are shown on the Hottinger parcel, but the structure shown on the Altman parcel seems to be a partial structure.

• Condition #24: Notes on all sheets of the final plan shall be reviewed, and updated or corrected as necessary. The plans have been updated.

The drafted conditions of approval have been written to allow additional engineering review to be completed to the satisfaction of the Public Works Department and City Engineer. If the Board agrees, a suggested motion is: “I move that the Board grant approval for the final subdivision plan based on the following findings of fact and conditions of approval.”

Page 14: Planning and Development Emily Cole-Prescott Saco City ... Meeting Pac… · 2. Baxter Lane: Street Acceptance Recommendation Request a. Memo from City Planner b. Letter, Warranty

2

Saco Planning Board

Eloise’s Place Subdivision Findings of Fact – Final Subdivision Plan

April 2, 2019

The Saco Planning Board hereby finds: 1. The Eloise’s Way subdivision has a project area of 23.4 acres. It is proposed for the development

of single-family dwellings on four (4) lots, served by a dead-end street with turn-around built to City standards, and a stormwater management system. A fifth lot will be part of the subdivision, with access directly on Lincoln Road. A private well and individual septic system would service each of the proposed lots. Four of the lots would be serviced by underground utilities located within the Eloise’s Way right of way. The fifth lot will be served by overhead utilities from Lincoln Road.

2. The record owner of the property and the applicant is CVS Foundations, LLC, 1 Fiero Drive, Old

Orchard Beach ME 04064. 3. The project manager is Walter Pelkey, BH2M Engineers, 28 State Street, Gorham, Maine 04038. 4. The project parcel is identified as Tax Map 101, Lot 31-2, in the C-1 zoning district. Said lot is

referenced in Book 17509, Page 369, York County Registry of Deeds. 5. The project requires review and approval according to City of Saco Subdivision Regulations. 6. The applicant has submitted a plan set dated February 2018 and revised through 03/13/19. The

sheets are listed as follows:

• Sheet 1 Final Plan

• 2 Roadway Profile

• 3 Erosion Control Details

• 4 Standard Details 7. Traffic generated by the five proposed lots would result in approximately forty-eight (48) vehicle

trips on a typical weekday. Sight distance is reported as greater than 550 feet in each direction for a vehicle exiting Eloise’s Way onto Lincoln Road.

8. Pedestrian needs: The applicant has requested a waiver of Section 5.2.2(16) sidewalks and curbs,

which was granted by vote of the Board at its 10/2/18 meeting. 9. Sewer service does not exist in the immediate area. A preliminary soil evaluation has been

submitted, dated July 24, 2018, prepared by Mark Hampton Associates, Inc. Suitable soils and adequate area for a septic system have been identified on each of the proposed lots.

10. Public water does not exist in the immediate area. Individual drilled wells are proposed as a source

of domestic water.

Page 15: Planning and Development Emily Cole-Prescott Saco City ... Meeting Pac… · 2. Baxter Lane: Street Acceptance Recommendation Request a. Memo from City Planner b. Letter, Warranty

3

11. Stormwater Management: A stormwater management report has been submitted that identifies a

proposed public road and associated utilities. A proposed private road serving lots 1 and 2 was included on an initial plan set, but has subsequently been revised to indicate lot 5 with no road. The two ways were designed for approximately 0.837 acre of impervious area, and 1.066 acre of vegetated area, totaling 1.903 acres of developed area.

12. Wetlands: A total of 3,891 s.f. of wetlands are proposed for disturbance on this site, as identified

and delineated by Mark Hampton, Mark Hampton Associates. A vernal pool assessment has been performed as well, dated May 28, 2018, and reports no egg masses or habitat suitable for amphibian breeding. The City has employed Normandeau Associates to review Mr. Hampton’s findings, which have been found acceptable. A Per Net Lot Area Calculation has been included on the preliminary subdivision plan detailing net lot area after wetland deductions.

13. Erosion and sedimentation control will be accomplished via temporary and permanent measures

as detailed on Sheet 3 of the plan set. 14. The submissions detailed above are sufficient to make a determination on the completeness of

submissions, and compliance with City of Saco Subdivision Regulations and Zoning Ordinance, of the preliminary subdivision plan.

The Planning Board has considered the following criteria from the Subdivision Regulations, and before granting approval for the preliminary plan has determined that:

1.1.1 Pollution. The proposed subdivision will not result in undue water or air pollution. In making this determination, it has at least considered:

A. The elevation of the land above sea level and its relation to the flood plains; B. The nature of soils and subsoils and their ability to adequately support waste disposal;

C. The slope of the land and its effect on effluents; D. The availability of streams for disposal of effluents; and

E. The applicable state and local health and water resource rules and regulations;

1.1.2 Sufficient water. The proposed subdivision has sufficient water available for the reasonably foreseeable needs of the subdivision based on the proximity of existing private wells in the area; no concerns have been reported;

1.1.3 Municipal water supply. The proposed subdivision will not cause an unreasonable burden on the existing water supply, as no connection to the Maine Water Company system is available or proposed;

1.1.4 Erosion. The proposed subdivision will not cause unreasonable soil erosion or a reduction in the land's capacity to hold water so that a dangerous or unhealthy condition results, based on the temporary and permanent erosion controls that are proposed;

1.1.5 Traffic. Though the proposed subdivision will not cause unreasonable highway or public road congestion or unsafe conditions with respect to the use of the highways or public roads existing or proposed, the applicant has agreed with the Board that a portion of the vehicular

Page 16: Planning and Development Emily Cole-Prescott Saco City ... Meeting Pac… · 2. Baxter Lane: Street Acceptance Recommendation Request a. Memo from City Planner b. Letter, Warranty

4

trips generated by this subdivision will utilize the Rte. 112/Exit 36 corridor. The applicant agrees to make provision for offsetting this impact through the payment of $925.00 per lot, payable to the Code office upon the issuance of a building permit. 1.1.6 Sewage disposal. The proposed subdivision will provide for adequate sewage waste disposal and will not cause an unreasonable burden on municipal services based on test pit locations and soil logs submitted;

1.1.7 Municipal solid waste disposal. The proposed subdivision will not cause an unreasonable burden on the municipality's ability to dispose of solid waste;

1.1.8 Aesthetic, cultural and natural values. The proposed subdivision will not have an undue adverse effect on the scenic or natural beauty of the area, aesthetics, historic sites, significant wildlife habitat identified by the Department of Inland Fisheries and Wildlife or the municipality, or rare and irreplaceable natural areas or any public rights for physical or visual access to the shoreline;

1.1.9 Conformity with local ordinances and plans. The proposed subdivision conforms with a duly adopted subdivision regulation, zoning ordinance, and the 2011 Comprehensive Plan;

1.1.10 Financial and technical capacity. The subdivider has adequate financial and technical capacity to meet the standards of this section;

1.1.11 Surface waters; outstanding river segments. Whenever situated entirely or partially within the watershed of any pond or lake or within 250 feet of any wetland, great pond or river as defined in Title 38, chapter 3, subchapter I, article 2-B, the proposed subdivision will not adversely affect the quality of that body of water or unreasonably affect the shoreline of that body of water. A. When lots in a subdivision have frontage on an outstanding river segment, the proposed subdivision plan must require principal structures to have a combined lot shore frontage and setback from the normal high-water mark of 500 feet.

(1) To avoid circumventing the intent of this provision, whenever a proposed subdivision adjoins a shoreland strip narrower than 250 feet which is not lotted, the proposed subdivision shall be reviewed as if lot lines extended to the shore. (2) The frontage and set-back provisions of this paragraph do not apply either within areas zoned as general development or its equivalent under shoreland zoning, Title 38, chapter 3, subchapter I, article 2-B, or within areas designated by ordinance as densely developed. The determination of which areas are densely developed must be based on a finding that existing development met the definitional requirements of section 4401, subsection 1, on September 23, 1983;

1.1.12 Ground water. The proposed subdivision will not, alone or in conjunction with existing activities, adversely affect the quality or quantity of ground water;

1.1.13 Flood areas. Based on the Federal Emergency Management Agency's Flood Boundary and Floodway Maps and Flood Insurance Rate Maps, and information presented by the applicant whether the subdivision is in a flood-prone area. The subdivision is not in such an area;

Page 17: Planning and Development Emily Cole-Prescott Saco City ... Meeting Pac… · 2. Baxter Lane: Street Acceptance Recommendation Request a. Memo from City Planner b. Letter, Warranty

5

1.1.14 Freshwater wetlands. All freshwater wetlands within the proposed subdivision have been identified on any maps submitted as part of the application, regardless of the size of these wetlands;

1.1.15 River, stream or brook. Any river, stream or brook within or abutting the proposed subdivision has been identified on any maps submitted as part of the application. For purposes of this section, "river, stream or brook" has the same meaning as in Title38, section 480-B, subsection 9;

1.1.16 Storm water. The proposed subdivision will provide for adequate storm water management, based on the submitted stormwater management plan and review of said plan by City Engineer Joseph Laverriere, P.E.;

1.1.17 Spaghetti-lots prohibited. If any lots in the proposed subdivision have shore frontage on a river, stream, brook, great pond or coastal wetland as these features are defined in Title 38, section 480-B, none of the lots created within the subdivision have a lot depth to shore frontage ratio greater than 5 to 1;

1.1.18 Lake phosphorus concentration. The long-term cumulative effects of the proposed subdivision will not unreasonably increase a great pond's phosphorus concentration during the construction phase and life of the proposed subdivision; and 1.1.19 Impact on adjoining municipality. The proposed subdivision will not cause unreasonable traffic congestion or unsafe conditions with respect to the use of existing public ways in an adjoining municipality.

15. Based on the foregoing, the project meets the standards of approval for the preliminary

subdivision plan, as outlined in the City of Saco Subdivision Regulations. Voted by the Planning Board on April 2, 2019. On Behalf of the Planning Board, Signed: __________________________________________ Emily Cole-Prescott Date City Planner

Page 18: Planning and Development Emily Cole-Prescott Saco City ... Meeting Pac… · 2. Baxter Lane: Street Acceptance Recommendation Request a. Memo from City Planner b. Letter, Warranty

6

Saco Planning Board Eloise’s Way Subdivision

Final Plan Review Conditions of Approval

April 2, 2019 1. All details will conform to City of Saco standards, including but not limited to the City of Saco

Zoning Ordinance and Subdivision Regulations. 2. Approval of the final plan is conditioned upon compliance by the applicant with any and all oral

commitments regarding the project which were specifically made by the applicant to the Board in the course of its deliberations.

3. This approval is governed by the action taken by the Saco Planning Board for the final subdivision

plan. 4. No deviations from the approved plans are permitted without prior approval from the Planning

Board for major changes, and from the City Planner for minor changes. The determination of major or minor shall be made by the City Planner.

5. A Letter of Credit, acceptable to the City of Saco, shall be established for 150% of the

construction cost of all required improvements, including but not limited to the following: utility installation, landscaping, paving, work within ROW, road construction, drainage, loam & seed, and sediment & erosion control. To establish the amount of the Letter of Credit, the applicant shall provide the City with itemized, per unit cost estimates, and a construction schedule, at least one week before any anticipated site work. This Letter of Credit shall be maintained for a period not less than three months beyond the anticipated completion of the project.

6. Prior to work commencing, the applicant shall establish a construction inspection account equal

to 3% of the base cost of the Letter of Credit. 7. No work shall commence until two mylar sets and three paper sets of the final plans have been

received by the Planning Office, signed by the Planning Board and recorded at the York County Registry of Deeds. Proof of recording shall be submitted to the Planning Office.

8. Prior to any construction activities, the applicant and contractor shall meet with the City Engineer

and City Planner to review plans, inspection schedules and erosion control practices. 9. All plans and specifications shall be provided on disk in an AutoCAD format. The final plan shall

be submitted in digital format as a single composite electronic file. The plan may be submitted on a disc, via e-mail, or other format acceptable to the City Planner, and shall be compatible with commonly used CAD and/or GIS software. See Section 6.2.6 of the Subdivision Regulations for further detail.

10. As-built plans shall be submitted before the final release of the Letter of Credit. 11. Stumps generated on-site will be ground and either used on-site for erosion control or will be

Page 19: Planning and Development Emily Cole-Prescott Saco City ... Meeting Pac… · 2. Baxter Lane: Street Acceptance Recommendation Request a. Memo from City Planner b. Letter, Warranty

7

hauled off-site. Stumps shall not be buried within areas shown as right of way on the final plan.

12. No filling or alteration of wetlands on individual lots shall be done without the appropriate state or local approvals.

14. The applicant shall be responsible for providing the following basic services:

• Snow plowing of all ways in a manner similar to that provided by the City of Saco for City streets;

• Trash pick-up from all inhabited units. This acknowledges that trash pick-up has customarily been provided by the City to homeowners on unaccepted subdivision streets if trash containers are transported to the corner of the unaccepted subdivision street and the nearest City street. If any homeowner is further than 500 feet from said City street, the applicant shall contract with a private hauler of solid waste in order to provide private curbside pick-up for such homeowners;

• Maintenance of all roadway surfaces, drains, sewers and other utilities;

• Installation of street signs and lights. Lights are to be energized no later than at the time of issuance of the Certificate of Occupancy to the first occupied residence in the subdivision;

• The costs of performing the provisions of this section shall be added into the bond or surety provided for in Article 8 or included in the covenant provided for in Article 8

15. The applicant shall, upon beginning construction of Eloise’s Way, post a sign of a size no

smaller than two feet by three feet and with two inch letters on black on a white background, with the following message: “This is not a public way owned by the City of Saco.” The sign shall identify the developer and include an address and telephone number which may be used to contact the applicant.

16. The applicant shall confer with the Parks and Recreation Department prior to planting of

street trees. 17. Upon completion, the subdivision is projected to generate 48 Average Daily Trips, a

percentage of which are anticipated to impact the Rte. 112/Exit 36 corridor. The 2015 update of the Rte. 112 Corridor Study recommends a mix of mitigation measures designed to address existing and potential operational and safety deficiencies within the corridor, including signalization of the Rte. 112 and Jenkins Road intersection upon achieving MDOT warrants, and consideration of a traffic signal at the Spring Street/North Street intersection. Based on the projected impacts of this project, a traffic impact fee of $925 per lot is required.

18. The design engineer shall be required to inspect the construction and stabilization of the

stormwater structures on the site in accordance with the requirements contained in Chapter 7 of the MDEP’s Volume III Stormwater BMP Technical Design Manual. Inspections shall be performed as detailed in the Construction Oversight requirements contained in Section 7.1.4.

19. The applicant shall be required to perform routine inspection and maintenance of the

stormwater facilities as outlined in the operations and maintenance manual development

Page 20: Planning and Development Emily Cole-Prescott Saco City ... Meeting Pac… · 2. Baxter Lane: Street Acceptance Recommendation Request a. Memo from City Planner b. Letter, Warranty

8

specifically for the site. A copy of the annual inspection and maintenance report including inspection log(s) shall be submitted annually (by July 15th of each year) to the City Public Works Department.

20. As part of the project’s as-built certification for roadway and utility infrastructure, the applicant

shall provide a Stormwater Management System As-Built Certification. Prior to the issuance of a Certificate of Occupancy for any lot, the Applicant shall submit evidence in the form of a letter with as-built survey plan prepared and stamped by a Professional Engineer who either prepared the Post-Construction Stormwater Management Plan and its associated Facilities or supervised the Plan and Facilities construction and implementation. The letter or plan shall certify that the Stormwater Management Facilities have been installed in accordance with the approved Post-Construction Stormwater Management Plan and that they will function as intended by said Plan. The as-built survey plan shall be performed for all post-construction stormwater facilities to document general conformance with the approved plans.

21. Proposed driveway locations to individual lots are subject to review and approval by the

Department of Public Works prior to the issuance of a building permit. 22. Documentation for any and all proposed easements will be submitted to the City Staff, and

completed to the satisfaction of City Staff. 23. Remaining engineering comments provided by City Engineer Joe Laverriere will be addressed

and incorporated to the satisfaction of City Staff. 24. Because the subdivision does not offer open space or recreational areas, the open space and

recreation impact fees shall be applied to each lot, payable to the Code Enforcement Department at time of building permit.

With these Conditions and the accompanying Findings of Fact, the Saco Planning Board hereby finds that the applicant has satisfied the requirements set forth in the City of Saco Subdivision Regulations and in the Zoning Ordinance. Approval for the final subdivision plan is hereby granted, contingent on these Conditions of Approval. Voted by the Saco Planning Board on April 2, 2019. Signed, on behalf of the Planning Board: ______________________________________________ Emily Cole-Prescott Date City Planner

Page 21: Planning and Development Emily Cole-Prescott Saco City ... Meeting Pac… · 2. Baxter Lane: Street Acceptance Recommendation Request a. Memo from City Planner b. Letter, Warranty
Page 22: Planning and Development Emily Cole-Prescott Saco City ... Meeting Pac… · 2. Baxter Lane: Street Acceptance Recommendation Request a. Memo from City Planner b. Letter, Warranty
Page 23: Planning and Development Emily Cole-Prescott Saco City ... Meeting Pac… · 2. Baxter Lane: Street Acceptance Recommendation Request a. Memo from City Planner b. Letter, Warranty
Page 24: Planning and Development Emily Cole-Prescott Saco City ... Meeting Pac… · 2. Baxter Lane: Street Acceptance Recommendation Request a. Memo from City Planner b. Letter, Warranty
Page 25: Planning and Development Emily Cole-Prescott Saco City ... Meeting Pac… · 2. Baxter Lane: Street Acceptance Recommendation Request a. Memo from City Planner b. Letter, Warranty
Page 26: Planning and Development Emily Cole-Prescott Saco City ... Meeting Pac… · 2. Baxter Lane: Street Acceptance Recommendation Request a. Memo from City Planner b. Letter, Warranty

1

Gorh

am, M

aine

040

3828

Sta

te S

tree

tFa

x (2

07) 8

39-8

250

Berr

y, H

uff,

McD

onal

d, M

illig

an In

c.

BH

2MEn

gine

ers,

Surv

eyor

s

Tel.

(207

) 839

-277

1

Old

Orc

hard

Bea

ch, M

aine

040

641

Fier

o D

rive

CV

S Fo

unda

tions

, LLC

FOR

ELO

ISES

PLA

CE

FIN

AL

PLA

N

LIN

CO

LN R

OA

DSA

CO

, MA

INE

Feb. 2018

As Noted

18026R. Libby Jr.

Dept.

W. Pelkey

100'0 200'100' 50'

Scale: 1" = 100'

G:\

2018

\18

026

\Su

b.dw

g, 2

/13

/20

19 2

:19:0

5 PM

, DW

G To

PDF

.pc3

AutoCAD SHX Text
%%ULOT 1
AutoCAD SHX Text
244,244 S.F.
AutoCAD SHX Text
%%ULOT 2
AutoCAD SHX Text
279,865 S.F.
AutoCAD SHX Text
%%ULOT 3
AutoCAD SHX Text
80,195 S.F.
AutoCAD SHX Text
%%ULOT 4
AutoCAD SHX Text
101,408 S.F.
AutoCAD SHX Text
LINCOLN ROAD
AutoCAD SHX Text
ELOISES WAY
AutoCAD SHX Text
LIMIT OF WETLANDS
AutoCAD SHX Text
WETLAND IMPACT
AutoCAD SHX Text
A - 1,731 S.F.
AutoCAD SHX Text
25' FOREST BUFFER
AutoCAD SHX Text
FOREST BUFFER
AutoCAD SHX Text
25' x 75' UTILITY/
AutoCAD SHX Text
STORMDRAIN
AutoCAD SHX Text
EASEMENT, SEE
AutoCAD SHX Text
WELL EXCLUSION
AutoCAD SHX Text
ZONE TYP.
AutoCAD SHX Text
SEPTIC
AutoCAD SHX Text
SEPTIC
AutoCAD SHX Text
NOTE 28
AutoCAD SHX Text
50' x 40' FIRE TANK EASEMENT TO
AutoCAD SHX Text
THE CITY OF SACO, SEE NOTE 30
AutoCAD SHX Text
PROPOSED 50' FUTURE RIGHT OF WAY
AutoCAD SHX Text
W.I. B - 2,160 S.F.
AutoCAD SHX Text
LANDSCAPE BOULDERS
AutoCAD SHX Text
SEE NOTE 31
AutoCAD SHX Text
180
AutoCAD SHX Text
N15°00'36"W
AutoCAD SHX Text
170
AutoCAD SHX Text
170
AutoCAD SHX Text
160
AutoCAD SHX Text
166
AutoCAD SHX Text
166
AutoCAD SHX Text
164
AutoCAD SHX Text
1.5" BAR 0.3' AG
AutoCAD SHX Text
N10°01'22"E
AutoCAD SHX Text
N11°15'26"E
AutoCAD SHX Text
148.50'
AutoCAD SHX Text
S34°03'43"E
AutoCAD SHX Text
333.98'
AutoCAD SHX Text
S51°10'53"E
AutoCAD SHX Text
581.74'
AutoCAD SHX Text
S00°57'53"E
AutoCAD SHX Text
1377.60'
AutoCAD SHX Text
S50°49'59"W
AutoCAD SHX Text
223.39'
AutoCAD SHX Text
N39°41'18"W
AutoCAD SHX Text
695.16'
AutoCAD SHX Text
N41°00'36"W
AutoCAD SHX Text
304.97'
AutoCAD SHX Text
N39°28'08"W
AutoCAD SHX Text
82.87'
AutoCAD SHX Text
N09°24'15"E
AutoCAD SHX Text
424.34'
AutoCAD SHX Text
N80°41'44"W
AutoCAD SHX Text
256.91'
AutoCAD SHX Text
S80°41'45"E
AutoCAD SHX Text
1013.16'
AutoCAD SHX Text
L1
AutoCAD SHX Text
N10°00'08"E
AutoCAD SHX Text
152.10'
AutoCAD SHX Text
N75°25'15"W
AutoCAD SHX Text
606.27'
AutoCAD SHX Text
N14°34'45"E
AutoCAD SHX Text
200.07'
AutoCAD SHX Text
N75°25'15"W
AutoCAD SHX Text
414.60'
AutoCAD SHX Text
206.70'
AutoCAD SHX Text
S83°37'42"E
AutoCAD SHX Text
231.55'
AutoCAD SHX Text
132.76'
AutoCAD SHX Text
61.19'
AutoCAD SHX Text
91.30'
AutoCAD SHX Text
484.11'
AutoCAD SHX Text
389.91'
AutoCAD SHX Text
623.10'
AutoCAD SHX Text
390.06'
AutoCAD SHX Text
366.80'
AutoCAD SHX Text
N74°59'24"E
AutoCAD SHX Text
225.00'
AutoCAD SHX Text
S15°00'36"E
AutoCAD SHX Text
122.28'
AutoCAD SHX Text
Bk. 15192, Pg. 176
AutoCAD SHX Text
169.52'
AutoCAD SHX Text
Cynthia E. &
AutoCAD SHX Text
C2
AutoCAD SHX Text
C1
AutoCAD SHX Text
UP#71/2
AutoCAD SHX Text
N/F
AutoCAD SHX Text
UP#18
AutoCAD SHX Text
UP#19
AutoCAD SHX Text
UP#224/2
AutoCAD SHX Text
UP#27
AutoCAD SHX Text
UP#J28/9
AutoCAD SHX Text
UP#29
AutoCAD SHX Text
UP#30
AutoCAD SHX Text
UP#31
AutoCAD SHX Text
UP#8
AutoCAD SHX Text
#5 IRF W/ CAP
AutoCAD SHX Text
#2104 0.4' AG
AutoCAD SHX Text
#5 IRF W/ CAP
AutoCAD SHX Text
#2104 0.1' AG
AutoCAD SHX Text
#5 IRF W/ CAP
AutoCAD SHX Text
#1137 0.6' AG
AutoCAD SHX Text
3/4" IPF 0.6' AG
AutoCAD SHX Text
3/4" IPF 0.4' AG
AutoCAD SHX Text
#5 IRF W/ CAP
AutoCAD SHX Text
#1201 0.7' AG
AutoCAD SHX Text
1" IPF BENT 0.1' AG
AutoCAD SHX Text
#5 IRF 0.9' AG
AutoCAD SHX Text
1.5" IPF 0.7' AG
AutoCAD SHX Text
1" IPF 0.5' AG
AutoCAD SHX Text
3/4" IPF 0.2' AG
AutoCAD SHX Text
1/2" IPF 2.9' AG
AutoCAD SHX Text
1" IPF 1.0' AG
AutoCAD SHX Text
#5 IRF W/ CAP
AutoCAD SHX Text
#1201 0.8' AG
AutoCAD SHX Text
#5 IRF W/ CAP
AutoCAD SHX Text
#1387 1.4' AG
AutoCAD SHX Text
STUMP W/ BARBWIRE
AutoCAD SHX Text
STUMP W/ BARBWIRE
AutoCAD SHX Text
#5 IRF W/ CAP 0.8' AG
AutoCAD SHX Text
#5 IRF W/ CAP
AutoCAD SHX Text
#1171 0.7' AG
AutoCAD SHX Text
#5 IRF W/ CAP
AutoCAD SHX Text
#1171 0.8' AG
AutoCAD SHX Text
#5 IRF W/ CAP
AutoCAD SHX Text
0.9' AG
AutoCAD SHX Text
STUMP W/ BARBWIRE
AutoCAD SHX Text
STUMP W/ BARBWIRE
AutoCAD SHX Text
STUMP W/ BARBWIRE
AutoCAD SHX Text
12" HEMLOCK W/ WIRE
AutoCAD SHX Text
8" MAPLE W/ WIRE
AutoCAD SHX Text
24" HEMLOCK W/ WIRE
AutoCAD SHX Text
N/F
AutoCAD SHX Text
Pet Haven
AutoCAD SHX Text
Cemetery Inc.
AutoCAD SHX Text
Bk. 2974, Pg. 278
AutoCAD SHX Text
N/F
AutoCAD SHX Text
Mystique A. Melancon
AutoCAD SHX Text
Maria Champagne
AutoCAD SHX Text
Bk. 16503, Pg. 205
AutoCAD SHX Text
N/F
AutoCAD SHX Text
Corey S. Zahares
AutoCAD SHX Text
Anna L. Newcomb
AutoCAD SHX Text
Bk. 8708, Pg. 76
AutoCAD SHX Text
N/F
AutoCAD SHX Text
Raymond J. &
AutoCAD SHX Text
Tina J. Theriault
AutoCAD SHX Text
Bk. 11482, Pg. 678
AutoCAD SHX Text
N/F
AutoCAD SHX Text
Kenneth R. Rice
AutoCAD SHX Text
Bk. 2682, Pg. 115
AutoCAD SHX Text
N/F
AutoCAD SHX Text
Kenneth R. Rice
AutoCAD SHX Text
Bk. 2682, Pg. 115
AutoCAD SHX Text
N/F
AutoCAD SHX Text
Edward R. Stockner
AutoCAD SHX Text
Elizabeth A. Peterson
AutoCAD SHX Text
Bk. 3934, Pg. 256
AutoCAD SHX Text
N/F
AutoCAD SHX Text
Edward A. &
AutoCAD SHX Text
Susan M. Kern
AutoCAD SHX Text
Bk. 4097, Pg. 8
AutoCAD SHX Text
N/F
AutoCAD SHX Text
Susan Kern Altman
AutoCAD SHX Text
Bk. 4094, Pg. 6
AutoCAD SHX Text
N/F
AutoCAD SHX Text
Larry W. & Janet D.
AutoCAD SHX Text
Hottinger
AutoCAD SHX Text
Bk. 15825, Pg. 508
AutoCAD SHX Text
N/F
AutoCAD SHX Text
Joseph & Sara
AutoCAD SHX Text
Johnson
AutoCAD SHX Text
N/F
AutoCAD SHX Text
Dean J. Metivier
AutoCAD SHX Text
Bk. 4842, Pg. 78
AutoCAD SHX Text
N/F
AutoCAD SHX Text
George G. Branco
AutoCAD SHX Text
Trustee
AutoCAD SHX Text
Bk. 14923, Pg. 179
AutoCAD SHX Text
N/F
AutoCAD SHX Text
Keith McKinnon
AutoCAD SHX Text
Bk. 9656, Pg. 116
AutoCAD SHX Text
Rebecca L. Williams
AutoCAD SHX Text
Bk. 16770, Pg. 71
AutoCAD SHX Text
N/F
AutoCAD SHX Text
John W. Lane
AutoCAD SHX Text
Bk. 10326, Pg. 129
AutoCAD SHX Text
168
AutoCAD SHX Text
178
AutoCAD SHX Text
178
AutoCAD SHX Text
178
AutoCAD SHX Text
176
AutoCAD SHX Text
174
AutoCAD SHX Text
170
AutoCAD SHX Text
168
AutoCAD SHX Text
166
AutoCAD SHX Text
164
AutoCAD SHX Text
160
AutoCAD SHX Text
162
AutoCAD SHX Text
174
AutoCAD SHX Text
176
AutoCAD SHX Text
170
AutoCAD SHX Text
166
AutoCAD SHX Text
164
AutoCAD SHX Text
166
AutoCAD SHX Text
168
AutoCAD SHX Text
162
AutoCAD SHX Text
164
AutoCAD SHX Text
168
AutoCAD SHX Text
164
AutoCAD SHX Text
166
AutoCAD SHX Text
164
AutoCAD SHX Text
164
AutoCAD SHX Text
166
AutoCAD SHX Text
166
AutoCAD SHX Text
166
AutoCAD SHX Text
164
AutoCAD SHX Text
164
AutoCAD SHX Text
164
AutoCAD SHX Text
TP
AutoCAD SHX Text
3
AutoCAD SHX Text
TP
AutoCAD SHX Text
TP
AutoCAD SHX Text
8
AutoCAD SHX Text
7
AutoCAD SHX Text
9
AutoCAD SHX Text
TP
AutoCAD SHX Text
TP
AutoCAD SHX Text
TP
AutoCAD SHX Text
10
AutoCAD SHX Text
11
AutoCAD SHX Text
TP
AutoCAD SHX Text
12
AutoCAD SHX Text
75.00'
AutoCAD SHX Text
133.00'
AutoCAD SHX Text
C4
AutoCAD SHX Text
C3
AutoCAD SHX Text
508.47'
AutoCAD SHX Text
L2
AutoCAD SHX Text
L4
AutoCAD SHX Text
L3
AutoCAD SHX Text
L5
AutoCAD SHX Text
L6
AutoCAD SHX Text
S74°59'24"W
AutoCAD SHX Text
323.20'
AutoCAD SHX Text
175.00'
AutoCAD SHX Text
1007.15'
AutoCAD SHX Text
119.75'
AutoCAD SHX Text
498.68'
AutoCAD SHX Text
753.23'
AutoCAD SHX Text
245.37
AutoCAD SHX Text
185.05'
AutoCAD SHX Text
250.07'
AutoCAD SHX Text
50' R.O.W.
AutoCAD SHX Text
GRADING & UTILITY
AutoCAD SHX Text
EASEMENT, SEE NOTE 32
AutoCAD SHX Text
257,585 S.F.
AutoCAD SHX Text
%%ULOT 5
AutoCAD SHX Text
A
AutoCAD SHX Text
B
AutoCAD SHX Text
C
AutoCAD SHX Text
D
AutoCAD SHX Text
DESIGNED
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
CHECKED
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
JOB. NO.
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
NO.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
REPRODUCTION OR REUSE OF THIS
AutoCAD SHX Text
DOCUMENT WITHOUT THE
AutoCAD SHX Text
EXPRESSED WRITTEN CONSENT
AutoCAD SHX Text
OF BH2M INC. IS PROHIBITED
AutoCAD SHX Text
OF SACO PLANNING BOARD.
AutoCAD SHX Text
THIS PLAN REVIEWED AND APPROVED BY THE CITY
AutoCAD SHX Text
CHAIR
AutoCAD SHX Text
DATE
AutoCAD SHX Text
I CERTIFY THAT THIS SURVEY CONFORMS
AutoCAD SHX Text
TO THE MAINE BOARD OF LICENSURE
AutoCAD SHX Text
FOR PROFESSIONAL LAND SURVEYORS
AutoCAD SHX Text
TECHNICAL STANDARDS OF PRACTICE FOR
AutoCAD SHX Text
A STANDARD BOUNDARY SURVEY WITH
AutoCAD SHX Text
THE FOLLOWING EXCEPTIONS:
AutoCAD SHX Text
NO SURVEYORS REPORT
AutoCAD SHX Text
ROBERT C. LIBBY JR. PLS #2190
AutoCAD SHX Text
ELECTRIC/TELEPHONE:
AutoCAD SHX Text
12.
AutoCAD SHX Text
OVERHEAD FROM LINCOLN ROAD (LOT 5)
AutoCAD SHX Text
MIN. STANDARDS C-1:
AutoCAD SHX Text
WATER SERVICE:
AutoCAD SHX Text
SEWER SERVICE:
AutoCAD SHX Text
10.
AutoCAD SHX Text
11.
AutoCAD SHX Text
9.
AutoCAD SHX Text
SETBACKS - 30' FRONT, 25' SIDE & REAR
AutoCAD SHX Text
LOT SIZE - 80,000 S.F. (UNSEWERED)
AutoCAD SHX Text
FRONTAGE - 200'
AutoCAD SHX Text
INDIVIDUAL SUBSURFACE DISPOSAL SYSTEM
AutoCAD SHX Text
INDIVIDUAL DRILLED WELLS
AutoCAD SHX Text
TAX MAP REFERENCE:
AutoCAD SHX Text
PROPOSED USE:
AutoCAD SHX Text
PROJECT AREA:
AutoCAD SHX Text
ZONING:
AutoCAD SHX Text
DEED REFERENCE:
AutoCAD SHX Text
6.
AutoCAD SHX Text
7.
AutoCAD SHX Text
8.
AutoCAD SHX Text
4.
AutoCAD SHX Text
5.
AutoCAD SHX Text
SURVEYOR:
AutoCAD SHX Text
2.
AutoCAD SHX Text
NOTES:
AutoCAD SHX Text
OWNER/APPLICANT:
AutoCAD SHX Text
1.
AutoCAD SHX Text
23.404 ACRES
AutoCAD SHX Text
BK. 17509, PG. 369
AutoCAD SHX Text
MAP 101, LOT 31-2
AutoCAD SHX Text
5 LOT SUBDIVISION
AutoCAD SHX Text
C-1 CONSERVATION
AutoCAD SHX Text
GORHAM, MAINE 04038
AutoCAD SHX Text
28 STATE STREET
AutoCAD SHX Text
ROBERT C. LIBBY JR., PLS #2190
AutoCAD SHX Text
BH2M
AutoCAD SHX Text
OLD ORCHARD BEACH, MAINE
AutoCAD SHX Text
3 FIERO DRIVE
AutoCAD SHX Text
CVS FOUNDATIONS, LLC
AutoCAD SHX Text
UNDERGROUND (LOTS 1-4)
AutoCAD SHX Text
SCALE: 1" = 2 MILES
AutoCAD SHX Text
LOCATION MAP
AutoCAD SHX Text
SCARBOROUGH
AutoCAD SHX Text
SACO
AutoCAD SHX Text
I95
AutoCAD SHX Text
RIVER ROAD
AutoCAD SHX Text
RTE 112
AutoCAD SHX Text
I195
AutoCAD SHX Text
JENKINS RD
AutoCAD SHX Text
RTE 1
AutoCAD SHX Text
RTE 98
AutoCAD SHX Text
SMUTTY LN
AutoCAD SHX Text
RTE 5
AutoCAD SHX Text
SACO RIVER
AutoCAD SHX Text
HEATH RD
AutoCAD SHX Text
FLAG POND RD
AutoCAD SHX Text
GRANT RD
AutoCAD SHX Text
MCKENNEY RD
AutoCAD SHX Text
LINCOLN RD
AutoCAD SHX Text
RICKER RD
AutoCAD SHX Text
BROADTURN RD
AutoCAD SHX Text
ASH
AutoCAD SHX Text
SWAMP
AutoCAD SHX Text
RD
AutoCAD SHX Text
CUMERLAND CO
AutoCAD SHX Text
YORK CO
AutoCAD SHX Text
WATSON
AutoCAD SHX Text
MILL
AutoCAD SHX Text
RD
AutoCAD SHX Text
BUXTON
AutoCAD SHX Text
DAYTON
AutoCAD SHX Text
SIMPSON
AutoCAD SHX Text
RD
AutoCAD SHX Text
LORD RD
AutoCAD SHX Text
MAGNETIC
AutoCAD SHX Text
SITE
AutoCAD SHX Text
HEMLOCK WITH WIRE
AutoCAD SHX Text
MAPLE WITH WIRE
AutoCAD SHX Text
EXISTING CONTOUR
AutoCAD SHX Text
NOW OR FORMERLY
AutoCAD SHX Text
ABOVE GROUND
AutoCAD SHX Text
EDGE OF PAVEMENT
AutoCAD SHX Text
PROPERTY LINE
AutoCAD SHX Text
WELL LOCATION
AutoCAD SHX Text
UTILITY POLE
AutoCAD SHX Text
5/8" IRON ROD W/ CAP TO BE SET
AutoCAD SHX Text
IRON PIPE/ROD FOUND
AutoCAD SHX Text
GRANITE MONUMENT FOUND
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
W
AutoCAD SHX Text
130
AutoCAD SHX Text
N/F
AutoCAD SHX Text
A.G.
AutoCAD SHX Text
IPF/IRF
AutoCAD SHX Text
SYMBOL
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
WETLANDS/SITE
AutoCAD SHX Text
3.
AutoCAD SHX Text
PORTLAND, MAINE
AutoCAD SHX Text
MARK HAMPTON
AutoCAD SHX Text
MARK HAMPTON ASSOCIATES
AutoCAD SHX Text
EVALUATOR:
AutoCAD SHX Text
PLAN REFERENCE:
AutoCAD SHX Text
13.
AutoCAD SHX Text
"STANDARD BOUNDARY SURVEY, LAND TO
AutoCAD SHX Text
BE CONVEYED BY CLINTON N. FECTEAU TO
AutoCAD SHX Text
WILFRED ALLEN JR.", DATED 5-30-89, BY
AutoCAD SHX Text
GADBOIS & ASSOCIATES.
AutoCAD SHX Text
FAILURE TO COMMENCE SUBSTANTIAL CONSTRUCTION OF
AutoCAD SHX Text
THIS SUBDIVISION WITHIN TWO YEARS OF THE DATE OF APPROVAL
AutoCAD SHX Text
AND SIGNING OF THE PLAN SHALL RENDER THE PLAN NULL
AutoCAD SHX Text
AND VOID. ALL ROAD AND INFRASTRUCTURE CONSTRUCTION
AutoCAD SHX Text
THE NEED AND PLACEMENT OF STREET TREES SHALL BE
AutoCAD SHX Text
DETERMINED BY THE PARKS AND REC DIRECTOR DURING
AutoCAD SHX Text
ROADWAY CONSTRUCTION.
AutoCAD SHX Text
TRAFFIC ESTIMATE:
AutoCAD SHX Text
9.57 TRIPS/LOT/DAY
AutoCAD SHX Text
5 LOTS x 9.57 = 47.85 TRIPS/DAY
AutoCAD SHX Text
16.
AutoCAD SHX Text
17.
AutoCAD SHX Text
18.
AutoCAD SHX Text
DENSITY:
AutoCAD SHX Text
SUBDIVISION NET DENSITY
AutoCAD SHX Text
PROJECT AREA
AutoCAD SHX Text
WETLANDS
AutoCAD SHX Text
R.O.W.
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
1,019,489 S.F.
AutoCAD SHX Text
447,426 S.F.
AutoCAD SHX Text
60,461 S.F.
AutoCAD SHX Text
511,602
AutoCAD SHX Text
80,000
AutoCAD SHX Text
= 6.4 LOTS
AutoCAD SHX Text
19.
AutoCAD SHX Text
BENCHMARK:
AutoCAD SHX Text
14.
AutoCAD SHX Text
SPIKE SET IN BASE OF UTILITY POLE 27
AutoCAD SHX Text
DRIVEWAY LOCATIONS SHALL BE REVIEWED AND APPROVED BY
AutoCAD SHX Text
THE DEPARTMENT OF PUBLIC WORKS AS PART OF THE BUILDING
AutoCAD SHX Text
20.
AutoCAD SHX Text
UNTIL SUCH TIME THAT THE STORMWATER FACILITIES ARE OFFERED
AutoCAD SHX Text
AND ACCEPTED BY THE CITY, THE APPLICANT SHALL BE REQUIRED
AutoCAD SHX Text
TO PERFORM ROUTINE INSPECTION AND MAINTENANCE OF THE
AutoCAD SHX Text
STORMWATER FACILITIES AS OUTLINED IN THE OPERATIONS AND
AutoCAD SHX Text
21.
AutoCAD SHX Text
MAINTENANCE MANUAL DEVELOPED SPECIFICALLY FOR THE SITE.
AutoCAD SHX Text
A COPY OF THE ANNUAL INSPECTION AND MAINTENANCE REPORT
AutoCAD SHX Text
INCLUDING INSPECTION LOG(S) SHALL BE SUBMITTED ANNUALLY
AutoCAD SHX Text
(BY JULY 15 OF EACH YEAR) TO THE CITY PUBLIC WORKS
AutoCAD SHX Text
LIMITED DISTURBANCE FOREST BUFFERS SHALL BE LEFT
AutoCAD SHX Text
UNDISTURBED EXCEPT FOR REMOVING DEAD OR DISEASED TREES.
AutoCAD SHX Text
22.
AutoCAD SHX Text
SLOPES >20%%%
AutoCAD SHX Text
THE APPLICANT SHALL, UPON BEGINNING CONSTRUCTION OF A
AutoCAD SHX Text
STREET WHICH INTERSECTS WITH A PUBLIC WAY, POST A SIGN OF
AutoCAD SHX Text
A SIZE NO SMALLER THAN TWO FEET BY THREE FEET AND WITH
AutoCAD SHX Text
TWO INCH LETTER IN BLACK ON A WHITE BACKGROUND, WHICH
AutoCAD SHX Text
STATES THE FOLLOWING THIS IS NOT A PUBLIC WAY OWNED BY THE
AutoCAD SHX Text
23.
AutoCAD SHX Text
511,602 S.F.
AutoCAD SHX Text
100 YEAR FLOOD
AutoCAD SHX Text
CITY OF SACO THE SIGN SHALL FURTHER IDENTIFY THE OWNER OF
AutoCAD SHX Text
PLAN WAIVERS:
AutoCAD SHX Text
APPROXIMATE DATUM ELEVATION 168.12
AutoCAD SHX Text
PERMIT PROCESS.
AutoCAD SHX Text
SECTION 5.2.2(16) SIDEWALKS, CURBS
AutoCAD SHX Text
SHALL BE COMPLETED PER THE APPROVED PLAN NO LATER
AutoCAD SHX Text
THAN 36 MONTHS AFTER THE POSTING OF THE FINANCIAL
AutoCAD SHX Text
GUARANTEE. ALL ROADS AND INFRASTRUCTURE INTENDED
AutoCAD SHX Text
FOR CITY ACCEPTANCE SHALL BE OFFERED TO THE CITY
AutoCAD SHX Text
WITHIN 90 DAYS AFTER THE END OF THE 36 MONTH PERIOD.
AutoCAD SHX Text
24.
AutoCAD SHX Text
DEPARTMENT.
AutoCAD SHX Text
THE WAY AND ITS ADDRESS.
AutoCAD SHX Text
0 S.F.
AutoCAD SHX Text
0 S.F.
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
NAVD 88 DATUM.
AutoCAD SHX Text
LIMIT OF WETLANDS
AutoCAD SHX Text
LINE/CURVE DATA
AutoCAD SHX Text
N09%%D07'37"E 50.00'
AutoCAD SHX Text
N74%%D59'24"E 30.00'
AutoCAD SHX Text
R=175.00', L=200.63'
AutoCAD SHX Text
R=125.00', L=142.30'
AutoCAD SHX Text
C2 -
AutoCAD SHX Text
C1 -
AutoCAD SHX Text
L2 -
AutoCAD SHX Text
L1 -
AutoCAD SHX Text
S15%%D00'36"E 50.00'
AutoCAD SHX Text
L3 -
AutoCAD SHX Text
N74%%D59'24"E 30.00'
AutoCAD SHX Text
L4 -
AutoCAD SHX Text
S15%%D00'36"E 61.67'
AutoCAD SHX Text
L5 -
AutoCAD SHX Text
L6 -
AutoCAD SHX Text
S74%%D59'24"W 50.00'
AutoCAD SHX Text
TOPOGRAPHY:
AutoCAD SHX Text
15.
AutoCAD SHX Text
STATE OF MAINE GIS DATUM (2' INCREMENTS)
AutoCAD SHX Text
WETLAND IMPACTS:
AutoCAD SHX Text
3,891 S.F.
AutoCAD SHX Text
25.
AutoCAD SHX Text
FIRE PROTECTION:
AutoCAD SHX Text
ON SITE FIRE CISTERN, SEE NOTE 30
AutoCAD SHX Text
26.
AutoCAD SHX Text
PRIOR TO THE ISSUANCE OF A BUILDING PERMIT, THE APPLICANT
AutoCAD SHX Text
SHALL SUBMIT A PLOT PLAN FOR EACH LOT SHOWING BUILDING,
AutoCAD SHX Text
DRIVEWAY LOCATION, SITE GRADING AND ALL SITE CONSTRAINTS.
AutoCAD SHX Text
27.
AutoCAD SHX Text
YORK ss REGISTRY OF DEEDS
AutoCAD SHX Text
RECEIVED%%U %%U 20%%U
AutoCAD SHX Text
AT%%U %%UH%%U %%UM%%U %%UM., AND
AutoCAD SHX Text
RECORDED IN BOOK %%U %%UPAGE %%U
AutoCAD SHX Text
ATTEST:
AutoCAD SHX Text
%%U
AutoCAD SHX Text
REGISTER
AutoCAD SHX Text
THE CITY OF SACO HAS THE RIGHT TO ACCESS UTILITY/STORMWATER
AutoCAD SHX Text
EASEMENT FOR INSPECTION. NO BUILDING, STRUCTURE OR
AutoCAD SHX Text
PERMANENT OBSTRUCTIONS (I.E. FENCES, RETAINING WALLS,
AutoCAD SHX Text
TREES, ETC.) SHALL BE ERECTED WITHIN SAID EASEMENT WITHOUT
AutoCAD SHX Text
PRIOR CONSENT BY THE CITY OF SACO. THE PROPERTY OWNERS
AutoCAD SHX Text
SHALL BE RESPONSIBLE FOR ALL COSTS TO REMOVE NON-
AutoCAD SHX Text
PERMITTED ACTIVITIES WITHIN THE EASEMENT AREA.
AutoCAD SHX Text
28.
AutoCAD SHX Text
R=20.00', L=31.42'
AutoCAD SHX Text
C3 -
AutoCAD SHX Text
R=20.00', L=31.42'
AutoCAD SHX Text
C4 -
AutoCAD SHX Text
FUTURE BUILDERS, OF INDIVIDUAL LOT DEVELOPMENT, SHALL ADHERE
AutoCAD SHX Text
TO ALL PLAN REQUIREMENTS AND CONDITIONS OF APPROVAL AS
AutoCAD SHX Text
THEY APPLY.
AutoCAD SHX Text
29.
AutoCAD SHX Text
2
AutoCAD SHX Text
8/20/18
AutoCAD SHX Text
Rev'd. Per City Depts. Review
AutoCAD SHX Text
THE FIRE CISTERN TANK SHALL BE INSTALLED IN ACCORDANCE WITH
AutoCAD SHX Text
THE SACO FIRE DEPARTMENT STANDARDS. A MANUFACTURER'S
AutoCAD SHX Text
SUBMITTAL FOR THE FIRE CISTERN TANK AND APPURTENANCES
AutoCAD SHX Text
SHALL BE SUBMITTED TO THE SACO FIRE DEPT. FOR REVIEW AND
AutoCAD SHX Text
APPROVAL PRIOR TO ORDERING THE STRUCTURE. CITY OF SACO
AutoCAD SHX Text
HAS THE RIGHT TO ACCESS, REPAIR AND MAINTAIN FIRE CISTERN
AutoCAD SHX Text
TANK AND APPURTENANCES WITHIN THE 40'x50' EASEMENT SHOWN.
AutoCAD SHX Text
30.
AutoCAD SHX Text
3
AutoCAD SHX Text
9/18/18
AutoCAD SHX Text
Rev'd. Per City Depts. Review (9-14-18 Memo)
AutoCAD SHX Text
N14%%D34'45"E 50.00'
AutoCAD SHX Text
L7 -
AutoCAD SHX Text
4
AutoCAD SHX Text
10/19/18
AutoCAD SHX Text
Cluster Layout
AutoCAD SHX Text
APPLICANT SHALL PLACE LANDSCAPE BOULDERS, APPROXIMATELY
AutoCAD SHX Text
4' DIAMETER, AT 50' O.C.%%P TO DESIGNATE MAPPED WETLANDS
AutoCAD SHX Text
31.
AutoCAD SHX Text
IN AREAS OF BUILDING WINDOWS.
AutoCAD SHX Text
5
AutoCAD SHX Text
10/29/18
AutoCAD SHX Text
Revised per City Comments
AutoCAD SHX Text
ROBERT
AutoCAD SHX Text
C.
AutoCAD SHX Text
LIBBY, JR.
AutoCAD SHX Text
2190
AutoCAD SHX Text
U
AutoCAD SHX Text
O
AutoCAD SHX Text
F
AutoCAD SHX Text
M
AutoCAD SHX Text
A
AutoCAD SHX Text
I
AutoCAD SHX Text
N
AutoCAD SHX Text
E
AutoCAD SHX Text
S
AutoCAD SHX Text
T
AutoCAD SHX Text
A
AutoCAD SHX Text
T
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
S
AutoCAD SHX Text
V
AutoCAD SHX Text
Y
AutoCAD SHX Text
O
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
L
AutoCAD SHX Text
D
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
F
AutoCAD SHX Text
E
AutoCAD SHX Text
O
AutoCAD SHX Text
P
AutoCAD SHX Text
R
AutoCAD SHX Text
N
AutoCAD SHX Text
A
AutoCAD SHX Text
I
AutoCAD SHX Text
O
AutoCAD SHX Text
L
AutoCAD SHX Text
R=20.00', L=31.42'
AutoCAD SHX Text
C5 -
AutoCAD SHX Text
R=20.00', L=31.42'
AutoCAD SHX Text
C6 -
AutoCAD SHX Text
R=20.00', L=29.83'
AutoCAD SHX Text
C7 -
AutoCAD SHX Text
S72%%D25'15"E 50.00'
AutoCAD SHX Text
L8 -
AutoCAD SHX Text
S14%%D34'45"W 50.00'
AutoCAD SHX Text
L9 -
AutoCAD SHX Text
32.
AutoCAD SHX Text
S72%%D25'15"E 50.00'
AutoCAD SHX Text
L10 -
AutoCAD SHX Text
6
AutoCAD SHX Text
12/17/18
AutoCAD SHX Text
Revised per City Comments
AutoCAD SHX Text
A GRADING EASEMENT AT LOT 1 (15') AND LOTS 3 & 4 (20'), ALONG
AutoCAD SHX Text
ELOISES WAY SHALL BE GRANTED TO THE CITY OF SACO AS PART
AutoCAD SHX Text
OF ANY FUTURE ACCEPTANCE OF THE PUBLIC ROADWAY.
AutoCAD SHX Text
7
AutoCAD SHX Text
1/7/19
AutoCAD SHX Text
Revised per City Comments
AutoCAD SHX Text
8
AutoCAD SHX Text
1/30/19
AutoCAD SHX Text
Revised per City 1/22 Comments
AutoCAD SHX Text
SECTION 10.11.2 THRU STREET
AutoCAD SHX Text
9
AutoCAD SHX Text
2/6/19
AutoCAD SHX Text
Revised per Planning Board Review
AutoCAD SHX Text
MAINE STATE COORDINATE DATA
AutoCAD SHX Text
PROPERTY CORNER
AutoCAD SHX Text
NORTHING
AutoCAD SHX Text
EASTING
AutoCAD SHX Text
A
AutoCAD SHX Text
B
AutoCAD SHX Text
C
AutoCAD SHX Text
D
AutoCAD SHX Text
270409.5204
AutoCAD SHX Text
270136.5644
AutoCAD SHX Text
268811.3018
AutoCAD SHX Text
269252.8091
AutoCAD SHX Text
2877255.1454
AutoCAD SHX Text
2878258.2991
AutoCAD SHX Text
2878634.4199
AutoCAD SHX Text
2877617.0050
AutoCAD SHX Text
2877617.0050
Page 27: Planning and Development Emily Cole-Prescott Saco City ... Meeting Pac… · 2. Baxter Lane: Street Acceptance Recommendation Request a. Memo from City Planner b. Letter, Warranty

Gorh

am, M

aine

040

3828

Sta

te S

tree

tFa

x (2

07) 8

39-8

250

Berr

y, H

uff,

McD

onal

d, M

illig

an In

c.

BH

2MEn

gine

ers,

Surv

eyor

s

Tel.

(207

) 839

-277

1

40'0 80'40'

Scale: 1" = 40'

2

Old

Orc

har

d B

each

, M

ain

e 0

40

64

1 F

iero

Dri

ve

CV

S F

oundat

ions,

LL

CF

OR

EL

OIS

ES

PL

AC

E

RO

AD

WA

Y P

RO

FIL

E

LIN

CO

LN

RD

SA

CO

, M

AIN

E

Feb. 2018

As Noted

18026A. Morrell

Dept.

W. Pelkey

Page 28: Planning and Development Emily Cole-Prescott Saco City ... Meeting Pac… · 2. Baxter Lane: Street Acceptance Recommendation Request a. Memo from City Planner b. Letter, Warranty

Gorh

am, M

aine

040

3828

Sta

te S

tree

tFa

x (2

07) 8

39-8

250

Berr

y, H

uff,

McD

onal

d, M

illig

an In

c.

BH

2MEn

gine

ers,

Surv

eyor

s

Tel.

(207

) 839

-277

1

3

Old

Orc

har

d B

each

, M

ain

e 0

40

64

1 F

iero

Dri

ve

CV

S F

oundat

ions,

LL

CF

OR

EL

OIS

ES

PL

AC

E

ER

OS

ION

CO

NT

RO

L

LIN

CO

LN

RD

SA

CO

, M

AIN

E

Feb. 2018

As Noted

18026A. Morrell

Dept.

W. Pelkey

DE

TA

ILS

Page 29: Planning and Development Emily Cole-Prescott Saco City ... Meeting Pac… · 2. Baxter Lane: Street Acceptance Recommendation Request a. Memo from City Planner b. Letter, Warranty

Gorh

am, M

aine

040

3828

Sta

te S

tree

tFa

x (2

07) 8

39-8

250

Berr

y, H

uff,

McD

onal

d, M

illig

an In

c.

BH

2MEn

gine

ers,

Surv

eyor

s

Tel.

(207

) 839

-277

1

4

Old

Orc

har

d B

each

, M

ain

e 0

40

64

1 F

iero

Dri

ve

CV

S F

oundat

ions,

LL

CF

OR

EL

OIS

ES

PL

AC

E

ST

AN

DA

RD

LIN

CO

LN

RD

SA

CO

, M

AIN

E

Feb. 2018

As Noted

18026A. Morrell

Dept.

W. Pelkey

DE

TA

ILS

Page 30: Planning and Development Emily Cole-Prescott Saco City ... Meeting Pac… · 2. Baxter Lane: Street Acceptance Recommendation Request a. Memo from City Planner b. Letter, Warranty

https://cityofsaco.sharepoint.com/PlanningDepartment/SecurePlanDev/Shared Documents/Properties and Developments/ELOISE WAY_off Lincoln

Rd/2019-3-5 Eloises Way Review Memo.docx Page 1 of 1

MEMORANDUM

TO: Denise Clavette, Interim Planner Planning Account No.: 300345

DATE: March 5, 2019

RE: Eloises Way Subdivision – Final Subdivision Plan Tax Map 101, Lot 31-2

The Department of Public Works (DPW) has reviewed the final subdivision plan application materials for the above referenced project prepared by BH2M, dated February 14, 2019. The following comments have been prepared

based upon our review of the recent resubmission:

1. As commented previously, the roadway embankment grading depicts 2:1 slopes in several areas, which does not meet the 3:1 standards in the Subdivision Regulations nor the typical detail shown on the plans.

2. As commented previously, prior to the start of construction, the applicant shall submit a copy of the CMP electrical plan for the development and the applicant shall confer with the DPW for the location of an

electrical service and meter set to serve the street light system.

3. As commented previously, due to the flat nature of the site, the depth of the roadside ditches shall be

designed to provide 2’ of cover over the top of all driveway culverts. The typical roadway sections should specify the minimum roadside ditch depth as 39” in all locations to ensure adequate cover over driveway

culverts. The plans have been revised with changes to the ditch line vs. raising the road profile to achieve

drainage depth below the roadway base. These ditches have slopes of less than 1% to 0%, no slope at all for several hundred feet, which is not acceptable. It appears that the road profile for the first half of the

road is too low.

4. The roadway embankment slopes appear very steep. All grading within the public right-of-way are

typically 3H:1V. In instances where this cannot be met, then the slope may be increased to 2H:1V with consent from DPW. This appears to be the case at the intersection with Lincoln Road in order to maintain

2’ of cover over the entrance culvert.

We look forward to discussing this project further and would be happy to clarify any of our comments made within this

review memo.

CITY OF SACO, MAINE Saco Public Works Department Joseph A. Laverriere, P.E. – City Engineer 300 Main Street Telephone: (207) 284-6641

Saco, Maine 04072 Email: [email protected]

Page 31: Planning and Development Emily Cole-Prescott Saco City ... Meeting Pac… · 2. Baxter Lane: Street Acceptance Recommendation Request a. Memo from City Planner b. Letter, Warranty
Page 32: Planning and Development Emily Cole-Prescott Saco City ... Meeting Pac… · 2. Baxter Lane: Street Acceptance Recommendation Request a. Memo from City Planner b. Letter, Warranty

1

Gorh

am, M

aine

040

3828

Sta

te S

tree

tFa

x (2

07) 8

39-8

250

Berr

y, H

uff,

McD

onal

d, M

illig

an In

c.

BH

2MEn

gine

ers,

Surv

eyor

s

Tel.

(207

) 839

-277

1

Old

Orc

hard

Bea

ch, M

aine

040

641

Fier

o D

rive

CV

S Fo

unda

tions

, LLC

FOR

ELO

ISES

PLA

CE

FIN

AL

PLA

N

LIN

CO

LN R

OA

DSA

CO

, MA

INE

Feb. 2018

As Noted

18026R. Libby Jr.

Dept.

W. Pelkey

100'0 200'100' 50'

Scale: 1" = 100'

G:\

2018

\18

026

\Su

b.dw

g, 3

/14

/20

19 3

:47:

07

PM, D

WG

To P

DF.p

c3

AutoCAD SHX Text
%%ULOT 1
AutoCAD SHX Text
244,244 S.F.
AutoCAD SHX Text
%%ULOT 2
AutoCAD SHX Text
279,865 S.F.
AutoCAD SHX Text
%%ULOT 3
AutoCAD SHX Text
80,195 S.F.
AutoCAD SHX Text
%%ULOT 4
AutoCAD SHX Text
101,408 S.F.
AutoCAD SHX Text
LINCOLN ROAD
AutoCAD SHX Text
ELOISES WAY
AutoCAD SHX Text
LIMIT OF WETLANDS
AutoCAD SHX Text
WETLAND IMPACT
AutoCAD SHX Text
A - 1,731 S.F.
AutoCAD SHX Text
25' FOREST BUFFER
AutoCAD SHX Text
FOREST BUFFER
AutoCAD SHX Text
25' x 100' UTILITY/
AutoCAD SHX Text
STORMDRAIN
AutoCAD SHX Text
EASEMENT, SEE
AutoCAD SHX Text
WELL EXCLUSION
AutoCAD SHX Text
ZONE TYP.
AutoCAD SHX Text
SEPTIC
AutoCAD SHX Text
SEPTIC
AutoCAD SHX Text
NOTE 28
AutoCAD SHX Text
50' x 40' FIRE TANK EASEMENT TO
AutoCAD SHX Text
THE CITY OF SACO, SEE NOTE 30
AutoCAD SHX Text
PROPOSED 50' FUTURE RIGHT OF WAY
AutoCAD SHX Text
W.I. B - 2,160 S.F.
AutoCAD SHX Text
LANDSCAPE BOULDERS
AutoCAD SHX Text
SEE NOTE 31
AutoCAD SHX Text
S15°00'36"E
AutoCAD SHX Text
180
AutoCAD SHX Text
N15°00'36"W
AutoCAD SHX Text
170
AutoCAD SHX Text
170
AutoCAD SHX Text
160
AutoCAD SHX Text
166
AutoCAD SHX Text
166
AutoCAD SHX Text
164
AutoCAD SHX Text
1.5" BAR 0.3' AG
AutoCAD SHX Text
N10°01'22"E
AutoCAD SHX Text
N11°15'26"E
AutoCAD SHX Text
148.50'
AutoCAD SHX Text
S34°03'43"E
AutoCAD SHX Text
333.98'
AutoCAD SHX Text
S51°10'53"E
AutoCAD SHX Text
581.74'
AutoCAD SHX Text
S00°57'53"E
AutoCAD SHX Text
1377.60'
AutoCAD SHX Text
S50°49'59"W
AutoCAD SHX Text
223.39'
AutoCAD SHX Text
N39°41'18"W
AutoCAD SHX Text
695.16'
AutoCAD SHX Text
N41°00'36"W
AutoCAD SHX Text
304.97'
AutoCAD SHX Text
N39°28'08"W
AutoCAD SHX Text
82.87'
AutoCAD SHX Text
N09°24'15"E
AutoCAD SHX Text
424.34'
AutoCAD SHX Text
N80°41'44"W
AutoCAD SHX Text
256.91'
AutoCAD SHX Text
S80°41'45"E
AutoCAD SHX Text
1013.16'
AutoCAD SHX Text
L1
AutoCAD SHX Text
N10°00'08"E
AutoCAD SHX Text
152.10'
AutoCAD SHX Text
N75°25'15"W
AutoCAD SHX Text
606.27'
AutoCAD SHX Text
N14°34'45"E
AutoCAD SHX Text
200.07'
AutoCAD SHX Text
N75°25'15"W
AutoCAD SHX Text
414.60'
AutoCAD SHX Text
206.70'
AutoCAD SHX Text
S83°37'42"E
AutoCAD SHX Text
231.55'
AutoCAD SHX Text
132.76'
AutoCAD SHX Text
61.19'
AutoCAD SHX Text
91.30'
AutoCAD SHX Text
484.11'
AutoCAD SHX Text
389.91'
AutoCAD SHX Text
623.10'
AutoCAD SHX Text
390.06'
AutoCAD SHX Text
366.80'
AutoCAD SHX Text
N74°59'24"E
AutoCAD SHX Text
225.00'
AutoCAD SHX Text
122.28'
AutoCAD SHX Text
Bk. 15192, Pg. 176
AutoCAD SHX Text
169.52'
AutoCAD SHX Text
Cynthia E. &
AutoCAD SHX Text
C2
AutoCAD SHX Text
C1
AutoCAD SHX Text
UP#71/2
AutoCAD SHX Text
N/F
AutoCAD SHX Text
UP#18
AutoCAD SHX Text
UP#19
AutoCAD SHX Text
UP#224/2
AutoCAD SHX Text
UP#27
AutoCAD SHX Text
UP#J28/9
AutoCAD SHX Text
UP#29
AutoCAD SHX Text
UP#30
AutoCAD SHX Text
UP#31
AutoCAD SHX Text
UP#8
AutoCAD SHX Text
#5 IRF W/ CAP
AutoCAD SHX Text
#2104 0.4' AG
AutoCAD SHX Text
#5 IRF W/ CAP
AutoCAD SHX Text
#2104 0.1' AG
AutoCAD SHX Text
#5 IRF W/ CAP
AutoCAD SHX Text
#1137 0.6' AG
AutoCAD SHX Text
3/4" IPF 0.6' AG
AutoCAD SHX Text
3/4" IPF 0.4' AG
AutoCAD SHX Text
#5 IRF W/ CAP
AutoCAD SHX Text
#1201 0.7' AG
AutoCAD SHX Text
1" IPF BENT 0.1' AG
AutoCAD SHX Text
#5 IRF 0.9' AG
AutoCAD SHX Text
1.5" IPF 0.7' AG
AutoCAD SHX Text
1" IPF 0.5' AG
AutoCAD SHX Text
3/4" IPF 0.2' AG
AutoCAD SHX Text
1/2" IPF 2.9' AG
AutoCAD SHX Text
1" IPF 1.0' AG
AutoCAD SHX Text
#5 IRF W/ CAP
AutoCAD SHX Text
#1201 0.8' AG
AutoCAD SHX Text
#5 IRF W/ CAP
AutoCAD SHX Text
#1387 1.4' AG
AutoCAD SHX Text
STUMP W/ BARBWIRE
AutoCAD SHX Text
STUMP W/ BARBWIRE
AutoCAD SHX Text
#5 IRF W/ CAP 0.8' AG
AutoCAD SHX Text
#5 IRF W/ CAP
AutoCAD SHX Text
#1171 0.7' AG
AutoCAD SHX Text
#5 IRF W/ CAP
AutoCAD SHX Text
#1171 0.8' AG
AutoCAD SHX Text
#5 IRF W/ CAP
AutoCAD SHX Text
0.9' AG
AutoCAD SHX Text
STUMP W/ BARBWIRE
AutoCAD SHX Text
STUMP W/ BARBWIRE
AutoCAD SHX Text
STUMP W/ BARBWIRE
AutoCAD SHX Text
12" HEMLOCK W/ WIRE
AutoCAD SHX Text
8" MAPLE W/ WIRE
AutoCAD SHX Text
24" HEMLOCK W/ WIRE
AutoCAD SHX Text
N/F
AutoCAD SHX Text
Pet Haven
AutoCAD SHX Text
Cemetery Inc.
AutoCAD SHX Text
Bk. 2974, Pg. 278
AutoCAD SHX Text
N/F
AutoCAD SHX Text
Mystique A. Melancon
AutoCAD SHX Text
Maria Champagne
AutoCAD SHX Text
Bk. 16503, Pg. 205
AutoCAD SHX Text
N/F
AutoCAD SHX Text
Corey S. Zahares
AutoCAD SHX Text
Anna L. Newcomb
AutoCAD SHX Text
Bk. 8708, Pg. 76
AutoCAD SHX Text
N/F
AutoCAD SHX Text
Raymond J. &
AutoCAD SHX Text
Tina J. Theriault
AutoCAD SHX Text
Bk. 11482, Pg. 678
AutoCAD SHX Text
N/F
AutoCAD SHX Text
Kenneth R. Rice
AutoCAD SHX Text
Bk. 2682, Pg. 115
AutoCAD SHX Text
N/F
AutoCAD SHX Text
Kenneth R. Rice
AutoCAD SHX Text
Bk. 2682, Pg. 115
AutoCAD SHX Text
N/F
AutoCAD SHX Text
Edward R. Stockner
AutoCAD SHX Text
Elizabeth A. Peterson
AutoCAD SHX Text
Bk. 3934, Pg. 256
AutoCAD SHX Text
N/F
AutoCAD SHX Text
Edward A. &
AutoCAD SHX Text
Susan M. Kern
AutoCAD SHX Text
Bk. 4097, Pg. 8
AutoCAD SHX Text
N/F
AutoCAD SHX Text
Susan Kern Altman
AutoCAD SHX Text
Bk. 4094, Pg. 6
AutoCAD SHX Text
N/F
AutoCAD SHX Text
Larry W. & Janet D.
AutoCAD SHX Text
Hottinger
AutoCAD SHX Text
Bk. 15825, Pg. 508
AutoCAD SHX Text
N/F
AutoCAD SHX Text
Joseph & Sara
AutoCAD SHX Text
Johnson
AutoCAD SHX Text
N/F
AutoCAD SHX Text
Dean J. Metivier
AutoCAD SHX Text
Bk. 4842, Pg. 78
AutoCAD SHX Text
N/F
AutoCAD SHX Text
George G. Branco
AutoCAD SHX Text
Trustee
AutoCAD SHX Text
Bk. 14923, Pg. 179
AutoCAD SHX Text
N/F
AutoCAD SHX Text
Keith McKinnon
AutoCAD SHX Text
Bk. 9656, Pg. 116
AutoCAD SHX Text
Rebecca L. Williams
AutoCAD SHX Text
Bk. 16770, Pg. 71
AutoCAD SHX Text
N/F
AutoCAD SHX Text
John W. Lane
AutoCAD SHX Text
Bk. 10326, Pg. 129
AutoCAD SHX Text
168
AutoCAD SHX Text
178
AutoCAD SHX Text
178
AutoCAD SHX Text
178
AutoCAD SHX Text
176
AutoCAD SHX Text
174
AutoCAD SHX Text
170
AutoCAD SHX Text
168
AutoCAD SHX Text
166
AutoCAD SHX Text
164
AutoCAD SHX Text
160
AutoCAD SHX Text
162
AutoCAD SHX Text
174
AutoCAD SHX Text
176
AutoCAD SHX Text
170
AutoCAD SHX Text
166
AutoCAD SHX Text
164
AutoCAD SHX Text
166
AutoCAD SHX Text
168
AutoCAD SHX Text
162
AutoCAD SHX Text
164
AutoCAD SHX Text
168
AutoCAD SHX Text
164
AutoCAD SHX Text
166
AutoCAD SHX Text
164
AutoCAD SHX Text
164
AutoCAD SHX Text
166
AutoCAD SHX Text
166
AutoCAD SHX Text
166
AutoCAD SHX Text
164
AutoCAD SHX Text
164
AutoCAD SHX Text
164
AutoCAD SHX Text
TP
AutoCAD SHX Text
3
AutoCAD SHX Text
TP
AutoCAD SHX Text
TP
AutoCAD SHX Text
8
AutoCAD SHX Text
7
AutoCAD SHX Text
9
AutoCAD SHX Text
TP
AutoCAD SHX Text
TP
AutoCAD SHX Text
TP
AutoCAD SHX Text
10
AutoCAD SHX Text
11
AutoCAD SHX Text
TP
AutoCAD SHX Text
12
AutoCAD SHX Text
75.00'
AutoCAD SHX Text
133.00'
AutoCAD SHX Text
C4
AutoCAD SHX Text
C3
AutoCAD SHX Text
508.47'
AutoCAD SHX Text
L2
AutoCAD SHX Text
L4
AutoCAD SHX Text
L3
AutoCAD SHX Text
L5
AutoCAD SHX Text
L6
AutoCAD SHX Text
S74°59'24"W
AutoCAD SHX Text
323.20'
AutoCAD SHX Text
175.00'
AutoCAD SHX Text
1007.15'
AutoCAD SHX Text
119.75'
AutoCAD SHX Text
498.68'
AutoCAD SHX Text
753.23'
AutoCAD SHX Text
245.37
AutoCAD SHX Text
185.05'
AutoCAD SHX Text
250.07'
AutoCAD SHX Text
50' R.O.W.
AutoCAD SHX Text
GRADING & UTILITY
AutoCAD SHX Text
EASEMENT, SEE NOTE 32
AutoCAD SHX Text
257,585 S.F.
AutoCAD SHX Text
%%ULOT 5
AutoCAD SHX Text
A
AutoCAD SHX Text
B
AutoCAD SHX Text
C
AutoCAD SHX Text
D
AutoCAD SHX Text
DESIGNED
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
CHECKED
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
JOB. NO.
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
NO.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
REPRODUCTION OR REUSE OF THIS
AutoCAD SHX Text
DOCUMENT WITHOUT THE
AutoCAD SHX Text
EXPRESSED WRITTEN CONSENT
AutoCAD SHX Text
OF BH2M INC. IS PROHIBITED
AutoCAD SHX Text
OF SACO PLANNING BOARD.
AutoCAD SHX Text
THIS PLAN REVIEWED AND APPROVED BY THE CITY
AutoCAD SHX Text
CHAIR
AutoCAD SHX Text
DATE
AutoCAD SHX Text
I CERTIFY THAT THIS SURVEY CONFORMS
AutoCAD SHX Text
TO THE MAINE BOARD OF LICENSURE
AutoCAD SHX Text
FOR PROFESSIONAL LAND SURVEYORS
AutoCAD SHX Text
TECHNICAL STANDARDS OF PRACTICE FOR
AutoCAD SHX Text
A STANDARD BOUNDARY SURVEY WITH
AutoCAD SHX Text
THE FOLLOWING EXCEPTIONS:
AutoCAD SHX Text
NO SURVEYORS REPORT
AutoCAD SHX Text
ROBERT C. LIBBY JR. PLS #2190
AutoCAD SHX Text
ELECTRIC/TELEPHONE:
AutoCAD SHX Text
12.
AutoCAD SHX Text
OVERHEAD FROM LINCOLN ROAD (LOT 5)
AutoCAD SHX Text
MIN. STANDARDS C-1:
AutoCAD SHX Text
WATER SERVICE:
AutoCAD SHX Text
SEWER SERVICE:
AutoCAD SHX Text
10.
AutoCAD SHX Text
11.
AutoCAD SHX Text
9.
AutoCAD SHX Text
SETBACKS - 30' FRONT, 25' SIDE & REAR
AutoCAD SHX Text
LOT SIZE - 80,000 S.F. (UNSEWERED)
AutoCAD SHX Text
FRONTAGE - 200'
AutoCAD SHX Text
INDIVIDUAL SUBSURFACE DISPOSAL SYSTEM
AutoCAD SHX Text
INDIVIDUAL DRILLED WELLS
AutoCAD SHX Text
TAX MAP REFERENCE:
AutoCAD SHX Text
PROPOSED USE:
AutoCAD SHX Text
PROJECT AREA:
AutoCAD SHX Text
ZONING:
AutoCAD SHX Text
DEED REFERENCE:
AutoCAD SHX Text
6.
AutoCAD SHX Text
7.
AutoCAD SHX Text
8.
AutoCAD SHX Text
4.
AutoCAD SHX Text
5.
AutoCAD SHX Text
SURVEYOR:
AutoCAD SHX Text
2.
AutoCAD SHX Text
NOTES:
AutoCAD SHX Text
OWNER/APPLICANT:
AutoCAD SHX Text
1.
AutoCAD SHX Text
23.404 ACRES
AutoCAD SHX Text
BK. 17509, PG. 369
AutoCAD SHX Text
MAP 101, LOT 31-2
AutoCAD SHX Text
5 LOT SUBDIVISION
AutoCAD SHX Text
C-1 CONSERVATION
AutoCAD SHX Text
GORHAM, MAINE 04038
AutoCAD SHX Text
28 STATE STREET
AutoCAD SHX Text
ROBERT C. LIBBY JR., PLS #2190
AutoCAD SHX Text
BH2M
AutoCAD SHX Text
OLD ORCHARD BEACH, MAINE
AutoCAD SHX Text
3 FIERO DRIVE
AutoCAD SHX Text
CVS FOUNDATIONS, LLC
AutoCAD SHX Text
UNDERGROUND (LOTS 1-4)
AutoCAD SHX Text
SCALE: 1" = 2 MILES
AutoCAD SHX Text
LOCATION MAP
AutoCAD SHX Text
SCARBOROUGH
AutoCAD SHX Text
SACO
AutoCAD SHX Text
I95
AutoCAD SHX Text
RIVER ROAD
AutoCAD SHX Text
RTE 112
AutoCAD SHX Text
I195
AutoCAD SHX Text
JENKINS RD
AutoCAD SHX Text
RTE 1
AutoCAD SHX Text
RTE 98
AutoCAD SHX Text
SMUTTY LN
AutoCAD SHX Text
RTE 5
AutoCAD SHX Text
SACO RIVER
AutoCAD SHX Text
HEATH RD
AutoCAD SHX Text
FLAG POND RD
AutoCAD SHX Text
GRANT RD
AutoCAD SHX Text
MCKENNEY RD
AutoCAD SHX Text
LINCOLN RD
AutoCAD SHX Text
RICKER RD
AutoCAD SHX Text
BROADTURN RD
AutoCAD SHX Text
ASH
AutoCAD SHX Text
SWAMP
AutoCAD SHX Text
RD
AutoCAD SHX Text
CUMERLAND CO
AutoCAD SHX Text
YORK CO
AutoCAD SHX Text
WATSON
AutoCAD SHX Text
MILL
AutoCAD SHX Text
RD
AutoCAD SHX Text
BUXTON
AutoCAD SHX Text
DAYTON
AutoCAD SHX Text
SIMPSON
AutoCAD SHX Text
RD
AutoCAD SHX Text
LORD RD
AutoCAD SHX Text
MAGNETIC
AutoCAD SHX Text
SITE
AutoCAD SHX Text
HEMLOCK WITH WIRE
AutoCAD SHX Text
MAPLE WITH WIRE
AutoCAD SHX Text
EXISTING CONTOUR
AutoCAD SHX Text
NOW OR FORMERLY
AutoCAD SHX Text
ABOVE GROUND
AutoCAD SHX Text
EDGE OF PAVEMENT
AutoCAD SHX Text
PROPERTY LINE
AutoCAD SHX Text
WELL LOCATION
AutoCAD SHX Text
UTILITY POLE
AutoCAD SHX Text
5/8" IRON ROD W/ CAP TO BE SET
AutoCAD SHX Text
IRON PIPE/ROD FOUND
AutoCAD SHX Text
GRANITE MONUMENT FOUND
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
W
AutoCAD SHX Text
130
AutoCAD SHX Text
N/F
AutoCAD SHX Text
A.G.
AutoCAD SHX Text
IPF/IRF
AutoCAD SHX Text
SYMBOL
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
WETLANDS/SITE
AutoCAD SHX Text
3.
AutoCAD SHX Text
PORTLAND, MAINE
AutoCAD SHX Text
MARK HAMPTON
AutoCAD SHX Text
MARK HAMPTON ASSOCIATES
AutoCAD SHX Text
EVALUATOR:
AutoCAD SHX Text
PLAN REFERENCE:
AutoCAD SHX Text
13.
AutoCAD SHX Text
"STANDARD BOUNDARY SURVEY, LAND TO
AutoCAD SHX Text
BE CONVEYED BY CLINTON N. FECTEAU TO
AutoCAD SHX Text
WILFRED ALLEN JR.", DATED 5-30-89, BY
AutoCAD SHX Text
GADBOIS & ASSOCIATES.
AutoCAD SHX Text
FAILURE TO COMMENCE SUBSTANTIAL CONSTRUCTION OF
AutoCAD SHX Text
THIS SUBDIVISION WITHIN TWO YEARS OF THE DATE OF APPROVAL
AutoCAD SHX Text
AND SIGNING OF THE PLAN SHALL RENDER THE PLAN NULL
AutoCAD SHX Text
AND VOID. ALL ROAD AND INFRASTRUCTURE CONSTRUCTION
AutoCAD SHX Text
THE NEED AND PLACEMENT OF STREET TREES SHALL BE
AutoCAD SHX Text
DETERMINED BY THE PARKS AND REC DIRECTOR DURING
AutoCAD SHX Text
ROADWAY CONSTRUCTION.
AutoCAD SHX Text
TRAFFIC ESTIMATE:
AutoCAD SHX Text
9.57 TRIPS/LOT/DAY
AutoCAD SHX Text
5 LOTS x 9.57 = 47.85 TRIPS/DAY
AutoCAD SHX Text
16.
AutoCAD SHX Text
17.
AutoCAD SHX Text
18.
AutoCAD SHX Text
DENSITY:
AutoCAD SHX Text
SUBDIVISION NET DENSITY
AutoCAD SHX Text
PROJECT AREA
AutoCAD SHX Text
WETLANDS
AutoCAD SHX Text
R.O.W.
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
1,019,489 S.F.
AutoCAD SHX Text
447,426 S.F.
AutoCAD SHX Text
60,461 S.F.
AutoCAD SHX Text
511,602
AutoCAD SHX Text
80,000
AutoCAD SHX Text
= 6.4 LOTS
AutoCAD SHX Text
19.
AutoCAD SHX Text
BENCHMARK:
AutoCAD SHX Text
14.
AutoCAD SHX Text
SPIKE SET IN BASE OF UTILITY POLE 27
AutoCAD SHX Text
DRIVEWAY LOCATIONS SHALL BE REVIEWED AND APPROVED BY
AutoCAD SHX Text
THE DEPARTMENT OF PUBLIC WORKS AS PART OF THE BUILDING
AutoCAD SHX Text
20.
AutoCAD SHX Text
UNTIL SUCH TIME THAT THE STORMWATER FACILITIES ARE OFFERED
AutoCAD SHX Text
AND ACCEPTED BY THE CITY, THE APPLICANT SHALL BE REQUIRED
AutoCAD SHX Text
TO PERFORM ROUTINE INSPECTION AND MAINTENANCE OF THE
AutoCAD SHX Text
STORMWATER FACILITIES AS OUTLINED IN THE OPERATIONS AND
AutoCAD SHX Text
21.
AutoCAD SHX Text
MAINTENANCE MANUAL DEVELOPED SPECIFICALLY FOR THE SITE.
AutoCAD SHX Text
A COPY OF THE ANNUAL INSPECTION AND MAINTENANCE REPORT
AutoCAD SHX Text
INCLUDING INSPECTION LOG(S) SHALL BE SUBMITTED ANNUALLY
AutoCAD SHX Text
(BY JULY 15 OF EACH YEAR) TO THE CITY PUBLIC WORKS
AutoCAD SHX Text
LIMITED DISTURBANCE FOREST BUFFERS SHALL BE LEFT
AutoCAD SHX Text
UNDISTURBED EXCEPT FOR REMOVING DEAD OR DISEASED TREES.
AutoCAD SHX Text
22.
AutoCAD SHX Text
SLOPES >20%%%
AutoCAD SHX Text
THE APPLICANT SHALL, UPON BEGINNING CONSTRUCTION OF A
AutoCAD SHX Text
STREET WHICH INTERSECTS WITH A PUBLIC WAY, POST A SIGN OF
AutoCAD SHX Text
A SIZE NO SMALLER THAN TWO FEET BY THREE FEET AND WITH
AutoCAD SHX Text
TWO INCH LETTER IN BLACK ON A WHITE BACKGROUND, WHICH
AutoCAD SHX Text
STATES THE FOLLOWING THIS IS NOT A PUBLIC WAY OWNED BY THE
AutoCAD SHX Text
23.
AutoCAD SHX Text
511,602 S.F.
AutoCAD SHX Text
100 YEAR FLOOD
AutoCAD SHX Text
CITY OF SACO THE SIGN SHALL FURTHER IDENTIFY THE OWNER OF
AutoCAD SHX Text
PLAN WAIVERS:
AutoCAD SHX Text
APPROXIMATE DATUM ELEVATION 168.12
AutoCAD SHX Text
PERMIT PROCESS.
AutoCAD SHX Text
SECTION 5.2.2(16) SIDEWALKS, CURBS
AutoCAD SHX Text
SHALL BE COMPLETED PER THE APPROVED PLAN NO LATER
AutoCAD SHX Text
THAN 36 MONTHS AFTER THE POSTING OF THE FINANCIAL
AutoCAD SHX Text
GUARANTEE. ALL ROADS AND INFRASTRUCTURE INTENDED
AutoCAD SHX Text
FOR CITY ACCEPTANCE SHALL BE OFFERED TO THE CITY
AutoCAD SHX Text
WITHIN 90 DAYS AFTER THE END OF THE 36 MONTH PERIOD.
AutoCAD SHX Text
24.
AutoCAD SHX Text
DEPARTMENT.
AutoCAD SHX Text
THE WAY AND ITS ADDRESS.
AutoCAD SHX Text
0 S.F.
AutoCAD SHX Text
0 S.F.
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
NAVD 88 DATUM.
AutoCAD SHX Text
LIMIT OF WETLANDS
AutoCAD SHX Text
LINE/CURVE DATA
AutoCAD SHX Text
N09%%D07'37"E 50.00'
AutoCAD SHX Text
N74%%D59'24"E 30.00'
AutoCAD SHX Text
R=175.00', L=200.63'
AutoCAD SHX Text
R=125.00', L=142.30'
AutoCAD SHX Text
C2 -
AutoCAD SHX Text
C1 -
AutoCAD SHX Text
L2 -
AutoCAD SHX Text
L1 -
AutoCAD SHX Text
S15%%D00'36"E 50.00'
AutoCAD SHX Text
L3 -
AutoCAD SHX Text
N74%%D59'24"E 30.00'
AutoCAD SHX Text
L4 -
AutoCAD SHX Text
S15%%D00'36"E 61.67'
AutoCAD SHX Text
L5 -
AutoCAD SHX Text
L6 -
AutoCAD SHX Text
S74%%D59'24"W 50.00'
AutoCAD SHX Text
TOPOGRAPHY:
AutoCAD SHX Text
15.
AutoCAD SHX Text
STATE OF MAINE GIS DATUM (2' INCREMENTS)
AutoCAD SHX Text
WETLAND IMPACTS:
AutoCAD SHX Text
3,891 S.F.
AutoCAD SHX Text
25.
AutoCAD SHX Text
FIRE PROTECTION:
AutoCAD SHX Text
ON SITE FIRE CISTERN, SEE NOTE 30
AutoCAD SHX Text
26.
AutoCAD SHX Text
PRIOR TO THE ISSUANCE OF A BUILDING PERMIT, THE APPLICANT
AutoCAD SHX Text
SHALL SUBMIT A PLOT PLAN FOR EACH LOT SHOWING BUILDING,
AutoCAD SHX Text
DRIVEWAY LOCATION, SITE GRADING AND ALL SITE CONSTRAINTS.
AutoCAD SHX Text
27.
AutoCAD SHX Text
YORK ss REGISTRY OF DEEDS
AutoCAD SHX Text
RECEIVED%%U %%U 20%%U
AutoCAD SHX Text
AT%%U %%UH%%U %%UM%%U %%UM., AND
AutoCAD SHX Text
RECORDED IN BOOK %%U %%UPAGE %%U
AutoCAD SHX Text
ATTEST:
AutoCAD SHX Text
%%U
AutoCAD SHX Text
REGISTER
AutoCAD SHX Text
THE CITY OF SACO HAS THE RIGHT TO ACCESS UTILITY/STORMWATER
AutoCAD SHX Text
EASEMENT FOR INSPECTION. NO BUILDING, STRUCTURE OR
AutoCAD SHX Text
PERMANENT OBSTRUCTIONS (I.E. FENCES, RETAINING WALLS,
AutoCAD SHX Text
TREES, ETC.) SHALL BE ERECTED WITHIN SAID EASEMENT WITHOUT
AutoCAD SHX Text
PRIOR CONSENT BY THE CITY OF SACO. THE PROPERTY OWNERS
AutoCAD SHX Text
SHALL BE RESPONSIBLE FOR ALL COSTS TO REMOVE NON-
AutoCAD SHX Text
PERMITTED ACTIVITIES WITHIN THE EASEMENT AREA.
AutoCAD SHX Text
28.
AutoCAD SHX Text
R=20.00', L=31.42'
AutoCAD SHX Text
C3 -
AutoCAD SHX Text
R=20.00', L=31.42'
AutoCAD SHX Text
C4 -
AutoCAD SHX Text
FUTURE BUILDERS, OF INDIVIDUAL LOT DEVELOPMENT, SHALL ADHERE
AutoCAD SHX Text
TO ALL PLAN REQUIREMENTS AND CONDITIONS OF APPROVAL AS
AutoCAD SHX Text
THEY APPLY.
AutoCAD SHX Text
29.
AutoCAD SHX Text
THE FIRE CISTERN TANK SHALL BE INSTALLED IN ACCORDANCE WITH
AutoCAD SHX Text
THE SACO FIRE DEPARTMENT STANDARDS. A MANUFACTURER'S
AutoCAD SHX Text
SUBMITTAL FOR THE FIRE CISTERN TANK AND APPURTENANCES
AutoCAD SHX Text
SHALL BE SUBMITTED TO THE SACO FIRE DEPT. FOR REVIEW AND
AutoCAD SHX Text
APPROVAL PRIOR TO ORDERING THE STRUCTURE. CITY OF SACO
AutoCAD SHX Text
HAS THE RIGHT TO ACCESS, REPAIR AND MAINTAIN FIRE CISTERN
AutoCAD SHX Text
TANK AND APPURTENANCES WITHIN THE 40'x50' EASEMENT SHOWN.
AutoCAD SHX Text
30.
AutoCAD SHX Text
3
AutoCAD SHX Text
9/18/18
AutoCAD SHX Text
Rev'd. Per City Depts. Review (9-14-18 Memo)
AutoCAD SHX Text
N14%%D34'45"E 50.00'
AutoCAD SHX Text
L7 -
AutoCAD SHX Text
4
AutoCAD SHX Text
10/19/18
AutoCAD SHX Text
Cluster Layout
AutoCAD SHX Text
APPLICANT SHALL PLACE LANDSCAPE BOULDERS, APPROXIMATELY
AutoCAD SHX Text
4' DIAMETER, AT 50' O.C.%%P TO DESIGNATE MAPPED WETLANDS
AutoCAD SHX Text
31.
AutoCAD SHX Text
IN AREAS OF BUILDING WINDOWS.
AutoCAD SHX Text
5
AutoCAD SHX Text
10/29/18
AutoCAD SHX Text
Revised per City Comments
AutoCAD SHX Text
ROBERT
AutoCAD SHX Text
C.
AutoCAD SHX Text
LIBBY, JR.
AutoCAD SHX Text
2190
AutoCAD SHX Text
U
AutoCAD SHX Text
O
AutoCAD SHX Text
F
AutoCAD SHX Text
M
AutoCAD SHX Text
A
AutoCAD SHX Text
I
AutoCAD SHX Text
N
AutoCAD SHX Text
E
AutoCAD SHX Text
S
AutoCAD SHX Text
T
AutoCAD SHX Text
A
AutoCAD SHX Text
T
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
S
AutoCAD SHX Text
V
AutoCAD SHX Text
Y
AutoCAD SHX Text
O
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
L
AutoCAD SHX Text
D
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
F
AutoCAD SHX Text
E
AutoCAD SHX Text
O
AutoCAD SHX Text
P
AutoCAD SHX Text
R
AutoCAD SHX Text
N
AutoCAD SHX Text
A
AutoCAD SHX Text
I
AutoCAD SHX Text
O
AutoCAD SHX Text
L
AutoCAD SHX Text
R=20.00', L=31.42'
AutoCAD SHX Text
C5 -
AutoCAD SHX Text
R=20.00', L=31.42'
AutoCAD SHX Text
C6 -
AutoCAD SHX Text
R=20.00', L=29.83'
AutoCAD SHX Text
C7 -
AutoCAD SHX Text
S72%%D25'15"E 50.00'
AutoCAD SHX Text
L8 -
AutoCAD SHX Text
S14%%D34'45"W 50.00'
AutoCAD SHX Text
L9 -
AutoCAD SHX Text
32.
AutoCAD SHX Text
S72%%D25'15"E 50.00'
AutoCAD SHX Text
L10 -
AutoCAD SHX Text
6
AutoCAD SHX Text
12/17/18
AutoCAD SHX Text
Revised per City Comments
AutoCAD SHX Text
A GRADING EASEMENT AT LOT 1 (15') AND LOTS 3 & 4 (20'), ALONG
AutoCAD SHX Text
ELOISES WAY SHALL BE GRANTED TO THE CITY OF SACO AS PART
AutoCAD SHX Text
OF ANY FUTURE ACCEPTANCE OF THE PUBLIC ROADWAY.
AutoCAD SHX Text
7
AutoCAD SHX Text
1/7/19
AutoCAD SHX Text
Revised per City Comments
AutoCAD SHX Text
8
AutoCAD SHX Text
1/30/19
AutoCAD SHX Text
Revised per City 1/22 Comments
AutoCAD SHX Text
SECTION 10.11.2 THRU STREET
AutoCAD SHX Text
9
AutoCAD SHX Text
2/6/19
AutoCAD SHX Text
Revised per Planning Board Review
AutoCAD SHX Text
MAINE STATE COORDINATE DATA
AutoCAD SHX Text
PROPERTY CORNER
AutoCAD SHX Text
NORTHING
AutoCAD SHX Text
EASTING
AutoCAD SHX Text
A
AutoCAD SHX Text
B
AutoCAD SHX Text
C
AutoCAD SHX Text
D
AutoCAD SHX Text
270409.5204
AutoCAD SHX Text
270136.5644
AutoCAD SHX Text
268811.3018
AutoCAD SHX Text
269252.8091
AutoCAD SHX Text
2877255.1454
AutoCAD SHX Text
2878258.2991
AutoCAD SHX Text
2878634.4199
AutoCAD SHX Text
2877617.0050
AutoCAD SHX Text
10
AutoCAD SHX Text
3/13/19
AutoCAD SHX Text
Revised per DPW Comments
Page 33: Planning and Development Emily Cole-Prescott Saco City ... Meeting Pac… · 2. Baxter Lane: Street Acceptance Recommendation Request a. Memo from City Planner b. Letter, Warranty

Gorh

am, M

aine

040

3828

Sta

te S

tree

tFa

x (2

07) 8

39-8

250

Berr

y, H

uff,

McD

onal

d, M

illig

an In

c.

BH

2MEn

gine

ers,

Surv

eyor

s

Tel.

(207

) 839

-277

1

40'0 80'40'

Scale: 1" = 40'

2

Old

Orc

hard

Bea

ch, M

aine

040

641

Fier

o D

rive

CV

S Fo

unda

tions

, LLC

FOR

ELO

ISES

PLA

CE

RO

AD

WA

Y P

RO

FILE

LIN

CO

LN R

DSA

CO

, MA

INE

Feb. 2018

As Noted

18026A. Morrell

Dept.

W. Pelkey

G:\

2018

\18

026

\Pr

ofile

.dwg

, 3/

14/

2019

3:5

0:0

7 PM

, DW

G To

PDF

.pc3

AutoCAD SHX Text
PROP. 15" S.D.
AutoCAD SHX Text
PROP. 15" S.D.
AutoCAD SHX Text
END STA. 10+44.3
AutoCAD SHX Text
ELEV. 166.43
AutoCAD SHX Text
Susan Kern Altman
AutoCAD SHX Text
Bk. 4094, Pg. 6
AutoCAD SHX Text
N/F
AutoCAD SHX Text
Larry W. & Janet D.
AutoCAD SHX Text
Hottinger
AutoCAD SHX Text
Bk. 15825, Pg. 508
AutoCAD SHX Text
166
AutoCAD SHX Text
167
AutoCAD SHX Text
167
AutoCAD SHX Text
166
AutoCAD SHX Text
168
AutoCAD SHX Text
168
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
T
AutoCAD SHX Text
166
AutoCAD SHX Text
167
AutoCAD SHX Text
167
AutoCAD SHX Text
DESIGNED
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
CHECKED
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
JOB. NO.
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
NO.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
REPRODUCTION OR REUSE OF THIS
AutoCAD SHX Text
DOCUMENT WITHOUT THE
AutoCAD SHX Text
EXPRESSED WRITTEN CONSENT
AutoCAD SHX Text
OF BH2M INC. IS PROHIBITED
AutoCAD SHX Text
R=150.00'
AutoCAD SHX Text
L=171.96'
AutoCAD SHX Text
T=46.83'
AutoCAD SHX Text
PC=4+04.56
AutoCAD SHX Text
PT=5+76.53
AutoCAD SHX Text
C CURVE
AutoCAD SHX Text
C CURVE DATA
AutoCAD SHX Text
L
AutoCAD SHX Text
INSTALL STABILIZED CONSTRUCTION ENTRANCE
AutoCAD SHX Text
PRIOR TO CONSTRUCTION, SEE DETAIL.
AutoCAD SHX Text
INSTALL SILT FENCE PRIOR TO CONSTRUCTION.
AutoCAD SHX Text
1.
AutoCAD SHX Text
2.
AutoCAD SHX Text
NOTES:
AutoCAD SHX Text
3.
AutoCAD SHX Text
ENTRANCE.
AutoCAD SHX Text
SAWCUT EXISTING PAVEMENT AT PROJECT
AutoCAD SHX Text
%%uLEGEND
AutoCAD SHX Text
E
AutoCAD SHX Text
160
AutoCAD SHX Text
160
AutoCAD SHX Text
T
AutoCAD SHX Text
UNDERGROUND ELECTRIC
AutoCAD SHX Text
STORM DRAIN
AutoCAD SHX Text
SILT FENCE
AutoCAD SHX Text
EXISTING CONTOUR
AutoCAD SHX Text
PROPOSED CONTOUR
AutoCAD SHX Text
TRANFORMER PAD
AutoCAD SHX Text
UTILITY POLE
AutoCAD SHX Text
L
AutoCAD SHX Text
PROFILE
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
VERTICAL: 1' = 10'
AutoCAD SHX Text
HORIZONTAL: 1" = 40'
AutoCAD SHX Text
SILT FENCE, SEE DETAIL
AutoCAD SHX Text
24' BITUMINOUS ROADWAY
AutoCAD SHX Text
W/4' GRAVEL SHOULDERS
AutoCAD SHX Text
UNDERGROUND ELECTRIC,
AutoCAD SHX Text
CABLE TV AND TELEPHONE
AutoCAD SHX Text
Existing Utility Pole
AutoCAD SHX Text
PIPE OUTLET PROTECTION
AutoCAD SHX Text
SEE DETAIL, INV. 161.50
AutoCAD SHX Text
15" S.D., L=68'
AutoCAD SHX Text
S=0.004'/FT., INV. 162.20
AutoCAD SHX Text
CHECK DAM CULVERT
AutoCAD SHX Text
INLET TYP., SEE DETAIL
AutoCAD SHX Text
STREET/STOP SIGN
AutoCAD SHX Text
STABILIZED CONSTRUCTION
AutoCAD SHX Text
ENTRANCE, SEE DETAIL
AutoCAD SHX Text
SAWCUT PAV'T. EDGE
AutoCAD SHX Text
SIGHT DIST. 550'+
AutoCAD SHX Text
SIGHT DIST. 550'+
AutoCAD SHX Text
35 MPH ZONE
AutoCAD SHX Text
LINCOLN ROAD
AutoCAD SHX Text
ELOISES WAY
AutoCAD SHX Text
2:1 SLOPE
AutoCAD SHX Text
Ex. 12" CMP, Inv. 161.12
AutoCAD SHX Text
15" S.D., L=50',
AutoCAD SHX Text
S=0.014'/FT., INV. 162.20
AutoCAD SHX Text
Ex. 12" CMP
AutoCAD SHX Text
REMOVE
AutoCAD SHX Text
LEVEL LIP SPREADER,
AutoCAD SHX Text
LIP EL. 161.50, SEE DETAIL
AutoCAD SHX Text
LOT 1
AutoCAD SHX Text
LOT 2
AutoCAD SHX Text
LOT 3
AutoCAD SHX Text
LOT 4
AutoCAD SHX Text
25' x 75' FOREST BUFFER
AutoCAD SHX Text
FOREST BUFFER
AutoCAD SHX Text
N/F
AutoCAD SHX Text
Hottinger
AutoCAD SHX Text
N/F
AutoCAD SHX Text
Hottinger
AutoCAD SHX Text
STA. 9+78.33
AutoCAD SHX Text
R=20' TYP.
AutoCAD SHX Text
166.4
AutoCAD SHX Text
PIPE OUTLET PROTECTION
AutoCAD SHX Text
SEE DETAIL, INV. 161.90
AutoCAD SHX Text
2:1 SLOPE
AutoCAD SHX Text
STONE CHECK
AutoCAD SHX Text
DAM, SEE DETAIL
AutoCAD SHX Text
WETLAND IMPACT B - 1731 S.F.
AutoCAD SHX Text
WETLAND IMPACT A - 2160 S.F.
AutoCAD SHX Text
PROPOSED C GRADE
AutoCAD SHX Text
L
AutoCAD SHX Text
Existing C Grade
AutoCAD SHX Text
L
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
G
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
N
AutoCAD SHX Text
E
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
T
AutoCAD SHX Text
A
AutoCAD SHX Text
O
AutoCAD SHX Text
F
AutoCAD SHX Text
R
AutoCAD SHX Text
P
AutoCAD SHX Text
ANDREW S.
AutoCAD SHX Text
E
AutoCAD SHX Text
F
AutoCAD SHX Text
I
AutoCAD SHX Text
O
AutoCAD SHX Text
A
AutoCAD SHX Text
M
AutoCAD SHX Text
No. 13285
AutoCAD SHX Text
MORRELL
AutoCAD SHX Text
D
AutoCAD SHX Text
E
AutoCAD SHX Text
N
AutoCAD SHX Text
S
AutoCAD SHX Text
E
AutoCAD SHX Text
C
AutoCAD SHX Text
I
AutoCAD SHX Text
L
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
S
AutoCAD SHX Text
N
AutoCAD SHX Text
E
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
L
AutoCAD SHX Text
O
AutoCAD SHX Text
S
AutoCAD SHX Text
I
AutoCAD SHX Text
"DEAD END" SIGN
AutoCAD SHX Text
STREET LIGHT, PER CITY STANDARD
AutoCAD SHX Text
FIRE TANK, SEE SHT. 4
AutoCAD SHX Text
R=20'
AutoCAD SHX Text
DRIVEWAY ACCESS
AutoCAD SHX Text
EXCLUSION AREA
AutoCAD SHX Text
DRIVEWAY ACCESS
AutoCAD SHX Text
EXCLUSION AREA
AutoCAD SHX Text
3
AutoCAD SHX Text
9/18/18
AutoCAD SHX Text
Rev'd. Per City Depts. Review (9-14-18 Memo)
AutoCAD SHX Text
GANG MAILBOXES
AutoCAD SHX Text
8'x30' TURNOUT
AutoCAD SHX Text
DRIVEWAY CULVERTS
AutoCAD SHX Text
LOT #
AutoCAD SHX Text
CULV. SIZE
AutoCAD SHX Text
APPROX. LOCATION
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
3
AutoCAD SHX Text
4
AutoCAD SHX Text
NONE
AutoCAD SHX Text
NONE
AutoCAD SHX Text
15"
AutoCAD SHX Text
15"
AutoCAD SHX Text
STA. 9+40
AutoCAD SHX Text
TURN AROUND
AutoCAD SHX Text
STA. 8+50
AutoCAD SHX Text
STA. 7+25
AutoCAD SHX Text
10'
AutoCAD SHX Text
20'
AutoCAD SHX Text
10'
AutoCAD SHX Text
10'
AutoCAD SHX Text
4
AutoCAD SHX Text
10/19/18
AutoCAD SHX Text
Cluster Layout
AutoCAD SHX Text
5
AutoCAD SHX Text
10/29/18
AutoCAD SHX Text
Revised per City Comments
AutoCAD SHX Text
6
AutoCAD SHX Text
12/17/18
AutoCAD SHX Text
Revised per City Comments
AutoCAD SHX Text
7
AutoCAD SHX Text
1/7/19
AutoCAD SHX Text
Revised per City Comments
AutoCAD SHX Text
LOT 2 DRIVEWAY LOCATION
AutoCAD SHX Text
(SIZED FOR 50 - YEAR STORM EVENT)
AutoCAD SHX Text
8
AutoCAD SHX Text
1/30/19
AutoCAD SHX Text
Revised per City 1/22 Comments
AutoCAD SHX Text
9
AutoCAD SHX Text
2/6/19
AutoCAD SHX Text
Revised per Planning Board Review
AutoCAD SHX Text
DITCH AT 1%%%
AutoCAD SHX Text
DITCH AT 0.7%%%
AutoCAD SHX Text
DITCH AT 0.4%%%
AutoCAD SHX Text
10
AutoCAD SHX Text
3/13/19
AutoCAD SHX Text
Revised per DPW Comments
AutoCAD SHX Text
Revised per DPW Comments
Page 34: Planning and Development Emily Cole-Prescott Saco City ... Meeting Pac… · 2. Baxter Lane: Street Acceptance Recommendation Request a. Memo from City Planner b. Letter, Warranty

Gorh

am, M

aine

040

3828

Sta

te S

tree

tFa

x (2

07) 8

39-8

250

Berr

y, H

uff,

McD

onal

d, M

illig

an In

c.

BH

2MEn

gine

ers,

Surv

eyor

s

Tel.

(207

) 839

-277

1

3

Old

Orc

hard

Bea

ch, M

aine

040

641

Fier

o D

rive

CV

S Fo

unda

tions

, LLC

FOR

ELO

ISES

PLA

CE

ERO

SIO

N C

ON

TRO

L

LIN

CO

LN R

DSA

CO

, MA

INE

Feb. 2018

As Noted

18026A. Morrell

Dept.

W. Pelkey

DET

AIL

S

G:\

2018

\18

026

\De

tails

A.d

wg, 3

/14

/20

19 3

:52:

01 P

M, D

WG

To P

DF.p

c3

AutoCAD SHX Text
DESIGNED
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
CHECKED
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
JOB. NO.
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
NO.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
REPRODUCTION OR REUSE OF THIS
AutoCAD SHX Text
DOCUMENT WITHOUT THE
AutoCAD SHX Text
EXPRESSED WRITTEN CONSENT
AutoCAD SHX Text
OF BH2M INC. IS PROHIBITED
AutoCAD SHX Text
FLOW
AutoCAD SHX Text
2:1
AutoCAD SHX Text
2'
AutoCAD SHX Text
3:1
AutoCAD SHX Text
12"
AutoCAD SHX Text
15"
AutoCAD SHX Text
18"
AutoCAD SHX Text
24"
AutoCAD SHX Text
30"
AutoCAD SHX Text
7'
AutoCAD SHX Text
8'
AutoCAD SHX Text
7'
AutoCAD SHX Text
7'
AutoCAD SHX Text
7'
AutoCAD SHX Text
DIA.
AutoCAD SHX Text
R
AutoCAD SHX Text
PIPE
AutoCAD SHX Text
R
AutoCAD SHX Text
A
AutoCAD SHX Text
CULVERT
AutoCAD SHX Text
CULVERT
AutoCAD SHX Text
GEOTEXTILE
AutoCAD SHX Text
NTS
AutoCAD SHX Text
SECTION A-A
AutoCAD SHX Text
TEMPORARY CHECK DAM
AutoCAD SHX Text
PLAN VIEW
AutoCAD SHX Text
2'
AutoCAD SHX Text
A
AutoCAD SHX Text
1.
AutoCAD SHX Text
2.
AutoCAD SHX Text
3.
AutoCAD SHX Text
4.
AutoCAD SHX Text
5.
AutoCAD SHX Text
6.
AutoCAD SHX Text
USE 2" TO 3" STONE.
AutoCAD SHX Text
PLACE STONE OVER GEOTEXTILE.
AutoCAD SHX Text
ONCE THE AREAS UPSTREAM FROM THE CHECK DAM ARE
AutoCAD SHX Text
THE CHECK DAMS SHALL BE FLATTENED AND GRADED IN
AutoCAD SHX Text
THE GEOTEXTILE SHALL BE DISPOSED OF OFFSITE.
AutoCAD SHX Text
THE AREA CONTRIBUTING TO THE CHECK DAM SHALL NOT
AutoCAD SHX Text
STABILIZED BY VEGETATION, THE SEDIMENT TRAPPED
AutoCAD SHX Text
BEHIND/WITHIN THE DAM SHALL BE RELOCATED TO AN
AutoCAD SHX Text
AREA UNDERGOING FINAL GRADING.
AutoCAD SHX Text
A MANNER WHICH PROTECTS THE AREA FROM EROSION
AutoCAD SHX Text
AND CHANNEL BLOCKAGE. (GEOTEXTILE MUST BE REMOVED)
AutoCAD SHX Text
EXCEED 10 ACRES.
AutoCAD SHX Text
AT CULVERT INLET
AutoCAD SHX Text
NTS
AutoCAD SHX Text
STABILIZED CONSTRUCTION ENTRANCE
AutoCAD SHX Text
PLAN
AutoCAD SHX Text
PROFILE
AutoCAD SHX Text
Ex. Pavement
AutoCAD SHX Text
Ex. Ground
AutoCAD SHX Text
12' MIN.
AutoCAD SHX Text
R=20' TYP.
AutoCAD SHX Text
DIVERSION RIDGE REQ'D. WHERE
AutoCAD SHX Text
Ex. Ground
AutoCAD SHX Text
Existing Pavement
AutoCAD SHX Text
PROPOSED GRADE EXCEEDS 2%%%
AutoCAD SHX Text
6" MIN. 2-3" DIA. STONE
AutoCAD SHX Text
FABRIC OR EQUAL
AutoCAD SHX Text
MIRAFI 600X FILTER
AutoCAD SHX Text
50' MIN.
AutoCAD SHX Text
5:1
AutoCAD SHX Text
5:1
AutoCAD SHX Text
5:1
AutoCAD SHX Text
3'
AutoCAD SHX Text
NOTES:
AutoCAD SHX Text
THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION THAT WILL PREVENT
AutoCAD SHX Text
TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC RIGHT OF WAYS. THIS MAY
AutoCAD SHX Text
REQUIRE TOP DRESSING, REPAIR AND/OR CLEANOUT OF ANY MEASURES USED
AutoCAD SHX Text
TO TRAP SEDIMENT.
AutoCAD SHX Text
WHEN NECESSARY, WHEELS SHALL BE CLEANED PRIOR TO ENTRANCE ONTO
AutoCAD SHX Text
PUBLIC RIGHT OF WAY.
AutoCAD SHX Text
WHEN WASHING IS REQUIRED, IT SHALL BE DONE ON AN AREA STABILIZED
AutoCAD SHX Text
WITH CRUSHED STONE THAT DRAINS INTO AN APPROVED SEDIMENT TRAP
AutoCAD SHX Text
OR SEDIMENT BASIN.
AutoCAD SHX Text
%%UHOUSEKEEPING;
AutoCAD SHX Text
1.
AutoCAD SHX Text
%%USPILL PREVENTION.%%U CONTROLS MUST BE USED TO PREVENT POLLUTANTS FROM BEING DISCHARGED FROM MATERIALS
AutoCAD SHX Text
ON SITE, INCLUDING STORAGE PRACTICES TO MINIMIZE EXPOSURE OF THE MATERIALS TO STORMWATER, AND
AutoCAD SHX Text
APPROPRIATE SPILL PREVENTION, CONTAINMENT, AND RESPONSE PLANNING AND IMPLEMENTATION.
AutoCAD SHX Text
%%UGROUNDWATER PROTECTION.%%U DURING CONSTRUCTION, LIQUID PETROLEUM PRODUCTS AND OTHER HAZARDOUS MATERIALS
AutoCAD SHX Text
WITH THE POTENTIAL TO CONTAMINATE GROUNDWATER MAY NOT BE STORED OR HANDLED IN AREAS OF THE SITE
AutoCAD SHX Text
DRAINING TO AN INFILTRATION AREA. AN "INFILTRATION AREA" IS ANY AREA OF THE SITE THAT BY DESIGN OR AS A
AutoCAD SHX Text
RESULT OF SOILS, TOPOGRAPHY, AND OTHER RELEVANT FACTORS ACCUMULATES RUNOFF THAT INFILTRATES INTO THE
AutoCAD SHX Text
SOIL. DIKES, BERMS, SUMPS, AND OTHER FORMS OF SECONDARY CONTAINMENT THAT PREVENT DISCHARGE TO
AutoCAD SHX Text
GROUNDWATER MAY BE USED TO ISOLATE PORTIONS OF THE SITE FOR THE PURPOSES OF STORAGE AND HANDLING OF
AutoCAD SHX Text
THESE MATERIALS.
AutoCAD SHX Text
%%UFUGITIVE SEDIMENT AND DUST.%%U ACTIONS MUST BE TAKEN TO ENSURE THAT ACTIVITIES DO NOT RESULT IN NOTICEABLE
AutoCAD SHX Text
EROSION OF SOILS OR FUGITIVE DUST EMISSIONS DURING OR AFTER CONSTRUCTION. OIL MY NOT BE USED FOR
AutoCAD SHX Text
DUST CONTROL.
AutoCAD SHX Text
%%UDEBRIS AND OTHER MATERIALS.%%U LITTER, CONSTRUCTION DEBRIS, AND CHEMICALS EXPOSED TO STORMWATER MUST BE
AutoCAD SHX Text
PREVENTED FROM BECOMING A POLLUTANT SOURCE.
AutoCAD SHX Text
%%UTRENCH OR FOUNDATION DE-WATERING.%%U TRENCH DE-WATERING IS THE REMOVAL OF WATER FROM TRENCHES, FOUNDATIONS,
AutoCAD SHX Text
COFFER DAMS, PONDS, AND OTHER AREAS WITHIN THE CONSTRUCTION AREA THAT RETAIN WATER AFTER EXCAVATION. IN
AutoCAD SHX Text
MOST CASES THE COLLECTED WATER IS HEAVILY SILTED AND HINDERS CORRECT SAFE CONSTRUCTION PRACTICES. THE
AutoCAD SHX Text
COLLECTED WATER MUST BE REMOVED FROM THE PONDED AREA, EITHER THROUGH GRAVITY OR PUMPING, AND MUST BE
AutoCAD SHX Text
SPREAD THROUGH NATURAL WOODED BUFFERS OR REMOVED TO AREAS THAT ARE SPECIFICALLY DESIGNED TO COLLECT THE
AutoCAD SHX Text
MAXIMUM AMOUNT OF SEDIMENT POSSIBLE, LIKE A COFFERDAM SEDIMENTATION BASIN AVOID ALLOWING THE WATER TO FLOW
AutoCAD SHX Text
OVER DISTURBED AREAS OF THE SITE. EQUIVALENT MEASURES MAY BE TAKEN IF APPROVED BY THE DEPARTMENT.
AutoCAD SHX Text
%%UNON-STORMWATER DISCHARGES.%%U IDENTIFY AND PREVENT CONTAMINATION BY NON-STORMWATER DISCHARGES.
AutoCAD SHX Text
%%UADDITIONAL REQUIREMENTS.%%U ADDITIONAL REQUIREMENTS MAY BE APPLIED ON A SITE-SPECIFIC BASIS.
AutoCAD SHX Text
2.
AutoCAD SHX Text
3.
AutoCAD SHX Text
4.
AutoCAD SHX Text
5.
AutoCAD SHX Text
6.
AutoCAD SHX Text
7.
AutoCAD SHX Text
8.
AutoCAD SHX Text
7.
AutoCAD SHX Text
SLOPES THAT ARE COVERED WITH RIPRAP MUST BE CONSTRUCTED BY THAT DATE.
AutoCAD SHX Text
ALL STONE LINED DITCHES AND CHANNELS MUST BE CONSTRUCTED AND STABILIZED.
AutoCAD SHX Text
3 POUNDS PER 1000 SQUARE FEET AND MULCHED.
AutoCAD SHX Text
AREAS TO BE PROTECTED WITH AN ANNUAL GRASS MUST BE SEEDED AT A SEEDING RATE OF
AutoCAD SHX Text
IF THE SLOPE IS STABILIZED WITH AN EROSION CONTROL BLANKET AND SEEDED. ALL DISTURBED
AutoCAD SHX Text
CONTROL BLANKET
AutoCAD SHX Text
ALL GRASS LINED DITCHES AND CHANNELS MUST BE STABILIZED WITH MULCH OR AN EROSION
AutoCAD SHX Text
ALL SLOPES MUST BE STABILIZED, SEEDED AND MULCHED.
AutoCAD SHX Text
ALL DISTURBED AREAS MUST BE SEEDED AND MULCHED.
AutoCAD SHX Text
NOVEMBER 15
AutoCAD SHX Text
OCTOBER 1
AutoCAD SHX Text
SEPTEMBER 15
AutoCAD SHX Text
STABILIZATION SCHEDULE BEFORE WINTER:
AutoCAD SHX Text
A MINIMUM OF 85 TO 90% OF AREAS VEGETATED WITH VIGOROUS GROWTH.
AutoCAD SHX Text
IN THE SPRING, INSPECT AND REPAIR ANY DAMAGES AND/OR BARE SPOTS. AN ESTABLISHED VEGETATIVE COVER MEANS
AutoCAD SHX Text
CONTINUOUS FUNCTION. FOLLOWING THE TEMPORARY AND/OR FINAL SEEDING AND MULCHING, THE CONTRACTOR SHALL,
AutoCAD SHX Text
INSPECTION OF ALL INSTALLED EROSION CONTROL MEASURES AND PERFORM REPAIRS AS NEEDED TO INSURE THEIR
AutoCAD SHX Text
RAINFALL, SNOW STORM OR PERIOD OF THAWING AND RUNOFF, THE SITE CONTRACTOR SHALL PERFORM A VISUAL
AutoCAD SHX Text
MAINTENANCE MEASURES SHALL BE APPLIED AS NEEDED DURING THE ENTIRE CONSTRUCTION SEASON. AFTER EACH
AutoCAD SHX Text
MAINTENANCE:
AutoCAD SHX Text
C.
AutoCAD SHX Text
B.
AutoCAD SHX Text
FROM MOVING THE MULCH OFF THE DISTURBED SOIL.
AutoCAD SHX Text
IMMEDIATELY AFTER APPLYING THE MULCH, ANCHOR THE MULCH WITH PLASTIC NETTING TO PREVENT WIND
AutoCAD SHX Text
150 POUNDS PER 1000 SQUARE FEET ON THE AREA SO THAT NO SOIL IS VISIBLE THROUGH THE MULCH.
AutoCAD SHX Text
BY NOVEMBER 15, MULCH THE DISTURBED SOIL BY SPREADING HAY OR STRAW AT A RATE OF AT LEAST
AutoCAD SHX Text
STABILIZE THE SOIL WITH MULCH:
AutoCAD SHX Text
DISTURBED SOIL.
AutoCAD SHX Text
BETWEEN THE SOD AND UNDERLYING SOIL, AND WATERING THE SOD TO PROMOTE ROOT GROWTH INTO THE
AutoCAD SHX Text
INCLUDES PINNING THE SOD ONTO THE SOIL WITH WIRE PINS, ROLLINIG THE SOD TO GUARANTEE CONTACT
AutoCAD SHX Text
STABILIZE THE DISTURBED SOIL WITH PROPERLY INSTALLED SOD BY OCTOBER 1. PROPER INSTALLATION
AutoCAD SHX Text
STABILIZE THE SOIL WITH SOD:
AutoCAD SHX Text
AS DESCRIBED BELOW.
AutoCAD SHX Text
75% OF THE DISTURBED SOILD BEFORE NOVEMBER 1, THEN MULCH THE AREA FOR OVER-WINTER PROTECTION
AutoCAD SHX Text
THE NEXT 30 DAYS. IF THE RYE FAILS TO GROW AT LEAST THREE INCHES OR FAILS TO COVER AT LEAST
AutoCAD SHX Text
SQUARE FEET, AND ANCHOR THE MULCH WITH PLASTIC NETTING. MONITOR GROWTH OF THE RYE OVER
AutoCAD SHX Text
1000 SQUARE FEET, LIGHTLY MULCH THE SEEDED SOIL WITH HAY OR STRAW AT 75 POUNDS PER 1000
AutoCAD SHX Text
BY OCTOBER 1, SEED THE DISTURBED SOIL WITH WINTER RYE AT A SEEDING RATE OF 3 POUNDS PER
AutoCAD SHX Text
STABILIZE THE SOIL WITH TEMPORARY VEGETATION:
AutoCAD SHX Text
A.
AutoCAD SHX Text
MUST BE TAKEN TO STABILIZE THE SOIL FOR LATE FALL AND WINTER.
AutoCAD SHX Text
MULCHED. IF THE DISTURBED AREAS ARE NOT STABILIZED BY THIS DATE, THEN ONE OF THE FOLLOWING ACTIONS
AutoCAD SHX Text
BY SEPTEMBER 15, ALL DISTURBED SOILS ON AREAS HAVING A SLOPE LESS THAN 15% MUST BE SEEDED AND
AutoCAD SHX Text
OVERWINTER STABILIZATION OF DISTURBED SOILS:
AutoCAD SHX Text
9.
AutoCAD SHX Text
C.
AutoCAD SHX Text
B.
AutoCAD SHX Text
6.
AutoCAD SHX Text
5.
AutoCAD SHX Text
STABILLIZATION BMP SECTION.
AutoCAD SHX Text
THE SLOPE AND TO DESIGN A FILTER LAYER FOR UNDERNEATH THE RIPRAP. SEE THE RIPRAP SLOPE
AutoCAD SHX Text
HIRE A REGISTERED PROFESSIONAL ENGINEER TO DETERMINE THE STONE SIZE NEEDED FOR STABILITY ON
AutoCAD SHX Text
PLACE A LAYER OF STONE RIPRAP ON THE SLOPE BY NOVEMBER 15. THE DEVELOPMENT'S OWNER WILL
AutoCAD SHX Text
STABILIZE THE SOIL WITH STONE RIPRAP:
AutoCAD SHX Text
GROUNDWATER SEEPS ON THE SLOPE FACE. SEE THE TEMPORARY MULCHING BMP SECTION.
AutoCAD SHX Text
USE EROSION CONTROL MIX TO STABILIZE SLOPES HAVING GREATER THAN 50% (2H:1V) OR HAVING
AutoCAD SHX Text
EROSION CONTROL MIX MUST BE PROPERLY INSTALLED BY NOVEMBER 15. THE CONTRACTOR WILL NOT
AutoCAD SHX Text
STABILIZE THE SOIL WITH EROSION CONTROL MIX:
AutoCAD SHX Text
GROUNDWATER SEEPS ON THE SLOPE FACE.
AutoCAD SHX Text
SOD INSTALLATION TO STABILIZE SLOPES HAVING A GRADE GREATER THAN 33% (3H:1V) OR HAVING
AutoCAD SHX Text
TO PROMOTE ROOT GROWTH INTO THE DISTURBED SOIL. THE CONTRACTOR WILL NOT USE LATE SEASON
AutoCAD SHX Text
THE SOD TO GUARANTEE CONTACT BETWEEN THE SOD AND UNDERLYING SOIL, AND WATERING THE SOD
AutoCAD SHX Text
INSTALLATION INCLUDES THE CONTRACTOR PINNING THE SOD ONTO THE SLOPE WITH WIRE PINS, ROLLING
AutoCAD SHX Text
THE DISTURBED SLOPE MUST BE STABILIZED WITH PROPERLY INSTALLED SOD BY OCTOBER 1. PROPER
AutoCAD SHX Text
STABILIZE THE SOIL WITH SOD:
AutoCAD SHX Text
A.
AutoCAD SHX Text
STANDARDS.
AutoCAD SHX Text
COVER THE SLOPE WITH A LAYER OF EROSION CONTROL MIX OR WITH STONE RIPRAP AS DESCRIBED IN THE FOLLOWING
AutoCAD SHX Text
THREE INCHES OR FAILS TO COVER AT LEAST 75% OF THE SLOPE BY NOVEMBER 1, THEN THE CONTRACTOR WILL
AutoCAD SHX Text
INSTALL EROSION CONTROL MATS OR ANCHORED MULCH OVER THE SEEDING. IF THE RYE FAILS TO GROW AT LEAST
AutoCAD SHX Text
SLOPE MUST BE SEEDED WITH WINTER RYE AT A SEEDING RATE OF 3 POUNDS PER 1000 SQUARE FEET AND THEN
AutoCAD SHX Text
STABILIZE THE SOIL WITH TEMPORARY VEGATATION AND EROSION CONTROL MATS. BY OCTOBER 1 THE DISTURBED
AutoCAD SHX Text
THEN ONE OF THE FOLLOWING ACTIONS MUST BE TAKEN TO STABILIZE THE SLOPE FOR LATE FALL AND WINTER.
AutoCAD SHX Text
A GRADE GREATER THAN 15% TO BE A SLOPE. IF A SLOPE TO BE VEGETATED IS NOT STABILIZED BY SEPTEMBER 1,
AutoCAD SHX Text
VEGETATED MUST BE SEEDED AND MULCHED BY SEPTEMBER 1. THE DEPARTMENT WILL CONSIDER ANY AREA HAVING
AutoCAD SHX Text
ALL STONE-COVERED SLOPES MUST BE CONSTRUCTED AND STABILIZED BY NOVEMBER 15. ALL SLOPES TO BE
AutoCAD SHX Text
OVERWINTER STABILIZATION OF DISTURBED SLOPES:
AutoCAD SHX Text
B.
AutoCAD SHX Text
REDUCING THE DITCH'S CROSS-SECTIONAL AREA.
AutoCAD SHX Text
WILL REGRADE THE DITCH PRIOR TO PLACING THE STONE LINING SO TO PREVENT THE STONE LINING FROM
AutoCAD SHX Text
ANTICIPATED FLOW VELOCITIES AND FLOW DEPTHS WITHIN THE DITCH. IF NECESSARY, THE CONTRACTOR
AutoCAD SHX Text
MUST BE HIRED TO DETERMINE THE STONE SIZE AND LINING THICKNESS NEEDED TO WITHSTAND THE
AutoCAD SHX Text
A DITCH MUST BE LINED WITH STONE RIPRAP BY NOVEMBER 15. A REGISTERED PROFESSIONAL ENGINEER
AutoCAD SHX Text
INSTALL A STONE LINING IN THE DITCH:
AutoCAD SHX Text
SOD FROM SLOUGHING DURING FLOW CONDITIONS. SEE THE PERMANENT VEGETATION BMP SECTION.
AutoCAD SHX Text
SOIL, AND ANCHORING SOD AT THE BASE OF THE DITCH WITH JUTE OR PLASTIC MESH TO PREVENT THE
AutoCAD SHX Text
THE SOD AND UNDERLYING SOIL, WATERING THE SOD TO PROMOTE ROOT GROWTH INTO THE DISTURBED
AutoCAD SHX Text
PINNING THE SOD ONTO THE SOIL WITH WIRE PINS, ROLLING THE SOD TO GUARANTEE CONTACT BETWEEN
AutoCAD SHX Text
A DITCH MUST BE LINED WITH PROPERLY INSTALLED SOD BY OCTOBER 1. PROPER INSTALLATION INCLUDES:
AutoCAD SHX Text
INSTALL A SOD LINING IN THE DITCH:
AutoCAD SHX Text
A.
AutoCAD SHX Text
DITCH FOR LATE FALL AND WINTER.
AutoCAD SHX Text
IS NOT GRASS-LINED BY SEPTEMBER 1, THEN ONE OF THE FOLLOWING ACTIONS MUST BE TAKEN TO STABILIZE THE
AutoCAD SHX Text
LINED DITCHES AND CHANNELS MUST BE CONSTRUCTED AND STABILIZED BY SEPTEMBER 1. IF A DITCH OR CHANNEL
AutoCAD SHX Text
ALL STONE-LINED DITCHES AND CHANNELS MUST BE CONSTRUCTED AND STABILIZED BY NOVEMBER 15. ALL GRASS
AutoCAD SHX Text
OVERWINTER STABILIZATION OF DITCHES AND CHANNELS:
AutoCAD SHX Text
OF PERMANENT STABILIZATION. PERMANENT STABILIZATION IS 90% GRASS CATCH IN VEGETATED AREAS.
AutoCAD SHX Text
MANUAL.
AutoCAD SHX Text
SHOULD BE INSTALLED PRIOR TO ANY SOIL DISTURBANCE OF THE CONTRIBUTING DRAINAGE AREA ABOVE THEM.
AutoCAD SHX Text
EROSION AND SEDIMENT CONTROL PLAN
AutoCAD SHX Text
DAYS OR PRIOR TO ANY STORM EVENT (THIS WOULD INCLUDE WETLANDS).
AutoCAD SHX Text
INSTALLATION. EROSION CONTROL MIX WILL REMAIN IN PLACE PER NOTE #5
AutoCAD SHX Text
SEEDING AS FOLLOWS:
AutoCAD SHX Text
SURFACE.
AutoCAD SHX Text
SEEDING UNTIL THE NEXT RECOMMENDED SEEDING PERIOD.
AutoCAD SHX Text
A RATE OF 3 TONS PER ACRE (138 LB PER 1,000 SQ. FT.).
AutoCAD SHX Text
SUBSTITUTED FOR SEED. SEED MIX SHALL CONTAIN 10% ANNUAL RYE GRASS.
AutoCAD SHX Text
MULCH
AutoCAD SHX Text
MULCH AND MULCH ANCHORING
AutoCAD SHX Text
BE USED IN ALL DITCHES AND SWALES AS SHOWN IN DETAILS.
AutoCAD SHX Text
(ANCHORED) *
AutoCAD SHX Text
CORNSTALKS
AutoCAD SHX Text
STEEP SLOPES
AutoCAD SHX Text
EQUAL TO 3:1)
AutoCAD SHX Text
MULCH ANCHORING
AutoCAD SHX Text
(GREATER THAN OR
AutoCAD SHX Text
(GREATER THAN OR EQUAL TO 3:1)
AutoCAD SHX Text
PROTECTED AREA STRAW OR HAY * 100 POUNDS
AutoCAD SHX Text
LOCATION MULCH RATE (1000 S.F.)
AutoCAD SHX Text
WINDY AREAS SHREDDED OR CHOPPED 185-275 POUNDS
AutoCAD SHX Text
STRAW OR HAY 100 POUNDS
AutoCAD SHX Text
MODERATE TO HIGH JUTE MESH OR AS REQUIRED
AutoCAD SHX Text
VELOCITY AREAS OR EXCELSIOR MAT AS REQUIRED
AutoCAD SHX Text
OF THE WETLAND OR THE BOUNDARY OF WETLAND DISTURBANCE.
AutoCAD SHX Text
WITH 90% GRASS CATCH IN VEGETATED AREAS. TEMPORARY EROSION AND SEDIMENT CONTROL BLANKET SHALL
AutoCAD SHX Text
CURASOL OR RMB PLUS WILL BE USED ON HAY MULCH FOR WIND CONTROL.
AutoCAD SHX Text
UNTIL AREAS UPSLOPE ARE STABILIZED BY TURF. EROSION CONTROL MEASURES SHALL BE REMOVED WITHIN 30 DAYS
AutoCAD SHX Text
THIS PLAN HAS BEEN DEVELOPED AS A STRATEGY TO CONTROL SOIL EROSION AND SEDIMENTATION DURING AND AFTER
AutoCAD SHX Text
CONSTRUCTION. THIS PLAN IS BASED ON THE STANDARDS AND SPECIFICATIONS FOR EROSION PREVENTION IN
AutoCAD SHX Text
DEVELOPING AREAS AS CONTAINED IN THE "MAINE EROSION AND SEDIMENT CONTROL BMP'S", DEPARTMENT OF
AutoCAD SHX Text
ENVIRONMENTAL PROTECTION LATEST REVISION. FOR ADDITIONAL DETAILS AND SPECIFICATIONS SEE BMP'S
AutoCAD SHX Text
THE PROPOSED LOCATIONS OF SILTATION AND EROSION CONTROL STRUCTURES ARE SHOWN ON THE SITE PLAN.
AutoCAD SHX Text
1. ALL SEDIMENT AND EROSION CONTROL MEASURES SHALL BE DONE IN ACCORDANCE WITH THE "MAINE EROSION
AutoCAD SHX Text
AND SEDIMENT CONTROL BMP'S", DEPARTMENT OF ENVIRONMENTAL PROTECTION, LATEST REVISION.
AutoCAD SHX Text
2. THOSE AREAS UNDERGOING ACTUAL CONSTRUCTION WILL BE LEFT IN AN UNTREATED OR UNVEGETATED
AutoCAD SHX Text
CONDITION FOR A MINIMUM TIME. AREAS SHALL BE PERMANENTLY STABILIZED WITHIN 7 DAYS OF FINAL
AutoCAD SHX Text
GRADING AND TEMPORARILY STABILIZED WITHIN 7 DAYS OF INITIAL DISTURBANCE OF THE SOIL. IF THE
AutoCAD SHX Text
DISTURBANCE IS WITHIN 100 FEET OF A STREAM OR POND, THE AREA SHALL BE STABILIZED WITHIN 2
AutoCAD SHX Text
3. SEDIMENT BARRIERS (EROSION CONTROL MIX, STONE CHECK DAMS, STABILIZED CONSTRUCTION ENTRANCE, ETC.)
AutoCAD SHX Text
4. INSTALL EROSION CONTROL MIX AT TOE OF SLOPES TO FILTER SILT FROM RUNOFF. SEE E.C. MIX DETAIL FOR PROPER
AutoCAD SHX Text
5. ALL EROSION CONTROL STRUCTURES WILL BE INSPECTED, REPLACED AND/OR REPAIRED EVERY 7 DAYS AND
AutoCAD SHX Text
IMMEDIATELY BEFORE AND FOLLOWING ANY SIGNIFICANT RAINFALL (0.5 INCHES) OR SNOW MELT OR WHEN NO LONGER
AutoCAD SHX Text
SERVICEABLE DUE TO SEDIMENT ACCUMULATION OR DECOMPOSURE. SEDIMENT DEPOSITS SHOULD BE REMOVED AFTER
AutoCAD SHX Text
EACH STORM EVENT. THEY MUST BE REMOVED WHEN DEPOSITS REACH APPROXIMATELY ONE HALF THE HEIGHT OF
AutoCAD SHX Text
THE BARRIER. SEDIMENT CONTROL DEVICES SHALL REMAIN IN PLACE AND BE MAINTAINED BY THE CONTRACTOR
AutoCAD SHX Text
b. APPLY LIMESTONE AND FERTILIZER ACCORDING TO SOIL TEST. IF SOIL TESTING IS NOT FEASIBLE ON
AutoCAD SHX Text
SMALL OR VARIABLE SITES, OR WHERE TIMING IS CRITICAL, FERTILIZER MAY BE APPLIED AT THE RATE
AutoCAD SHX Text
OF 800 POUNDS PER ACRE OR 18.4 POUNDS PER 1,000 SQUARE FEET USING 10-20-20 (N-P205-K20) OR
AutoCAD SHX Text
EQUIVALENT. APPLY GROUND LIMESTONE (EQUIVALENT TO 50% CALCIUM PLUS MAGNESIUM OXIDE) AT
AutoCAD SHX Text
c. FOLLOWING SEED BED PREPARATION, DITCHES AND BACK SLOPES WILL BE SEEDED TO A MIXTURE OF
AutoCAD SHX Text
47% CREEPING RED FESCUE, 5% REDTOP, AND 48% TALL FESCUE. THE LAWN AREAS WILL BE SEEDED
AutoCAD SHX Text
TO A PREMIUM TURF MIXTURE OF 44% KENTUCKY BLUEGRASS, 44% CREEPING RED FESCUE, AND 12%
AutoCAD SHX Text
PERENNIAL RYEGRASS: SEEDING RATE IS 1.03 LBS PER 1000 SQ. FT. LAWN QUALITY SOD MAY BE
AutoCAD SHX Text
d. HAY MULCH AT THE RATE OF 70-90 LBS PER 1000 SQUARE FEET OR A HYDRO-APPLICATION OF ASPHALT,
AutoCAD SHX Text
WOOD OR PAPER FIBER SHALL BE APPLIED FOLLOWING SEEDING. A SUITABLE BINDER SUCH AS
AutoCAD SHX Text
11. ALL TEMPORARY EROSION CONTROL MEASURES SHALL BE REMOVED WITHIN 30 DAYS ONCE THE SITE IS STABILIZED
AutoCAD SHX Text
12. WETLANDS WILL BE PROTECTED WITH EROSION CONTROL MIX OR SILT FENCE INSTALLED AT THE EDGE
AutoCAD SHX Text
* A HYDRO-APPLICATION OF ASPHALT, WOOD, OR PAPER FIBER MAY BE APPLIED FOLLOWING SEEDING. A SUITABLE
AutoCAD SHX Text
BINDER SUCH AS CURASOL OR RMB PLUS SHALL BE USED ON HAY MULCH FOR WIND CONTROL.
AutoCAD SHX Text
6. NO SLOPES, EITHER PERMANENT OR TEMPORARY, SHALL BE STEEPER THAN TWO TO ONE (2 TO 1).
AutoCAD SHX Text
7. IF FINAL SEEDING OF THE DISTURBED AREAS IS NOT COMPLETED 45 DAYS PRIOR TO THE FIRST KILLING FROST,
AutoCAD SHX Text
USE TEMPORARY MULCHING (DORMANT SEEDING MAY BE ATTEMPTED AS WELL) TO PROTECT THE SITE AND DELAY
AutoCAD SHX Text
45 DAYS PRIOR TO THE FIRST KILLING FROST (OCT. 1) TO PROTECT FROM SPRING RUNOFF PROBLEMS.
AutoCAD SHX Text
9. DURING THE CONSTRUCTION PHASE, INTERCEPTED SEDIMENT WILL BE RETURNED TO THE SITE AND REGRADED
AutoCAD SHX Text
ONTO OPEN AREAS. POST SEEDING SEDIMENT, IF ANY WILL BE DISPOSED OF IN AN ACCEPTABLE MANNER.
AutoCAD SHX Text
10. REVEGETATION MEASURES WILL COMMENCE UPON COMPLETION OF CONSTRUCTION EXCEPT AS NOTED ABOVE.
AutoCAD SHX Text
ALL DISTURBED AREAS NOT OTHERWISE STABILIZED WILL BE GRADED, SMOOTHED, AND PREPARED FOR FINAL
AutoCAD SHX Text
a. FOUR INCHES OF LOAM WILL BE SPREAD OVER DISTURBED AREAS AND SMOOTHED TO A UNIFORM
AutoCAD SHX Text
8. TEMPORARY SEEDING OF DISTURBED AREAS THAT HAVE NOT BEEN FINAL GRADED SHALL BE COMPLETED BY AUG. 15 OR
AutoCAD SHX Text
WINTER CONSTRUCTION
AutoCAD SHX Text
*Seed Rate Only
AutoCAD SHX Text
3.
AutoCAD SHX Text
AREAS AND ROAD DITCHES MAY BE PERMITTED.
AutoCAD SHX Text
Late Summer/Early Fall Prennial Ryegrass 40 lbs/acre
AutoCAD SHX Text
Annual Ryegrass 40 lbs/acre
AutoCAD SHX Text
Spring (4/1 - 7/1) Oats 80 lbs/acre
AutoCAD SHX Text
Winter (11/1 - 4/1)Mulch w/ Dormant Seed 80 lbs/acre*
AutoCAD SHX Text
Fall (9/15 - 11/1) Winter Rye 112 lbs/acre
AutoCAD SHX Text
Oats 80 lbs/acre
AutoCAD SHX Text
Summer (5/15 - 8/15) Sudangrass 40 lbs/acre
AutoCAD SHX Text
(8/15 - 9/15)
AutoCAD SHX Text
Season Seed Rate
AutoCAD SHX Text
Additional temporary seed mixture (for periods less than 12 months).
AutoCAD SHX Text
EROSION CONTROL DURING CONSTRUCTION
AutoCAD SHX Text
1. WINTER CONSTRUCTION PERIOD: OCTOBER 1 THROUGH APRIL 15
AutoCAD SHX Text
WITHOUT STABILIZATION AT ANY ONE TIME.
AutoCAD SHX Text
TO PLACEMENT.
AutoCAD SHX Text
SITE IS WITHOUT EROSION CONTROL PROTECTION.
AutoCAD SHX Text
SEDIMENT BARRIERS MUST BE USED.
AutoCAD SHX Text
10. AREAS WITHIN 100 FEET OF STREAMS THAT ARE NOT STABILIZED WITH VEGETATION BY DEC. 1 SHALL BE MULCHED
AutoCAD SHX Text
AND ANCHORED WITH NETTING. IF WORK CONTINUES IN THIS AREA DURING THE WINTER, A DOUBLE LINE OF
AutoCAD SHX Text
2. WINTER EXCAVATION AND EARTHWORK SHALL BE DONE SUCH THAT NO MORE THAN 1 ACRES OF THE SITE IS
AutoCAD SHX Text
4. CONTINUATION OF EARTHWORK OPERATIONS ON ADDITIONAL AREAS SHALL NOT BEGIN UNTIL THE EXPOSED SOIL
AutoCAD SHX Text
SURFACE ON THE AREA BEING WORKED HAS BEEN STABILIZED SUCH THAT NO MORE THAN ONE ACRE OF THE
AutoCAD SHX Text
EXPOSED AREA SHOULD BE LIMITED TO THAT WHICH CAN BE MULCHED IN ONE DAY PRIOR TO ANY SNOW EVENT.
AutoCAD SHX Text
DURING WINTER CONSTRUCTION PERIOD ALL SNOW SHALL BE REMOVED FROM AREAS OF SEEDING AND MULCHING PRIOR
AutoCAD SHX Text
ANCHOR MULCH WITH PEG AND TWINE (1 SQ. YD./BLOCK); MULCH NETTING (AS PER MANUFACTURED; ASPHALT EMULSION
AutoCAD SHX Text
(0.04 GALLONS PER SQ YD.); LIQUID ASPHALT (0.10 GALLONS PER SQ. YD.); WOOD CELLULOSE FIBER (750 LBS/ACRE);
AutoCAD SHX Text
CHEMICAL TACK (AS PER MANUFACTURERS SPECIFICATIONS); USE OF A SERRATED STRAIGHT DISK. WETTING FOR SMALL
AutoCAD SHX Text
NTS
AutoCAD SHX Text
PIPE OUTLET PROTECTION
AutoCAD SHX Text
PLAN
AutoCAD SHX Text
SECTION
AutoCAD SHX Text
FOOT ABOVE MAX. TAILWATER OR UP TO BANK FULL, WHICHEVER IS LESS.
AutoCAD SHX Text
IN DEFINED CHANNELS, APRON SHALL EXTEND FULL WIDTH OF BOTTOM AND ONE
AutoCAD SHX Text
CHART
AutoCAD SHX Text
D50 SELECTION PER
AutoCAD SHX Text
HARD ANGULAR ROCK
AutoCAD SHX Text
APRON LENGTH + 1D
AutoCAD SHX Text
'D' = PIPE DIAMETER
AutoCAD SHX Text
APRON LENGTH PER DESIGN (la)
AutoCAD SHX Text
MIN.
AutoCAD SHX Text
0.5 x 'D'
AutoCAD SHX Text
'D'
AutoCAD SHX Text
GRAVEL FREE OF FINES, CLAYS, SILTS
AutoCAD SHX Text
OR 6' OF 4" - MINUS BANK RUN
AutoCAD SHX Text
STONE BASED ON UNDISTURBED SOILS,
AutoCAD SHX Text
GEOTEXTILE FILTER FABRIC BENEATH
AutoCAD SHX Text
ELEVATION
AutoCAD SHX Text
RECEIVING
AutoCAD SHX Text
2.25 x D50
AutoCAD SHX Text
LAYER THICKNESS
AutoCAD SHX Text
1.0 x D (12" MIN.)
AutoCAD SHX Text
1D MIN.
AutoCAD SHX Text
2" TO 3" STONE
AutoCAD SHX Text
FLOW
AutoCAD SHX Text
L = DISTANCE SUCH THAT
AutoCAD SHX Text
POINTS A AND B ARE
AutoCAD SHX Text
OF EQUAL ELEVATION
AutoCAD SHX Text
L
AutoCAD SHX Text
A
AutoCAD SHX Text
B
AutoCAD SHX Text
6"
AutoCAD SHX Text
NTS
AutoCAD SHX Text
ELEVATION
AutoCAD SHX Text
CROSS SECTION
AutoCAD SHX Text
SPACING
AutoCAD SHX Text
STONE CHECK DAM DETAIL
AutoCAD SHX Text
SLOPE (FT/FT)
AutoCAD SHX Text
L (FT)
AutoCAD SHX Text
0.020
AutoCAD SHX Text
0.030
AutoCAD SHX Text
0.040
AutoCAD SHX Text
0.050
AutoCAD SHX Text
0.080
AutoCAD SHX Text
0.100
AutoCAD SHX Text
0.120
AutoCAD SHX Text
0.150
AutoCAD SHX Text
100
AutoCAD SHX Text
66
AutoCAD SHX Text
50
AutoCAD SHX Text
40
AutoCAD SHX Text
25
AutoCAD SHX Text
20
AutoCAD SHX Text
17
AutoCAD SHX Text
13
AutoCAD SHX Text
24"
AutoCAD SHX Text
2:1
AutoCAD SHX Text
8'
AutoCAD SHX Text
18"
AutoCAD SHX Text
NOTE:
AutoCAD SHX Text
KEY STONE INTO CHANNEL BANKS AND
AutoCAD SHX Text
EXTEND IT BEYOND THE ABUTMENTS A
AutoCAD SHX Text
MINIMUM OF 18" (0.5m) TO PREVENT
AutoCAD SHX Text
FLOW AROUND DAM.
AutoCAD SHX Text
on min. 2" loam bed
AutoCAD SHX Text
at exist. grade
AutoCAD SHX Text
Install sod on
AutoCAD SHX Text
Exist. Grade
AutoCAD SHX Text
2'
AutoCAD SHX Text
4'
AutoCAD SHX Text
5.5' Min.
AutoCAD SHX Text
w/ 3" deep 90%%D notches at 18" O.C.
AutoCAD SHX Text
8" x 3/8" x 8' Aluminum Bar Stock
AutoCAD SHX Text
Slope to conform to Grading Plan
AutoCAD SHX Text
14" Layer riprap D50 = 6"
AutoCAD SHX Text
6" MDOT type "D" subbase gravel
AutoCAD SHX Text
Geotextile - MIRAFI 140N or equal
AutoCAD SHX Text
Level-Lip Spreader
AutoCAD SHX Text
Typical Section
AutoCAD SHX Text
subbase gravel
AutoCAD SHX Text
MDOT type "D"
AutoCAD SHX Text
12" Dia. Sonotube
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
N.T.S.
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
4" x 12" x 16' (or 8') pressure treated
AutoCAD SHX Text
4" x 12" pressure treated timber
AutoCAD SHX Text
Outlet Pipe
AutoCAD SHX Text
8'
AutoCAD SHX Text
1 1/2" x 2" Stainless Steel
AutoCAD SHX Text
Lag Bolts
AutoCAD SHX Text
Southern Yellow Pine
AutoCAD SHX Text
bolted to steel plates
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
G
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
N
AutoCAD SHX Text
E
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
T
AutoCAD SHX Text
A
AutoCAD SHX Text
O
AutoCAD SHX Text
F
AutoCAD SHX Text
R
AutoCAD SHX Text
P
AutoCAD SHX Text
ANDREW S.
AutoCAD SHX Text
E
AutoCAD SHX Text
F
AutoCAD SHX Text
I
AutoCAD SHX Text
O
AutoCAD SHX Text
A
AutoCAD SHX Text
M
AutoCAD SHX Text
No. 13285
AutoCAD SHX Text
MORRELL
AutoCAD SHX Text
D
AutoCAD SHX Text
E
AutoCAD SHX Text
N
AutoCAD SHX Text
S
AutoCAD SHX Text
E
AutoCAD SHX Text
C
AutoCAD SHX Text
I
AutoCAD SHX Text
L
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
S
AutoCAD SHX Text
N
AutoCAD SHX Text
E
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
L
AutoCAD SHX Text
O
AutoCAD SHX Text
S
AutoCAD SHX Text
I
AutoCAD SHX Text
546
AutoCAD SHX Text
545
AutoCAD SHX Text
546
AutoCAD SHX Text
%%UTYPICAL EROSION CONTROL MEASURES
AutoCAD SHX Text
%%UFOR RESIDENTIAL LOTS
AutoCAD SHX Text
Roadway
AutoCAD SHX Text
Drive
AutoCAD SHX Text
546
AutoCAD SHX Text
Rip Rap at Inlet & Outlet
AutoCAD SHX Text
of Culvert - See Detail
AutoCAD SHX Text
for Installation
AutoCAD SHX Text
Drainage Swale
AutoCAD SHX Text
Sedimentation Control Plan
AutoCAD SHX Text
According to Erosion &
AutoCAD SHX Text
are to be Revegetated
AutoCAD SHX Text
All Disturbed Areas
AutoCAD SHX Text
Wetlands
AutoCAD SHX Text
546
AutoCAD SHX Text
546
AutoCAD SHX Text
548
AutoCAD SHX Text
548
AutoCAD SHX Text
544
AutoCAD SHX Text
Property Line
AutoCAD SHX Text
Residential Structure
AutoCAD SHX Text
of Silt Fence for
AutoCAD SHX Text
Downstream Slopes
AutoCAD SHX Text
in Excess of 15%)
AutoCAD SHX Text
Surface Run-off
AutoCAD SHX Text
Existing Woodlot to Remain
AutoCAD SHX Text
Limit of Clearing
AutoCAD SHX Text
& Site Disturbance
AutoCAD SHX Text
Siltation Fence
AutoCAD SHX Text
(Provide Double Row
AutoCAD SHX Text
Installation
AutoCAD SHX Text
See Detail for
AutoCAD SHX Text
NTS
AutoCAD SHX Text
4" LOAM AND SEED
AutoCAD SHX Text
3
AutoCAD SHX Text
1
AutoCAD SHX Text
1
AutoCAD SHX Text
3
AutoCAD SHX Text
NTS
AutoCAD SHX Text
VARIES SEE PLANS
AutoCAD SHX Text
TEMPORARY EROSION CONTROL BLANKET
AutoCAD SHX Text
MDOT SPEC. #717.061
AutoCAD SHX Text
VEGETATED DITCH DETAIL
AutoCAD SHX Text
FLOW
AutoCAD SHX Text
SILT FENCE DETAIL
AutoCAD SHX Text
REINF. POSTS 6' O.C.)
AutoCAD SHX Text
N.T.S.
AutoCAD SHX Text
FILTER FABRIC
AutoCAD SHX Text
BACKFILL.
AutoCAD SHX Text
KEY FABRIC IN A
AutoCAD SHX Text
4"X4" TRENCH W/
AutoCAD SHX Text
SILT FENCE SHALL BE
AutoCAD SHX Text
A 3' FENCE OF 120LB/M
AutoCAD SHX Text
(W/ REINF. BACK OF 6"
AutoCAD SHX Text
WIRE MESH, POSTS 10' O.C.)
AutoCAD SHX Text
OR 200LB/M (W/ NO
AutoCAD SHX Text
EXIST. GROUND
AutoCAD SHX Text
2.
AutoCAD SHX Text
1.
AutoCAD SHX Text
WOODEN STAKES
AutoCAD SHX Text
(MIN. 4' LONG)
AutoCAD SHX Text
INSTALL PER CUMBERLAND
AutoCAD SHX Text
COUNTY S.W.C.D. STANDARDS
AutoCAD SHX Text
3.
AutoCAD SHX Text
FILTER FABRIC
AutoCAD SHX Text
WOODEN STAKES
AutoCAD SHX Text
ROLL END STAKES
AutoCAD SHX Text
END POST DETAIL
AutoCAD SHX Text
NTS
AutoCAD SHX Text
AND PLACEMENT.
AutoCAD SHX Text
CONTROL BMP FOR COMPOSITION
AutoCAD SHX Text
SEE MAINE EROSION AND SEDIMENT
AutoCAD SHX Text
VOIDS.
AutoCAD SHX Text
VEGETATION TO AVOID CREATING
AutoCAD SHX Text
REMOVE TALL GRASSES OR WOODY
AutoCAD SHX Text
LEVEL CONTOUR.
AutoCAD SHX Text
PLACE BARRIER ALONG RELATIVELY
AutoCAD SHX Text
EROSION CONTROL
AutoCAD SHX Text
MIX BERM
AutoCAD SHX Text
NTS
AutoCAD SHX Text
24" MIN.
AutoCAD SHX Text
MIN.
AutoCAD SHX Text
12"
AutoCAD SHX Text
3
AutoCAD SHX Text
9/18/18
AutoCAD SHX Text
Rev'd. Per City Depts. Review (9-14-18 Memo)
AutoCAD SHX Text
4
AutoCAD SHX Text
10/19/18
AutoCAD SHX Text
Cluster Layout
AutoCAD SHX Text
5
AutoCAD SHX Text
10/29/18
AutoCAD SHX Text
Revised per City Comments
AutoCAD SHX Text
6
AutoCAD SHX Text
12/17/18
AutoCAD SHX Text
Revised per City Comments
AutoCAD SHX Text
7
AutoCAD SHX Text
1/7/19
AutoCAD SHX Text
Revised per City Comments
AutoCAD SHX Text
8
AutoCAD SHX Text
1/30/19
AutoCAD SHX Text
Revised per City 1/22 Comments
AutoCAD SHX Text
9
AutoCAD SHX Text
2/6/19
AutoCAD SHX Text
Revised per Planning Board Review
AutoCAD SHX Text
10
AutoCAD SHX Text
3/13/19
AutoCAD SHX Text
Revised per DPW Comments
AutoCAD SHX Text
Revised per DPW Comments
Page 35: Planning and Development Emily Cole-Prescott Saco City ... Meeting Pac… · 2. Baxter Lane: Street Acceptance Recommendation Request a. Memo from City Planner b. Letter, Warranty

Gorh

am, M

aine

040

3828

Sta

te S

tree

tFa

x (2

07) 8

39-8

250

Berr

y, H

uff,

McD

onal

d, M

illig

an In

c.

BH

2MEn

gine

ers,

Surv

eyor

s

Tel.

(207

) 839

-277

1

4

Old

Orc

hard

Bea

ch, M

aine

040

641

Fier

o D

rive

CV

S Fo

unda

tions

, LLC

FOR

ELO

ISES

PLA

CE

STA

ND

AR

D

LIN

CO

LN R

DSA

CO

, MA

INE

Feb. 2018

As Noted

18026A. Morrell

Dept.

W. Pelkey

DET

AIL

S

SECTION A-A

PLAN VIEW

G:\

2018

\18

026

\De

tails

B.d

wg, 3

/14

/20

19 3

:53:

58 P

M, D

WG

To P

DF.p

c3

AutoCAD SHX Text
DESIGNED
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
CHECKED
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
JOB. NO.
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
NO.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
REPRODUCTION OR REUSE OF THIS
AutoCAD SHX Text
DOCUMENT WITHOUT THE
AutoCAD SHX Text
EXPRESSED WRITTEN CONSENT
AutoCAD SHX Text
OF BH2M INC. IS PROHIBITED
AutoCAD SHX Text
FINISHED GRADE
AutoCAD SHX Text
SEE PLAN FOR
AutoCAD SHX Text
SURFACE FINISH
AutoCAD SHX Text
PLASTIC "ELECTRIC" MARKER
AutoCAD SHX Text
TAPE PLACED APPROX. 12"
AutoCAD SHX Text
BELOW FINISH GRADE AND NO
AutoCAD SHX Text
CLEAN BACKFILL CONTAINING
AutoCAD SHX Text
NO ROCKS LARGER THAN 4"
AutoCAD SHX Text
DIA. AND FREE OF ROOTS,
AutoCAD SHX Text
PRIMARY CABLE
AutoCAD SHX Text
COMMUNICATION CABLE
AutoCAD SHX Text
6" MIN.
AutoCAD SHX Text
12" MIN.
AutoCAD SHX Text
36" MIN.
AutoCAD SHX Text
NTS
AutoCAD SHX Text
UNDERGROUND CABLE TRENCH
AutoCAD SHX Text
LESS THAN 12" ABOVE CABLE
AutoCAD SHX Text
STUMPS AND OTHER DEBRIS
AutoCAD SHX Text
SECONDARY OR SERVICE CABLE
AutoCAD SHX Text
(CONDUIT AS REQUIRED)
AutoCAD SHX Text
12" MIN.
AutoCAD SHX Text
6"
AutoCAD SHX Text
MIN.
AutoCAD SHX Text
6" MIN.
AutoCAD SHX Text
24" MIN.
AutoCAD SHX Text
TOP OF CONDUIT
AutoCAD SHX Text
(CONDUIT AS REQUIRED)
AutoCAD SHX Text
2ND PRIMARY CABLE, IF
AutoCAD SHX Text
NEEDED, CONDUIT AS REQ'D.
AutoCAD SHX Text
BEDDING OF SOIL CONTAINING NO
AutoCAD SHX Text
ROCKS, ROOTS, STUMPS OR DEBRIS
AutoCAD SHX Text
NOTES:
AutoCAD SHX Text
INSTALLATION SHOULD NOT ALLOW THE INTER-TWINING
AutoCAD SHX Text
OF CABLES.
AutoCAD SHX Text
COMMUNICATION AND POWER CABLES SHALL HAVE NO
AutoCAD SHX Text
LESS THAN 12" OF RADIAL SEPARATION.
AutoCAD SHX Text
CONDUITS FOR POWER AND COMMUNICATION CABLES
AutoCAD SHX Text
SHALL BE SPECIFIED BY APPROPRIATE UTILITY COMPANIES.
AutoCAD SHX Text
3.
AutoCAD SHX Text
Concrete pipe shall have sand bedding.
AutoCAD SHX Text
(e.g. PVC, Poltyethylene)
AutoCAD SHX Text
TRENCH DETAIL
AutoCAD SHX Text
NTS
AutoCAD SHX Text
DIRECTED
AutoCAD SHX Text
GRANULAR FILL AS
AutoCAD SHX Text
MAT'L. OR COMPACTED
AutoCAD SHX Text
COMPACTED EXCAVATED
AutoCAD SHX Text
3/4" DIA. CRUSHED STONE
AutoCAD SHX Text
BASE MAT'L.
AutoCAD SHX Text
PAVING &
AutoCAD SHX Text
(36" MIN.)
AutoCAD SHX Text
TRENCH WIDTH
AutoCAD SHX Text
12"
AutoCAD SHX Text
12"
AutoCAD SHX Text
LOAM & SEED
AutoCAD SHX Text
UNPAVED
AutoCAD SHX Text
PAVED
AutoCAD SHX Text
2.
AutoCAD SHX Text
1.
AutoCAD SHX Text
Do not mechanically compact directly over flexible pipe
AutoCAD SHX Text
unsuitable material.
AutoCAD SHX Text
Trench width shown is payment width for rockexcavation & replacement of
AutoCAD SHX Text
NOTES:
AutoCAD SHX Text
STORMDRAIN (ADS N12 OR EQUAL)
AutoCAD SHX Text
TO 6" ABOVE AND BELOW PIPE
AutoCAD SHX Text
4'
AutoCAD SHX Text
12'
AutoCAD SHX Text
TRAVEL WIDTH
AutoCAD SHX Text
12'
AutoCAD SHX Text
4'
AutoCAD SHX Text
3/8"/FT.
AutoCAD SHX Text
2:1 MAX.
AutoCAD SHX Text
2:1 MAX. (SEE PLANS)
AutoCAD SHX Text
NTS
AutoCAD SHX Text
18" SPEC. 703.06 TYPE "D" GRAVEL
AutoCAD SHX Text
3" SPEC. 703.06 TYPE "A" CRUSHED GRAVEL
AutoCAD SHX Text
SUITABLE SUBBASE
AutoCAD SHX Text
ROADWAY SECTION
AutoCAD SHX Text
GRAVEL SHOULDER
AutoCAD SHX Text
4" LOAM AND SEED
AutoCAD SHX Text
5.
AutoCAD SHX Text
SPECIFICATIONS, LATEST REVISION
AutoCAD SHX Text
ALL MATERIALS AND CONSTRUCTION REQUIREMENTS SHALL CONFORM TO MDOT STANDARD
AutoCAD SHX Text
SHALL BE MECHANICALLY TAMPERED.
AutoCAD SHX Text
LOOSE AND THEN COMPACTED. THE FILLING OF UTILITY TRENCHES AND OTHER PLACES
AutoCAD SHX Text
THE STREET SITE. THE FILL SHALL BE SPREAD IN LAYERS NOT TO EXCEED 8 INCHES
AutoCAD SHX Text
SOFT CLAYS, WET AND NON COMPACTABLE MATERIALS, ETC. SHALL BE REMOVED FROM
AutoCAD SHX Text
DENSITY (PER ASTM D 1557 MOD.). EXCESS MATERIALS INCLUDING ORGANIC MATERIALS,
AutoCAD SHX Text
SPECIFICATIONS, EXCEPT THAT COMPACTION SHALL NOT BE LESS THAN 95% OF MAXIMUM
AutoCAD SHX Text
THROUGH 203.17 OF THE MAINE DEPARTMENT OF TRANSPORTATION STANDARD
AutoCAD SHX Text
QUALITY TO MEET THE STANDARDS FOR EMBANKMENT CONSTRUCTION, SECTIONS 203.02
AutoCAD SHX Text
ALL MATERIAL USED IN THE CONSTRUCTION OF EMBANKMENTS SHALL BE OF THE
AutoCAD SHX Text
FILL:
AutoCAD SHX Text
4.
AutoCAD SHX Text
3.
AutoCAD SHX Text
2.
AutoCAD SHX Text
1.
AutoCAD SHX Text
GRADING:
AutoCAD SHX Text
ALL STREETS, ROADS, WALKS ETC. SHALL BE GRADED TO THEIR FULL WIDTH BY
AutoCAD SHX Text
THE DEVELOPER (SUBDIVIDER) SO THAT PAVEMENTS AND SIDEWALKS CAN BE
AutoCAD SHX Text
CONSTRUCTED ON PARALLEL PROFILES.
AutoCAD SHX Text
PREPARATION:
AutoCAD SHX Text
BEFORE GRADING IS STARTED, THE ENTIRE RIGHT-OF-WAY AREA SHALL BE
AutoCAD SHX Text
CLEARED OF ALL STUMPS, ROOTS, BRUSH AND OTHER OBJECTIONABLE MATERIAL AND ALL
AutoCAD SHX Text
TREES NOT INTENDED FOR PRESERVATION, AS DESIGNATED BY THE CITY ENGINEER.
AutoCAD SHX Text
CUTS:
AutoCAD SHX Text
TREE STUMPS AND OTHER ORGANIC MATERIALS SHALL BE REMOVED BELOW THE
AutoCAD SHX Text
SUB GRADE. ROCKS AND BOULDERS, WHEN ENCOUNTERED, SHALL BE REMOVED TO
AutoCAD SHX Text
TO SUB GRADE.
AutoCAD SHX Text
THE BASE AND SURFACE PAVEMENT THICKNESS' NOTED IS THE MINIMUM REQUIRED THICKNESS.
AutoCAD SHX Text
CORES WILL BE TAKEN TO VERIFY. FAILURE TO MEET THE MINIMUM THICKNESS IS CAUSE FOR
AutoCAD SHX Text
NOT ACCEPTING ROADWAYS.
AutoCAD SHX Text
6.
AutoCAD SHX Text
BASE - 2" HOT MIX ASPHALT 12.5 mm
AutoCAD SHX Text
SURFACE - 1 1/2" HOT MIX ASPHALT 9.5 mm
AutoCAD SHX Text
3 1/2" HOT BITUMINOUS PAVEMENT
AutoCAD SHX Text
SUBBASE
AutoCAD SHX Text
PRIOR TO PROPOSED PAVING (AS REQ'D)
AutoCAD SHX Text
A NEAT EVEN VERTICAL JOINT, APPLY TACK
AutoCAD SHX Text
SAWCUT EXIST. PAVEMENT ALONG A SMOOTH LINE TO
AutoCAD SHX Text
PAVEMENT JOINT DETAIL
AutoCAD SHX Text
EXIST. PAVEMENT
AutoCAD SHX Text
N.T.S.
AutoCAD SHX Text
PROPOSED PAVEMENT
AutoCAD SHX Text
BASE
AutoCAD SHX Text
12"
AutoCAD SHX Text
MIN.
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
G
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
N
AutoCAD SHX Text
E
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
T
AutoCAD SHX Text
A
AutoCAD SHX Text
O
AutoCAD SHX Text
F
AutoCAD SHX Text
R
AutoCAD SHX Text
P
AutoCAD SHX Text
ANDREW S.
AutoCAD SHX Text
E
AutoCAD SHX Text
F
AutoCAD SHX Text
I
AutoCAD SHX Text
O
AutoCAD SHX Text
A
AutoCAD SHX Text
M
AutoCAD SHX Text
No. 13285
AutoCAD SHX Text
MORRELL
AutoCAD SHX Text
D
AutoCAD SHX Text
E
AutoCAD SHX Text
N
AutoCAD SHX Text
S
AutoCAD SHX Text
E
AutoCAD SHX Text
C
AutoCAD SHX Text
I
AutoCAD SHX Text
L
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
S
AutoCAD SHX Text
N
AutoCAD SHX Text
E
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
L
AutoCAD SHX Text
O
AutoCAD SHX Text
S
AutoCAD SHX Text
I
AutoCAD SHX Text
RUBBER.
AutoCAD SHX Text
TOP
AutoCAD SHX Text
MAXIMUM DRY DENSITY. SAND SHALL MEET THE FOLLOWING
AutoCAD SHX Text
SIEVE ANALYSIS BY WEIGHT:
AutoCAD SHX Text
12" SAND BED FULL LENGTH COMPACT SAND TO 95%%% OF
AutoCAD SHX Text
%%USIEVE SIZE
AutoCAD SHX Text
8
AutoCAD SHX Text
3
AutoCAD SHX Text
NO. 4
AutoCAD SHX Text
%%UMAX. %%% PASSING BY WEIGHT
AutoCAD SHX Text
NO. 100
AutoCAD SHX Text
NO. 16
AutoCAD SHX Text
2-10
AutoCAD SHX Text
95-100
AutoCAD SHX Text
100
AutoCAD SHX Text
50-85
AutoCAD SHX Text
PAVED ACCESS WITH APRON
AutoCAD SHX Text
WITH CITY STANDARDS FOR
AutoCAD SHX Text
TO HYDRANT IN ACCORDANCE
AutoCAD SHX Text
LOCAL ROADWAY SECTION
AutoCAD SHX Text
HYDRANT
AutoCAD SHX Text
40'
AutoCAD SHX Text
50'
AutoCAD SHX Text
36.5'
AutoCAD SHX Text
17'
AutoCAD SHX Text
8'
AutoCAD SHX Text
PUBLIC RIGHT-OF-WAY
AutoCAD SHX Text
6" SCH-80 PVC PIPE
AutoCAD SHX Text
5' MIN.
AutoCAD SHX Text
x 1 1/4" STRIP OF ASPHALTIC BUTYL
AutoCAD SHX Text
2 - SHIPLAP JOINTS ARE SEALED WITH A 2
AutoCAD SHX Text
1 - CONCRETE 5000 PSI AT 28 DAYS.
AutoCAD SHX Text
DESIGN NOTES:
AutoCAD SHX Text
3.67'
AutoCAD SHX Text
ITEM
AutoCAD SHX Text
10,800 LBS
AutoCAD SHX Text
15,000 LBS
AutoCAD SHX Text
3'-0" RISER
AutoCAD SHX Text
BASE
AutoCAD SHX Text
13,600 LBS
AutoCAD SHX Text
WEIGHT
AutoCAD SHX Text
2.5'
AutoCAD SHX Text
2'
AutoCAD SHX Text
5'
AutoCAD SHX Text
2.5'
AutoCAD SHX Text
GRADE
AutoCAD SHX Text
0.5'
AutoCAD SHX Text
8.46'
AutoCAD SHX Text
0.67'
AutoCAD SHX Text
6" SCH-80 STEEL PIPE
AutoCAD SHX Text
6" SCH-80 STEEL PIPE WITH
AutoCAD SHX Text
WITH EPOXY COATING
AutoCAD SHX Text
EPOXY COATING
AutoCAD SHX Text
PVC VENT PIPES W/
AutoCAD SHX Text
STRUCTURAL STRUTS
AutoCAD SHX Text
4" X 10" INTEGRAL
AutoCAD SHX Text
(2) - 6" SCH 80
AutoCAD SHX Text
8B BOOTS
AutoCAD SHX Text
COUPLING
AutoCAD SHX Text
6" SCH-80
AutoCAD SHX Text
(3) - 8" SCH-80 PVC
AutoCAD SHX Text
FLOW PIPES W/ A127
AutoCAD SHX Text
(H-20) (TYP. 2
AutoCAD SHX Text
24" DIA. FRAME AND
AutoCAD SHX Text
PLACES)
AutoCAD SHX Text
BOOTS
AutoCAD SHX Text
BOLT DOWN COVER
AutoCAD SHX Text
PUMPER CONNECTION WITH 4 1/2" NST MALE
AutoCAD SHX Text
6" SCH-80 STEEL PIPE WITH EPOXY COATING
AutoCAD SHX Text
CONNECTION AND 2 1/2" NST CAP AND
AutoCAD SHX Text
CHAINS
AutoCAD SHX Text
2" STYROFOAM 5' DIA. AROUND PIPE
AutoCAD SHX Text
18" DIA. CONCRETE COLLAR
AutoCAD SHX Text
1' BARREL TO BE CAST INTO TOP WITH 8"
AutoCAD SHX Text
WITH CONCRETE COLLAR.
AutoCAD SHX Text
EXPOSED OUT TOP. 8" HOLE ON END
AutoCAD SHX Text
40' x 50' EASEMENT TO
AutoCAD SHX Text
CITY OF SACO
AutoCAD SHX Text
FIRE TANK DETAIL
AutoCAD SHX Text
NTS
AutoCAD SHX Text
A
AutoCAD SHX Text
CONC. BASE
AutoCAD SHX Text
3" DIA. ANCHOR RODS,
AutoCAD SHX Text
NUTS, LOCK WASHERS
AutoCAD SHX Text
& FLAT WASHERS, GALV.
AutoCAD SHX Text
STEEL (4) EA. REQ'D.
AutoCAD SHX Text
1" CHAMFER
AutoCAD SHX Text
POLES SHALL BE SUPPLIED
AutoCAD SHX Text
AND INSTALLED WITH
AutoCAD SHX Text
MANUFACTURERS ANCHOR
AutoCAD SHX Text
BOLTS
AutoCAD SHX Text
LIGHT POLE DETAIL
AutoCAD SHX Text
18" MIN. (DIA. OR SQ.)
AutoCAD SHX Text
N.T.S.
AutoCAD SHX Text
#3 REBAR TIES @ 12" O.C. HORZ.
AutoCAD SHX Text
ASTM A615 GRADE 60 CONC. REINF.
AutoCAD SHX Text
REINF.: (4) #4 REBAR VERTICAL
AutoCAD SHX Text
CONCRETE BASE
AutoCAD SHX Text
GROUND ROD
AutoCAD SHX Text
3/4" X 10' COPPER
AutoCAD SHX Text
BOLT LAYOUT
AutoCAD SHX Text
& MATERIALS
AutoCAD SHX Text
14'- 0"
AutoCAD SHX Text
5'-6"
AutoCAD SHX Text
6"
AutoCAD SHX Text
14" MIN.
AutoCAD SHX Text
ANCHOR BOLTS AS SPECIFIED
AutoCAD SHX Text
ELECTRICAL CONDUIT 2 REQ'D.
AutoCAD SHX Text
BY POLE MANUFACTURER
AutoCAD SHX Text
PROVIDE I INCH CHAMFERED EGDE
AutoCAD SHX Text
STREET LIGHT POLE SHALL BE A ROUND
AutoCAD SHX Text
TAPERED COMPOSITE TUFF-POLE
AutoCAD SHX Text
MANUFACTURED BY SHAKESPEARE
AutoCAD SHX Text
(AO1499S1BB01). POLES SHALL BE
AutoCAD SHX Text
EQUIPPED WITH A PHOTOCELL.
AutoCAD SHX Text
ALTERNATE POLE - LUMEC STEEL
AutoCAD SHX Text
BOTTLE NECK POLE (SM63V15).
AutoCAD SHX Text
MOUNTING BRACKET SHALL BE
AutoCAD SHX Text
LUMEC DBE-1A
AutoCAD SHX Text
6" MIN.
AutoCAD SHX Text
39" TYP.
AutoCAD SHX Text
17'
AutoCAD SHX Text
8.5'
AutoCAD SHX Text
5'
AutoCAD SHX Text
6'
AutoCAD SHX Text
5.5'
AutoCAD SHX Text
15'
AutoCAD SHX Text
5.5'
AutoCAD SHX Text
R=2'
AutoCAD SHX Text
4'
AutoCAD SHX Text
CONC. FILLED
AutoCAD SHX Text
PIPE BOLLARD
AutoCAD SHX Text
R=20'
AutoCAD SHX Text
R=20'
AutoCAD SHX Text
EDGE OF TRAVELWAY
AutoCAD SHX Text
18"
AutoCAD SHX Text
FILL ASSEMBLY
AutoCAD SHX Text
NOTES:
AutoCAD SHX Text
MIN. SIZE - 10,000 GALLONS
AutoCAD SHX Text
CONSTRUCTION - MUST BE DESIGNED TO SAFELY WITHSTAND THE SERVICE TO WHICH THE TANKS IS SUBJECTED
AutoCAD SHX Text
INCLUDING THE PRESSURE OF THE EARTH OR PAVEMENT ABOVE THE TANK.
AutoCAD SHX Text
MATERIALS - SUITABLE MATERIAL FOR TANK IS CONCRETE WITH CAST IRON FRAME AND COVERS.
AutoCAD SHX Text
INSTALLATION - TANKS SHALL BE SET ON FIRM FOUNDATIONS AND SURROUNDED WITH SOFT SAND, WELL
AutoCAD SHX Text
COMPACTED INTO PLACE. THE CONTRACTOR SHALL SUBMIT ANTI-FLOATATION CALCULATIONS TO THE CITY
AutoCAD SHX Text
ENGINEER FOR APPROVAL PRIOR TO SETTING THE TANKS. THE TANKS MUST BE ANCHORED OR WEIGHTED TO
AutoCAD SHX Text
PREVENT FLOATING IN LOCATIONS WHERE THE WATER TABLE IS HIGH OR MAY RISE.
AutoCAD SHX Text
FIRE DEPARTMENT CONNECTION (HYDRANT) - THE INSTALLATION SHALL BE PROVIDED WITH ONE 4.5" MALE
AutoCAD SHX Text
NATIONAL STANDARD THREAD (NST) HYDRANT CONNECTION WITH CAP. THIS CONNECTION SHALL BE PLACED
AutoCAD SHX Text
AT THE END OF A RISER WITH A 90%%D ELBOW CONSTRUCTED OF 6" SCHEDULE 80 STEEL PIPE WHICH TERMINATES
AutoCAD SHX Text
AT OR NEAR THE TANK TOP IN A 6" SCHEDULE 80 FEMALE ADAPTOR. THE HYDRANT CONNECTION RISER
AutoCAD SHX Text
INSIDE THE TANK SHALL BE 6" SCHEDULE 80 PVC FROM THE FEMALE ADAPTOR TO THE TANK BOTTOM AND
AutoCAD SHX Text
END WITH A 90%%D ELBOW. THE RISER INSIDE THE TANK SHALL BE SECURED IN AT LEAST 4 EVENLY SPACE
AutoCAD SHX Text
ATTACHMENT POINTS.
AutoCAD SHX Text
APRON - A HOT TOP APRON SUITABLE FOR SUPPORT OF FIRE APPARATUS SHALL BE LOCATED WITHIN 6' FROM
AutoCAD SHX Text
THE FACE OF THE HYDRANT CONNECTION. THE PREFERRED SITE LAYOUT PLAN SHALL HAVE AN APRON THAT IS
AutoCAD SHX Text
PERPENDICULAR FROM THE EDGE OF ROAD PAVEMENT AND MEASURE AS SHOWN.
AutoCAD SHX Text
TANK FILL & VENT - A TANK FILL ASSEMBLY SHALL BE INCORPORATED INTO THE VENT PIPE AT 18" ABOVE
AutoCAD SHX Text
FINAL GRADE. IT SHALL CONSIST OF A 6" SCHEDULE 80 PVC WYE SOCKET, 45%%D STREET ELBOW SPIGOT AND
AutoCAD SHX Text
SOCKET AND A 6"x4" STORTZ HYDRANT ADAPTOR WITH CAP AND CHAIN. AN APPROXIMATE VENT SHALL BE
AutoCAD SHX Text
PROVIDED FOR NORMAL OPERATION (1000 GALLONS PER MINUTE) OF THE INSTALLATION TO PERMIT FILLING
AutoCAD SHX Text
AND EMPTYING AND FOR THE MAXIMUM EXPANSION OR CONTRACTION OF THE INSTALLATION CONTENTS WITH
AutoCAD SHX Text
CHANGES IN TEMPERATURE. A SCREEN SHALL BE PROVIDED TO PREVENT A CLOGGED VENT WHICH COULD
AutoCAD SHX Text
RESULT IN A RUPTURING OF TANKS FROM THE INTERNAL PRESSURE OR COLLAPSE DUE TO INTERNAL VACUUM.
AutoCAD SHX Text
INADEQUATELY SIZED VENTS MAY HAVE A SAME RESULT. THE VENT SHALL BE A MINIMUM OF 6" SCHEDULE
AutoCAD SHX Text
80 PVC PIPE WITH TOP ELBOWS PROVIDING AN 180%%D TURN AND TERMINATE A MINIMUM OF 5' ABOVE GRADE.
AutoCAD SHX Text
THE INSTALLER, OWNER AND/OR RESPONSIBLE PARTY FOR THE INSTALLATION SHALL ENSURE THAT THE GRADE
AutoCAD SHX Text
TO TANK TOP DEPTH BE A MINIMUM OF 5' OF EARTH TO PROTECT FROM FREEZING. A STAMPED ENGINEERED
AutoCAD SHX Text
SYSTEM USING RIGID INSULATION AND REDUCED GROUND COVER CAN BE CONSIDERED BY THE CITY ENGINEER.
AutoCAD SHX Text
THE INSTALLER, OWNER AND/OR RESPONSIBLE PARTY SHALL BE REQUIRED TO PROVIDE ALL NECESSARY
AutoCAD SHX Text
MAINTENANCE FOR 1 YEAR PERIOD FROM THE DATE THE INSTALLATION GOES INTO SERVICE.
AutoCAD SHX Text
INSPECTION ACCESS TO TANKS OF THE INSTALLATION SHALL BE PROVIDED BY THE USE OF A RISER WITH A
AutoCAD SHX Text
24" DIAMETER CAST IRON FRAME AND COVER. THE COVER SHALL BE ABLE TO RECEIVE TYPICAL MANHOLE
AutoCAD SHX Text
COVER HOOKS FOR REMOVAL AND SHALL BE EITHER BLANK OR INSCRIBED WITH WORDS SUCH AS FIRE
AutoCAD SHX Text
DEPARTMENT, WATER SUPPLY, FIRE TANK OR SIMILAR.
AutoCAD SHX Text
TWO TANKS, OR MORE IF APPROVED BY THE CITY ENGINEER, MAY BE INTER-CONNECTED TO HOLD THE REQUIRED
AutoCAD SHX Text
CAPACITY OF WATER. THERE SHALL BE THREE 8" CROSS FLOW CONNECTIONS IN THE LOWER SIDE WALL OF
AutoCAD SHX Text
CONNECTED TANKS UTILIZING SCHEDULE 80 PVC PIPE. THERE SHALL BE TWO 6" CROSS VENT CONNECTIONS
AutoCAD SHX Text
IN THE UPPER SIDE WALLS OF CONNECTED TANKS UTILIZING SCHEDULE 80 PVE PIPE. ALL CONNECTIONS MUST
AutoCAD SHX Text
USE APPROPRIATELY SIZED BOOTS.
AutoCAD SHX Text
THE PIPING FOR THE HYDRANT CONNECTION RISER SHALL BE INSTALLED SO THAT IT ENTERS THE TANK THROUGH
AutoCAD SHX Text
THE TANK TOP AND NOT THROUGH THE TANK ENDS OR UNDERSIDE. THE HYDRANT CONNECTION AND RISER
AutoCAD SHX Text
SHALL BE PAINTED RED AND MEASURES 30" ABOVE GRADE.
AutoCAD SHX Text
AN 18" DIAMETER CONCRETE COLLAR AROUND THE HYDRANT CONNECTION RISER SHALL BE POURED INTO
AutoCAD SHX Text
PLACE ON THE TANK TOP. BOTH THE HYDRANT CONNECTION RISER AND THE TANK FILL & VENT PIPE SHALL
AutoCAD SHX Text
BE CENTERED WITHIN A 5' DIAMETER 2" RIGID STYROFOAM BARRIER APPROXIMATELY 30" ABOVE THE TANK TOP.
AutoCAD SHX Text
THERE SHALL BE AT LEAST 6' OF LEVEL GROUND AROUND THE HYDRANT CONNECTION RISER.
AutoCAD SHX Text
TWO 4" DIAMETER BY 4' TALL CONCRETE FILLED PROTECTIVE BOLLARDS SHALL BE INSTALLED APPROXIMATELY 4'
AutoCAD SHX Text
IN FRONT OF AND 2' TO EACH SIDE OF THE CENTER OF THE HYDRANT CONNECTION. THE BOLLARDS SHALL
AutoCAD SHX Text
BE RED IN COLOR.
AutoCAD SHX Text
THREADED OR WELDED PIPE CONNECTIONS ARE ACCEPTABLE.
AutoCAD SHX Text
TANKS ARE REQUIRED TO BE INSPECTED BY A REPRESENTATIVE DESIGNATED BY THE CITY OF SACO BEFORE
AutoCAD SHX Text
BEING FILLED WITH WATER.
AutoCAD SHX Text
THE INSTALLER, OWNER AND/OR RESPONSIBLE PARTY SHALL BE RESPONSIBLE FOR PUMPING ANY EXISTING
AutoCAD SHX Text
WATER FROM THE TANKS, REMOVING FOREIGN MATERIAL OF ANY KIND (IE GASKET MATERIAL, DIRT, LEAVES,
AutoCAD SHX Text
CONCRETE DUST, ETC.) PRIOR TO THE CITY INSPECTION.
AutoCAD SHX Text
THE INSTALLER, OWNER AND/OR RESPONSIBLE PARTY SHALL BE RESPONSIBLE FOR FILLING THE TANKS AND FOR
AutoCAD SHX Text
NOTING WHERE THE FULL (10,000 GALLONS) LEVEL IS AS MEASURED FROM THE EXTERIOR OF THE TANK TOP.
AutoCAD SHX Text
HE/SHE MAY THEN NOTIFY THE FIRE DEPARTMENT. THE FIRE DEPARTMENT WILL TEST THE INSTALLATION BY
AutoCAD SHX Text
DRAFTING WATER FROM THE TANKS AND PUMPING IT BACK INTO THE TANK AS SOON AS POSSIBLE BUT NOT
AutoCAD SHX Text
BEFORE TWENTY-FOUR HOURS OF THE TANKS BEING FILLED SO THAT IT CAN BE DETERMINED IF THERE IS A LEAK.
AutoCAD SHX Text
A METAL SIGN, APPROXIMATELY 24" X 24" WITH A CAPITAL H LETTERED ON IT SHALL BE AFFIXED AT A HEIGHT
AutoCAD SHX Text
OF APPROXIMATELY 5' TO A METAL POST INSTALLED IN THE GROUND IN THE VICINITY OF THE HYDRANT
AutoCAD SHX Text
CONNECTION AS APPROVED BY THE FIRE DEPARTMENT.
AutoCAD SHX Text
1.
AutoCAD SHX Text
2.
AutoCAD SHX Text
3.
AutoCAD SHX Text
4.
AutoCAD SHX Text
5.
AutoCAD SHX Text
6.
AutoCAD SHX Text
7.
AutoCAD SHX Text
8.
AutoCAD SHX Text
9.
AutoCAD SHX Text
10.
AutoCAD SHX Text
11.
AutoCAD SHX Text
12.
AutoCAD SHX Text
13.
AutoCAD SHX Text
14.
AutoCAD SHX Text
15.
AutoCAD SHX Text
16.
AutoCAD SHX Text
17.
AutoCAD SHX Text
18.
AutoCAD SHX Text
19.
AutoCAD SHX Text
20.
AutoCAD SHX Text
EVOLVE LED POST TOP
AutoCAD SHX Text
SALEM EPST - CITY OF SACO STANDARD
AutoCAD SHX Text
167
AutoCAD SHX Text
166
AutoCAD SHX Text
165
AutoCAD SHX Text
166
AutoCAD SHX Text
165
AutoCAD SHX Text
166.3
AutoCAD SHX Text
166.5
AutoCAD SHX Text
166.6
AutoCAD SHX Text
166.8
AutoCAD SHX Text
ELEV. 160.3%%P
AutoCAD SHX Text
3:1 TYPICAL
AutoCAD SHX Text
3
AutoCAD SHX Text
9/18/18
AutoCAD SHX Text
Rev'd. Per City Depts. Review (9-14-18 Memo)
AutoCAD SHX Text
4
AutoCAD SHX Text
10/19/18
AutoCAD SHX Text
Cluster Layout
AutoCAD SHX Text
5
AutoCAD SHX Text
10/29/18
AutoCAD SHX Text
Revised per City Comments
AutoCAD SHX Text
6
AutoCAD SHX Text
12/17/18
AutoCAD SHX Text
Revised per City Comments
AutoCAD SHX Text
7
AutoCAD SHX Text
1/7/19
AutoCAD SHX Text
Revised per City Comments
AutoCAD SHX Text
8
AutoCAD SHX Text
1/30/19
AutoCAD SHX Text
Revised per City 1/22 Comments
AutoCAD SHX Text
9
AutoCAD SHX Text
2/6/19
AutoCAD SHX Text
Revised per Planning Board Review
AutoCAD SHX Text
10
AutoCAD SHX Text
3/13/19
AutoCAD SHX Text
Revised per DPW Comments
AutoCAD SHX Text
Revised per DPW Comments
Page 36: Planning and Development Emily Cole-Prescott Saco City ... Meeting Pac… · 2. Baxter Lane: Street Acceptance Recommendation Request a. Memo from City Planner b. Letter, Warranty

C:\Users\emily.prescott\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\I72WZ44X\2019-3-27 Eloises Way Review Memo.docx Page 1 of

1

MEMORANDUM

TO: Emily Cole-Prescott, Planner Planning Account No.: 300345

DATE: March 27, 2019

RE: Eloises Way Subdivision – Final Subdivision Plan Tax Map 101, Lot 31-2

The Department of Public Works (DPW) has reviewed the revised final subdivision plan application materials for the above referenced project prepared by BH2M, dated March 13, 2019. The following comments have been

prepared based upon our review of the recent resubmission:

1. The 2:1 embankment grading on roadway slopes due to the existing right-of-way and wetland restrictions could be lessened with a 2’ gravel shoulder, rather than the 4’ wide shoulder. We are agreeable to the 2:1

embankment slopes along the proposed entrance road. There is a portion on the right hand side where the slopes exceed 2:1 near the entrance to Lincoln Road. We are not agreeable to the grading as shown in the

area. Possible solutions include obtaining an easement from the abutter to allow for the grading to be adjusted to allow for the 2:1 or enclosing a portion of the ditch within a short run of stormdrain per the

attached image and adjusting the grading accordingly.

2. The elevation of the designed entrance culvert may require ditching along Lincoln Road for positive drainage.

3. The continued revisions to obtain the required depth of ditches, without raising the road profile, still result in minimal slope ditches. The revisions also require an extension of the controlling outlet level lip spreader

beyond the shown contours. The roadway drainage is dependent upon this outlet elevation and ditches with less than 1% slopes. The outlet appears to be in an extremely flat contour area without a well-defined

positive slope swale between the roadway and the level lip spreader. With the designed profile of the roadway, there are areas of the roadway where subgrade will be lower than the adjacent wetlands, with

marginal drainage of the road subgrade.

The roadway profile and grading needs to be raised to improve the drainage system design. DPW requests

that the roadway subgrade be elevated above the existing elevations of the wetlands and that the ditches

have slopes of 1% minimum in order to effectively maintain. We continue to have concerns with the long-term performance and maintenance of this roadway as designed and therefore, we do not recommend

approval of this design for potential future acceptance by the City.

As part of any subsequent site plan or subdivision approval, we recommend the following conditions be included:

1. Prior to the start of construction, the buffer areas should be marked in the field and copies of the recorded

buffer deed restrictions shall be provided to the Planning Department.

We look forward to discussing this project further and would be happy to clarify any of our comments made within this

review memo.

CITY OF SACO, MAINE Saco Public Works Department Joseph A. Laverriere, P.E. – City Engineer 300 Main Street Telephone: (207) 284-6641

Saco, Maine 04072 Email: [email protected]

Page 37: Planning and Development Emily Cole-Prescott Saco City ... Meeting Pac… · 2. Baxter Lane: Street Acceptance Recommendation Request a. Memo from City Planner b. Letter, Warranty
Page 38: Planning and Development Emily Cole-Prescott Saco City ... Meeting Pac… · 2. Baxter Lane: Street Acceptance Recommendation Request a. Memo from City Planner b. Letter, Warranty

Planning and Development Saco City Hall

300 Main Street

Saco, Maine 04072-1538

Emily Cole-Prescott City Planner

[email protected]

Phone: (207) 282-3487 ext.357

TO: Planning Board CC: Walter Pelkey, BH2M & Nate Libby, Amari Holdings FROM: Emily Cole-Prescott, City Planner DATE: March 27, 2019 RE: Amari Site: Subdivision Amendment Request (Map 62 Lot 1-4)

Overview: As the Board is aware, Walter Pelkey and Nate Libby have been working on a site plan review application for a proposed 6,000 square ft. structure and associated site improvements on Lot C5-2. The site plan review application included an amended subdivision plan showing Lot C5-2 divided into two parcels. This divided parcel line was also shown on the site plans submitted for the Board’s review. This division meets the definition of “re-subdivision” found in the Subdivision Regulations, and therefore, requires a subdivision process of preliminary plan review and subsequent final plan review. As such, Walter Pelkey has submitted an application for the amended subdivision and copies of relevant documentation from the site plan review application have been added to this application to fulfill supporting documentation requirements. Before continued review of the site plan may occur, the Board must first review the amended subdivision plan. This proposed lot division meets the minimum lot size and dimensions specified in the Cascade Contract Zone (Contract Zone Agreement by and between Park North Development LLC and the City of Saco). Because this property is part of the existing contract zone, the applicant will be required to also obtain Council’s approval on the re-subdivision, which is a four-step Council meeting process (workshop, first reading, public hearing, and final reading). This item may be conditioned by the Board, to remain in compliance with the contract zone agreement. This site is also subject to a Site Location of Development Permit, which is administered by the DEP. The applicant will be required to record this amendment and obtain approval from the DEP. Application Completeness: The applicant has either submitted, or responded to, the submission requirements outlined in Section 5.2 of the Subdivision Regulations. Some of the noted submission requirements have been provided with the site plan review application, and I have added copies of relevant information to this re-subdivision application, for the record. The applicant has requested that financial and technical capacity be reviewed upon final plan review. The Board may waive this submission requirement. If the Board agrees, a suggested motion is: “I move to waive section 5.2.3(10), only for the Board’s review of the preliminary plan, not for final plan review.” If the Board grants that waiver, a suggested motion is: “I move to find the application complete for preliminary subdivision plan review for the division of one lot.” Departmental Reviews:

Page 39: Planning and Development Emily Cole-Prescott Saco City ... Meeting Pac… · 2. Baxter Lane: Street Acceptance Recommendation Request a. Memo from City Planner b. Letter, Warranty

2

Code Enforcement: Director Dick Lambert indicated that the proposal “meets all parameters of Cascade Contract Zone lot size and setback requirements.”

City Engineer: Joe Laverriere has provided a comment memo on both the re-subdivision application and the site plan review application. I have highlighted the two comments in his enclosed review memo which are most applicable to this application, which have to do with the name of the amendment, and reciprocal easements for vehicular access, utilities, solid waste, etc.

Fire Department: Deputy Fire Chief Dave Pendleton indicated “no concerns providing there are no changes to previously discussed fire department apparatus access and turning movements”.

Discussion: Many of the requirements for both subdivision review and site plan review overlap. However, this preliminary plan review is the first step in a three-step process with the Planning Board that will then require final plan review and continued site plan review. While the plan indicates “Sixth Amendment,” the overall Park North and Cascades subdivision, with this revision, is now on its ninth amendment. The plan should be revised accordingly, and this note has been added as a condition for the Board’s consideration. This revision to the lot lines is not expected to substantially alter the site. While one approval is not contingent upon another, the Board will have a more detailed review of what is planned for the site during the site plan review application process, the application on which the Board provided comments to the applicant on February 19, 2019. To review this application, the Board should consider the following standards found in the Subdivision Regulations: 1.1.1 Pollution. The proposed subdivision will not result in undue water or air pollution. In

making this determination, it shall at least consider: A. The elevation of the land above sea level and its relation to the flood plains; B. The nature of soils and subsoils and their ability to adequately support waste disposal; C. The slope of the land and its effect on effluents; D. The availability of streams for disposal of effluents; and E. The applicable state and local health and water resource rules and regulations;

1.1.2 Sufficient water. The proposed subdivision has sufficient water available for the reasonably foreseeable needs of the subdivision;

1.1.3 Municipal water supply. The proposed subdivision will not cause an unreasonable burden on an existing water supply, if one is to be used;

1.1.4 Erosion. The proposed subdivision will not cause unreasonable soil erosion or a reduction in the land’s capacity to hold water so that a dangerous or unhealthy condition results;

1.1.5 Traffic. The proposed subdivision will not cause unreasonable highway or public road congestion or unsafe conditions with respect to the use of the highways or public roads existing or proposed;

1.1.6 Sewage disposal. The proposed subdivision will provide for adequate sewage waste disposal and will not cause an unreasonable burden on municipal services if they are utilized;

1.1.7 Municipal solid waste disposal. The proposed subdivision will not cause an unreasonable burden on the municipality’s ability to dispose of solid waste, if municipal services are to be utilized;

1.1.8 Aesthetic, cultural and natural values. The proposed subdivision will not have an undue adverse effect on the scenic or natural beauty of the area, aesthetics, historic sites, significant

Page 40: Planning and Development Emily Cole-Prescott Saco City ... Meeting Pac… · 2. Baxter Lane: Street Acceptance Recommendation Request a. Memo from City Planner b. Letter, Warranty

3

wildlife habitat identified by the Department of Inland Fisheries and Wildlife or the municipality, or rare and irreplaceable natural areas or any public rights for physical or visual access to the shoreline;

1.1.9 Conformity with local ordinances and plans. The proposed subdivision conforms with a duly adopted subdivision regulation or ordinances, comprehensive plan, development plan or land use plan, if any. In making this determination, the municipal reviewing authority may interpret these ordinances and plans;

1.1.10 Financial and technical capacity. The subdivider has adequate financial and technical capacity to meet the standards of this section;

1.1.11 Surface waters; outstanding river segments. Whenever situated entirely or partially within the watershed of any pond or lake or within 250 feet of any wetland, great pond or river as defined in Title 38, Chapter 3, subchapter I, article 2-B, the proposed subdivision will not adversely affect the quality of that body of water or unreasonably affect the shoreline of that body of water. A. When lots in a subdivision have frontage on an outstanding river segment, the proposed

subdivision plan must require principal structures to have a combined lot shore frontage and setback from the normal high-water mark of 500 feet.

1) To avoid circumventing the intent of this provision, whenever a proposed subdivision adjoins a shoreland strip narrower than 250 feet which is not lotted, the proposed subdivision shall be reviewed as if lot lines extended to the shore.

2) The frontage and setback provisions of this paragraph do not apply either within areas zoned as general development or its equivalent under shoreland zoning, Title 38, chapter 3, subchapter I, article 2-B, or within areas designated by ordinance as densely developed. The determination of which areas are densely developed must be based on a finding that existing development met the definitional requirements of section 4401, subsection 1, on September 23, 1983;

1.1.12 Groundwater. The proposed subdivision will not, alone or in conjunction with existing activities, adversely affect the quality or quantity of groundwater;

1.1.13 Flood areas. Based on the Federal Emergency Management Agency’s Flood Boundary and Floodway Maps and Flood Insurance Rate Maps, and information presented by the applicant whether the subdivision is in a flood-prone area. If the subdivision, or any part of it, is in such an area, the subdivider shall determine the 100-year food elevation and flood hazard boundaries within the subdivision. The proposed subdivision plan must include a condition of plan approval requiring that principal structures in the subdivision will be constructed with their lowest floor, including basement, at least one foot above the 100-year flood elevation;

1.1.14 Freshwater wetlands. All freshwater wetlands within the proposed subdivision have been identified on any maps submitted as part of the application, regardless of the size of the wetlands. Any mapping of freshwater wetlands may be done with the help of the local soil and water conservation district;

1.1.15 River, stream or brook. Any river, stream or brook within or abutting the proposed subdivision has been identified on any maps submitted as part of the application. For purposes of this section, “river, stream or brook” has the same meaning as in Title 38, section 480-B, subsection 9;

1.1.16 Storm water. The proposed subdivision will provide for adequate stormwater management; 1.1.17 Spaghetti-lots prohibited. If any lots in the proposed subdivision have shore frontage on a

river, stream, or brook, great pond or coastal wetland as these features are defined in Title

Page 41: Planning and Development Emily Cole-Prescott Saco City ... Meeting Pac… · 2. Baxter Lane: Street Acceptance Recommendation Request a. Memo from City Planner b. Letter, Warranty

4

38, section 480-B, none of the lots created within the subdivision have a lot depth to shore frontage ratio greater than 5 to 1;

1.1.18 Lake phosphorous concentration. The long-term cumulative effects of the proposed subdivision will not unreasonably increase a great pond’s phosphorous concentration during the construction phase and life of the proposed subdivision; and

1.1.19 Impact on adjoining municipality. For any proposed subdivision that crosses municipal boundaries, the proposed subdivision will not cause unreasonable traffic congestion or unsafe conditions with respect to the use of existing public ways in an adjoining municipality in which part of the subdivision is located.

The conditions of approval and findings of fact are written in such a way to require any additional information to be submitted for the final plan review. If the Board agrees with the drafted Findings of Fact and Conditions of Approval, a suggested motion is: “ I move to approve the preliminary subdivision plan for Map 64 Lot 1-4 for the creation of one additional lot per the enclosed findings of fact and conditions of approval.”

Saco Planning Board Findings of Fact

Re-Subdivision: Amari Holdings Preliminary Plan Review

Map 62 Lot 1-4 April 2, 2019

1. The applicant and owner is Amari Holdings, LLC, with a mailing address of 5 Stony Pine Circle,

Saco, ME 04072. 2. The agent for the project is Walter Pelkey, of BH2M Engineering, with a mailing address of 28

State Street, Gorham, ME 04038. 3. The proposal is to further divide one lot into two lots (thereby creating one lot) in the Park

North/Cascades Subdivision. The applicant proposes a preliminary re-subdivision plan to create one additional lot from what is termed “Lot C5-2” on the proposed plan.

4. The proposed lot will be 42,779 square feet. The property is located within parcel one of the Cascade Contract Zone, which requires the following for property development:

a. Minimum Lot Size: 7,500 square feet b. Minimum Street Frontage: 50 feet c. Minimum Front Yard: 50 feet (for front yard facing Route 1) d. Minimum Side Yard: 10 feet (for lots not abutting residential/conservation) e. Minimum Rear Yard: 10 feet (for lots not abutting residential/conservation) f. Maximum Building Height: 60 feet g. Maximum Building Coverage: 50%

The property is to be subdivided for future development of a 6,000 square ft. commercial structure and associated site improvements. The applicant has proposed a site plan review application for the commercial building, which will be heard by the Board at a future meeting. 5. The owner has presented right, title and interest in the property with deed filed on the York

County Registry, Book 17473 Page 864. The property is known as 4 Cascade Road, and can be identified as Map 62 Lot 1-4.

6. Although the purpose of this proposal is to only create one lot, the parcel was part of an originally approved subdivision plan and therefore requires preliminary subdivision plan review

Page 42: Planning and Development Emily Cole-Prescott Saco City ... Meeting Pac… · 2. Baxter Lane: Street Acceptance Recommendation Request a. Memo from City Planner b. Letter, Warranty

5

per section 7.1 of the Subdivision Regulations, which outlines the requirements for revisions to approved plans.

7. The applicant has submitted the following Re-Subdivision Plan: Sheet 1 – Sixth Amended Parcel Plan for Park North & the Cascades dated January 2018 revised through February 26, 2019.

8. Traffic generated by this lot will be primarily determined by the use and site plan review proposal. Since the Department has already received documentation and peer review on the amount of traffic proposed with the new uses and newly proposed structure, this information has been included in this preliminary subdivision review application. The traffic analysis indicated that the proposed uses and square footage on site will generate 134 daily trips, with 15 to 16 trips during peak hours. This project is part of the Park North/Cascades subdivision and Cascade Contract Zone. Elliott Chamberlain, developer of Park North, has filed an updated Traffic Movement Permit with the Maine DOT which will include this property.

9. Connectivity/Pedestrian Needs: Any future development on lot C-5 will include sidewalk development as part of the development plan.

10. Sewer: The site will be served by the City’s sewer system, and the current lot is already served by the City’s sewer.

11. Public Water: The site is currently served by Maine Water, and the applicant has requested an updated letter to verify that there is enough capacity to serve this new lot.

12. Stormwater Management: The site is part of the larger Park North/Cascades Subdivision, which included provisions for stormwater. The Public Works Department monitors the amount of stormwater and infrastructure as part of each plan review, to ensure that the stormwater facilities are appropriately sized for new development as it is added to the site. The applicant is expected to fulfill specific stormwater standards through the site plan review process.

13. The submissions detailed above are sufficient to make a determination on the completeness of submissions, and compliance with the City of Saco Subdivisions and Zoning Ordinances, of the preliminary subdivision plan.

The Planning Board has considered the following criteria from the Subdivision Regulations, and before granting approval for the preliminary plan has determined that: 1.1.1 Pollution. The proposed subdivision will not result in undue water or air pollution. In making this determination, it shall at least consider: A. The elevation of the land above sea level and its relation to the flood plains; B. The nature of soils and subsoils and their ability to adequately support waste disposal; C. The slope of the land and its effect on effluents; D. The availability of streams for disposal of effluents; and E. The applicable state and local health and water resource rules and regulations; 1.1.2 Sufficient water. The proposed re-subdivision has sufficient water available for the reasonably foreseeable needs of the subdivision; No concerns have been reported. 1.1.3 Municipal water supply. The proposed subdivision will not cause an unreasonable burden on an existing water supply, if one is to be used; The existing lot is currently served by Maine Water. However, the applicant has requested a capacity letter from Maine Water. 1.1.4 Erosion. The proposed subdivision will not cause unreasonable soil erosion or a reduction in the land’s capacity to hold water so that a dangerous or unhealthy condition results; 1.1.5 Traffic. The proposed subdivision will not cause unreasonable highway or public road congestion or unsafe conditions with respect to the use of the highways or public roads existing or proposed; Material submitted

Page 43: Planning and Development Emily Cole-Prescott Saco City ... Meeting Pac… · 2. Baxter Lane: Street Acceptance Recommendation Request a. Memo from City Planner b. Letter, Warranty

6

with the site plan review application and added to the record for this application review indicate 134 daily vehicle trips, which does not require a traffic impact analysis. 1.1.6 Sewage disposal. The proposed subdivision will provide for adequate sewage waste disposal and will not cause an unreasonable burden on municipal services if they are utilized; The current site is served by the City’s sewer system, and the proposal is for this new lot to also be served by the existing sewer system. 1.1.7 Municipal solid waste disposal. The proposed subdivision will not cause an unreasonable burden on the municipality’s ability to dispose of solid waste, if municipal services are to be utilized; 1.1.8 Aesthetic, cultural and natural values. The proposed subdivision will not have an undue adverse effect on the scenic or natural beauty of the area, aesthetics, historic sites, significant wildlife habitat identified by the Department of Inland Fisheries and Wildlife or the municipality, or rare and irreplaceable natural areas or any public rights for physical or visual access to the shoreline; 1.1.9 Conformity with local ordinances and plans. The proposed subdivision conforms with a duly adopted subdivision regulation or ordinances, comprehensive plan, development plan or land use plan, if any. In making this determination, the municipal reviewing authority may interpret these ordinances and plans; 1.1.10 Financial and technical capacity. The subdivider has adequate financial and technical capacity to meet the standards of this section; The subdivider has completed other such projects, most recently the gym facility on 4 Cascade Road, next to the proposed location of this property. However, a waiver is requested of this standard only for preliminary plan review, indicating that the financial capacity documentation will be submitted upon final plan review. 1.1.11 Surface waters; outstanding river segments. Whenever situated entirely or partially within the watershed of any pond or lake or within 250 feet of any wetland, great pond or river as defined in Title 38, Chapter 3, subchapter I, article 2-B, the proposed subdivision will not adversely affect the quality of that body of water or unreasonably affect the shoreline of that body of water. A. When lots in a subdivision have frontage on an outstanding river segment, the proposed subdivision plan must require principal structures to have a combined lot shore frontage and setback from the normal high-water mark of 500 feet. 1) To avoid circumventing the intent of this provision, whenever a proposed subdivision adjoins a shoreland strip narrower than 250 feet which is not lotted, the proposed subdivision shall be reviewed as if lot lines extended to the shore. 2) The frontage and setback provisions of this paragraph do not apply either within areas zoned as general development or its equivalent under shoreland zoning, Title 38, chapter 3, subchapter I, article 2-B, or within areas designated by ordinance as densely developed. The determination of which areas are densely developed must be based on a finding that existing development met the definitional requirements of section 4401, subsection 1, on September 23, 1983; 1.1.12 Groundwater. The proposed subdivision will not, alone or in conjunction with existing activities, adversely affect the quality or quantity of groundwater; 1.1.13 Flood areas. Based on the Federal Emergency Management Agency’s Flood Boundary and Floodway Maps and Flood Insurance Rate Maps, and information presented by the applicant whether the subdivision is in a flood-prone area. If the subdivision, or any part of it, is in such an area, the subdivider shall determine the 100-year food elevation and flood hazard boundaries within the subdivision. The proposed subdivision plan must include a condition of plan approval requiring that principal structures in the subdivision will be constructed with their lowest floor, including basement, at least one foot above the 100- year flood elevation;

Page 44: Planning and Development Emily Cole-Prescott Saco City ... Meeting Pac… · 2. Baxter Lane: Street Acceptance Recommendation Request a. Memo from City Planner b. Letter, Warranty

7

1.1.14 Freshwater wetlands. All freshwater wetlands within the proposed subdivision have been identified on any maps submitted as part of the application, regardless of the size of the wetlands. Any mapping of freshwater wetlands may be done with the help of the local soil and water conservation district; A soil map of the site has been provided. 1.1.15 River, stream or brook. Any river, stream or brook within or abutting the proposed subdivision has been identified on any maps submitted as part of the application. For purposes of this section, “river, stream or brook” has the same meaning as in Title 38, section 480-B, subsection 9; 1.1.16 Storm water. The proposed subdivision will provide for adequate stormwater management; This division is part of a larger, previously-approved subdivision, Park North/Cascades. Stormwater facilities have been adequately sized and constructed to handle the additional stormwater impact from this one lot division. Further, more detailed review of the stormwater management will be done upon site plan review. 1.1.17 Spaghetti-lots prohibited. If any lots in the proposed subdivision have shore frontage on a river, stream, or brook, great pond or coastal wetland as these features are defined in Title 38, section 480-B, none of the lots created within the subdivision have a lot depth to shore frontage ratio greater than 5 to 1; 1.1.18 Lake phosphorous concentration. The long-term cumulative effects of the proposed subdivision will not unreasonably increase a great pond’s phosphorous concentration during the construction phase and life of the proposed subdivision; and 1.1.19 Impact on adjoining municipality. For any proposed subdivision that crosses municipal boundaries, the proposed subdivision will not cause unreasonable traffic congestion or unsafe conditions with respect to the use of existing public ways in an adjoining municipality in which part of the subdivision is located.

Saco Planning Board

Conditions of Approval Re-Subdivision: Amari Holdings

Preliminary Plan Review Map 62 Lot 1-4

April 2, 2019

1. All details will conform to City of Saco standards, including but not limited to the City of Saco Zoning Ordinance and Subdivision Regulations.

2. Approval of the preliminary plan is conditioned upon compliance by the applicant with any and all oral commitments regarding the project which were specifically made by the applicant to the Board in the course of its deliberations.

3. This approval is governed by the action taken by the Saco Planning Board for the preliminary subdivision plan application.

4. No deviations from the approved plans are permitted without prior approval from the Planning Board for major changes, and from the City Planner for minor changes. The determination of major or minor shall be made by the City Planner.

5. The applicant shall adhere to all outstanding comments from City Staff or consultants utilized by the City during review of the project. Failure to provide an adequate response to requests made during Planning Board review may result in denial or tabling.

6. A Letter of Credit, acceptable to the City of Saco, shall be established for 150% of the construction cost of all required improvements, including but not limited to the following: utility installation; landscaping; paving; work within ROW; road construction, drainage, loam & seed; and sediment & erosion control. To establish the amount of the Letter of Credit, the applicant shall provide the City with itemized, per unit cost estimates, and a construction schedule, at least

Page 45: Planning and Development Emily Cole-Prescott Saco City ... Meeting Pac… · 2. Baxter Lane: Street Acceptance Recommendation Request a. Memo from City Planner b. Letter, Warranty

8

one week before any anticipated site work. This Letter of Credit shall be maintained for a period not less than three months beyond the anticipated completion of the project.

7. Prior to work commencing, the applicant shall establish a construction inspection account equal to 3% of the base cost of the Letter of Credit.

8. No work shall commence until two mylar sets and three paper sets of the final plans have been received by the Planning & Development Department, signed by the Planning Board and recorded at the York County Registry of Deeds. Proof of recording shall be submitted to the Planning & Development Department.

9. Prior to any construction activities, the applicant and contractor shall meet with the City Engineer and City Planner to review plans, inspection schedules and erosion control practices.

10. All plans and specifications shall be provided on disk in an AutoCAD format. The final plan shall be submitted in digital format as a single composite electronic file. The plan may be submitted on a disc, via e-mail, or other format acceptable to the City Planner, and shall be compatible with commonly used CAD and/or GIS software. See Section 6.2.6 of the Subdivision Regulations for further detail.

11. As-built plans shall be submitted before the final release of the Letter of Credit. 12. Stumps generated on site will be ground and either used on site for erosion control or will be

hauled off-site. Stumps shall not be buried within areas shown as right-of-way on the final plan. 13. No filling or alteration of wetlands on individual lots shall be done without the appropriate state

or local approvals. 14. No Certificate of Occupancy may be issued without approval of the Traffic Movement Permit

for Park North and the Cascades, which has been filed by Elliott Chamberlain of Park North Development LLC.

15. The Board also references condition #13 of the fifth amended subdivision plan, approved by the Board on March 4, 2014 and incorporates this condition into this approval, which states: “Connectivity for motor vehicles and pedestrians between this development and abutting parcels is a priority for the Board and the City. Accordingly, the applicant and future tenants or buyers of lots within the Cascades and Park North subdivisions are required, where deemed applicable by the Board, to provide as an element of site plan review an engineered proposal with the goal of establishing a paved connection between parcels. An easement or easements that may be necessary to allow for connections between parcels shall be provided by the applicant(s).”

16. The final plan shall be revised to show the correct number of the amendment to the Park North and Cascades Subdivision – 9th Amendment.

17. The final plan shall be revised to indicate the current structures on adjacent parcels, Lots C5-1 and C5-2.

18. The applicant will present documentation of financial and technical capacity for the Board’s review of the final plan.

19. All previous conditions of approval for the Park North and Cascades Subdivisions and subsequent amendments are not altered with this approval. Where there appears to be conflicting conditions, the more strict condition of approval shall apply.

20. The applicant shall present reciprocal easements for vehicular access, solid waste, and any other proposed easements per comment #2 of the City Engineer’s memo dated March 26, 2019.

21. The applicant will file with and obtain approval with the DEP for an amendment to the existing Site Location of Development permit.

22. The applicant will add the applicable Tax Map and Lot numbers to all of the parcels, and shall confirm the numbering with City Staff for final plan review.

23. The applicant is required to obtain City Council’s review of the subdivision amendment, per the terms of the Cascade Contract Zone.

Page 46: Planning and Development Emily Cole-Prescott Saco City ... Meeting Pac… · 2. Baxter Lane: Street Acceptance Recommendation Request a. Memo from City Planner b. Letter, Warranty
Page 47: Planning and Development Emily Cole-Prescott Saco City ... Meeting Pac… · 2. Baxter Lane: Street Acceptance Recommendation Request a. Memo from City Planner b. Letter, Warranty
Page 48: Planning and Development Emily Cole-Prescott Saco City ... Meeting Pac… · 2. Baxter Lane: Street Acceptance Recommendation Request a. Memo from City Planner b. Letter, Warranty
Page 49: Planning and Development Emily Cole-Prescott Saco City ... Meeting Pac… · 2. Baxter Lane: Street Acceptance Recommendation Request a. Memo from City Planner b. Letter, Warranty
Page 50: Planning and Development Emily Cole-Prescott Saco City ... Meeting Pac… · 2. Baxter Lane: Street Acceptance Recommendation Request a. Memo from City Planner b. Letter, Warranty
Page 51: Planning and Development Emily Cole-Prescott Saco City ... Meeting Pac… · 2. Baxter Lane: Street Acceptance Recommendation Request a. Memo from City Planner b. Letter, Warranty
Page 52: Planning and Development Emily Cole-Prescott Saco City ... Meeting Pac… · 2. Baxter Lane: Street Acceptance Recommendation Request a. Memo from City Planner b. Letter, Warranty
Page 53: Planning and Development Emily Cole-Prescott Saco City ... Meeting Pac… · 2. Baxter Lane: Street Acceptance Recommendation Request a. Memo from City Planner b. Letter, Warranty
Page 54: Planning and Development Emily Cole-Prescott Saco City ... Meeting Pac… · 2. Baxter Lane: Street Acceptance Recommendation Request a. Memo from City Planner b. Letter, Warranty
Page 55: Planning and Development Emily Cole-Prescott Saco City ... Meeting Pac… · 2. Baxter Lane: Street Acceptance Recommendation Request a. Memo from City Planner b. Letter, Warranty
Page 56: Planning and Development Emily Cole-Prescott Saco City ... Meeting Pac… · 2. Baxter Lane: Street Acceptance Recommendation Request a. Memo from City Planner b. Letter, Warranty
Page 57: Planning and Development Emily Cole-Prescott Saco City ... Meeting Pac… · 2. Baxter Lane: Street Acceptance Recommendation Request a. Memo from City Planner b. Letter, Warranty
Page 58: Planning and Development Emily Cole-Prescott Saco City ... Meeting Pac… · 2. Baxter Lane: Street Acceptance Recommendation Request a. Memo from City Planner b. Letter, Warranty
Page 59: Planning and Development Emily Cole-Prescott Saco City ... Meeting Pac… · 2. Baxter Lane: Street Acceptance Recommendation Request a. Memo from City Planner b. Letter, Warranty
Page 60: Planning and Development Emily Cole-Prescott Saco City ... Meeting Pac… · 2. Baxter Lane: Street Acceptance Recommendation Request a. Memo from City Planner b. Letter, Warranty
Page 61: Planning and Development Emily Cole-Prescott Saco City ... Meeting Pac… · 2. Baxter Lane: Street Acceptance Recommendation Request a. Memo from City Planner b. Letter, Warranty
Page 62: Planning and Development Emily Cole-Prescott Saco City ... Meeting Pac… · 2. Baxter Lane: Street Acceptance Recommendation Request a. Memo from City Planner b. Letter, Warranty
Page 63: Planning and Development Emily Cole-Prescott Saco City ... Meeting Pac… · 2. Baxter Lane: Street Acceptance Recommendation Request a. Memo from City Planner b. Letter, Warranty
Page 64: Planning and Development Emily Cole-Prescott Saco City ... Meeting Pac… · 2. Baxter Lane: Street Acceptance Recommendation Request a. Memo from City Planner b. Letter, Warranty
Page 65: Planning and Development Emily Cole-Prescott Saco City ... Meeting Pac… · 2. Baxter Lane: Street Acceptance Recommendation Request a. Memo from City Planner b. Letter, Warranty
Page 66: Planning and Development Emily Cole-Prescott Saco City ... Meeting Pac… · 2. Baxter Lane: Street Acceptance Recommendation Request a. Memo from City Planner b. Letter, Warranty
Page 67: Planning and Development Emily Cole-Prescott Saco City ... Meeting Pac… · 2. Baxter Lane: Street Acceptance Recommendation Request a. Memo from City Planner b. Letter, Warranty
Page 68: Planning and Development Emily Cole-Prescott Saco City ... Meeting Pac… · 2. Baxter Lane: Street Acceptance Recommendation Request a. Memo from City Planner b. Letter, Warranty

Saco

, Mai

ne5

Ston

e Po

ny C

ircle

Am

ari H

oldi

ngs,

LLC

FOR

PAR

K N

OR

TH &

TH

E C

ASC

AD

ES

SIX

TH A

MEN

DED

PA

RC

EL

RO

UTE

ON

E &

CA

SCA

DE

RO

AD

SAC

O, M

AIN

E

Jan. 2018

1" = 50'

18055-Sub

1

R. Libby Jr.

Dept.

Survey

Gorh

am, M

aine

040

3828

Sta

te S

tree

tFa

x (2

07) 8

39-8

250

Berr

y, H

uff,

McD

onal

d, M

illig

an In

c.

BH

2MEn

gine

ers,

Surv

eyor

s

Tel.

(207

) 839

-277

1

50'0 100'50'

Scale: 1" = 50'

TOW

N &

CO

UN

TRY

FC

U

PLA

N

GRID NORTH

G:\

2018

\18

055

\Su

bdivi

sion.d

wg, 3

/12

/20

19 9

:37:

40 A

M, D

WG

To P

DF.p

c3

AutoCAD SHX Text
CASCADE
AutoCAD SHX Text
ROAD
AutoCAD SHX Text
PORTLAND ROAD - US ROUTE 1
AutoCAD SHX Text
TO SACO
AutoCAD SHX Text
FALL
AutoCAD SHX Text
(PUBLIC)
AutoCAD SHX Text
LOT C5
AutoCAD SHX Text
LOT C5-1
AutoCAD SHX Text
78,884 S.F.
AutoCAD SHX Text
Existing Right of Way
AutoCAD SHX Text
And Utility Easement
AutoCAD SHX Text
Existing Right of Way
AutoCAD SHX Text
And Utility Easement
AutoCAD SHX Text
20' SETBACK
AutoCAD SHX Text
50' SETBACK
AutoCAD SHX Text
Drainage Easement
AutoCAD SHX Text
N/F
AutoCAD SHX Text
Henry Properties LLC
AutoCAD SHX Text
29 Washington Ave
AutoCAD SHX Text
Scarborough, ME 04047
AutoCAD SHX Text
Bk. 15562, Pg. 724
AutoCAD SHX Text
N/F
AutoCAD SHX Text
Gordon ODonnell
AutoCAD SHX Text
885 Portland Road
AutoCAD SHX Text
Saco, ME 04072
AutoCAD SHX Text
Bk. 15068, Pg. 78
AutoCAD SHX Text
N/F
AutoCAD SHX Text
Heirs of James E Clair Sr.
AutoCAD SHX Text
PO Box 543
AutoCAD SHX Text
Winchester, MA 01890
AutoCAD SHX Text
Bk. 8175, Pg. 272
AutoCAD SHX Text
S15°25'59"W
AutoCAD SHX Text
72.41'
AutoCAD SHX Text
S35°35'56"W
AutoCAD SHX Text
121.49'
AutoCAD SHX Text
N/F
AutoCAD SHX Text
Park North Development LLC
AutoCAD SHX Text
1022 Portland Road
AutoCAD SHX Text
Saco, ME 04072
AutoCAD SHX Text
Bk. 15023, Pg. 731
AutoCAD SHX Text
CMF #5556
AutoCAD SHX Text
C1
AutoCAD SHX Text
L11
AutoCAD SHX Text
UP#1
AutoCAD SHX Text
IRS
AutoCAD SHX Text
IRS
AutoCAD SHX Text
IRS
AutoCAD SHX Text
PKS
AutoCAD SHX Text
PKS
AutoCAD SHX Text
PKS
AutoCAD SHX Text
PKS
AutoCAD SHX Text
PKS
AutoCAD SHX Text
PKS
AutoCAD SHX Text
L
AutoCAD SHX Text
=
AutoCAD SHX Text
1
AutoCAD SHX Text
0
AutoCAD SHX Text
8
AutoCAD SHX Text
.
AutoCAD SHX Text
4
AutoCAD SHX Text
1
AutoCAD SHX Text
R
AutoCAD SHX Text
=
AutoCAD SHX Text
2
AutoCAD SHX Text
8
AutoCAD SHX Text
7
AutoCAD SHX Text
.
AutoCAD SHX Text
5
AutoCAD SHX Text
0
AutoCAD SHX Text
IRS
AutoCAD SHX Text
E1
AutoCAD SHX Text
E2
AutoCAD SHX Text
E29
AutoCAD SHX Text
E30
AutoCAD SHX Text
E3
AutoCAD SHX Text
E4
AutoCAD SHX Text
E7
AutoCAD SHX Text
E8
AutoCAD SHX Text
E18
AutoCAD SHX Text
E17
AutoCAD SHX Text
E5
AutoCAD SHX Text
E6
AutoCAD SHX Text
E15
AutoCAD SHX Text
E9
AutoCAD SHX Text
E10
AutoCAD SHX Text
E11
AutoCAD SHX Text
E12
AutoCAD SHX Text
E13
AutoCAD SHX Text
E14
AutoCAD SHX Text
E16
AutoCAD SHX Text
E19
AutoCAD SHX Text
E20
AutoCAD SHX Text
E21
AutoCAD SHX Text
E22
AutoCAD SHX Text
E23
AutoCAD SHX Text
E24
AutoCAD SHX Text
E25
AutoCAD SHX Text
E26
AutoCAD SHX Text
E27
AutoCAD SHX Text
E28
AutoCAD SHX Text
E31
AutoCAD SHX Text
E32
AutoCAD SHX Text
L12
AutoCAD SHX Text
L13
AutoCAD SHX Text
L14
AutoCAD SHX Text
163.61'
AutoCAD SHX Text
N33°57'00"E
AutoCAD SHX Text
156.13'
AutoCAD SHX Text
L
AutoCAD SHX Text
=
AutoCAD SHX Text
1
AutoCAD SHX Text
0
AutoCAD SHX Text
2
AutoCAD SHX Text
.
AutoCAD SHX Text
4
AutoCAD SHX Text
8'
AutoCAD SHX Text
L=5.93'
AutoCAD SHX Text
7.28'
AutoCAD SHX Text
S56°03'00"E
AutoCAD SHX Text
183.00'
AutoCAD SHX Text
N56°03'00"W
AutoCAD SHX Text
197.20'
AutoCAD SHX Text
S33°57'00"W
AutoCAD SHX Text
118.50
AutoCAD SHX Text
28.00'
AutoCAD SHX Text
N33°57'00"E
AutoCAD SHX Text
92.50'
AutoCAD SHX Text
L9
AutoCAD SHX Text
L7
AutoCAD SHX Text
138.13'
AutoCAD SHX Text
C1
AutoCAD SHX Text
IRS
AutoCAD SHX Text
L6
AutoCAD SHX Text
L5
AutoCAD SHX Text
18.0'
AutoCAD SHX Text
L8
AutoCAD SHX Text
L1
AutoCAD SHX Text
PKS
AutoCAD SHX Text
L2
AutoCAD SHX Text
L3
AutoCAD SHX Text
L4
AutoCAD SHX Text
PKS
AutoCAD SHX Text
PKS
AutoCAD SHX Text
L
AutoCAD SHX Text
=
AutoCAD SHX Text
1
AutoCAD SHX Text
0
AutoCAD SHX Text
9
AutoCAD SHX Text
.
AutoCAD SHX Text
8
AutoCAD SHX Text
1
AutoCAD SHX Text
R
AutoCAD SHX Text
=
AutoCAD SHX Text
3
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
.
AutoCAD SHX Text
0
AutoCAD SHX Text
0
AutoCAD SHX Text
L=71.98'
AutoCAD SHX Text
L=24.04'
AutoCAD SHX Text
L=13.79'
AutoCAD SHX Text
L10
AutoCAD SHX Text
IRS
AutoCAD SHX Text
IRS
AutoCAD SHX Text
IRS
AutoCAD SHX Text
LOT C5-2
AutoCAD SHX Text
ACCESS EASEMENT FOR LOT C5
AutoCAD SHX Text
ACCESS EASEMENT FOR LOT C5
AutoCAD SHX Text
ACCESS EASEMENT
AutoCAD SHX Text
TO LOT C5-2
AutoCAD SHX Text
60,619 S.F.
AutoCAD SHX Text
42,779 S.F.
AutoCAD SHX Text
WATER
AutoCAD SHX Text
DRIVE
AutoCAD SHX Text
DESIGNED
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
CHECKED
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
JOB. NO.
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
NO.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
REPRODUCTION OR REUSE OF THIS
AutoCAD SHX Text
DOCUMENT WITHOUT THE
AutoCAD SHX Text
EXPRESSED WRITTEN CONSENT
AutoCAD SHX Text
OF BH2M INC. IS PROHIBITED
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
JENKINS RD.
AutoCAD SHX Text
RTE. 5
AutoCAD SHX Text
SCALE: 1" = 2 MILES
AutoCAD SHX Text
LOCATION MAP
AutoCAD SHX Text
SACO
AutoCAD SHX Text
BEACH
AutoCAD SHX Text
ORCHARD
AutoCAD SHX Text
FLAG
AutoCAD SHX Text
ST.
AutoCAD SHX Text
195
AutoCAD SHX Text
RTE
AutoCAD SHX Text
ROSS
AutoCAD SHX Text
INT. 95
AutoCAD SHX Text
POND
AutoCAD SHX Text
RD.
AutoCAD SHX Text
RTE. 9
AutoCAD SHX Text
OLD
AutoCAD SHX Text
SITE
AutoCAD SHX Text
RTE 1
AutoCAD SHX Text
(Dunstan)
AutoCAD SHX Text
West Scarborough
AutoCAD SHX Text
HEARN ROAD
AutoCAD SHX Text
SWAMP
AutoCAD SHX Text
ASH
AutoCAD SHX Text
RD.
AutoCAD SHX Text
INT. 95
AutoCAD SHX Text
PLAN REFERENCES:
AutoCAD SHX Text
7.
AutoCAD SHX Text
A.
AutoCAD SHX Text
TAX MAP REFERENCE:
AutoCAD SHX Text
DEED REFERENCE:
AutoCAD SHX Text
ZONING:
AutoCAD SHX Text
5.
AutoCAD SHX Text
4.
AutoCAD SHX Text
3.
AutoCAD SHX Text
SURVEYOR:
AutoCAD SHX Text
2.
AutoCAD SHX Text
OWNER:
AutoCAD SHX Text
1.
AutoCAD SHX Text
SACO, MAINE 04072
AutoCAD SHX Text
CASCADE CONTRACT ZONE
AutoCAD SHX Text
ROBERT C. LIBBY JR., PLS #2190
AutoCAD SHX Text
MAP 62, LOT 1-4
AutoCAD SHX Text
BOOK 17473, PAGE 864
AutoCAD SHX Text
28 STATE STREET
AutoCAD SHX Text
GORHAM, MAINE
AutoCAD SHX Text
BH2M
AutoCAD SHX Text
AMARI HOLDINGS, LLC
AutoCAD SHX Text
5 STONE PONY CIRCLE
AutoCAD SHX Text
NOTES:
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
UTILITY POLE
AutoCAD SHX Text
SYMBOL
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
PK NAIL TO BE SET
AutoCAD SHX Text
5/8" IRON ROD W/ CAP TO BE SET
AutoCAD SHX Text
CONCRETE MONUMENT FOUND
AutoCAD SHX Text
PKS
AutoCAD SHX Text
IRS
AutoCAD SHX Text
I CERTIFY THAT THIS SURVEY CONFORMS
AutoCAD SHX Text
TO THE MAINE BOARD OF LICENSURE
AutoCAD SHX Text
FOR PROFESSIONAL LAND SURVEYORS
AutoCAD SHX Text
TECHNICAL STANDARDS OF PRACTICE FOR
AutoCAD SHX Text
A STANDARD BOUNDARY SURVEY WITH
AutoCAD SHX Text
THE FOLLOWING EXCEPTIONS:
AutoCAD SHX Text
NO SURVEYORS REPORT
AutoCAD SHX Text
ROBERT C. LIBBY JR. PLS #2190
AutoCAD SHX Text
1.
AutoCAD SHX Text
ROBERT
AutoCAD SHX Text
C.
AutoCAD SHX Text
LIBBY, JR.
AutoCAD SHX Text
2190
AutoCAD SHX Text
U
AutoCAD SHX Text
O
AutoCAD SHX Text
F
AutoCAD SHX Text
M
AutoCAD SHX Text
A
AutoCAD SHX Text
I
AutoCAD SHX Text
N
AutoCAD SHX Text
E
AutoCAD SHX Text
S
AutoCAD SHX Text
T
AutoCAD SHX Text
A
AutoCAD SHX Text
T
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
S
AutoCAD SHX Text
V
AutoCAD SHX Text
Y
AutoCAD SHX Text
O
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
L
AutoCAD SHX Text
D
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
F
AutoCAD SHX Text
E
AutoCAD SHX Text
O
AutoCAD SHX Text
P
AutoCAD SHX Text
R
AutoCAD SHX Text
N
AutoCAD SHX Text
A
AutoCAD SHX Text
I
AutoCAD SHX Text
O
AutoCAD SHX Text
L
AutoCAD SHX Text
B.
AutoCAD SHX Text
DATED 7-13-09 AND RECORDED IN THE
AutoCAD SHX Text
"FOURTH AMENDED OVERALL SUBDIVISION
AutoCAD SHX Text
OF PARK NORTH & THE CASCADES", BY
AutoCAD SHX Text
SEBAGO TECHNICS, PROJECT #05082
AutoCAD SHX Text
Y.C.R.D., PLAN BOOK 338, PAGE 19.
AutoCAD SHX Text
DATED 7-13-09 AND RECORDED IN THE
AutoCAD SHX Text
"FOURTH AMENDED PARCEL PLAN OF
AutoCAD SHX Text
PARK NORTH & THE CASCADES", BY
AutoCAD SHX Text
SEBAGO TECHNICS, PROJECT #05082
AutoCAD SHX Text
Y.C.R.D., PLAN BOOK 338, PAGE 23.
AutoCAD SHX Text
EDGE OF PAVEMENT
AutoCAD SHX Text
PROPERTY LINE
AutoCAD SHX Text
EXISTING EASEMENT
AutoCAD SHX Text
PAGE 39. AMENDEMENT WAS FOR DIVISION OF LOT C5.
AutoCAD SHX Text
& THE CASCADES" DATED DEC. 2016 BY BH2M AND RECORDED
AutoCAD SHX Text
TITLED "FIFTH AMENDED PARCEL PLAN OF PARK NORTH
AutoCAD SHX Text
THIS PLAN SUPERSEDES THE PREVIOUSLY RECORDED PLAN
AutoCAD SHX Text
IN THE YORK COUNTY REGISTRY OF DEEDS IN PLAN BOOK 388,
AutoCAD SHX Text
N01%%D58'47"W, 31.69'
AutoCAD SHX Text
R=435.00', L=30.01'
AutoCAD SHX Text
R=330.00', L=164.71'
AutoCAD SHX Text
N47%%D10'24"W, 33.26'
AutoCAD SHX Text
R=435.00', L=30.01'
AutoCAD SHX Text
R=330.00', L=95.47'
AutoCAD SHX Text
S53%%D48'23"E, 30.91'
AutoCAD SHX Text
S21%%D30'57"E, 39.86'
AutoCAD SHX Text
N77%%D28'57"W, 31.95'
AutoCAD SHX Text
R=330.00', L=40.90'
AutoCAD SHX Text
R=270.00', L=101.82'
AutoCAD SHX Text
N77%%D28'57"W, 45.93'
AutoCAD SHX Text
N55%%D52'35"W, 147.20'
AutoCAD SHX Text
EASEMENT LINE/CURVE DATA
AutoCAD SHX Text
S53%%D48'23"E, 30.91'
AutoCAD SHX Text
R=312.50', L=2.90'
AutoCAD SHX Text
S25%%D12'32"E, 28.95'
AutoCAD SHX Text
N46%%D01'48"W, 10.00'
AutoCAD SHX Text
LINE/CURVE DATA
AutoCAD SHX Text
N12%%D30'14"E, 6.90'
AutoCAD SHX Text
R=295.00', L=92.34'
AutoCAD SHX Text
S53%%D48'23"E, 30.91'
AutoCAD SHX Text
R=295.00', L=147.24'
AutoCAD SHX Text
L11
AutoCAD SHX Text
L12
AutoCAD SHX Text
L13
AutoCAD SHX Text
L14
AutoCAD SHX Text
C2
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
E1
AutoCAD SHX Text
E2
AutoCAD SHX Text
E3
AutoCAD SHX Text
E4
AutoCAD SHX Text
E5
AutoCAD SHX Text
E6
AutoCAD SHX Text
E7
AutoCAD SHX Text
E8
AutoCAD SHX Text
E9
AutoCAD SHX Text
E10
AutoCAD SHX Text
E11
AutoCAD SHX Text
E12
AutoCAD SHX Text
E13
AutoCAD SHX Text
E14
AutoCAD SHX Text
E15
AutoCAD SHX Text
E16
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
THIS PLAN REVIEWED AND APPROVED BY THE CITY
AutoCAD SHX Text
OF SACO PLANNING BOARD.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
CHAIR
AutoCAD SHX Text
N55%%D52'35"W, 147.31'
AutoCAD SHX Text
R=305.00', L=115.01'
AutoCAD SHX Text
S15%%D25'59"W, 44.01''
AutoCAD SHX Text
S31%%D01'29"E, 13.77'
AutoCAD SHX Text
N77%%D28'57"W, 52.37'
AutoCAD SHX Text
S35%%D35'56"W, 120.93'
AutoCAD SHX Text
R=294.50', L=103.65'
AutoCAD SHX Text
N61%%D20'52"E, 13.98'
AutoCAD SHX Text
R=1687.28', L=17.52'
AutoCAD SHX Text
R=1687.28', L=17.51'
AutoCAD SHX Text
R=329.50', L=115.97'
AutoCAD SHX Text
S35%%D35'56"W, 122.23'
AutoCAD SHX Text
S15%%D25'59"W, 45.09'
AutoCAD SHX Text
N34%%D52'10"E, 40.00'
AutoCAD SHX Text
N34%%D52'10"E, 40.00'
AutoCAD SHX Text
N89%%D29'29"W, 40.64'
AutoCAD SHX Text
E17
AutoCAD SHX Text
E18
AutoCAD SHX Text
E19
AutoCAD SHX Text
E20
AutoCAD SHX Text
E21
AutoCAD SHX Text
E22
AutoCAD SHX Text
E23
AutoCAD SHX Text
E24
AutoCAD SHX Text
E25
AutoCAD SHX Text
E26
AutoCAD SHX Text
E27
AutoCAD SHX Text
E28
AutoCAD SHX Text
E29
AutoCAD SHX Text
E30
AutoCAD SHX Text
E31
AutoCAD SHX Text
E32
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
MINIMUM STANDARDS:
AutoCAD SHX Text
6.
AutoCAD SHX Text
FRONTAGE 50'
AutoCAD SHX Text
SETBACKS- 50' FRONT (ROUTE 1)
AutoCAD SHX Text
20' FRONT ALL OTHER ROADS
AutoCAD SHX Text
10' SIDE AND REAR
AutoCAD SHX Text
N33%%D57'00"E, 40.00'
AutoCAD SHX Text
N56%%D03'00"W, 10.09'
AutoCAD SHX Text
L1
AutoCAD SHX Text
L2
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
S56%%D03'00"E, 35.00'
AutoCAD SHX Text
L3
AutoCAD SHX Text
-
AutoCAD SHX Text
N33%%D57'00"E, 53.60'
AutoCAD SHX Text
L4
AutoCAD SHX Text
-
AutoCAD SHX Text
N33%%D57'00"E, 17.63'
AutoCAD SHX Text
L5
AutoCAD SHX Text
-
AutoCAD SHX Text
N56%%D03'00"W, 42.00'
AutoCAD SHX Text
L6
AutoCAD SHX Text
-
AutoCAD SHX Text
S56%%D03'00"E, 18.00'
AutoCAD SHX Text
L7
AutoCAD SHX Text
-
AutoCAD SHX Text
N56%%D03'00"W, 18.00'
AutoCAD SHX Text
L8
AutoCAD SHX Text
-
AutoCAD SHX Text
S33%%D57'00"W, 6.00'
AutoCAD SHX Text
L9
AutoCAD SHX Text
-
AutoCAD SHX Text
S33%%D57'00"W, 56.64'
AutoCAD SHX Text
L10
AutoCAD SHX Text
-
AutoCAD SHX Text
R=30.00', L=47.12'
AutoCAD SHX Text
C1
AutoCAD SHX Text
-
AutoCAD SHX Text
B.
AutoCAD SHX Text
DATED DEC. 2016 AND RECORDED IN THE
AutoCAD SHX Text
"FIFTH AMENDED PARCEL PLAN OF
AutoCAD SHX Text
PARK NORTH & THE CASCADES", BY
AutoCAD SHX Text
BH2M, FOR AMARI HOLDINGS, LLC
AutoCAD SHX Text
Y.C.R.D., PLAN BOOK 388, PAGE 39.
AutoCAD SHX Text
1
AutoCAD SHX Text
12/18/18
AutoCAD SHX Text
Rev'd Per City Review
AutoCAD SHX Text
2
AutoCAD SHX Text
1/11/19
AutoCAD SHX Text
City Preliminary Submission
AutoCAD SHX Text
Rev'd For Final Approval
AutoCAD SHX Text
3
AutoCAD SHX Text
2/26/19
AutoCAD SHX Text
2/26/19
Page 69: Planning and Development Emily Cole-Prescott Saco City ... Meeting Pac… · 2. Baxter Lane: Street Acceptance Recommendation Request a. Memo from City Planner b. Letter, Warranty

Saco

, Mai

ne5

Ston

e Po

ny C

ircle

Am

ari H

oldi

ngs,

LLC

FOR

CO

MM

ERC

IAL

BU

ILD

ING

EXIS

TIN

G C

ON

DIT

ION

S

CA

SCA

DE

RO

AD

SAC

O, M

AIN

E

Aug. 2018

As Noted

18055

2

W. Pelkey

Dept.

A. Fagan

Gorh

am, M

aine

040

3828

Sta

te S

tree

tFa

x (2

07) 8

39-8

250

Berr

y, H

uff,

McD

onal

d, M

illig

an In

c.

BH

2MEn

gine

ers,

Surv

eyor

s

Tel.

(207

) 839

-277

1

25'0 50'25'

Scale: 1" = 25'

G:\

2018

\18

055

\Ex

isting

.dwg

, 2/

26/

2019

8:5

7:55

AM

, Aut

oCAD

PDF

(Hi

gh Q

ualit

y Pr

int).

pc3

AutoCAD SHX Text
S
AutoCAD SHX Text
WV
AutoCAD SHX Text
D
AutoCAD SHX Text
Y
AutoCAD SHX Text
H
AutoCAD SHX Text
S
AutoCAD SHX Text
N/F
AutoCAD SHX Text
Henry Properties LLC
AutoCAD SHX Text
29 Washington Ave
AutoCAD SHX Text
Scarborough, ME 04047
AutoCAD SHX Text
Bk. 15562, Pg. 724
AutoCAD SHX Text
N/F
AutoCAD SHX Text
Gordon ODonnell
AutoCAD SHX Text
885 Portland Road
AutoCAD SHX Text
Saco, ME 04072
AutoCAD SHX Text
Bk. 15068, Pg. 78
AutoCAD SHX Text
N34°52'10"E
AutoCAD SHX Text
255.06'
AutoCAD SHX Text
S55°52'35"E
AutoCAD SHX Text
180.63'
AutoCAD SHX Text
S15°25'59"W
AutoCAD SHX Text
72.41'
AutoCAD SHX Text
S35°35'56"W
AutoCAD SHX Text
121.49'
AutoCAD SHX Text
N59°58'55"W
AutoCAD SHX Text
170.89'
AutoCAD SHX Text
L
AutoCAD SHX Text
=
AutoCAD SHX Text
1
AutoCAD SHX Text
0
AutoCAD SHX Text
8
AutoCAD SHX Text
.
AutoCAD SHX Text
4
AutoCAD SHX Text
1
AutoCAD SHX Text
L
AutoCAD SHX Text
=
AutoCAD SHX Text
1
AutoCAD SHX Text
0
AutoCAD SHX Text
9
AutoCAD SHX Text
.
AutoCAD SHX Text
8
AutoCAD SHX Text
1
AutoCAD SHX Text
L
AutoCAD SHX Text
=
AutoCAD SHX Text
2
AutoCAD SHX Text
2
AutoCAD SHX Text
8
AutoCAD SHX Text
.
AutoCAD SHX Text
5
AutoCAD SHX Text
2
AutoCAD SHX Text
R
AutoCAD SHX Text
=
AutoCAD SHX Text
1
AutoCAD SHX Text
6
AutoCAD SHX Text
8
AutoCAD SHX Text
7
AutoCAD SHX Text
.
AutoCAD SHX Text
2
AutoCAD SHX Text
8
AutoCAD SHX Text
0
AutoCAD SHX Text
R
AutoCAD SHX Text
=
AutoCAD SHX Text
3
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
.
AutoCAD SHX Text
0
AutoCAD SHX Text
0
AutoCAD SHX Text
0
AutoCAD SHX Text
R
AutoCAD SHX Text
=
AutoCAD SHX Text
2
AutoCAD SHX Text
8
AutoCAD SHX Text
7
AutoCAD SHX Text
.
AutoCAD SHX Text
5
AutoCAD SHX Text
0
AutoCAD SHX Text
0
AutoCAD SHX Text
N/F
AutoCAD SHX Text
Park North Development LLC
AutoCAD SHX Text
1022 Portland Road
AutoCAD SHX Text
Saco, ME 04072
AutoCAD SHX Text
Bk. 15023, Pg. 731
AutoCAD SHX Text
CMF #5556
AutoCAD SHX Text
S77°28'57"E
AutoCAD SHX Text
77.88'
AutoCAD SHX Text
C1
AutoCAD SHX Text
L1
AutoCAD SHX Text
UP#1
AutoCAD SHX Text
96
AutoCAD SHX Text
D
AutoCAD SHX Text
x
AutoCAD SHX Text
PKS
AutoCAD SHX Text
PKS
AutoCAD SHX Text
PKS
AutoCAD SHX Text
PKS
AutoCAD SHX Text
PKS
AutoCAD SHX Text
PKS
AutoCAD SHX Text
PKS
AutoCAD SHX Text
E29
AutoCAD SHX Text
E30
AutoCAD SHX Text
E22
AutoCAD SHX Text
E23
AutoCAD SHX Text
E24
AutoCAD SHX Text
E25
AutoCAD SHX Text
E26
AutoCAD SHX Text
E27
AutoCAD SHX Text
E28
AutoCAD SHX Text
40.00'
AutoCAD SHX Text
97
AutoCAD SHX Text
95
AutoCAD SHX Text
94
AutoCAD SHX Text
93
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
97
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
3
AutoCAD SHX Text
4
AutoCAD SHX Text
S
AutoCAD SHX Text
98
AutoCAD SHX Text
98
AutoCAD SHX Text
98
AutoCAD SHX Text
98
AutoCAD SHX Text
98x0
AutoCAD SHX Text
95x3
AutoCAD SHX Text
97x3
AutoCAD SHX Text
98x0
AutoCAD SHX Text
97x7
AutoCAD SHX Text
98x1
AutoCAD SHX Text
98x0
AutoCAD SHX Text
95x3
AutoCAD SHX Text
94x6
AutoCAD SHX Text
95x3
AutoCAD SHX Text
95x3
AutoCAD SHX Text
143.65'
AutoCAD SHX Text
36.98'
AutoCAD SHX Text
PKS
AutoCAD SHX Text
163.61'
AutoCAD SHX Text
IRS
AutoCAD SHX Text
N33°57'00"E
AutoCAD SHX Text
156.13'
AutoCAD SHX Text
N33°57'00"E
AutoCAD SHX Text
L
AutoCAD SHX Text
53.64'
AutoCAD SHX Text
17.63'
AutoCAD SHX Text
=
AutoCAD SHX Text
1
AutoCAD SHX Text
0
AutoCAD SHX Text
2
AutoCAD SHX Text
.
AutoCAD SHX Text
4
AutoCAD SHX Text
8'
AutoCAD SHX Text
L=5.93'
AutoCAD SHX Text
PKS
AutoCAD SHX Text
7.28'
AutoCAD SHX Text
PKS
AutoCAD SHX Text
S56°03'00"E
AutoCAD SHX Text
24.91'
AutoCAD SHX Text
N33°57'00"E
AutoCAD SHX Text
40.00'
AutoCAD SHX Text
L1
AutoCAD SHX Text
S56°03'00"E
AutoCAD SHX Text
183.00'
AutoCAD SHX Text
N56°03'00"W
AutoCAD SHX Text
197.20'
AutoCAD SHX Text
S33°57'00"W
AutoCAD SHX Text
118.50
AutoCAD SHX Text
N56°03'00"W
AutoCAD SHX Text
42.00'
AutoCAD SHX Text
28.00'
AutoCAD SHX Text
N33°57'00"E
AutoCAD SHX Text
L4
AutoCAD SHX Text
92.50'
AutoCAD SHX Text
L3
AutoCAD SHX Text
L2
AutoCAD SHX Text
L4
AutoCAD SHX Text
C1
AutoCAD SHX Text
L=71.98'
AutoCAD SHX Text
L=24.04'
AutoCAD SHX Text
53.60'
AutoCAD SHX Text
IRS
AutoCAD SHX Text
IRS
AutoCAD SHX Text
IRS
AutoCAD SHX Text
CASCADE
AutoCAD SHX Text
ROAD
AutoCAD SHX Text
PORTLAND ROAD - US ROUTE 1
AutoCAD SHX Text
TO DOWNTOWN SACO
AutoCAD SHX Text
Ex. CB C
AutoCAD SHX Text
Ex. CB D
AutoCAD SHX Text
Ex. CB E
AutoCAD SHX Text
Ex. DMH
AutoCAD SHX Text
Ex. SMH
AutoCAD SHX Text
Ex. CB A
AutoCAD SHX Text
Ex. CB B
AutoCAD SHX Text
8"
AutoCAD SHX Text
8"
AutoCAD SHX Text
8"
AutoCAD SHX Text
15"
AutoCAD SHX Text
15"
AutoCAD SHX Text
18"
AutoCAD SHX Text
18"
AutoCAD SHX Text
18"
AutoCAD SHX Text
15"
AutoCAD SHX Text
Approx. Location 8" Watermain
AutoCAD SHX Text
Approx. Location 8" Watermain
AutoCAD SHX Text
UP
AutoCAD SHX Text
EXISTING BUSINESS
AutoCAD SHX Text
Remaining Land of
AutoCAD SHX Text
Town & Country
AutoCAD SHX Text
Federal Credit Union
AutoCAD SHX Text
Existing Concrete
AutoCAD SHX Text
Drainage Structure
AutoCAD SHX Text
Existing Right of Way And
AutoCAD SHX Text
Utility Easement
AutoCAD SHX Text
Existing Right of Way And
AutoCAD SHX Text
Utility Easement
AutoCAD SHX Text
Ex. 8" Sanitary Sewer Line
AutoCAD SHX Text
Ex. 10'x12' Dumpster Enclosure
AutoCAD SHX Text
On Concrete Pad
AutoCAD SHX Text
Stop Sign
AutoCAD SHX Text
Stop Sign
AutoCAD SHX Text
Drainage Easement
AutoCAD SHX Text
To Ex. Pump Station
AutoCAD SHX Text
To Ex. Detention Pond 5
AutoCAD SHX Text
Ex. SMH A
AutoCAD SHX Text
Ex. Light Pole, Typ.
AutoCAD SHX Text
Ex. CB#1
AutoCAD SHX Text
Ex. 12" S.D.
AutoCAD SHX Text
Ex. 8" Sanitary Sewer
AutoCAD SHX Text
Ex. Bituminous Parking Area
AutoCAD SHX Text
Ex. 6" Sanitary Sewer
AutoCAD SHX Text
Ex. 5' Bituminous Sidewalk
AutoCAD SHX Text
Ex. Handicap Accessible Sign
AutoCAD SHX Text
Ex. Handicap Sign
AutoCAD SHX Text
EXISTING BUILDING
AutoCAD SHX Text
Stub Inv. 86.04
AutoCAD SHX Text
LOT C5
AutoCAD SHX Text
42,779 S.F.
AutoCAD SHX Text
LOT C5-2
AutoCAD SHX Text
60,619 S.F.
AutoCAD SHX Text
ACCESS EASEMENT FOR LOT C5
AutoCAD SHX Text
ACCESS EASEMENT FOR LOT C5
AutoCAD SHX Text
ACCESS EASEMENT FOR
AutoCAD SHX Text
LOT C5-2
AutoCAD SHX Text
DESIGNED
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
CHECKED
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
JOB. NO.
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
NO.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
REPRODUCTION OR REUSE OF THIS
AutoCAD SHX Text
DOCUMENT WITHOUT THE
AutoCAD SHX Text
EXPRESSED WRITTEN CONSENT
AutoCAD SHX Text
OF BH2M INC. IS PROHIBITED
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
JENKINS RD.
AutoCAD SHX Text
RTE. 5
AutoCAD SHX Text
SCALE: 1" = 2 MILES
AutoCAD SHX Text
LOCATION MAP
AutoCAD SHX Text
SACO
AutoCAD SHX Text
BEACH
AutoCAD SHX Text
ORCHARD
AutoCAD SHX Text
FLAG
AutoCAD SHX Text
ST.
AutoCAD SHX Text
195
AutoCAD SHX Text
RTE
AutoCAD SHX Text
ROSS
AutoCAD SHX Text
INT. 95
AutoCAD SHX Text
POND
AutoCAD SHX Text
RD.
AutoCAD SHX Text
RTE. 9
AutoCAD SHX Text
OLD
AutoCAD SHX Text
SITE
AutoCAD SHX Text
RTE 1
AutoCAD SHX Text
(Dunstan)
AutoCAD SHX Text
West Scarborough
AutoCAD SHX Text
HEARN ROAD
AutoCAD SHX Text
SWAMP
AutoCAD SHX Text
ASH
AutoCAD SHX Text
RD.
AutoCAD SHX Text
INT. 95
AutoCAD SHX Text
PLAN REFERENCES:
AutoCAD SHX Text
9.
AutoCAD SHX Text
DATED 7-13-09 AND RECORDED IN THE
AutoCAD SHX Text
"FOURTH AMENDED OVERALL SUBDIVISION
AutoCAD SHX Text
OF PARK NORTH & THE CASCADES", BY
AutoCAD SHX Text
SEBAGO TECHNICS, PROJECT #05082
AutoCAD SHX Text
TAX MAP REFERENCE:
AutoCAD SHX Text
DEED REFERENCE:
AutoCAD SHX Text
ZONING:
AutoCAD SHX Text
PROJECT AREA:
AutoCAD SHX Text
8.
AutoCAD SHX Text
7.
AutoCAD SHX Text
6.
AutoCAD SHX Text
5.
AutoCAD SHX Text
ENGINEER:
AutoCAD SHX Text
SURVEYOR:
AutoCAD SHX Text
4.
AutoCAD SHX Text
3.
AutoCAD SHX Text
APPLICANT:
AutoCAD SHX Text
2.
AutoCAD SHX Text
SACO, MAINE 04072
AutoCAD SHX Text
CASCADE CONTRACT ZONE
AutoCAD SHX Text
ROBERT C. LIBBY JR., PLS #2190
AutoCAD SHX Text
103,412 S.F.
AutoCAD SHX Text
MAP 62, LOT 1-2
AutoCAD SHX Text
BK. 15384, PG. 659
AutoCAD SHX Text
STEVE BLAKE, PE#11695
AutoCAD SHX Text
28 STATE STREET
AutoCAD SHX Text
GORHAM, MAINE
AutoCAD SHX Text
BH2M
AutoCAD SHX Text
BH2M
AutoCAD SHX Text
AMARI HOLDINGS, LLC
AutoCAD SHX Text
5 STONE PONY CIRCLE
AutoCAD SHX Text
NOTES:
AutoCAD SHX Text
Y.C.R.D., PL. BK. 338, PG. 19.
AutoCAD SHX Text
EX. STORMDRAIN/SEWER STRUCTURES
AutoCAD SHX Text
HYDRANT
AutoCAD SHX Text
H
AutoCAD SHX Text
Y
AutoCAD SHX Text
D
AutoCAD SHX Text
EXISTING CONTOUR
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
PROPOSED CONTOUR
AutoCAD SHX Text
LIMIT OF WETLANDS
AutoCAD SHX Text
UTILITY POLE
AutoCAD SHX Text
SANITARY SEWER
AutoCAD SHX Text
WATER LINE
AutoCAD SHX Text
DRAIN MANHOLE
AutoCAD SHX Text
SANITARY SEWER MANHOLE
AutoCAD SHX Text
SYMBOL
AutoCAD SHX Text
S
AutoCAD SHX Text
D
AutoCAD SHX Text
S
AutoCAD SHX Text
W
AutoCAD SHX Text
151
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
151
AutoCAD SHX Text
PK NAIL TO BE SET
AutoCAD SHX Text
5/8" IRON ROD W/ CAP TO BE SET
AutoCAD SHX Text
SIGN
AutoCAD SHX Text
CONCRETE MONUMENT FOUND
AutoCAD SHX Text
DECIDUOUS TREE
AutoCAD SHX Text
PKS
AutoCAD SHX Text
IRS
AutoCAD SHX Text
WV
AutoCAD SHX Text
WATER VALVE
AutoCAD SHX Text
PROPOSED SPOT GRADE
AutoCAD SHX Text
95.55
AutoCAD SHX Text
EXISTING CURB
AutoCAD SHX Text
SETBACK
AutoCAD SHX Text
GRID-NORTH
AutoCAD SHX Text
LINE/CURVE DATA
AutoCAD SHX Text
N55%%D52'35"W, 147.31'
AutoCAD SHX Text
R=305.00', L=115.01'
AutoCAD SHX Text
S15%%D25'59"W, 44.01''
AutoCAD SHX Text
S31%%D01'29"E, 13.77'
AutoCAD SHX Text
N77%%D28'57"W, 52.37'
AutoCAD SHX Text
S35%%D35'56"W, 120.93'
AutoCAD SHX Text
R=294.50', L=103.65'
AutoCAD SHX Text
N89%%D29'29"W, 40.64'
AutoCAD SHX Text
E23
AutoCAD SHX Text
E24
AutoCAD SHX Text
E25
AutoCAD SHX Text
E26
AutoCAD SHX Text
E27
AutoCAD SHX Text
E28
AutoCAD SHX Text
E29
AutoCAD SHX Text
E30
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
NORTH & THE CASCADES, BY BH2M
AutoCAD SHX Text
FIFTH AMENDED PARCEL PLAN, PARK
AutoCAD SHX Text
PROJECT #16087, DATED DEC. 2016
AutoCAD SHX Text
TO BE RECORDED.
AutoCAD SHX Text
RIM 92.46
AutoCAD SHX Text
15" INV. IN 88.11
AutoCAD SHX Text
CB B
AutoCAD SHX Text
15" INV. OUT 87.96
AutoCAD SHX Text
18" INV. OUT 85.67
AutoCAD SHX Text
CB E
AutoCAD SHX Text
INV'S IN 85.97
AutoCAD SHX Text
RIM 92.54
AutoCAD SHX Text
RIM 92.62
AutoCAD SHX Text
15" INV. IN 86.34
AutoCAD SHX Text
CB D
AutoCAD SHX Text
15" INV. OUT 86.24
AutoCAD SHX Text
15" INV. OUT 86.95
AutoCAD SHX Text
RIM 92.32
AutoCAD SHX Text
18" INV'S. IN 85.12
AutoCAD SHX Text
18" INV. OUT 85.07
AutoCAD SHX Text
EX. DMH
AutoCAD SHX Text
CB C
AutoCAD SHX Text
CB A
AutoCAD SHX Text
15" INV. IN 86.98
AutoCAD SHX Text
RIM 90.58
AutoCAD SHX Text
15" INV. 88.32
AutoCAD SHX Text
RIM 92.37
AutoCAD SHX Text
RIM 92.28
AutoCAD SHX Text
8" INV'S. IN 83.37
AutoCAD SHX Text
8" INV. OUT 83.28
AutoCAD SHX Text
EX. SMH
AutoCAD SHX Text
RIM 95.35
AutoCAD SHX Text
8" INV. IN 85.15
AutoCAD SHX Text
8" INV. OUT 85.05
AutoCAD SHX Text
SMH A
AutoCAD SHX Text
12" INV. IN 87.16
AutoCAD SHX Text
6" INV. IN 85.15
AutoCAD SHX Text
CB#1
AutoCAD SHX Text
12" INV. 88.84
AutoCAD SHX Text
RIM 93.24
AutoCAD SHX Text
PLAN TITLED "SITE PLAN, GYM FACILITY"
AutoCAD SHX Text
BY BH2M, PROJECT #16087, DATED
AutoCAD SHX Text
AND RECORDED IN THE Y.C.R.D., PLAN
AutoCAD SHX Text
BOOK 388, PAGE 40.
AutoCAD SHX Text
SACO, MAINE 04072
AutoCAD SHX Text
AMARI HOLDINGS, LLC
AutoCAD SHX Text
5 STONE PONY CIRCLE
AutoCAD SHX Text
OWNER/APPLICANT:
AutoCAD SHX Text
1.
AutoCAD SHX Text
ROBERT
AutoCAD SHX Text
C.
AutoCAD SHX Text
LIBBY, JR.
AutoCAD SHX Text
2190
AutoCAD SHX Text
U
AutoCAD SHX Text
O
AutoCAD SHX Text
F
AutoCAD SHX Text
M
AutoCAD SHX Text
A
AutoCAD SHX Text
I
AutoCAD SHX Text
N
AutoCAD SHX Text
E
AutoCAD SHX Text
S
AutoCAD SHX Text
T
AutoCAD SHX Text
A
AutoCAD SHX Text
T
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
S
AutoCAD SHX Text
V
AutoCAD SHX Text
Y
AutoCAD SHX Text
O
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
L
AutoCAD SHX Text
D
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
F
AutoCAD SHX Text
E
AutoCAD SHX Text
O
AutoCAD SHX Text
P
AutoCAD SHX Text
R
AutoCAD SHX Text
N
AutoCAD SHX Text
A
AutoCAD SHX Text
I
AutoCAD SHX Text
O
AutoCAD SHX Text
L
AutoCAD SHX Text
SOILS:
AutoCAD SHX Text
10.
AutoCAD SHX Text
ELMWOOD FINE SANDY LOAM, PER YORK
AutoCAD SHX Text
COUNTY MEDIUM INTENSITY SOILS MAPS
AutoCAD SHX Text
1
AutoCAD SHX Text
12/18/18
AutoCAD SHX Text
Rev'd Per City Review
AutoCAD SHX Text
2
AutoCAD SHX Text
1/11/19
AutoCAD SHX Text
City Preliminary Submission
AutoCAD SHX Text
Rev'd For Final Approval
AutoCAD SHX Text
3
AutoCAD SHX Text
2/26/19
AutoCAD SHX Text
N56%%D03'00"W, 10.09'
AutoCAD SHX Text
L1
AutoCAD SHX Text
N33%%D57'00"E, 18.00'
AutoCAD SHX Text
L2
AutoCAD SHX Text
N56%%D03'00"W, 18.00'
AutoCAD SHX Text
L3
AutoCAD SHX Text
S33%%D57'00"W, 6.00'
AutoCAD SHX Text
L4
AutoCAD SHX Text
R=30.00', L=47.12'
AutoCAD SHX Text
C1
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
-
Page 70: Planning and Development Emily Cole-Prescott Saco City ... Meeting Pac… · 2. Baxter Lane: Street Acceptance Recommendation Request a. Memo from City Planner b. Letter, Warranty

SUMMARY MEMORANDUM TO: Ms. Emily Cole-Prescott DATE: March 22, 2019

City Planner Saco City Hall 300 Main Street Saco, Maine 04072-1538

RE: Traffic Review for Proposed 4 Cascade Road Office Building – Amari ________________________________________________________________________

Maine Traffic Resources (MTR)/Sewall was requested by the City of Saco to

review traffic impact for the proposed office building at 4 Cascade Road. It is understood that the office building will provide 3,000 square feet (S.F.) of space for a general office and 3,000 S.F. of medical office space. I reviewed the plans and trip generation calculations you provided, prepared by BH2M. My preliminary review comments are summarized below:

1. Trip Generation. I calculated trip generation for the proposed uses utilizing the

most recent 10th edition ITE “Trip Generation” manual. The building, occupied by 3,000 S.F. of each general office and medical office, can be expected to generate:

Time Period # of One-Way Trip Ends

Weekday 134

AM Peak Hour 15

PM Peak Hour 16

As seen above, the office building is expected to generate 134 daily trips and 15 to 16 trips during peak hours. Given that daily trip generation will be less than 400 trips, a full Traffic Impact Analysis is not required by your Site Plan Review ordinance.

2. Existing TMP. There is an existing MaineDOT Traffic Movement Permit for the

Park North and Cascades development. As noted in my recent Park North Daycare Review (dated 1/2/2019), there are several TMP conditions that were required for development to date that have not yet been met. These conditions include:

Page 71: Planning and Development Emily Cole-Prescott Saco City ... Meeting Pac… · 2. Baxter Lane: Street Acceptance Recommendation Request a. Memo from City Planner b. Letter, Warranty

4 Cascade Road Office Building March 22. 2019 Page 2 of 3

• Improvements to Cascade Road including it be reconfigured to have separate 12-foot-wide left and right turn lanes 200 feet in length, a 4-foot-wide raised island extending back to the most easterly drive and a 12-foot-wide receiving lane. A 75-foot-long fully shadowed left turn lane (with appropriate taper) shall be constructed for vehicles entering into the easterly drive. The easterly drive shall have separate right and left turn lanes, a 15-foot-wide island and a single ingress lane. A stamped island may be used for the westbound approach at the easterly driveway. The westerly driveway shall be a single ingress and egress lane, but shall be right in and right out only. Those improvements shall be constructed prior to occupancy of any building lot within The Cascade portion of the subdivision.

• Interconnect the existing traffic signal at Cascade Road to the proposed

signals and implement a coordination plan between the signals. Coordination plan shall be developed for time of day and by season. These improvements shall be completed once MDOT and City has approved operation, of sequenced traffic signals at Flag Pond Road/Site Drive and Route 1 intersection.

• Route 1 and Waterfall Drive. This intersection is intended to be signalized.

A fully actuated traffic signal shall be installed, but shall remain in flash mode until such time that a signal warrant is met. The entrance shall have two egress lanes consisting of an exclusive left and exclusive right turn lane and two ingress lanes. The ingress and egress lanes shall be separated by a 15-foot-wide island. A 175-foot-long right turn lane with appropriate taper shall be constructed on Route 1. An exclusive left turn lane 150-foot-long shall be constructed opposite the center left turn lane and shall be fully shadowed by a stamped pavement island with appropriate tapers. These improvements shall be completed when the volume of peak hour trips generated by approved sites on building lots within this portion of the subdivision exceed 100 peak hour trips or when the volume of trips projected to enter the subdivision via a left turn exceeds 25 vehicles per hour, unless completed earlier by the applicant.”

Sebago Technics recently indicated for the Cascades Falls Apartments that the Route 1 turn lanes and traffic signal are under design and that the site drive has been completed. Based upon Google Earth, there are no lane lines or pavement markings on the site drive exit, such as left and right turn arrows and stop bar. These site drive markings should be incorporated into the design and installed as soon as feasible.

Page 72: Planning and Development Emily Cole-Prescott Saco City ... Meeting Pac… · 2. Baxter Lane: Street Acceptance Recommendation Request a. Memo from City Planner b. Letter, Warranty
Page 73: Planning and Development Emily Cole-Prescott Saco City ... Meeting Pac… · 2. Baxter Lane: Street Acceptance Recommendation Request a. Memo from City Planner b. Letter, Warranty
Page 74: Planning and Development Emily Cole-Prescott Saco City ... Meeting Pac… · 2. Baxter Lane: Street Acceptance Recommendation Request a. Memo from City Planner b. Letter, Warranty

  

Planning and Development Saco City Hall 300 Main Street Saco, Maine 04072-1538

Emily C. PrescottCity Planner

[email protected] Phone: (207) 282-3487 ext.357

TO: Review Committee Comments Due: _________________

FROM: Maggie Edwards Meeting Date: __________________

DATE: _______________ Review Type: __________________

RE:_______________________________________________________________

__________________________________________________________________

Departments:________________________________________________________ Reviewer: _____________________________ Time: _________________________________

Comments:

Page 75: Planning and Development Emily Cole-Prescott Saco City ... Meeting Pac… · 2. Baxter Lane: Street Acceptance Recommendation Request a. Memo from City Planner b. Letter, Warranty

  

Planning and Development Saco City Hall 300 Main Street Saco, Maine 04072-1538

Emily C. PrescottCity Planner

[email protected] Phone: (207) 282-3487 ext.357

TO: Review Committee Comments Due: _________________

FROM: Maggie Edwards Meeting Date: __________________

DATE: _______________ Review Type: __________________

RE:_______________________________________________________________

__________________________________________________________________

Departments:________________________________________________________ Reviewer: _____________________________ Time: _________________________________

Comments:

Page 76: Planning and Development Emily Cole-Prescott Saco City ... Meeting Pac… · 2. Baxter Lane: Street Acceptance Recommendation Request a. Memo from City Planner b. Letter, Warranty

https://cityofsaco.sharepoint.com/PlanningDepartment/SecurePlanDev/Shared Documents/Properties and Developments/Amari Subdivision Amendment 031219/2019-3-26 DPW Review Cascade Road Commercial.docx Page 1 of 1

MEMORANDUM

TO: Emily Cole-Prescott, Planner Planning Account No.: TBD

DATE: March 26, 2019

RE: Cascade Road Commercial Building Tax Map 62, Lot 1-2

The Department of Public Works (DPW) has reviewed the revised site plan application materials for the above referenced project prepared by BH2M, dated February 26, 2019. The following comments have been prepared

based upon our review:

1. The amended subdivision plan is titled “sixth amended”. Is that correct?

2. The amended subdivision plan should be revised to include reciprocal easements for vehicular access,

utilities, solid waste, etc.

3. There still appears to be discrepancies between the building plans exterior access doors and configuration

of walkways. The walkways do not appear to align with the doors on the west elevation, and the east elevation shows two doors and one walk. The location of the handicap parking spaces on the east entrance

should be reviewed with the access door locations.

4. The curb at the driveway entrances should be labeled on the plan.

5. It appears the existing gym building is fed by underground electrical service from pole #5556 and not from

the adjacent pole as shown on the site plan. Please confirm. If the existing building is serviced from pole #5556, then confirm with CMP that the new building can be served from Up-1 as shown on the plan. These

lines will cross each other and potentially conflict.

6. Confirm with CMP that additional pole mounted transformers can be accommodated for this project. If a pad mounted transformer is required, then it needs to be shown on the site plan.

7. As commented previously, the final design of the water distribution system needs to be reviewed and

approved by the Maine Water Company prior to site plan approval.

8. It is our understanding that the original developer is resubmitting to MaineDOT for the Traffic Movement

Permit associated with the overall development. Without that in place, then it is our understanding that

the City will not allow occupancy of the building until the new permit is in place.

9. Is there any new landscaping proposed as part of this project? The resubmittal indicates no additional

landscaping; however, the architect states landscaping will be provided at each entrance to define and give

them prominence.

10. Has the City’s site lighting peer review consultant reviewed and commented on the exterior lighting

photometrics plan and fixtures with respect to Ordinance standards?

We look forward to discussing this project further and would be happy to clarify any of our comments made within this review memo.

CITY OF SACO, MAINE Saco Public Works Department Joseph A. Laverriere, P.E. – City Engineer 300 Main Street Telephone: (207) 284-6641 Saco, Maine 04072 Email: [email protected]