PROTOCOL FOR INSPECTION & HYDRAULIC TEST OF PIPING FOR BOILER MAKER NO.VWHA048 at M/s. MAA KALI ALLOYS UDYOG (P) LTD. RAIGARH. 1. The Pipe line drawing have been approved by the chief Inspector of Boilers, Chattisgarh, Raipur vide letter No. .CIB/RG-201/554 Dated 07.03.12 2. The Permission for site erection has been issued by the Chief Inspector of Boilers, Chattisgargh, vide letter no. CIB/RG-201/554 Dated 07.03.12 3. The Permission for welding has been issued by the Chief Inspector Boilers, Chattisgargh, vide letter no. CIB/RG- 201/554 Dated 07.03.12 4. The drawing scrutiny and Hydraulic test fees has been deposited vide challan no. 10874346 Dated 08.02.13 and submitted by letter no………………….for the amount of Rs.9900/- only. 5. Details of drawing scrutiny and Hydraulic test fees are as follows. S.NO Drg. Description Length up to 100NB (m) Length over 100NB (m) Total Length (m) Scruti ny Fees (R.S) H.T Fees (R.S) 1. 2. 3. 4. 5.

Upload: manikandan-elumalai

Post on 06-Nov-2015

222 views

Category:

Documents


6 download

DESCRIPTION

Piping Hydro Test Protocal for Maakali

TRANSCRIPT

PROTOCOL FOR INSPECTION & HYDRAULIC TEST OF PIPING FOR BOILER MAKER NO.VWHA048 at M/s. MAA KALI ALLOYS UDYOG (P) LTD. RAIGARH.

1. The Pipe line drawing have been approved by the chief Inspector of Boilers, Chattisgarh, Raipur vide letter No. .CIB/RG-201/554 Dated 07.03.12

2. The Permission for site erection has been issued by the Chief Inspector of Boilers, Chattisgargh, vide letter no. CIB/RG-201/554 Dated 07.03.12

3. The Permission for welding has been issued by the Chief Inspector Boilers, Chattisgargh, vide letter no. CIB/RG-201/554 Dated 07.03.12

4. The drawing scrutiny and Hydraulic test fees has been deposited vide challan no. 10874346 Dated 08.02.13 and submitted by letter no.for the amount of Rs.9900/- only.

5. Details of drawing scrutiny and Hydraulic test fees are as follows.

S.NODrg. DescriptionLength up to 100NB (m)Length over 100NB (m)Total Length (m)ScrutinyFees (R.S)H.T Fees (R.S)

1.

2.

3.

4.

5.

6.

7.

8.

9.

6. All materials were offered for ground Inspection before erection.

7. X-ray and stress relieving of welded joints carried out as per IBR-1950 and the same approved by Chief Inspector of Boilers, Chhattisgarh Raipur. Vide letter no.RG-203/CIB/777 Dated 01.03.13.

The details of X-ray & Stress Relieving are as under

S.NODrg No.& Description

Size NBTotal jointTotal jointx-rayedTotal Joint stress relievingRemarks

8. After Erection, All Integral Piping & Feed Piping has been Hydraulic tested as per the following details Witnessed by The Inspector of Boilers, Chattisgargh, and Raipur,On 07.03.13 and Hydraulic test found satisfactory. S.NODrg. No & Description Design Pressure kg/cmDesign TemperatureCHydro Test PressureDuration of H.T Minutes

30 minutes

M/s.VESPL M/s. MKAUPL INSPECTOR OF BOILER .