plan of improvement profile and project … · 451+86 el. 64.2 458+24 el. 45.1 456+24 transition to...
TRANSCRIPT
40
30
20
10
0
40
30
20
10
0
S.P.R.R. Levee crown shaping and surfacing - left and right banksCL Nest Lane
CL 300+50 Calaveras River = 0+00 Stockton Diverting Canal
EQ. {
CL 310+00CL 320+00 300+00CL CL 290+00 CL 280+00 CL 270+00
CL
C L
CL
CL 260+00 CL 250+00
New bridge under construction
Flow23 823 6 22 823 8
Levee crownCL W.P.R.R.
Shaping and Surfacing ----- Left Bank
20 6
25 024 724 7
295+
50C L
CL
30
20
10
0
10CL 240+00CL 250+00
CL 180+00 CL 170+00 CL 160+00 CL 150+00
C L77
+50
CL 140+00 CL 130+00 CL 120+00 CL 110+00
230+00CL CL 220+00 CL 210+00 CL 200+00 CL 190+00 CL 250+00
Flow
Flow
CL30
20
10
0
10
Levee crown Shaping and surfacing - left bankEl Dorado AvenuePacific Avenue (N)
levee shaping and surfacing - left and right banksPacific Avenue (S)crown
18 2 18 118 8
15 5
15 9
15 7
16 2
20.4
+50
Levee crown shaping and surfacing - left and right banks Levee crown shaping and surfacing - right bank Levee crown shaping only - right bank
Levee crown shaping and surfacing - left bankLevee crown shaping only - right bank
30
20
10
0
10
30
20
10
0
10
20
20
10
0
10
20
Pershing AvenueCL30
20
10
0
10
30
20
10
0
10
20
20
10
0
10
20CL 40+00 CL 30+00 CL 20+00 CL 10+00 CL 0+00
CL 110+00 CL 100+00 CL 90+00 CL 80+00 CL 70+00 CL 60+00 CL 50+00 CL 40+00
Levee crown shaping and surfacing - right bank
Flow
San Joaquin River
Flow
10 411 413 513 614 2
10 2 9 7 9 1 8 5
8 1 8 1 Project design flood plane
Top of existing levee - left bank
Top of existing levee - right bank
Adjacent ground line - left bank
Adjacent ground line - right bank
Bottom of existing streambed
+ _
C L52
+20
+ _
C L40
+60
+ _
Mormon Slough ProjectSan Joaquin County, California
CHANNEL IMPROVEMENTAND LEVEE CONSTRUCTION
Calaveras River, Diverting Canal and MormonSlough, from San Joaquin River to Bellota
PLAN OF IMPROVEMENTPROFILE AND PROJECT FLOOD PLANE
U.S. Army Engineer DistrictCorps of Engineers, Sacramento, California
CORPS OF ENGINEERS U.S. ARMY
Date: 19 November, 1965File No. 3-20-142
Sheets 142/1 to 142/20 Sheet no. 142/3
PLATE III SHEET 1 of 6Re-created 2006
Elevations refer to Sea Level Datum, 1929
CALAVERAS RIVER
E L
E V
A T
I O
N S
I
N
F E
E T
STOCKTON DIVERTING CANAL
CALAVERAS RIVER
341+
20El
. 29.
4
S=.000458
38 337 9 37 6 37 5
37 0
37 836 7 36 4
35 8
35 735 4
199+
36El
. 24.
2
S=.000405
38 6
Level
S.P.R.R.
191+
14El
. 41.
1
190+
62El
. 41.
1
188+
85El
. 40.
8
S=.001695
CL
S=.000427
Levee construction - right bankLevee crown shaping and surfacing - left bank
Flow
160+
74El
. 39.
6
160+
74El
. 39.
6
CL Linden Road
S=.000399
Excavated channel - 100’ bottom width
S=.000602
35 1
60
50
40
30
20
10
60
50
40
30
20
10CL 730+00CL 740+00CL 730+00CL 760+00CL 770+00CL 210+00 CL 720+00 140+00CL
60
50
40
30
20
10
60
50
40
30
20
10CL 90+00CL 100+00CL 100+00CL 120+00CL 130+00CL140+00 CL 80+00 70+00CL
S=.000599
S=.00060234 7 34 9
33 9 33 6
33 733 2 33 0 32 6 32 3 32 0 31 7 31 5
31 830 6
29 9
29 731 8
32 4
32 532 6
127+
22El
. 20.
0
S=.000574
Excavated channel - 100’ bottom width
Excavated channel100’ bottom width
118+
90El
. 37.
1
118+
60El
. 37.
1
Levee construction - right bankLevee crown shaping and surfacing - left bank
Levee construction - right bankLevee crown shaping and surfacing - left bank
Levee construction - left bank
S.T. & E. R.R.CLCL
Level
Transition from natural channel
Transition to natural channelTransition to natural channel Transition to natural channel
Transition fromnatural channel
Transition from natural channelTransition from natural channel
Transition to natural channelTransition from natural channel
Transition to natural channel
Flashboard dam
S=.000747
S=.000516
Flow
111+
80El
. 19.
0
110+
20El
. 18.
8
102+45El. 18.4
97+70
98+70El. 18.2
103+
20
101+
20El
. 35.
8
CL Waterloo Road
East Hwy. 99 (northbound)Hwy. 99 (southbound)CL
Existing highway embankment - right bankLevee crown shaping and surfacing - left bank
92+8
0El
. 35.
1
Highway embankment
CL
S=.000615
S=.000676 S=.000900
S=.000969
Excavated channel - 100’ bottom width
Excavated channel - 100’ bottom width Excavated channel - 100’ bottom width
79+20El. 17.0
CL Cherokee Lane
72+0
4El
. 33.
8
71+7
6El
. 33.
8
Level
Levee construction - right bankLevee crown shaping and surfacing - left bank
CL 20+00CL 30+00CL 40+00CL 50+00CL 60+00CL 70+00 CL 10+00 0+00CL
50
40
30
20
10
0
50
40
30
20
10
0
Excavated channel - 100’ bottom width
S=.000900
S=.000969
29 6
29 2 29 0 28 3 28 2 27 9 27 7
27 6
27 5 27 0 26 8 26 5
26 8
25 8 25 4
28 3
53+4
2El
. 32.
1
54+42El. 14.6
S=.001238
S=.000878
S=.000762
CL
53+2
0El
. 32.
1
52+56El. 14.4
49+1
6El
. 31.
6
42+6
0El
. 31.
1
44+00El. 13.7
CLCentral California Traction R.R.
42+0
0El
. 31.
1
Wilson Way
40+30El. 13.5
51+1
6
46+1
7 39+1
3
S=.000638
S=.000727
S=.000130
Flow18+30El. 11.9
91+1
8
16+94El. 11.8
15+2
0
17+8
5El
. 29.
8
17+6
5El
. 29.
8
CL Sanguinetti Road
16+9
4El
. 29.
3
S=.007042
S=.000704
7+00
El. 2
8.6
S=.000767
25 225 0
0+00 Stockton Diverting Canals = 300+50 Calaveras River
CLCL
0+00El. 10.5
S=.000177
25 025 425 425 525 525 625 9
26 026 3
26 326 326 5 26 3
25 4
25 8
Flow
Flashboard dam Mc Allen RoadCL
55+1
6
Stockton Diverting Canal
307+
30El
. 28.
6
300+50 Calaveras River = 0+00 Stockton Diverting CanalCLCL
Farm bridge
322+
66El
. 28.
8
CL 300+00CL 310+00CL 320+00CL 330+00CL 340+00CL 350+00
40
30
20
10
0
40
30
20
10
0
Top of spoil dikes
Project design flood plane
Top of existing levee - left bank
Top of existing levee - right bank
Adjacent ground line - left bank
Adjacent ground line - right bank
Bottom of existing streambed
Excavated channelNote:Elevations refer to Sea Level Datum, 1929
Mormon Slough ProjectSan Joaquin County, California
CHANNEL IMPROVEMENTAND LEVEE CONSTRUCTION
Calaveras River, Diverting Canal and MormonSlough, from San Joaquin River to Bellota
PLAN OF IMPROVEMENTPROFILE AND PROJECT FLOOD PLANE
U.S. Army Engineer DistrictCorps of Engineers, Sacramento, California
Date: 19 November, 1965File No. 3-20-142
Sheets 142/1 to 142/20 Sheet no. 142/4
PLATE III SHEET 2 of 6Re-created 2006
E L
E V
A T
I O
N S
I
N
F E
E T
CORPS OF ENGINEERS U.S. ARMY
Top of project levees
Project design flood plane
Top of existing levee - left bank
Top of existing levee - right bank
Adjacent ground line - left bank
Adjacent ground line - right bank
Bottom of existing streambed
Excavated channel
Top of spoil dikes
Elevations refer to Sea Level Datum, 1929
Dry - weather maintenance roads for maintenance purposes will be provided upstream from about Potter Creek on the crown of spoil dikes and existing levees or on the channel banks where adjacent landside ground furnishes adequate freeboard over the project design flood plane.
Mormon Slough ProjectSan Joaquin County, California
CHANNEL IMPROVEMENTAND LEVEE CONSTRUCTION
Calaveras River, Diverting Canal and MormonSlough, from San Joaquin River to Bellota
PLAN OF IMPROVEMENTPROFILE AND PROJECT FLOOD PLANE
U.S. Army Engineer DistrictCorps of Engineers, Sacramento, California
Date: 19 November, 1965File No. 3-20-142
Sheets 142/1 to 142/20 Sheet no. 142/5
PLATE III SHEET 3 of 6Re-created 2006
E L
E V
A T
I O
N S
I
N
F E
E T
S=.000744
451+
86El
. 64.
2
458+24El. 45.1
456+
24
Transition to natural channel
Excavated channel - 50’ bottom width
Excavated channel - 50’ bottom width
Transition from natural channel
S=.000928
Spoil dike construction - right bank
Spoil dike construction - left and right banks
458+
24El
. 64.
9
63 6 61 861 9
61 1
S=.001097 S=.001165
Spoil dike construction - left bank
4391
+84
El. 6
2.8 60 1
59 359 2 57 0
56 8
59 0
56 0 63 3Flow
423+30El. 42.5
420+25El. 42.4
CL
CL
Conc. dam
Transition to natural channel
433+
65
419+
66
Jack Tone Road
S=.001480S390+52El. 380
Excavated channel - 50’ bottom width
CL 410+00CL 420+00CL 430+00CL 440+00CL 450+00CL 460+00 CL 400+00 390+00 CL
70
60
50
40
30
20
70
60
50
40
30
20
Low water crossingCL
53 752 9
S=.0022121
S=.006678
51 5 51 5
CL 372+40 Mormon Slough =0+00 Potter Creek
50 7
50 7 50 1 49 848 9 48 1
47 4 47 046 3
Panella farm bridge CL
El. 53.3
363+64El. 32.3
363.
64
Flow
Levee construction - left bank
S=.001005S=.00070434
3+75
El. 5
1.3 Levee construction - left and right banks
329+
55El
. 50.
3
S=.000678
S=.000311
337+65El. 29.0
Excavated channel - 50’ bottom width
S=.001270
CL 340+00CL 350+00CL 360+00CL 370+00CL 380+00CL 390+00 CL 330+00 320+00CL
60
50
40
30
20
10
60
50
40
30
20
10
60
50
40
30
20
10
60
50
40
30
20
10
45 7 45 4
305+
96El
.48.
7
44 643 9
Excavation channel50’ bar width Transition
315+
45
311+
70
Excavated channel - 60’ bottom width
CL 270+00CL 280+00CL 290+00CL 300+00CL 310+00CL 320+00 CL 260+00 250+00CL
Levee construction - left and right banks
S=.000311
Flow43 4
S=.000311
42 6
42 0
270+20El. 26.9
41 4
41 241 1 40 7
S=.001372
S=.000270
268+
58El
. 34.
4
41 4
267+
56El
. 45.
4
CL
266+26El. 26.8
267+82El. 19.0
30’ bottom
S=.05
S=.000455
250+
00El
. 44.
0
60
50
40
30
20
10CL 210+00CL 220+00CL 230+00CL 240+00CL 250+00
60
50
40
30
20
10
Flow
S=.000498
S=.000405
39 940 2
40 440 340 6
S=.000462
248+70El. 26.2
245+
35El
. 43.
8
249+
68El
. 44.
0
CL
248+
02
Transition to natural channelExcavated channel - 100’ bottom width
Levee construction - right bankLevee crown shaping and surfacing - left bank
39 4 39 0
261+
60
CORPS OF ENGINEERS U.S. ARMY
291+
70
287+
60
Transition Excavated channel - 70’ bottom width
268+62El. 19.0
Transition 30’ to 70’ bottomTransition 80’ to 30’ bottom Transition from natural channel
Transition100’ to 80’ bottom
MORMON SLOUGH
Excavated channel - 100’ bottom width
STOCKTON DIVERTING CANAL
De Amico Road
level
Levee construction - right bankLevee crown shaping and resurfacing - left bank
261+
00El
. 44.
5
MORMON SLOUGH
253+
35
251+70El. 26.3
258+84El. 26.6
level
S=.000420
STOCKTON DIVERTING CANAL
CopperopolisRoad
S=.002666
33 7
706+
80El
. 94.
6
705+
30El
. 94.
2
705+
30
704+85El. 76.4
Transition to natural channel
100
90
80
70
60
50
Spoil dike construction - left bankLevee crown shaping and surfacing - right bank
92 091 2 90 2 89 3
88 787 5 86 2 84 969
3+00
S=.001300
S=.000909
Flow
679+
30El
. 91.
2
667+
20El
. 90.
1
CL 660+00CL 670+00CL 680+00CL 690+00CL 700+00CL 710+00 CL CL 650+00 640+00
Spoil dike construction - left bank
Left bank road embankment
645+30El. 69.4
657+16El. 70.2
S=.002454
643+
34
Excavated channel50’ bottom width
Transition to natural channelTransition from natural channel
659+
32
Excavated channel - 50’ bottom width
83 283 384 3 83 1
82 6 81 8
S=.001408
S=.0
0245
4
Spoil dike construction- right bank
639+
24
Transition from natural channelTransition to natural channel
621+30El. 65.0
619+
30
Excavation channel -50’ bottom width
613+
06
S=.000465
S=.001044
Transition from natural channel
Transition to natural channel
601+87El. 64.0
610+54El. 64.5
Flow
S=.001566
600+
72
80 679 5 79 0 79 0 78 8
77 576 9 77 0
75 6 74 477 2
604+
76El
. 81.
7
618+
80El
. 83.
6
613+
06El
. 83.
0
Spoil dike construction - left bank
S=.001790
Excavated channel - 50’ bottom width
584+
68
584+00El. 60.8
CLCLCL
CL
Transition to natural channel
Transition from natural channel
S.P.R.R.
578+46El. 59.5
574+
44
S=001070
Excavation channel50’ bottom width
100
90
80
70
60
50
40
100
90
80
70
60
50
40
CL 660+00CL 600+00CL 610+00CL 620+00CL 630+00CL 640+00 CL CL 650+00 570+00
90
80
70
60
50
40
30CL 520+00CL 530+00CL 540+00CL 550+00CL 560+00CL 570+00 CL CL 510+00 500+00
90
80
70
60
50
40
30
Transition from natural channel
548+56El. 56.3
550+
54
Excavated channel - 50’ bottom width
S=.001070
73 672 9
72 7 72 1 71 7 71 0 71 069 5
68 9 68 4 68 6 68 167 2
71 0
Flow
Milton Road
633+
22El
. 85.
4
628+
25El
. 84.
7638+78El. 67.8
Duncan Road
S.P. dam barrier582+94 Mormon Slough
0+00 S.P.R.R.
513+
08El
. 70.
2
508+
50El
. 69.
8
Spoil dike construction- left bank
Low water crossing
Excavated channel - 50’ bottom width
Transition 50’ to 40’ bottom width
CL CL
CL
CL
Copperopolis Road
Check dam
536+66El. 50.5
S=.001155
528+00El. 49.5
527+25El. 52.8
S=.001187
S=.000873
CL
Transition to natural channel 535+
12
S=.004
Excavation channel - 40’ bottom width
Top of spoil dikes
Project design flood plane
Top of existing levee - left bank
Top of existing levee - right bank
Adjacent ground line - left bank
Adjacent ground line - right bank
Bottom of existing streambed
Excavated channel
80
70
60
50
40
30
80
70
60
50
40
30
65 666 3
Flow
64 9 64 463 7
S=.001187
Excavated channel - 50’ bottom width
467+44El. 45.7
469+
90
Transition from natural channel
S=.000928
Spoil dike construction - right bank
467+
94El
. 65.
8
MORMON SLOUGHCL 460+00CL 470+00CL 480+00CL 490+00CL 500+00
Note:Elevations refer to Sea Level Datum, 1929
E L
E V
A T
I O
N S
I
N
F E
E T
Mormon Slough ProjectSan Joaquin County, California
CHANNEL IMPROVEMENTAND LEVEE CONSTRUCTION
Calaveras River, Diverting Canal and MormonSlough, from San Joaquin River to Bellota
PLAN OF IMPROVEMENTPROFILE AND PROJECT FLOOD PLANE
U.S. Army Engineer DistrictCorps of Engineers, Sacramento, California
Date: 19 November, 1965File No. 3-20-142
Sheets 142/1 to 142/20 Sheet no. 142/6
PLATE III SHEET 4 of 6Re-created 2006
CORPS OF ENGINEERS U.S. ARMY
100
90
80
70
60
50
Top of spoil dikes
Project design flood plane
Top of existing levee - left bank
Top of existing levee - right bank
Adjacent ground line - left bank
Adjacent ground line - right bank
Bottom of existing streambed
Excavated channel
S=.001522
775+34El. 82.8
776+
66
E L
E V
A T
I O
N S
I
N
F E
E T
110
100
90
80
70
60
1016
Excavation channel50’ bottom width
Transition from natural channel
99 31003 98 5 98 1 98 2
Levee crown shaping and surfacing -- right bank
Flood Road
Flow
CL
97 2
740+
60El
. 98.
5
S=.001
738+
60El
. 98.
3
Spoil dike construction - left bank
96 5 95 8
94 6 94 4 94 1
94 2 94 9 95 1
Spoil dike construction - left bank
Flashboard damLow water bridge CL
CL
S=.001320
725+
56El
. 97.
2
714+
20El
. 95.
7
110
100
90
80
70
60CL 730+00CL 740+00CL 730+00CL 760+00CL 770+00CL 780+00 CL CL 720+00 710+00
CL 800+00CL 810+00CL 820+00CL 830+00CL 840+00CL 850+00 CL CL 790+00 780+00
120
110
100
90
80
70
60
130
120
110
100
90
80
10921081 1077
Levee crown shaping and surfacing - right bank
Levee crown shaping and surfacing - right bank
10651054 1052
814+75El. 88.8
Flow
Fine RoadCL
10461039
1026
1026
S=.001522
S=.000820
797+
98El
. 103
.7
783+
10El
. 103
.3
Spoil dike construction - left bank
Excavated channel - 50’ bottom width
END CHANNEL EXCAVATION
Transition to natural channel
812+
75
MORMON SLOUGH
CL 870+00CL 880+00CL 890+00CL 900+00CL 910+00CL 920+00 CL CL 860+00 850+00
11031107111311271135
Flow
1148115111611178
CORPS OF ENGINEERS U.S. ARMY
Note:Elevations refer to Sea Level Datum, 1929
Mormon Slough ProjectSan Joaquin County, California
CHANNEL IMPROVEMENTAND LEVEE CONSTRUCTION
Calaveras River, Diverting Canal and MormonSlough, from San Joaquin River to Bellota
PLAN OF IMPROVEMENTPROFILE AND PROJECT FLOOD PLANE
U.S. Army Engineer DistrictCorps of Engineers, Sacramento, California
Date: 19 November, 1965File No. 3-20-142
Sheets 142/1 to 142/20 Sheet no. 142/7
PLATE III SHEET 5 of 6Re-created 2006
120
110
100
90
80
70
60
130
120
110
100
90
80
Left bank road embankment
S=.002353
Top of ballast(Rt. bank)
S.P.R.R. bridge (Rt. bank)
Top of project levees
Project design flood plane
Top of existing levee - left bank
Top of existing levee - right bank
Adjacent ground line - left bank
Adjacent ground line - right bank
Bottom of existing streambed
Excavated channel
CORPS OF ENGINEERS U.S. ARMY
End channel excavation
Transition to natural channel
41+00El. 51.0
57 858 4
49+3
04
58 4 57 756 1
CLJack Tone RoadCL
32+50El. 49.0
55 2 54 4Flow
Concrete culvert: (2-4” Dia.)
S=.001351
Levee construction - left bank
53 6
CL Dirt road and concrete culverts (2 - 10” diameter)
S = .001618 51 5 51 2
0+00 Potter Creek372+40 Mormon Slough
CLCL
4+68El. 44.3
BEGIN CHANNEL EXCAVATION
Excavated channel - 16’ bottom widthTransitionExcavated channel - 22’ bottom width
52 2
CL 10+00CL 20+00CL 30+00CL 40+00CL 50+00CL 50+00 CL 0+00
38+8
5
El. 6
1.1
70
60
50
40
30
20
70
60
50
40
30
20
2+67
El. 5
4.8
POTTER CREEK
CL 10+00CL 20+00CL 30+00 CL 0+00
80 7 80 6 80 4 80 2
80 0 79 8
77 777 2 77 0
Flow
Duncan RoadCL
S.P.R.R. bridge (Rt. bank) Top of ballast (Rt. bank)
CLCL
0+0 S.P.R.R.582+94 Mormon Slough
S.P.R.R. DRAIN
MORMON SLOUGH
140
130
120
110
100
90
140
130
120
110
100
90
CL 940+00CL 950+00CL 960+00CL 970+00CL 980+00CL 990+00 CL 930+00 920+00CL
Calaveras River
124 1123 2 122 6 122 8 122 7 122 6
122 1 122 1 121 6120 2
119 6 118 2CLCL
971+28 Mormon Slough = 26+70 Upper Calaveras River
Flashboard DamCL
Road embankment - Lt. bank
Flow
CL Escalon-Bellota Road
Levee crown shaping and surfacing - right bankE L
E V
A T
I O
N S
I
N
F E
E T
Mormon Slough ProjectSan Joaquin County, California
CHANNEL IMPROVEMENTAND LEVEE CONSTRUCTION
Calaveras River, Diverting Canal and MormonSlough, from San Joaquin River to Bellota
PLAN OF IMPROVEMENTPROFILE AND PROJECT FLOOD PLANE
U.S. Army Engineer DistrictCorps of Engineers, Sacramento, California
Date: 19 November, 1965File No. 3-20-142
Sheets 142/1 to 142/20 Sheet no. 142/8
PLATE III SHEET 6 of 6Re-created 2006
Elevations refer to Sea Level Datum, 1929
22+8
6
18+7
3
100
90
80
70
60
50
100
90
80
70
60
50