plan of improvement profile and project … · 451+86 el. 64.2 458+24 el. 45.1 456+24 transition to...

6
40 30 20 10 0 40 30 20 10 0 S.P.R.R. Levee crown shaping and surfacing - left and right banks C L Nest Lane C L 300+50 Calaveras River = 0+00 Stockton Diverting Canal EQ. { C L 310+00 C L 320+00 300+00 C L C L 290+00 C L 280+00 C L 270+00 C L C L C L C L 260+00 C L 250+00 New bridge under construction Flow 23 8 23 6 22 8 23 8 Levee crown C L W.P.R.R. Shaping and Surfacing ----- Left Bank 20 6 25 0 24 7 24 7 295+50 C L C L 30 20 10 0 10 C L 240+00 C L 250+00 C L 180+00 C L 170+00 C L 160+00 C L 150+00 C L 77+50 C L 140+00 C L 130+00 C L 120+00 C L 110+00 230+00 C L C L 220+00 C L 210+00 C L 200+00 C L 190+00 C L 250+00 Flow Flow C L 30 20 10 0 10 Levee crown Shaping and surfacing - left bank El Dorado Avenue Pacific Avenue (N) levee shaping and surfacing - left and right banks Pacific Avenue (S) crown 18 2 18 1 18 8 15 5 15 9 15 7 16 2 20.4+50 Levee crown shaping and surfacing - left and right banks Levee crown shaping and surfacing - right bank Levee crown shaping only - right bank Levee crown shaping and surfacing - left bank Levee crown shaping only - right bank 30 20 10 0 10 30 20 10 0 10 20 20 10 0 10 20 Pershing Avenue C L 30 20 10 0 10 30 20 10 0 10 20 20 10 0 10 20 C L 40+00 C L 30+00 C L 20+00 C L 10+00 C L 0+00 C L 110+00 C L 100+00 C L 90+00 C L 80+00 C L 70+00 C L 60+00 C L 50+00 C L 40+00 Levee crown shaping and surfacing - right bank Flow San Joaquin River Flow 10 4 11 4 13 5 13 6 14 2 10 2 9 7 9 1 8 5 8 1 8 1 Project design flood plane Top of existing levee - left bank Top of existing levee - right bank Adjacent ground line - left bank Adjacent ground line - right bank Bottom of existing streambed + _ C L 52+20 + _ C L 40+60 + _ Mormon Slough Project San Joaquin County, California CHANNEL IMPROVEMENT AND LEVEE CONSTRUCTION Calaveras River, Diverting Canal and Mormon Slough, from San Joaquin River to Bellota PLAN OF IMPROVEMENT PROFILE AND PROJECT FLOOD PLANE U.S. Army Engineer District Corps of Engineers, Sacramento, California CORPS OF ENGINEERS U.S. ARMY Date: 19 November, 1965 File No. 3-20-142 Sheets 142/1 to 142/20 Sheet no. 142/3 PLATE III SHEET 1 of 6 Re-created 2006 Elevations refer to Sea Level Datum, 1929 CALAVERAS RIVER E L E V A T I O N S I N F E E T

Upload: doanhanh

Post on 24-May-2018

216 views

Category:

Documents


2 download

TRANSCRIPT

40

30

20

10

0

40

30

20

10

0

S.P.R.R. Levee crown shaping and surfacing - left and right banksCL Nest Lane

CL 300+50 Calaveras River = 0+00 Stockton Diverting Canal

EQ. {

CL 310+00CL 320+00 300+00CL CL 290+00 CL 280+00 CL 270+00

CL

C L

CL

CL 260+00 CL 250+00

New bridge under construction

Flow23 823 6 22 823 8

Levee crownCL W.P.R.R.

Shaping and Surfacing ----- Left Bank

20 6

25 024 724 7

295+

50C L

CL

30

20

10

0

10CL 240+00CL 250+00

CL 180+00 CL 170+00 CL 160+00 CL 150+00

C L77

+50

CL 140+00 CL 130+00 CL 120+00 CL 110+00

230+00CL CL 220+00 CL 210+00 CL 200+00 CL 190+00 CL 250+00

Flow

Flow

CL30

20

10

0

10

Levee crown Shaping and surfacing - left bankEl Dorado AvenuePacific Avenue (N)

levee shaping and surfacing - left and right banksPacific Avenue (S)crown

18 2 18 118 8

15 5

15 9

15 7

16 2

20.4

+50

Levee crown shaping and surfacing - left and right banks Levee crown shaping and surfacing - right bank Levee crown shaping only - right bank

Levee crown shaping and surfacing - left bankLevee crown shaping only - right bank

30

20

10

0

10

30

20

10

0

10

20

20

10

0

10

20

Pershing AvenueCL30

20

10

0

10

30

20

10

0

10

20

20

10

0

10

20CL 40+00 CL 30+00 CL 20+00 CL 10+00 CL 0+00

CL 110+00 CL 100+00 CL 90+00 CL 80+00 CL 70+00 CL 60+00 CL 50+00 CL 40+00

Levee crown shaping and surfacing - right bank

Flow

San Joaquin River

Flow

10 411 413 513 614 2

10 2 9 7 9 1 8 5

8 1 8 1 Project design flood plane

Top of existing levee - left bank

Top of existing levee - right bank

Adjacent ground line - left bank

Adjacent ground line - right bank

Bottom of existing streambed

+ _

C L52

+20

+ _

C L40

+60

+ _

Mormon Slough ProjectSan Joaquin County, California

CHANNEL IMPROVEMENTAND LEVEE CONSTRUCTION

Calaveras River, Diverting Canal and MormonSlough, from San Joaquin River to Bellota

PLAN OF IMPROVEMENTPROFILE AND PROJECT FLOOD PLANE

U.S. Army Engineer DistrictCorps of Engineers, Sacramento, California

CORPS OF ENGINEERS U.S. ARMY

Date: 19 November, 1965File No. 3-20-142

Sheets 142/1 to 142/20 Sheet no. 142/3

PLATE III SHEET 1 of 6Re-created 2006

Elevations refer to Sea Level Datum, 1929

CALAVERAS RIVER

E L

E V

A T

I O

N S

I

N

F E

E T

STOCKTON DIVERTING CANAL

CALAVERAS RIVER

341+

20El

. 29.

4

S=.000458

38 337 9 37 6 37 5

37 0

37 836 7 36 4

35 8

35 735 4

199+

36El

. 24.

2

S=.000405

38 6

Level

S.P.R.R.

191+

14El

. 41.

1

190+

62El

. 41.

1

188+

85El

. 40.

8

S=.001695

CL

S=.000427

Levee construction - right bankLevee crown shaping and surfacing - left bank

Flow

160+

74El

. 39.

6

160+

74El

. 39.

6

CL Linden Road

S=.000399

Excavated channel - 100’ bottom width

S=.000602

35 1

60

50

40

30

20

10

60

50

40

30

20

10CL 730+00CL 740+00CL 730+00CL 760+00CL 770+00CL 210+00 CL 720+00 140+00CL

60

50

40

30

20

10

60

50

40

30

20

10CL 90+00CL 100+00CL 100+00CL 120+00CL 130+00CL140+00 CL 80+00 70+00CL

S=.000599

S=.00060234 7 34 9

33 9 33 6

33 733 2 33 0 32 6 32 3 32 0 31 7 31 5

31 830 6

29 9

29 731 8

32 4

32 532 6

127+

22El

. 20.

0

S=.000574

Excavated channel - 100’ bottom width

Excavated channel100’ bottom width

118+

90El

. 37.

1

118+

60El

. 37.

1

Levee construction - right bankLevee crown shaping and surfacing - left bank

Levee construction - right bankLevee crown shaping and surfacing - left bank

Levee construction - left bank

S.T. & E. R.R.CLCL

Level

Transition from natural channel

Transition to natural channelTransition to natural channel Transition to natural channel

Transition fromnatural channel

Transition from natural channelTransition from natural channel

Transition to natural channelTransition from natural channel

Transition to natural channel

Flashboard dam

S=.000747

S=.000516

Flow

111+

80El

. 19.

0

110+

20El

. 18.

8

102+45El. 18.4

97+70

98+70El. 18.2

103+

20

101+

20El

. 35.

8

CL Waterloo Road

East Hwy. 99 (northbound)Hwy. 99 (southbound)CL

Existing highway embankment - right bankLevee crown shaping and surfacing - left bank

92+8

0El

. 35.

1

Highway embankment

CL

S=.000615

S=.000676 S=.000900

S=.000969

Excavated channel - 100’ bottom width

Excavated channel - 100’ bottom width Excavated channel - 100’ bottom width

79+20El. 17.0

CL Cherokee Lane

72+0

4El

. 33.

8

71+7

6El

. 33.

8

Level

Levee construction - right bankLevee crown shaping and surfacing - left bank

CL 20+00CL 30+00CL 40+00CL 50+00CL 60+00CL 70+00 CL 10+00 0+00CL

50

40

30

20

10

0

50

40

30

20

10

0

Excavated channel - 100’ bottom width

S=.000900

S=.000969

29 6

29 2 29 0 28 3 28 2 27 9 27 7

27 6

27 5 27 0 26 8 26 5

26 8

25 8 25 4

28 3

53+4

2El

. 32.

1

54+42El. 14.6

S=.001238

S=.000878

S=.000762

CL

53+2

0El

. 32.

1

52+56El. 14.4

49+1

6El

. 31.

6

42+6

0El

. 31.

1

44+00El. 13.7

CLCentral California Traction R.R.

42+0

0El

. 31.

1

Wilson Way

40+30El. 13.5

51+1

6

46+1

7 39+1

3

S=.000638

S=.000727

S=.000130

Flow18+30El. 11.9

91+1

8

16+94El. 11.8

15+2

0

17+8

5El

. 29.

8

17+6

5El

. 29.

8

CL Sanguinetti Road

16+9

4El

. 29.

3

S=.007042

S=.000704

7+00

El. 2

8.6

S=.000767

25 225 0

0+00 Stockton Diverting Canals = 300+50 Calaveras River

CLCL

0+00El. 10.5

S=.000177

25 025 425 425 525 525 625 9

26 026 3

26 326 326 5 26 3

25 4

25 8

Flow

Flashboard dam Mc Allen RoadCL

55+1

6

Stockton Diverting Canal

307+

30El

. 28.

6

300+50 Calaveras River = 0+00 Stockton Diverting CanalCLCL

Farm bridge

322+

66El

. 28.

8

CL 300+00CL 310+00CL 320+00CL 330+00CL 340+00CL 350+00

40

30

20

10

0

40

30

20

10

0

Top of spoil dikes

Project design flood plane

Top of existing levee - left bank

Top of existing levee - right bank

Adjacent ground line - left bank

Adjacent ground line - right bank

Bottom of existing streambed

Excavated channelNote:Elevations refer to Sea Level Datum, 1929

Mormon Slough ProjectSan Joaquin County, California

CHANNEL IMPROVEMENTAND LEVEE CONSTRUCTION

Calaveras River, Diverting Canal and MormonSlough, from San Joaquin River to Bellota

PLAN OF IMPROVEMENTPROFILE AND PROJECT FLOOD PLANE

U.S. Army Engineer DistrictCorps of Engineers, Sacramento, California

Date: 19 November, 1965File No. 3-20-142

Sheets 142/1 to 142/20 Sheet no. 142/4

PLATE III SHEET 2 of 6Re-created 2006

E L

E V

A T

I O

N S

I

N

F E

E T

CORPS OF ENGINEERS U.S. ARMY

Top of project levees

Project design flood plane

Top of existing levee - left bank

Top of existing levee - right bank

Adjacent ground line - left bank

Adjacent ground line - right bank

Bottom of existing streambed

Excavated channel

Top of spoil dikes

Elevations refer to Sea Level Datum, 1929

Dry - weather maintenance roads for maintenance purposes will be provided upstream from about Potter Creek on the crown of spoil dikes and existing levees or on the channel banks where adjacent landside ground furnishes adequate freeboard over the project design flood plane.

Mormon Slough ProjectSan Joaquin County, California

CHANNEL IMPROVEMENTAND LEVEE CONSTRUCTION

Calaveras River, Diverting Canal and MormonSlough, from San Joaquin River to Bellota

PLAN OF IMPROVEMENTPROFILE AND PROJECT FLOOD PLANE

U.S. Army Engineer DistrictCorps of Engineers, Sacramento, California

Date: 19 November, 1965File No. 3-20-142

Sheets 142/1 to 142/20 Sheet no. 142/5

PLATE III SHEET 3 of 6Re-created 2006

E L

E V

A T

I O

N S

I

N

F E

E T

S=.000744

451+

86El

. 64.

2

458+24El. 45.1

456+

24

Transition to natural channel

Excavated channel - 50’ bottom width

Excavated channel - 50’ bottom width

Transition from natural channel

S=.000928

Spoil dike construction - right bank

Spoil dike construction - left and right banks

458+

24El

. 64.

9

63 6 61 861 9

61 1

S=.001097 S=.001165

Spoil dike construction - left bank

4391

+84

El. 6

2.8 60 1

59 359 2 57 0

56 8

59 0

56 0 63 3Flow

423+30El. 42.5

420+25El. 42.4

CL

CL

Conc. dam

Transition to natural channel

433+

65

419+

66

Jack Tone Road

S=.001480S390+52El. 380

Excavated channel - 50’ bottom width

CL 410+00CL 420+00CL 430+00CL 440+00CL 450+00CL 460+00 CL 400+00 390+00 CL

70

60

50

40

30

20

70

60

50

40

30

20

Low water crossingCL

53 752 9

S=.0022121

S=.006678

51 5 51 5

CL 372+40 Mormon Slough =0+00 Potter Creek

50 7

50 7 50 1 49 848 9 48 1

47 4 47 046 3

Panella farm bridge CL

El. 53.3

363+64El. 32.3

363.

64

Flow

Levee construction - left bank

S=.001005S=.00070434

3+75

El. 5

1.3 Levee construction - left and right banks

329+

55El

. 50.

3

S=.000678

S=.000311

337+65El. 29.0

Excavated channel - 50’ bottom width

S=.001270

CL 340+00CL 350+00CL 360+00CL 370+00CL 380+00CL 390+00 CL 330+00 320+00CL

60

50

40

30

20

10

60

50

40

30

20

10

60

50

40

30

20

10

60

50

40

30

20

10

45 7 45 4

305+

96El

.48.

7

44 643 9

Excavation channel50’ bar width Transition

315+

45

311+

70

Excavated channel - 60’ bottom width

CL 270+00CL 280+00CL 290+00CL 300+00CL 310+00CL 320+00 CL 260+00 250+00CL

Levee construction - left and right banks

S=.000311

Flow43 4

S=.000311

42 6

42 0

270+20El. 26.9

41 4

41 241 1 40 7

S=.001372

S=.000270

268+

58El

. 34.

4

41 4

267+

56El

. 45.

4

CL

266+26El. 26.8

267+82El. 19.0

30’ bottom

S=.05

S=.000455

250+

00El

. 44.

0

60

50

40

30

20

10CL 210+00CL 220+00CL 230+00CL 240+00CL 250+00

60

50

40

30

20

10

Flow

S=.000498

S=.000405

39 940 2

40 440 340 6

S=.000462

248+70El. 26.2

245+

35El

. 43.

8

249+

68El

. 44.

0

CL

248+

02

Transition to natural channelExcavated channel - 100’ bottom width

Levee construction - right bankLevee crown shaping and surfacing - left bank

39 4 39 0

261+

60

CORPS OF ENGINEERS U.S. ARMY

291+

70

287+

60

Transition Excavated channel - 70’ bottom width

268+62El. 19.0

Transition 30’ to 70’ bottomTransition 80’ to 30’ bottom Transition from natural channel

Transition100’ to 80’ bottom

MORMON SLOUGH

Excavated channel - 100’ bottom width

STOCKTON DIVERTING CANAL

De Amico Road

level

Levee construction - right bankLevee crown shaping and resurfacing - left bank

261+

00El

. 44.

5

MORMON SLOUGH

253+

35

251+70El. 26.3

258+84El. 26.6

level

S=.000420

STOCKTON DIVERTING CANAL

CopperopolisRoad

S=.002666

33 7

706+

80El

. 94.

6

705+

30El

. 94.

2

705+

30

704+85El. 76.4

Transition to natural channel

100

90

80

70

60

50

Spoil dike construction - left bankLevee crown shaping and surfacing - right bank

92 091 2 90 2 89 3

88 787 5 86 2 84 969

3+00

S=.001300

S=.000909

Flow

679+

30El

. 91.

2

667+

20El

. 90.

1

CL 660+00CL 670+00CL 680+00CL 690+00CL 700+00CL 710+00 CL CL 650+00 640+00

Spoil dike construction - left bank

Left bank road embankment

645+30El. 69.4

657+16El. 70.2

S=.002454

643+

34

Excavated channel50’ bottom width

Transition to natural channelTransition from natural channel

659+

32

Excavated channel - 50’ bottom width

83 283 384 3 83 1

82 6 81 8

S=.001408

S=.0

0245

4

Spoil dike construction- right bank

639+

24

Transition from natural channelTransition to natural channel

621+30El. 65.0

619+

30

Excavation channel -50’ bottom width

613+

06

S=.000465

S=.001044

Transition from natural channel

Transition to natural channel

601+87El. 64.0

610+54El. 64.5

Flow

S=.001566

600+

72

80 679 5 79 0 79 0 78 8

77 576 9 77 0

75 6 74 477 2

604+

76El

. 81.

7

618+

80El

. 83.

6

613+

06El

. 83.

0

Spoil dike construction - left bank

S=.001790

Excavated channel - 50’ bottom width

584+

68

584+00El. 60.8

CLCLCL

CL

Transition to natural channel

Transition from natural channel

S.P.R.R.

578+46El. 59.5

574+

44

S=001070

Excavation channel50’ bottom width

100

90

80

70

60

50

40

100

90

80

70

60

50

40

CL 660+00CL 600+00CL 610+00CL 620+00CL 630+00CL 640+00 CL CL 650+00 570+00

90

80

70

60

50

40

30CL 520+00CL 530+00CL 540+00CL 550+00CL 560+00CL 570+00 CL CL 510+00 500+00

90

80

70

60

50

40

30

Transition from natural channel

548+56El. 56.3

550+

54

Excavated channel - 50’ bottom width

S=.001070

73 672 9

72 7 72 1 71 7 71 0 71 069 5

68 9 68 4 68 6 68 167 2

71 0

Flow

Milton Road

633+

22El

. 85.

4

628+

25El

. 84.

7638+78El. 67.8

Duncan Road

S.P. dam barrier582+94 Mormon Slough

0+00 S.P.R.R.

513+

08El

. 70.

2

508+

50El

. 69.

8

Spoil dike construction- left bank

Low water crossing

Excavated channel - 50’ bottom width

Transition 50’ to 40’ bottom width

CL CL

CL

CL

Copperopolis Road

Check dam

536+66El. 50.5

S=.001155

528+00El. 49.5

527+25El. 52.8

S=.001187

S=.000873

CL

Transition to natural channel 535+

12

S=.004

Excavation channel - 40’ bottom width

Top of spoil dikes

Project design flood plane

Top of existing levee - left bank

Top of existing levee - right bank

Adjacent ground line - left bank

Adjacent ground line - right bank

Bottom of existing streambed

Excavated channel

80

70

60

50

40

30

80

70

60

50

40

30

65 666 3

Flow

64 9 64 463 7

S=.001187

Excavated channel - 50’ bottom width

467+44El. 45.7

469+

90

Transition from natural channel

S=.000928

Spoil dike construction - right bank

467+

94El

. 65.

8

MORMON SLOUGHCL 460+00CL 470+00CL 480+00CL 490+00CL 500+00

Note:Elevations refer to Sea Level Datum, 1929

E L

E V

A T

I O

N S

I

N

F E

E T

Mormon Slough ProjectSan Joaquin County, California

CHANNEL IMPROVEMENTAND LEVEE CONSTRUCTION

Calaveras River, Diverting Canal and MormonSlough, from San Joaquin River to Bellota

PLAN OF IMPROVEMENTPROFILE AND PROJECT FLOOD PLANE

U.S. Army Engineer DistrictCorps of Engineers, Sacramento, California

Date: 19 November, 1965File No. 3-20-142

Sheets 142/1 to 142/20 Sheet no. 142/6

PLATE III SHEET 4 of 6Re-created 2006

CORPS OF ENGINEERS U.S. ARMY

100

90

80

70

60

50

Top of spoil dikes

Project design flood plane

Top of existing levee - left bank

Top of existing levee - right bank

Adjacent ground line - left bank

Adjacent ground line - right bank

Bottom of existing streambed

Excavated channel

S=.001522

775+34El. 82.8

776+

66

E L

E V

A T

I O

N S

I

N

F E

E T

110

100

90

80

70

60

1016

Excavation channel50’ bottom width

Transition from natural channel

99 31003 98 5 98 1 98 2

Levee crown shaping and surfacing -- right bank

Flood Road

Flow

CL

97 2

740+

60El

. 98.

5

S=.001

738+

60El

. 98.

3

Spoil dike construction - left bank

96 5 95 8

94 6 94 4 94 1

94 2 94 9 95 1

Spoil dike construction - left bank

Flashboard damLow water bridge CL

CL

S=.001320

725+

56El

. 97.

2

714+

20El

. 95.

7

110

100

90

80

70

60CL 730+00CL 740+00CL 730+00CL 760+00CL 770+00CL 780+00 CL CL 720+00 710+00

CL 800+00CL 810+00CL 820+00CL 830+00CL 840+00CL 850+00 CL CL 790+00 780+00

120

110

100

90

80

70

60

130

120

110

100

90

80

10921081 1077

Levee crown shaping and surfacing - right bank

Levee crown shaping and surfacing - right bank

10651054 1052

814+75El. 88.8

Flow

Fine RoadCL

10461039

1026

1026

S=.001522

S=.000820

797+

98El

. 103

.7

783+

10El

. 103

.3

Spoil dike construction - left bank

Excavated channel - 50’ bottom width

END CHANNEL EXCAVATION

Transition to natural channel

812+

75

MORMON SLOUGH

CL 870+00CL 880+00CL 890+00CL 900+00CL 910+00CL 920+00 CL CL 860+00 850+00

11031107111311271135

Flow

1148115111611178

CORPS OF ENGINEERS U.S. ARMY

Note:Elevations refer to Sea Level Datum, 1929

Mormon Slough ProjectSan Joaquin County, California

CHANNEL IMPROVEMENTAND LEVEE CONSTRUCTION

Calaveras River, Diverting Canal and MormonSlough, from San Joaquin River to Bellota

PLAN OF IMPROVEMENTPROFILE AND PROJECT FLOOD PLANE

U.S. Army Engineer DistrictCorps of Engineers, Sacramento, California

Date: 19 November, 1965File No. 3-20-142

Sheets 142/1 to 142/20 Sheet no. 142/7

PLATE III SHEET 5 of 6Re-created 2006

120

110

100

90

80

70

60

130

120

110

100

90

80

Left bank road embankment

S=.002353

Top of ballast(Rt. bank)

S.P.R.R. bridge (Rt. bank)

Top of project levees

Project design flood plane

Top of existing levee - left bank

Top of existing levee - right bank

Adjacent ground line - left bank

Adjacent ground line - right bank

Bottom of existing streambed

Excavated channel

CORPS OF ENGINEERS U.S. ARMY

End channel excavation

Transition to natural channel

41+00El. 51.0

57 858 4

49+3

04

58 4 57 756 1

CLJack Tone RoadCL

32+50El. 49.0

55 2 54 4Flow

Concrete culvert: (2-4” Dia.)

S=.001351

Levee construction - left bank

53 6

CL Dirt road and concrete culverts (2 - 10” diameter)

S = .001618 51 5 51 2

0+00 Potter Creek372+40 Mormon Slough

CLCL

4+68El. 44.3

BEGIN CHANNEL EXCAVATION

Excavated channel - 16’ bottom widthTransitionExcavated channel - 22’ bottom width

52 2

CL 10+00CL 20+00CL 30+00CL 40+00CL 50+00CL 50+00 CL 0+00

38+8

5

El. 6

1.1

70

60

50

40

30

20

70

60

50

40

30

20

2+67

El. 5

4.8

POTTER CREEK

CL 10+00CL 20+00CL 30+00 CL 0+00

80 7 80 6 80 4 80 2

80 0 79 8

77 777 2 77 0

Flow

Duncan RoadCL

S.P.R.R. bridge (Rt. bank) Top of ballast (Rt. bank)

CLCL

0+0 S.P.R.R.582+94 Mormon Slough

S.P.R.R. DRAIN

MORMON SLOUGH

140

130

120

110

100

90

140

130

120

110

100

90

CL 940+00CL 950+00CL 960+00CL 970+00CL 980+00CL 990+00 CL 930+00 920+00CL

Calaveras River

124 1123 2 122 6 122 8 122 7 122 6

122 1 122 1 121 6120 2

119 6 118 2CLCL

971+28 Mormon Slough = 26+70 Upper Calaveras River

Flashboard DamCL

Road embankment - Lt. bank

Flow

CL Escalon-Bellota Road

Levee crown shaping and surfacing - right bankE L

E V

A T

I O

N S

I

N

F E

E T

Mormon Slough ProjectSan Joaquin County, California

CHANNEL IMPROVEMENTAND LEVEE CONSTRUCTION

Calaveras River, Diverting Canal and MormonSlough, from San Joaquin River to Bellota

PLAN OF IMPROVEMENTPROFILE AND PROJECT FLOOD PLANE

U.S. Army Engineer DistrictCorps of Engineers, Sacramento, California

Date: 19 November, 1965File No. 3-20-142

Sheets 142/1 to 142/20 Sheet no. 142/8

PLATE III SHEET 6 of 6Re-created 2006

Elevations refer to Sea Level Datum, 1929

22+8

6

18+7

3

100

90

80

70

60

50

100

90

80

70

60

50