![Page 1: PISTON ACCUMULATOR INSTALLATION AND OPERATION MANUAL · PDF filemanual form attached in this document to monitor the accumulator’s ... checked with the aid of the liquid side](https://reader034.vdocuments.us/reader034/viewer/2022051717/5a700f0f7f8b9ab1538b98d1/html5/thumbnails/1.jpg)
PISTON ACCUMULATOR
INSTALLATION AND OPERATION MANUAL
Revision no. 2013-02
![Page 2: PISTON ACCUMULATOR INSTALLATION AND OPERATION MANUAL · PDF filemanual form attached in this document to monitor the accumulator’s ... checked with the aid of the liquid side](https://reader034.vdocuments.us/reader034/viewer/2022051717/5a700f0f7f8b9ab1538b98d1/html5/thumbnails/2.jpg)
www.hydroll.com Copyright © Hydroll. All rights reserved. INSTALLATION AND OPERATION MANUAL | 2/15
Table of contents
1 Introduction 3
2 Safety 4
3 Warranty 5
4 Technical specifications and labels 6
5 General illustration of the accumulator structure 7
6 Installation 8
7 Maintenance 9
8 Calculated service life - Dynamic load 10
9 Storage 11
10 Transportation 11
11 Withdrawal from service and disposal 12
12 Practical advices for user 13
13 Monitoring pre-charge pressure 14
Symbols used in the operating instructions
Additional information
Important points that require attention
Points that require caution
![Page 3: PISTON ACCUMULATOR INSTALLATION AND OPERATION MANUAL · PDF filemanual form attached in this document to monitor the accumulator’s ... checked with the aid of the liquid side](https://reader034.vdocuments.us/reader034/viewer/2022051717/5a700f0f7f8b9ab1538b98d1/html5/thumbnails/3.jpg)
1 Introduction
EN 14359 standard defines the device described
in this manual as follows: A gas pressurised accu-
mulator for hydraulic applications. Subsequently,
the device is simply referred to as the ‘accumulator’.
The accumulator is designed, manufactured and
tested according to the PED(97/23/EC) guidelines.
Hydroll accumulators also covers SELO Pressure
Vessels A1 certificate as well as ASME for under
6” or 152mm internal diameter
When the instructions of this manual and the limit values for the accumulator are
followed, the operation is safe and accumulator will remain functional throughout
the planned lifecycle. The accumulator is safe and reliable to use when it is serviced
according to the instructions specified in this manual. To avoid injuries and damage
to the devices, it is important to read through these instructions before installation
of the accumulator in a hydraulic system.
Hydroll Oy reserves the right to make changes to its products without prior notice.
The information provided in this instruction manual is valid at the time of its
publication. The manufacturer will not be liable for direct or indirect injuries or
material damages if the instructions provided below are not complied with.
www.hydroll.com Copyright © Hydroll. All rights reserved. INSTALLATION AND OPERATION MANUAL | 3/15
![Page 4: PISTON ACCUMULATOR INSTALLATION AND OPERATION MANUAL · PDF filemanual form attached in this document to monitor the accumulator’s ... checked with the aid of the liquid side](https://reader034.vdocuments.us/reader034/viewer/2022051717/5a700f0f7f8b9ab1538b98d1/html5/thumbnails/4.jpg)
2 Safety
Hydraulic accumulators are pressure vessels and must be treated accordingly. Only
trained and qualified individuals should perform installation and maintenance procedures
on the accumulators. Following safety instruction must always be followed.
Only use nitrogen (N2) as a charging gas. Never use air or oxygen for
charging (this may lead to an explosion).
Never loosen the gas valve if the accumulator is pressurised.
Never disassemble a pressurised accumulator. The energy of
pressurised accumulators may discharge suddenly. Contact your dealer
or manufacturer in case of failure and for maintenance procedures.
The accumulator structure and operation may not be modified
in any ways.
Always consider accumulator contain pressure until proven otherwise.
Always wear safety glasses, and chemical resistant protective
gloves, if needed.
www.hydroll.com Copyright © Hydroll. All rights reserved. INSTALLATION AND OPERATION MANUAL | 4/15
![Page 5: PISTON ACCUMULATOR INSTALLATION AND OPERATION MANUAL · PDF filemanual form attached in this document to monitor the accumulator’s ... checked with the aid of the liquid side](https://reader034.vdocuments.us/reader034/viewer/2022051717/5a700f0f7f8b9ab1538b98d1/html5/thumbnails/5.jpg)
3 Warranty
Hydroll provides a one-year material guarantee on its accumulators provided that the
instructions for installation and operation are followed and the acceptable accumulator
limit values have not been exceeded. The guarantee does not cover normal wear during
the use of the accumulator. In case of failure of the accumulator during the warranty
period contact to Hydroll personnel. Hydroll is not responsible of changes of any kind
made to accumulator design.
Limitation of the liablity
Only trained and qualified individuals should perform installation and maintenance
on the accumulators. Manufacturer’s installation and maintenance instructions must
always be followed in combination with local working and safety procedures and
guidelines. Hydroll is not in responsible of direct or indirect damages that have been
caused by accumulator misuse, mishandling or faulty installation by not following the
manufacturer’s instructions. Neither is the manufacturer responsible of the direct or
indirect damages caused by neglecting of the local working and safety instruction.
www.hydroll.com Copyright © Hydroll. All rights reserved. INSTALLATION AND OPERATION MANUAL | 5/15
![Page 6: PISTON ACCUMULATOR INSTALLATION AND OPERATION MANUAL · PDF filemanual form attached in this document to monitor the accumulator’s ... checked with the aid of the liquid side](https://reader034.vdocuments.us/reader034/viewer/2022051717/5a700f0f7f8b9ab1538b98d1/html5/thumbnails/6.jpg)
4 Technical specifications and labels
These instructions apply to the accumulator sizes ID 50 to 250 mm, with a pressure area
between 250 and 650 bars depending on the accumulator model and a capacity between
0.1 to 100 litres.
Hydroll piston pressure accumulator product groups:
The HPS series includes single piston pressure accumulators.
The HPD series includes dual piston pressure accumulators.
The HDC series includes dual piston and dual mode pressure accumulators.
The accumulator type plate contains the following information:
www.hydroll.com Copyright © Hydroll. All rights reserved. INSTALLATION AND OPERATION MANUAL | 6/15
▪ Hydroll Oy contact details
▪ Serial and lot numbers
▪ Date of manufacture
▪ Type consisting of the accumulator
series, the design pressure and the
sheath inner diameter values
▪ UN number and class
▪ Design pressure
▪ Temperature area
▪ Capacity
▪ Test pressure
▪ Date of proof test
▪ Gas pre-charge pressure
▪ Device warnings
▪ Compliance markings (CE, SELO…)
▪ Test oil cleanliness level
Examples of the product labels
![Page 7: PISTON ACCUMULATOR INSTALLATION AND OPERATION MANUAL · PDF filemanual form attached in this document to monitor the accumulator’s ... checked with the aid of the liquid side](https://reader034.vdocuments.us/reader034/viewer/2022051717/5a700f0f7f8b9ab1538b98d1/html5/thumbnails/7.jpg)
5 General illustration of the accumulator structure
Figure 1. HPS10 ø 80 structural image
www.hydroll.com Copyright © Hydroll. All rights reserved. INSTALLATION AND OPERATION MANUAL | 7/15
InnerDiameterID
FluidPort(egG1/2)
OuterDiameterOD
30mm
LengthL
Parts List
Part No. Part Pcs
1 Cylinder Tube 1
2 Gas End-Flange 1
3 Fluid End-Flange 1
4 Piston 1
5 Valve 1
6 Protection Cap 1
7 Support Ring 2
8 O-Ring 2
9 Piston Seal 1
10 Guide Ring 2
![Page 8: PISTON ACCUMULATOR INSTALLATION AND OPERATION MANUAL · PDF filemanual form attached in this document to monitor the accumulator’s ... checked with the aid of the liquid side](https://reader034.vdocuments.us/reader034/viewer/2022051717/5a700f0f7f8b9ab1538b98d1/html5/thumbnails/8.jpg)
6 Installation
Following table provides step by step procedure for the accumulator installation.
1. Visually inspect the accumulator for damage.
2. Handle the accumulator with care to avoid damaging the paintwork. Damage
to the paintwork may expose the device to corrosion. Paint damages must
be repaired immediately with 2-component polyurethane paint.
3. Check the capacity and the design pressure of the accumulator on its type
plate. Ensure that the indicated temperature range is appropriate for the
prevailing conditions. Never exceed the design pressure.
4. Ensure the cleanliness of the hydraulic system that will be connected to
the accumulator. The accumulator manufacturer’s guarantee will be void
if the contaminants in the system enter the accumulator and damage it.
5. Where possible, install the accumulator in an upright position with
the gas side upwards. This will ensure the longest possible service life.
Other positions are also allowed since the piston pressure accumulator
construction will be functional regardless of the position.
6. Attach the accumulator with the brackets provided by the manufacturer
as illustrated in Figure 2.
7. Measure the pre-charge within one month after the installation.
Damagedaccumulatorshouldnotbeconnectedtothesystem.
Figure 2. Recommended bracket positions
10-70mm
Note: The torque of the binding bolt between the bracket and the accumulator
▪ M10thread¨20Nm▪ M12thread¨30Nm
www.hydroll.com Copyright © Hydroll. All rights reserved. INSTALLATION AND OPERATION MANUAL | 8/15
![Page 9: PISTON ACCUMULATOR INSTALLATION AND OPERATION MANUAL · PDF filemanual form attached in this document to monitor the accumulator’s ... checked with the aid of the liquid side](https://reader034.vdocuments.us/reader034/viewer/2022051717/5a700f0f7f8b9ab1538b98d1/html5/thumbnails/9.jpg)
7 Maintenance
Check the pre-charge pressure at minimum once a year and write the result on the
manual form attached in this document to monitor the accumulator’s condition. Where
necessary, add nitrogen gas (N2) to the accumulator. Detailed instructions for N2 filling
printed in Hydroll accumulator charging kit cover. After inspection the pre-charge
ensure the gas valve functionality by adding soap water in the top of the valve to detect
potential leakages.
Please note that temperature will have an effect on the nitrogen pressure.
The manufacturer will indicate the pre-charge pressure (Po) at +20°C. The
pressure change will comply with formula P=Po*(T+273)/293.
▪ NOTE: The gas pre-charge pressure inspection interval will be
affected by the maximum operating pressure, the extent and speed
of pressure fluctuation, and the frequency of extreme operating
temperatures.
▪ If the operation of the accumulator is unsatisfactory, check the
pressure and add gas where necessary. If the pressure is discharged
from the accumulator after recharging, contact your dealer or
manufacturer.
▪ Ensure the hydraulic system oil contains no contaminants and
change the oil and filter according to the device manufacturer’s
instructions.
▪ Clean the accumulator’s outer surfaces and ensure that the paintwork
is intact when checking the pre-charge pressure. Cleaning helps
prevent corrosion. Damages to the paintwork should be repaired
immediately, since the accumulator structure does not allow for
corrosion. Repair the paintwork with two-component polyurethane
paint.
▪ Check the torque of the accumulator bracket bots during the
periodical maintenance.
▪ Only use the manufacturer’s original spare parts. Contact the
manufacturer when necessary.
www.hydroll.com Copyright © Hydroll. All rights reserved. INSTALLATION AND OPERATION MANUAL | 9/15
![Page 10: PISTON ACCUMULATOR INSTALLATION AND OPERATION MANUAL · PDF filemanual form attached in this document to monitor the accumulator’s ... checked with the aid of the liquid side](https://reader034.vdocuments.us/reader034/viewer/2022051717/5a700f0f7f8b9ab1538b98d1/html5/thumbnails/10.jpg)
The accumulator ( exluding HPS14 model) is designed to be serviced by
removing the threaded ends. When removing or attaching the liquid joint or
the gas valve, please note that the end should be prevented from rotating,
for instance by using a spanner wrench illustrated below. Tools are supplied
by Hydroll Oy.
The liquid joint torque with rubber steel sealing:
▪ Rp ¼” 30 Nm; Rp 3/8” 45 Nm
▪ Rp ½” 65 Nm; Rp ¾” 90 Nm
▪ Rp 1” 150 Nm; Rp 1 ¼” 240 Nm
▪ Rp 1 ½” 290 Nm
Figure 3. Spanner wrench
8 Calculated life time - Dynamic load
Theoretical accumulator fatigue based on EN 13345-3 standard. The graph below
illustrates the worst case scenario for structure fatigue.
NOTE: Practical fatigue curve is application dependent however pressure variation
being the main factor that influences on the shape and location of the curve.
www.hydroll.com Copyright © Hydroll. All rights reserved. INSTALLATION AND OPERATION MANUAL | 10/15
DynamicloadΔP/Pmax
Cycles/1000
FatiqueboarderlineUnlimitedzoneline
Cycleamountunlimited
![Page 11: PISTON ACCUMULATOR INSTALLATION AND OPERATION MANUAL · PDF filemanual form attached in this document to monitor the accumulator’s ... checked with the aid of the liquid side](https://reader034.vdocuments.us/reader034/viewer/2022051717/5a700f0f7f8b9ab1538b98d1/html5/thumbnails/11.jpg)
9 Storage
The accumulator should be stored in a dry and cool spot with a constant temperature.
All accumulator joints should be plugged. The accumulator should not be exposed to
excessive heat (i.e. temperatures over 40°C for long periods of time). If the accumulator
is stored for more than six months, the pre-charge pressure should be checked taking
the ambient temperature correction into account. Handle the accumulator with care.
Use approved lifting devices to lift and move the accumulator.
Take particular care not to damage the charging valve.
10 Transportation
Pressurised Hydropneumatic Piston Accumulators are considered as dangerous goods
UN 3164, Articles, Pressurized, Pneumatic, 2.2 when the accumulator is pre-charged
with compressed nitrogen on Road, Railway, Sea and Air. For this reason the shipping
company should have qualified personnel to handle the shipments and packaging of
accumulators. EU legistation requires that at least one person has been educated for
shipping dangerous goods in the company (ADR / RID-, IMDG- and IATA-regulations)
Unpressurised accumulator is not considered as dangerous goods UN 3164 and may
also be transported as standard air freight.
Valid documentation and instruction for transportation and packaging are downloadable
in Hydroll www-site: www.hydroll.com
Navigate: Downloads -> Technical Documentation -> Transportation Documentation
www.hydroll.com Copyright © Hydroll. All rights reserved. INSTALLATION AND OPERATION MANUAL | 11/15
![Page 12: PISTON ACCUMULATOR INSTALLATION AND OPERATION MANUAL · PDF filemanual form attached in this document to monitor the accumulator’s ... checked with the aid of the liquid side](https://reader034.vdocuments.us/reader034/viewer/2022051717/5a700f0f7f8b9ab1538b98d1/html5/thumbnails/12.jpg)
11 Withdrawal from service and disposal
1. A pressurised accumulator must not be discarded; the pressure should be
discharged before disposal.
2. The pressure can be discharged by using a Hydroll charging device or a connector
compatible with the valve.
3. Once the pressure has been discharged and the gas valve has been removed, the
accumulator may be handed over to metal recycling.
www.hydroll.com Copyright © Hydroll. All rights reserved. INSTALLATION AND OPERATION MANUAL | 12/15
![Page 13: PISTON ACCUMULATOR INSTALLATION AND OPERATION MANUAL · PDF filemanual form attached in this document to monitor the accumulator’s ... checked with the aid of the liquid side](https://reader034.vdocuments.us/reader034/viewer/2022051717/5a700f0f7f8b9ab1538b98d1/html5/thumbnails/13.jpg)
12 Practical advices for user
▪ Soapy water may be used to locate gas leakages. Its use is also recommended to
ensure valve performance after pressure checks.
▪ Pre-charge pressure may be checked with the aid of the liquid side pressure
measurement: the system is pressurised to exceed the accumulator’s pre-charge
pressure, and the system pressure is discharged by limiting the outflow in order
for the pressure to decrease slowly (~5 bars/min). Once the system pressure has
reached the accumulator’s pre-charge pressure, the system pressure decreases
rapidly.
Recommendation for system equipment:
▪ Pressure relief valve, the opening pressure should be lower than
the maximum allowed charger pressure retaining valve between the
charger and the pump
▪ Stopcock to allow the isolation of the charger from the system
▪ The figure below depicts normal wear and the resulting leakage in
relation to time
www.hydroll.com Copyright © Hydroll. All rights reserved. INSTALLATION AND OPERATION MANUAL | 13/15
![Page 14: PISTON ACCUMULATOR INSTALLATION AND OPERATION MANUAL · PDF filemanual form attached in this document to monitor the accumulator’s ... checked with the aid of the liquid side](https://reader034.vdocuments.us/reader034/viewer/2022051717/5a700f0f7f8b9ab1538b98d1/html5/thumbnails/14.jpg)
13 Monitoring pre-charge pressure
Accumulator serial number Pressure Date Inspector
Notes:
www.hydroll.com Copyright © Hydroll. All rights reserved. INSTALLATION AND OPERATION MANUAL | 14/15
![Page 15: PISTON ACCUMULATOR INSTALLATION AND OPERATION MANUAL · PDF filemanual form attached in this document to monitor the accumulator’s ... checked with the aid of the liquid side](https://reader034.vdocuments.us/reader034/viewer/2022051717/5a700f0f7f8b9ab1538b98d1/html5/thumbnails/15.jpg)
Hydroll OyPL 12, Lohkarekuja 6, FIN-62101 Lapua, FINLANDtel. +358 (0)20 765 7900 • fax +358 (0)20 765 7901www.hydroll.com • [email protected]
PISTON ACCUMULATOR
INSTALLATION AND OPERATION MANUALRevision no. 2013-02