TITLE :TRAIN PLATFORM SCAFFOLD
ARRIVACAMPBELL ROADEASTLEIGH
DRAWN BY :C J BURCH
CHECKED BY :C E BURCH
DATE : 22nd Sept 18
DRAWING :
CLIENT :T.B.A.
Not for construction until over printed working drawing
WORKING DRAWING
SPECIAL NOTESGENERAL NOTES
A. This drawing is confidential and the exclusive property of the Client.No unauthorised use, copy or disclosure is to be made and it is to be returned upon request.
B. All services, plant, equipment and materials supplied are subject to the scaffold contractors conditions of Contract, Hire or Sale as applicable.
C. This drawing has been prepared from details supplied to us by the Client the Scaffold Contractor should check that we have correctly interpreted his requirements and that all loadings, dimensions, details, erection and striking sequences are correct and practicable. No alterations may be made withouth reference to the Client.
D. The Client is to prepare and ensure that the foundations are suitable for supporting the loads imposed upon it by our scaffold including its working load.
E. No sheeting whatsover, unless already shown, will be added to the scaffold without reference to the Client.
F. It is the responsiblity of the enquirer / Client to ensure that adequate facilities for tying the scaffold are made available and that the building or structure is capable of withstanding the loads applied to it by the scaffold and its working load.
G. No ties or braces are to be removed or any modifications to be made to the scaffold without reference and apporval from the Client.
H. The Scaffold Contractor is to design, supply and fix all necessary auxillary equipment, including, but not limited to, shuttering, timbers, bearers, steel joists and to ensure that such auxillary equipment is capable of safely transmitting the loads to the standards.
J. The Scaffold Contractor will be responsible for the setting out and final levelling of scaffolding or similar equipment used as a system of support.
K. All dimensions are as stated or as calculated. Drawing must not be scaled.
L. This drawing has been prepared on the assumption that all loads will be applied axially to the tubes unless stated otherwise.
M. Scaffold has been designed in accordance with TG20:13
NOTE : Scaffold has been designed for a maximum imposed load of 5.0 kN/sq.m. on one number working lift
SCALE :1:100 at A1
Any Queries relating to this drawing should be directed to the Christchurch Design Office 01425 283988
DESIGNER: SCAFFOLD DESIGNERS LTD Unit 6A, Priory Industrial Estate, Airspeed Road
Christchurch, Dorset. BH23 4HD. Tel : 01425 283988 www.scaffolddesigners.co.uk
M YOUNG SCAFFOLDING
Unit A, 73 Common RoadChandlers Ford
Eastleight, Hants.
Tel Fax : 02380 276 444
7335-18-01
PLAN TO GROUND LEVEL
END ELEVATIONLEFT SIDE ELEVATION
A A
BB
ISOMETRIC VIEW
Face/ Sway bracing to be fitted to all standards to every fifth bay
Ledger braces to be fitted to every bay to alternate sides
Underslung transom to support central double ledger to alternate bays
Staircase to be formed with Appollo stair treads or similar to each end of platform
Platform to be formed with single layers of scaffold boards
Board bearers to be fitted at max 0.45m centers to suit boards
Central standards to be adjusted to suit sleepers and ballast locations
All scaffold to be based on steel base plates on 450mm long single sole boards on firm and level ground
Double ledgers to be fitted to central standards
Check couplers to be fitted to positions shown thus
Handrails to be fitted at 950mm above boarded level
Outer boards to be notched around standards if scaffold to be formed less than 4.2m overall
Double rakers to form handrail to stairs
SCAFFOLD TO EXTEND FOR 240M IN SIMILAR TO ARRANGEMENT AS SHOWN
SCAFFOLD TO EXTEND FOR 240M IN SIMILAR TO ARRANGEMENT AS SHOWN
Staircase to be formed with Appollo stair treads or similar to each end of platform
Double rakers to form handrail to stairs
Central standards to be adjusted to suit sleepers and ballast locations
Note scaffold reduces in width by 0.225m to this last 3.9m bay
Note scaffold reduces in width by 0.225m to this last 3.9m bay
Staircase to be formed with Appollo stair treads or similar to each end of platform
Face/ Sway bracing to be fitted to all standards to every fifth bay
Ledger braces to be fitted to every bay to alternate sides
All scaffold to be based on steel base plates on 450mm long single sole boards on firm and level ground
Central standards to be adjusted to suit sleepers and ballast locations
Note scaffold reduces in width by 0.225m to this last 3.9m bay
TITLE :TRAIN PLATFORM SCAFFOLD
ARRIVACAMPBELL ROADEASTLEIGH
DRAWN BY :C J BURCH
CHECKED BY :C E BURCH
DATE : 22nd Sept 18
DRAWING :
CLIENT :T.B.A.
Not for construction until over printed working drawing
WORKING DRAWING
SPECIAL NOTESGENERAL NOTES
A. This drawing is confidential and the exclusive property of the Client.No unauthorised use, copy or disclosure is to be made and it is to be returned upon request.
B. All services, plant, equipment and materials supplied are subject to the scaffold contractors conditions of Contract, Hire or Sale as applicable.
C. This drawing has been prepared from details supplied to us by the Client the Scaffold Contractor should check that we have correctly interpreted his requirements and that all loadings, dimensions, details, erection and striking sequences are correct and practicable. No alterations may be made withouth reference to the Client.
D. The Client is to prepare and ensure that the foundations are suitable for supporting the loads imposed upon it by our scaffold including its working load.
E. No sheeting whatsover, unless already shown, will be added to the scaffold without reference to the Client.
F. It is the responsiblity of the enquirer / Client to ensure that adequate facilities for tying the scaffold are made available and that the building or structure is capable of withstanding the loads applied to it by the scaffold and its working load.
G. No ties or braces are to be removed or any modifications to be made to the scaffold without reference and apporval from the Client.
H. The Scaffold Contractor is to design, supply and fix all necessary auxillary equipment, including, but not limited to, shuttering, timbers, bearers, steel joists and to ensure that such auxillary equipment is capable of safely transmitting the loads to the standards.
J. The Scaffold Contractor will be responsible for the setting out and final levelling of scaffolding or similar equipment used as a system of support.
K. All dimensions are as stated or as calculated. Drawing must not be scaled.
L. This drawing has been prepared on the assumption that all loads will be applied axially to the tubes unless stated otherwise.
M. Scaffold has been designed in accordance with TG20:13
NOTE : Scaffold has been designed for a maximum imposed load of 5.0 kN/sq.m. on one number working lift
SCALE :1:100 at A1
Any Queries relating to this drawing should be directed to the Christchurch Design Office 01425 283988
DESIGNER: SCAFFOLD DESIGNERS LTD Unit 6A, Priory Industrial Estate, Airspeed Road
Christchurch, Dorset. BH23 4HD. Tel : 01425 283988 www.scaffolddesigners.co.uk
M YOUNG SCAFFOLDING
Unit A, 73 Common RoadChandlers Ford
Eastleight, Hants.
Tel Fax : 02380 276 444
7321-18-02b
Face/ Sway bracing to be fitted to all standards to every fifth bay
Ledger braces to be fitted to every bay to alternate sides Underslung transom to
support central double ledger to alternate bays
TOP PLAN
SECTION A - A
A A
Staircase to be formed with Appollo stair treads or similar to each end of platform
Platform to be formed with single layers of scaffold boards
Board bearers to be fitted at max 0.45m centers to suit boards
Central standards to be adjusted to suit sleepers and ballast locations
BB
SECTION B - B
ISOMETRIC VIEW
All scaffold to be based on steel base plates on 450mm long single sole boards on firm and level ground
Double ledgers to be fitted to central standards
Check couplers to be fitted to positions shown thus
Handrails to be fitted at 950mm above boarded level
Outer boards to be notched around standards if scaffold to be formed less than 4.2m overall
Double rakers to form handrail to stairs
SCAFFOLD TO EXTEND FOR 240M IN SIMILAR TO ARRANGEMENT AS SHOWN
SCAFFOLD TO EXTEND FOR 240M IN SIMILAR TO ARRANGEMENT AS SHOWN
Double check couplers to be fitted below ledger and transom couplers to central standards
Platform to be formed with single layers of scaffold boards
Board bearers to be fitted at max 0.45m centers to suit boards
Double ledgers to be fitted to central standards
Check couplers to be fitted to positions shown thus
Double check couplers to be fitted below ledger and transom couplers to central standards
Platform to be formed with single layers of scaffold boards
Board bearers to be fitted at max 0.45m centers to suit boards
Double ledgers to be fitted to central standards
Handrails to be fitted at 950mm above boarded level
Outer boards to be notched around standards if scaffold to be formed less than 4.2m overall
Underslung transom to support central double ledger to alternate bays
Double rakers to form handrail to stairs
Note scaffold reduces in width by 0.225m to this last 3.9m bay
Staircase to be formed with Appollo stair treads or similar to each end of platform