PIPING
9. Recently awardedmajor projects
Main contact Information: AITOR ALBISU – ULMA PIPING
EPC PROJECT DIVISIONSALES & MARKETING DIRECTOR ([email protected])
10. Why choose ULMA?
1. IntroductionCOMPANY PROFILE:
• Brand/marketing name: ULMA PIPING
• Registered name: ULMA FORJA S.COOP. (Since:1996, former name: ENARA S.COOP)
• Organization : Privately owned cooperative company established in 1962.
• Location: Manufacturing plant and headquarters located in Oñati, a town in the centre of the Basque Country, an area in northern Spain
and to the west of the French border with a deeply-rooted industrial tradition. Oñati is just 1 hour´s drive from Bilbao (International
Airport)
ACTIVITY / PRODUCT LINE:
Manufacture and supply of:
1- FLANGES (Full range)
2- FORGED STEEL FITTINGS (high pressure fittings ,¼” up to 4”, CS only, only for stockist)
3- OTHER PIPING PRODUCTS:
3-1 LINE BLANKS (Spectacles, Spacers, Paddles)
3-2 WELD OVERLAYED SPOOL FABRICATION
3-3 SPECIALTY FORGINGS
3-4 ENGINEERED PRODUCTs.
1. Introduction
Stock Business EPC Project Business
BUSINESS – SALES CHANNELS:
Currently 2 business divisions:
1. DISTRIBUTION- STOCK BUSINESS Operating since 1970, dealing with both stockist and
project oriented distributors as well).
Recognized world leader in the approved stock
business, largest stocks worldwide, over 70
countries.
Main products:
• FLANGES and FORGED STEEL FITTINGS
• LINE BLANKS (for projects only)• LINE BLANKS (for projects only)
2. EPC PROJECT BUSINESS Operating since 2006 ,dealing directly with EPC
contractors worlwide basis, New business
division created, manufactured range expanded
in materials and sizes , offered products and
services range extended, strong investment
plan completed.
Main products:
• FLANGES
• LINE BLANKS
• SPOOL FABRICATION (Including weld
overlay)
• SPECIALTY FORGINGS
• ENGINEERED PRODUCTs
1. Introduction (ULMA PIPING)1. Introduction (ULMA PIPING)1. Introduction
HISTORY
Since establishment in 1962 , ULMA has left its mark on numerous projects in the field of hydrocarbons and mineral refining plants,
supplying FLANGES in all over the world (over 70 countries worldwide, 95% overseas).
YEAR ACTIVITY:
1962 Activity starts
1970 FLANGE production starts
1980 SHELL official approval
1986 Joined ULMA Corporation
1992 ISO 9001 certification (Lloyds Register)
1996 8000 tn press, largest in the world
2002 ISO 14001 certification (Lloyds Register) 2002 ISO 14001 certification (Lloyds Register)
2005 Ring Roll 160/125 up to 3m OD
2006 Strategic Plan 2006-2008 Targeting EPC Projects
2008 Manufacturing facility and product line expansion completed (over 50 M USD investment)
2009 Many orders bagged from most of the world leading EPC contractors
2010 OHSAS 18001 certification (Lloyds Register)
2011 New forging company adquired, specialized in custom made forgings and exotic materials
2. ANNUAL TURNOVER2. ANNUAL TURNOVER
Year-> 2006 2007 2008 2009 2010
Total Sales
(Million Euros)
55 62 67 44 54
Workforce 182 218 230 200 215
1. Introduction
ORGANIZATION:
Cooperative company. (All the workers at ULMA are shareholders of the company).
ULMA Piping is a member of ULMA Group which includes 8 cooperative companies in different sectors, all located in the area of Oñati
(Basque Country, Northern Spain) .
ULMA Corporation is associated with Mondragon. Mondragon the largest association of cooperative companies in the world. Its
aim is to support all associated companies providing all types of external services.The association has its own University, R&D Centers,
Bank & Health System serving all associated companies. Mondragon is the leading bussines corporation in the Basque Country and the
7th largest in Spain.
Group
Year Personnel Total Sales (Millions of euro)Year Personnel Total Sales (Millions of euro)2005 3,094 5082006 3,493 6252007 4,751 7232008 4,638 7252009 4,130 5692010 4,060 589
CONSTRUCTION
HANDLINGSYSTEMS
POLIMERO
PACKAGING
FORKLIFTTRUCKS
ULMA Corporate video
PIPING
AGRICOLA
Year Personnel Total Sales (Millions of euro)
2005 79,273 11,7762006 82,600 13,3002007 100,000 15,0002008 101,321 15,4322009 85,066 14.7692010 83,470 15.089
CONVEYOR
COMPONENTS
2.Markets
1. NATURAL GAS
(UPSTREAM /DOWNSTREAM)
1.1 Natural Gas production
1.2 Natural Gas pipelines
1.3 Natural Gas treatment plants
1.4 Gas compression stations
1.5 LNG-LPG-GTL. Complete Chain
Production-processing-transportation-re-processing
Onshore & Offshore
5, MINERAL REFINING:
Aluminium RefineriesNickel Refineries
4. POWER GENERATION
Power generation plants (Gas-fuel-coal-nuclear)
2. OIL AND PETROLEUM
(UPSTREAM / DOWNSTREAM)
Production-processing-transportation-re-processing
Onshore & Offshore
3. PETROCHEMICALS & CHEMICALS
Ethylene plants
Propylene plants
Polymer plants
Aromatics plants
Fine chemical plants
3. Product and services range
FO
We offer a wide selection of products to meet the needs of all industry sector:
Main Business
Other Piping Product Business
- Material Grades for forged products -
FERRITIC AUSTENITIC STAINLESS STEEL (DUPLEX-SUPERDUPLEX)
CARBON STEEL FOR PIPING
A105N
C21(German Standard)
BF48N (French Standard)
CSA GR 248 CAT I (Canadian Standard)
*NACE for SOUR SERVICE available.
CARBON AND LOW ALLOY FOR LOW TEMPERATURE
A350LF2 Class1& Class 2
A350LF3 Class 1 & Class 2
A350LF6 Class 1,2 & 3
A707 L3 Class 3 & 4
BF48F (French Standard)
CSA GR 248 CAT II (Canadian Standard)
AUSTENITIC STAINLESS STEEL FOR HIGH TEMPERATURE SERVICEA182F304
A182F304 H
A182F304 L
A182F316
A182F316 H
A182F316L
A182F316Ti
A182F321
A182F321H
A182F347
A182F347H
A182F44
A182F904L
3. Product and services range
HIGH YIELD CARBON STEEL FOR HP SERVICE
A694F42
A694F46
A694F52
A694F60
A694F65
A694F70
NICKEL ALLOYS AND OTHERSALLOY 600-600H
ALLOY 625
ALLOY 800-800H
ALLOY 825
MONEL 4400
FERRITIC AUSTENITIC STAINLESS STEEL (DUPLEX-SUPERDUPLEX) A182F51
A182F53
A182F55LOW ALLOY STEEL FOR HIGH TEMPERATURE SERVICES
A182F1
A182F5
A182F5A
A182F6
A182F9
A182F11 Class2
A182F22 Class3
A182F91
CSA GR 248 CAT II (Canadian Standard)
*Requiring Notch Toughness Testing
4.Our customers (Partial list of end user approvals )
ULMA has held its approvals from the largest end users worlwide since the early 1980s
4.Our customers (Partial list of end user approvals )
Achilles UK, NL and Ireland- FPAL Achilles NORWAY - JQS Achilles SPAIN - REPRO
5.Quality
ULMA Flanges are well-known worldwide, with a reputation for reliability and high
quality.
The operations and processes are implemented and governed by our quality
assurance system. This system is certified to ISO 9001 standards, awarded by
LLOYD’S REGISTER QUALITY ASSURANCE and subjected to continuous review
and audit by internal quality audits, third-party inspection agencies, major
engineering companies worldwide, and end users such as : SHELL,
EXXON-MOBIL, SAUDI ARAMCO, BP, REPSOL, PDVSA, PETROBRAS, etc.
We are equipped with the most modern forging and machining facilities and a
highly-qualified work force, enabling us to offer the widest possible range of
flanges. We combine high standards in technology, quality and productivity, as well
as tradition, experience and dependability, with an unrivalled reputation for
quality and service. “Management based on the strictest quality
standards allows ULMA to develop the
product which best satisfies our customers”.
5.Quality
Every step from purchase order receipt through procurement, raw material inspection,
machining, final inspection, painting and packaging is in accordance with regulations stipulated
in our QA Manuals.
• Proud of our quality:
“ We use our golden rustproof varnish to highlight any possible surface defects ”
INCOMINGRAW MATERIAL(ORANGE LABEL)
INSPECTIONPCA-7.3.07
BACK TO SUPPLIER
(RED LABEL)
ULMA’S HEAT NO.(GREEN LABEL)
FORGINGPCA-7.3.03
(BLUE LABEL)
VISUAL AND DIMENSIONAL INSPECTIONPCA-7.3.10
OK
REJECTED
HEAT TREATMENTPCA-7.3.15
(YELLOW LABEL)
MACHINING & MARKINGPCA-7.3.04
(YELLOW LABEL)
VISUAL AND DIMENSIONAL INSPECTIONPCA-7.3.10
PACKING-STORAGE
DISPATCHPCA-7.3.05
, TRACEABILITY AND INSPECTION PROCEDUREQuality
Inspection
QualityInspection
QualityInspection
6. Health , Safety & Environment (HSE)
ULMA is the first flange manufacturing company in the world
being triple certified (ISO 9001 – ISO 14001 – OHSAS 18001) by
Lloyds Register Quality Assurance
HSE management is accorded top priority in ULMA and Quality
Occupational Health Safety and Environment Management System
(QHSE MS) has been developed, implemented and certified at
operating facility as per the requirements of ISO 9001 (since 1992),
OHSAS 18001(since 2010) and ISO 14001 (since 2002).
To enhance credibility, the QHSE management system at operating
facility is third party certified by LLOYDS REGISTER QUALITY
ASSURANCE and subjected to annual surveillance audit.
HSE issues are addressed systematically, effectively and proactively
as per requirements of ISO standards/ OHSAS guidelines by making
specific objectives and targets to address them.
The system works on the principle of risk management / environmental
aspects management by identifying, quantifying and addressing them
through appropriate work instructions and management plans.
7. Production System
Raw material
* Chemical
composition
* Sizes
* Quality
Handling
Forging
Heating + Cutting
QualityInspection
QualityInspection
Ring Rolling
Machining
� -Upsetting� - Forging
� -Punching� -Trimming
Plant
Heat Treatment
� Packing � -Painting � -Marking � - Drilling � -Turning
* Storage, fully automatic
warehouse
Shipping Area
Transportation
QualityInspection
QualityInspection3º Party
Production capacity, finished flanges: over 45,000 tn / year (1/2”up to 100”, 150Production capacity, finished flanges: over 45,000 tn / year (1/2”up to 100”, 150--2500, all kind of materials)2500, all kind of materials)
7. Production System (Forging)
Billet heating up to 1,200 ºC. Billet heating up to 1,200 ºC.
Hot cuttingHot cutting Hot Hot
ForgingForging Punching and clippingPunching and clipping
Hot Hot upsettingupsetting
BlockBlock PrePre--formform
Flange ready to be Flange ready to be punched and burredpunched and burred
Rough forged flangeRough forged flange
Punching slugPunching slug
ClipClip
7. Production System (Machining)
Machining step 1Machining step 1 CountersinkingCountersinking
Welding NeckWelding Neck
Slip OnSlip On
Machining step 2Machining step 2 Machining step 3Machining step 3
Lap JointLap Joint
BlindBlind
: Machined surface: Machined surface
8. Organization Chart-Comunication Channels
D and DPMCFEEDFeasibility /conceptual
ULMA is perfectly prepared to support EPC contractors /engineering firms at every stage of the project:
- EPC PROJECT DIVISION -
Once a P.O. is awarded to ULMA, a Project Team is formed which will be the focal point
for every comunication between the EPC Contractor and ULMA , ensuring efficient
execution of the project:
PROJECT MANAGER = AREA MANAGER
PROJECT DOCUMENTATION COORDINATOR
8. Organization Chart (Worldwide Sales Network)
ULMA Piping Korea
UK
JAPAN
HEADQUARTERSOÑATI (SPAIN)
FRANCE
ITALY
- EPC PROJECT DIVISION -
Industrias ULMA Venezolana
INDONESIA
IRAN
QATAR
MEXICO
TAIWAN
NIGERIA
INDIA
PHILIPPINES
MALAYSIA
ARGENTINA
CHILE
UAE
ULMA Product Worlwide Stock Availability
ULMA is the recognized world leader in the approved stock-distribution business, largest stocks worldwide, over 70 countries
- DISTRIBUTION BUSINESS DIVISION -
9. Recently awarded major projects
PROJECT NAMEPROJECT NAME YEARYEAR END USEREND USER EPC CONTRACTOREPC CONTRACTOREPC EPC
COUNTRYCOUNTRY
YANBU ETHYLENE GLYCOL YANBU ETHYLENE GLYCOL PLANT PLANT
(Kingdom of Saudi Arabia)(Kingdom of Saudi Arabia)20072007 SABICSABIC
Toyo Engineering Toyo Engineering Corporation (Europe)Corporation (Europe)
JAPANJAPAN
DUNG QUAT REFINERY DUNG QUAT REFINERY (Vietnam)(Vietnam)
20072007 PETROVIETNAMPETROVIETNAM Toyo Kanetsu KK.Toyo Kanetsu KK. JAPANJAPAN
KHURSANIYAH GAS PLANTKHURSANIYAH GAS PLANT(Kingdom of Saudi Arabia)(Kingdom of Saudi Arabia) 20072007 ARAMCOARAMCO Bechtel & TechnipBechtel & Technip UKUK--ITALYITALY
KHURSANIYAH GAS PLANTKHURSANIYAH GAS PLANT(Kingdom of Saudi Arabia)(Kingdom of Saudi Arabia) 20072007 ARAMCOARAMCO
SABCO (Bechtel Saudi SABCO (Bechtel Saudi KINGDOM OF KINGDOM OF
SAUDI SAUDI (Kingdom of Saudi Arabia)(Kingdom of Saudi Arabia) 20072007 ARAMCOARAMCOSABCO (Bechtel Saudi SABCO (Bechtel Saudi
Arabia)Arabia)--TechnipTechnipSAUDI SAUDI
ARABIAARABIA
MORON FERTILIZER PROJECT MORON FERTILIZER PROJECT (Venezuela)(Venezuela)
20072007Petroquímica de Petroquímica de Venezuela, S.A. Venezuela, S.A.
(PEQUIVEN) (PEQUIVEN)
Toyo Engineering Toyo Engineering Corporation (Japan)Corporation (Japan)
JAPANJAPAN
YANBU ETHYLENE GLYCOL YANBU ETHYLENE GLYCOL PLANT PLANT
(Kingdom of Saudi Arabia)(Kingdom of Saudi Arabia)20082008 SABICSABIC
SATEC Saudi Toyo SATEC Saudi Toyo Engineering Company Engineering Company
KINGDOM OF KINGDOM OF SAUDI SAUDI
ARABIAARABIA
SPOX PROJECTSPOX PROJECT
(Polypropylene Expansion (Polypropylene Expansion Project) SingaporeProject) Singapore
20082008 EXXON MOBILEXXON MOBIL
MITSUBISHI HEAVY MITSUBISHI HEAVY INDUSTRIES INDUSTRIES –– Plant and Plant and Transportation Systems Transportation Systems
Engineering & Construction Engineering & Construction CenterCenter
JAPANJAPAN
SCOPE OF SUPPLY: FLANGES (WN, BLIND,…….), SIZE RANGE: ½” up to 60”, RATING: 150-2500, MATERIALS: Carbon steel , Low temp, Low Alloy, High Yield, SS, DSS, SDSS
9. Recently awarded major projects
PIPINGPROJECT NAMEPROJECT NAME YEARYEAR END USEREND USER EPC CONTRACTOREPC CONTRACTOR
EPC EPC COUNTRYCOUNTRY
PEARL GTL EPCM Project PEARL GTL EPCM Project (Qatar)(Qatar)
20082008
QATAR SHELL QATAR SHELL
GTL LTDGTL LTDM.W. Kellogg Limited M.W. Kellogg Limited UKUK
KHURSANIYAH GAS PLANTKHURSANIYAH GAS PLANT(Kingdom of Saudi Arabia)(Kingdom of Saudi Arabia) 20082008 ARAMCOARAMCO Bechtel & TechnipBechtel & Technip UKUK--ITALYITALY
MORON FERTILIZER PROJECTMORON FERTILIZER PROJECT
(Venezuela)(Venezuela)20082008
Petroquímica de Petroquímica de Venezuela, S.A. Venezuela, S.A.
(PEQUIVEN) (PEQUIVEN)
Toyo Engineering Toyo Engineering Corporation (Japan)Corporation (Japan)
JAPANJAPAN
BG Group BG Group DRAGON LNG DRAGON LNG
(Milford Haven, Wales, UK)(Milford Haven, Wales, UK)20082008
BG Group BG Group PetronasPetronas
4 Gas4 GasWhessoe Oil & GasWhessoe Oil & Gas UKUK
LARGE SCALE PTA PLANT LARGE SCALE PTA PLANT (Poland)(Poland) 20082008 PKN ORLEN PKN ORLEN
MITSUBISHI HEAVY MITSUBISHI HEAVY INDUSTRIES INDUSTRIES –– Plant and Plant and Transportation Systems Transportation Systems
Engineering & Construction Engineering & Construction CenterCenter
JAPANJAPAN
ETHANE CRACKER PROJECTETHANE CRACKER PROJECT--1000 KMTA ETHYLENE PLANT 1000 KMTA ETHYLENE PLANT
(Thailand)(Thailand)20082008
PTT PTT POLYETHYLENE POLYETHYLENE
COMPANYCOMPANY
Toyo Engineering Toyo Engineering Corporation (Japan)Corporation (Japan) JAPANJAPAN
SCOPE OF SUPPLY: FLANGES (WN, BLIND,…….), SIZE RANGE: ½” up to 60”, RATING: 150-2500, MATERIALS: Carbon steel , Low temp, Low Alloy, High Yield, SS, DSS, SDSS
9. Recently awarded major projects
PIPINGPROJECT NAMEPROJECT NAME YEARYEAR END USEREND USER EPC CONTRACTOREPC CONTRACTOR
EPC EPC COUNTRYCOUNTRY
PEARL GTL EPCM Project PEARL GTL EPCM Project (Qatar)(Qatar)
20082008
QATAR SHELL QATAR SHELL
GTL LTDGTL LTDM.W. Kellogg Limited M.W. Kellogg Limited UKUK
KHURSANIYAH GAS PLANTKHURSANIYAH GAS PLANT(Kingdom of Saudi Arabia)(Kingdom of Saudi Arabia) 20082008 ARAMCOARAMCO
SABCO (Bechtel Saudi SABCO (Bechtel Saudi Arabia)Arabia)--TechnipTechnip
KINGDOM OF KINGDOM OF SAUDI SAUDI
ARABIAARABIA
SAMIR Refinery Upgrading SAMIR Refinery Upgrading ProjectProject (Morocco)(Morocco)
20082008 SAMIRSAMIR SAIPEM SPASAIPEM SPA ITALYITALY
MORON FERTILIZER PROJECTMORON FERTILIZER PROJECT20082008
Petroquímica de Petroquímica de Venezuela, S.A. Venezuela, S.A.
Toyo Engineering Toyo Engineering JAPANJAPAN
MORON FERTILIZER PROJECTMORON FERTILIZER PROJECT
(Venezuela)(Venezuela)20082008 Venezuela, S.A. Venezuela, S.A.
(PEQUIVEN) (PEQUIVEN)
Toyo Engineering Toyo Engineering Corporation (Japan)Corporation (Japan)
JAPANJAPAN
HASDRUBAL PROJECTHASDRUBAL PROJECT
Gas processing plant and LPG Gas processing plant and LPG facility (Tunisia)facility (Tunisia)
20082008 BG Tunisia LimitedBG Tunisia Limited PETROFAC E&C Int.PETROFAC E&C Int. UAEUAE
CORINTH REFINERY CORINTH REFINERY
Crude Oil Distillation Unit Crude Oil Distillation Unit (Greece)(Greece)
20082008 Corinth refineriesCorinth refineries
TECNICAS REUNIDAS TECNICAS REUNIDAS (Tecnical, Heat Exchanger (Tecnical, Heat Exchanger
Division)Division)SPAINSPAIN
HASSI MESSAOUD REFINERY HASSI MESSAOUD REFINERY (Algeria)(Algeria)
20082008 SONATRACHSONATRACHHEURTEY PETROCHEM HEURTEY PETROCHEM
SAIPEM (Global contractor)SAIPEM (Global contractor) FRANCEFRANCE
SCOPE OF SUPPLY: FLANGES (WN, BLIND,…….), SIZE RANGE: ½” up to 60”, RATING: 150-2500, MATERIALS: Carbon steel , Low temp, Low Alloy, High Yield, SS, DSS, SDSS
9. Recently awarded major projects
PIPINGPROJECT NAMEPROJECT NAME YEARYEAR END USEREND USER EPC CONTRACTOREPC CONTRACTOR
EPC EPC COUNTRYCOUNTRY
Newfoundland oil refinery Newfoundland oil refinery
(Canada)(Canada)20082008
North Atlantic North Atlantic RefineryRefinery
FMC TECHNOLOGIES FMC TECHNOLOGIES (Jetty Marine loading arms(Jetty Marine loading arms) FRANCEFRANCE
EDOP PIPELINE EDOP PIPELINE (Emergency Repair Project) (Emergency Repair Project)
(Nigeria)(Nigeria)20082008
EXXON MOBIL EXXON MOBIL (Mobil Producing (Mobil Producing Nigeria Unlimited)Nigeria Unlimited)
DELTAAFRIK ENGINEERING / DELTAAFRIK ENGINEERING / WORLEY PARSONSWORLEY PARSONS
NIGERIANIGERIA
Parallel Train Petrochemical Parallel Train Petrochemical Project (Jurong Island Project (Jurong Island ––
Singapore)Singapore)20082008 EXXON MOBILEXXON MOBIL SHAW SHAW –– STONE & WEBSTERSTONE & WEBSTER USAUSA
Ratnagiri Gas and Ratnagiri Gas and WHESSOE WHESSOE
Ratnagiri LNG Terminal Ratnagiri LNG Terminal
(Maharashtra(Maharashtra--India)India)20082008
Ratnagiri Gas and Ratnagiri Gas and
Power Pvt LtdPower Pvt Ltd
PUNJ LLOYDPUNJ LLOYD
AKER KVAERNER AKER KVAERNER
EIL (PMC)EIL (PMC)
UKUK--INDIAINDIA
Angola LNGAngola LNG
(supply of two large LNG tanks (supply of two large LNG tanks and two LPG tanks)and two LPG tanks)
20082008
Sonangol Sonangol
Chevron Chevron
BP BP
Total Total
ENI ENI
TOYO KK TOYO KK (Global contractor: (Global contractor:
BECHTEL)BECHTEL)JAPANJAPAN
Aconcagua Refinery (Chile)Aconcagua Refinery (Chile) 20082008 ENAPENAP
TECNICAS REUNIDASTECNICAS REUNIDAS--INITEC (Tecnical, Heat INITEC (Tecnical, Heat Exchanger Division)Exchanger Division)
SPAINSPAIN
SCOPE OF SUPPLY: FLANGES (WN, BLIND,…….), SIZE RANGE: ½” up to 60”, RATING: 150-2500, MATERIALS: Carbon steel , Low temp, Low Alloy, High Yield, SS, DSS, SDSS
9. Recently awarded major projects
PIPINGPROJECT NAMEPROJECT NAME YEARYEAR END USEREND USER EPC CONTRACTOREPC CONTRACTOR
EPC EPC COUNTRYCOUNTRY
Ras Tanura RefineryRas Tanura Refinery
DHT ProjectDHT Project
(Kingdom of Saudi Arabia)(Kingdom of Saudi Arabia)20082008 SAUDI ARAMCOSAUDI ARAMCO
ZEECO ZEECO –– SAMSUNG SAMSUNG ENGINEERING CO LTD.ENGINEERING CO LTD.
USAUSA--KOREAKOREA
KHURSANIYAH GAS PLANTKHURSANIYAH GAS PLANT(Kingdom of Saudi Arabia)(Kingdom of Saudi Arabia) 20092009 ARAMCOARAMCO
SABCO (Bechtel Saudi SABCO (Bechtel Saudi Arabia)Arabia)--TechnipTechnip
KINGDOM OF KINGDOM OF SAUDI SAUDI
ARABIAARABIA
MORON FERTILIZER PROJECTMORON FERTILIZER PROJECT
(Venezuela)(Venezuela)20092009
Petroquímica de Petroquímica de Venezuela, S.A. Venezuela, S.A.
(PEQUIVEN) (PEQUIVEN)
Toyo Engineering Toyo Engineering Corporation (Japan)Corporation (Japan)
JAPANJAPAN(Venezuela)(Venezuela)
(PEQUIVEN) (PEQUIVEN) Corporation (Japan)Corporation (Japan)
GRTgazGRTgaz--Gaz de France Gaz de France (compression stations)(compression stations)
20092009 GAZ DE FRANCEGAZ DE FRANCE SNC LAVALINSNC LAVALINFRANCEFRANCE--
SPAINSPAIN
Rajasthan Northern Area Rajasthan Northern Area Development Project (India)Development Project (India)
20092009CAIRN ENERGY CAIRN ENERGY INDIA LIMITEDINDIA LIMITED
LARSEN & TOUBRO LimitedLARSEN & TOUBRO Limited INDIAINDIA
New Booster Station BS160 New Booster Station BS160 ProjectProject
(South East Kuwait)(South East Kuwait)
20092009KOCKOC
(Kuwait Oil (Kuwait Oil Company) Company)
SAIPEM SPASAIPEM SPA ITALYITALY--INDIAINDIA
Parallel Train Petrochemical Parallel Train Petrochemical Project (Jurong Island Project (Jurong Island ––
Singapore)Singapore)20092009 EXXON MOBILEXXON MOBIL SHAW SHAW –– STONE & WEBSTERSTONE & WEBSTER USAUSA
Isle of Grain Isle of Grain –– (UK)(UK) 20092009 NATIONAL GRIDNATIONAL GRID CB&ICB&I UKUK
SCOPE OF SUPPLY: FLANGES (WN, BLIND,…….), SIZE RANGE: ½” up to 60”, RATING: 150-2500, MATERIALS: Carbon steel , Low temp, Low Alloy, High Yield, SS, DSS, SDSS
9. Recently awarded major projects
PIPINGPROJECT NAMEPROJECT NAME YEARYEAR END USEREND USER EPC CONTRACTOREPC CONTRACTOR
EPC EPC COUNTRYCOUNTRY
Habhsan Gas Complex Habhsan Gas Complex Expansion Expansion (UAE)(UAE) 20092009 GASCOGASCO FLUORFLUOR MIDDLE EASTMIDDLE EAST
Leyte Geothermal Production Leyte Geothermal Production FieldField
(Philippines)(Philippines)20092009 PNOCPNOC--EDCEDC
ENERGY DEVELOPMENT ENERGY DEVELOPMENT CORPORATIONCORPORATION
PHILIPPINESPHILIPPINES
Bagru projectBagru project 20092009 BAPCOBAPCO JGC GulfJGC Gulf KSAKSA
India Panipat Naphtha CrackerIndia Panipat Naphtha Cracker 20092009 IOCLIOCL TOYO ENGINEERINGTOYO ENGINEERING JAPANJAPAN
Golar Freeze FSRUGolar Freeze FSRU 20092009 GOLAR LNGGOLAR LNG MOSS MARITIMEMOSS MARITIME NORWAYNORWAY
GRTgazGRTgaz--Gaz de France Gaz de France (compression stations)(compression stations)
20092009 GAZ DE FRANCEGAZ DE FRANCE SNC LAVALINSNC LAVALINFRANCEFRANCE--
SPAINSPAIN
DQUP ProjectDQUP Project 20092009Numaligarh Numaligarh
Refinery LimitedRefinery LimitedEIL (PMC)EIL (PMC) INDIAINDIA
Acueducto 2 Acueducto 2 -- QueretaroQueretaro 20092009 CONS / FCCCONS / FCC ICAICA--FLUORFLUOR MEXICOMEXICO
Keystone Oil Pipeline ProjectKeystone Oil Pipeline Project 20092009 TRANSCANADATRANSCANADABECHTEL / WORLEY BECHTEL / WORLEY
PARSONSPARSONSUSAUSA
EKPE ASABO Pipeline EKPE ASABO Pipeline Replacement projectReplacement project
20092009 EXXON MOBILEXXON MOBILWORLEY PARSONS WORLEY PARSONS
(Deltaafrik)(Deltaafrik)NIGERIANIGERIA
SCOPE OF SUPPLY: FLANGES (WN, BLIND,…….), SIZE RANGE: ½” up to 60”, RATING: 150-2500, MATERIALS: Carbon steel , Low temp, Low Alloy, High Yield, SS, DSS, SDSS
9. Recently awarded major projects
PIPINGPROJECT NAMEPROJECT NAME YEARYEAR END USEREND USER EPC CONTRACTOREPC CONTRACTOR
EPC EPC COUNTRYCOUNTRY
FUJIAN LNG (China)FUJIAN LNG (China) 20092009 CNOOC CNOOC CB&ICB&I MIDDLE EASTMIDDLE EAST
SAMIR Refinery Upgrading SAMIR Refinery Upgrading ProjectProject (Morocco)(Morocco)
20092009 SAMIRSAMIR SAIPEM SPASAIPEM SPA ITALYITALY
ABU ALI Plant Upgrade (Saudi ABU ALI Plant Upgrade (Saudi Arabia)Arabia)
20092009 ARAMCOARAMCO BONATTIBONATTI ITALYITALY
Domestic Pipeline ProjectDomestic Pipeline Project((Czech Republic)Czech Republic) 20092009 -- PLYNOSTAVPLYNOSTAV
Czech Czech RepublicRepublic
SSGP PIPELINE PROJECT SSGP PIPELINE PROJECT 20092009 PETRONASPETRONAS PUNJ LLOYDPUNJ LLOYD
MALAYSIAMALAYSIA--SSGP PIPELINE PROJECT SSGP PIPELINE PROJECT (Malaysia)(Malaysia)
20092009 PETRONASPETRONAS PUNJ LLOYDPUNJ LLOYDMALAYSIAMALAYSIA--
INDIAINDIA
EKPE ASABO Pipeline EKPE ASABO Pipeline Replacement project (Nigeria)Replacement project (Nigeria)
20102010 EXXON MOBILEXXON MOBILWORLEY PARSONS WORLEY PARSONS
(Deltaafrik)(Deltaafrik)NIGERIANIGERIA
Domestic Pipeline ProjectDomestic Pipeline Project((Czech Republic)Czech Republic) 20102010 -- PLYNOSTAVPLYNOSTAV
Czech Czech RepublicRepublic
Geothermal Plant Compressors Geothermal Plant Compressors (Mexico)(Mexico)
20102010 CFECFE ALSTOMALSTOM MEXICOMEXICO
KXL Pipeline Project KXL Pipeline Project (Canadian Package)(Canadian Package)
20102010 TRANSCANADATRANSCANADABECHTEL / WORLEY BECHTEL / WORLEY
PARSONSPARSONSUSAUSA
JUBAIL EXPOR REFINERY JUBAIL EXPOR REFINERY (JERP) (JERP) –– Saudi ArabiaSaudi Arabia
20102010SATORP (Saudi SATORP (Saudi Aramco Aramco –– Total)Total)
SK Engineering & SK Engineering & ConstructionConstruction
SOUTH SOUTH KOREAKOREA
SCOPE OF SUPPLY: FLANGES (WN, BLIND,…….), SIZE RANGE: ½” up to 60”, RATING: 150-2500, MATERIALS: Carbon steel , Low temp, Low Alloy, High Yield, SS, DSS, SDSS
9. Recently awarded major projects
PIPINGPROJECT NAMEPROJECT NAME YEARYEAR END USEREND USER EPC CONTRACTOREPC CONTRACTOR
EPC EPC COUNTRYCOUNTRY
FLEAR GAS PROJECTFLEAR GAS PROJECT 20102010 GASCOGASCOCCC CCC
(Consolidated Contractors (Consolidated Contractors Company)Company)
ABU DHABIABU DHABI
KAUTHER DEPLETION KAUTHER DEPLETION COMPRESSION PROJECTCOMPRESSION PROJECT
20102010 PDOPDO PETROFAC E&C Int.PETROFAC E&C Int. SHARJAHSHARJAH
KARAN GAS KARAN GAS 20102010 SAUDI ARAMCOSAUDI ARAMCO PETROFAC E&C Int.PETROFAC E&C Int. SHARJAHSHARJAH
JERP (JUBAIL EXPORT JERP (JUBAIL EXPORT REFINERY)REFINERY)
20102010
SATORPSATORP(SAUDI ARAMCO(SAUDI ARAMCO--
TOTAL)TOTAL)BIHLBIHL UKUK
IGD (INTEGRATED GAS IGD (INTEGRATED GAS DEVELOPMENT)DEVELOPMENT)
20102010 GASCOGASCO CB&ICB&IUSAUSA--
SHARJAHSHARJAH
MANIFAMANIFA 20102010 SAUDI ARAMCOSAUDI ARAMCO CB&ICB&I SHARJAHSHARJAH
EL MERK EL MERK 20102010 SONATRACHSONATRACH PETROFAC E&C Int.PETROFAC E&C Int. SHARJAHSHARJAH
JERP (JUBAIL EXPORT JERP (JUBAIL EXPORT REFINERY)REFINERY)
20102010
SATORPSATORP(SAUDI ARAMCO(SAUDI ARAMCO--
TOTAL)TOTAL)PUNJ LLOYDPUNJ LLOYD
SAUDI SAUDI ARABIAARABIA
ASAB 3ASAB 3 20102010 GASCOGASCO TECHNIP ABU DHABITECHNIP ABU DHABI UAEUAE
RUWAIS RUWAIS –– IGD ProjectIGD Project 20102010 GASCOGASCO TOYO KANETSU TOYO KANETSU -- DAEWOODAEWOOJAPAN JAPAN --KOREAKOREA
SCOPE OF SUPPLY: FLANGES (WN, BLIND,…….), SIZE RANGE: ½” up to 60”, RATING: 150-2500, MATERIALS: Carbon steel , Low temp, Low Alloy, High Yield, SS, DSS, SDSS
9. Recently awarded major projects
PROJECT NAMEPROJECT NAME YEARYEAR END USEREND USER EPC CONTRACTOREPC CONTRACTOREPC EPC
COUNTRYCOUNTRY
Sahil & Shah Full Fields Sahil & Shah Full Fields Development Pipeline (UAE)Development Pipeline (UAE)
20102010 ADCOADCO TECNICAS REUNIDAS/INITECTECNICAS REUNIDAS/INITEC SPAINSPAIN
NCP NCP -- Jubail Olefins ComplexJubail Olefins Complex(KSA)(KSA)
20102010 NCPNCP DAELIMDAELIM KOREAKOREA
Sahil & Shah Full Fields Sahil & Shah Full Fields Development Pipeline (UAE)Development Pipeline (UAE)
20102010 ADCOADCO CCCCCC ABU DHABIABU DHABI
SCOT & SWS4 (KSA)SCOT & SWS4 (KSA) 20102010 ARAMCOARAMCO--SHELLSHELL JGC GulfJGC Gulf KSAKSA
EXXON MOBILEXXON MOBILSANTOSSANTOS
PNG LNG (Papua New Guinea)PNG LNG (Papua New Guinea) 20102010SANTOSSANTOS
AGLAGLNIPPON OILNIPPON OIL
MRDCMRDC
CHIYODA CHIYODA -- JGCJGC JAPANJAPAN
ELIXIER 2 GAS PIPELINE ELIXIER 2 GAS PIPELINE PROJECT (UAE)PROJECT (UAE)
20102010 GASCOGASCO DODSAL E&CDODSAL E&C UAEUAE
JERP (JUBAIL EXPORT JERP (JUBAIL EXPORT REFINERY) (KSA)REFINERY) (KSA)
20102010SATORPSATORP
(SAUDI ARAMCO(SAUDI ARAMCO--TOTAL)TOTAL)
ROTARYROTARY SINGAPORESINGAPORE
HABSHAN V (UAE)HABSHAN V (UAE) 20102010 GASCOGASCO TECNIMONT TECNIMONT -- JGCJGC ITALY ITALY -- JAPANJAPAN
Saudi Kayan Saudi Kayan -- Jubail Olefins Jubail Olefins ComplexComplex –– LDPE (KSA)LDPE (KSA)
20102010 SAUDI KAYANSAUDI KAYAN DAELIMDAELIM KOREAKOREA
EDC / CA (KSA)EDC / CA (KSA) 20102010Arabian Chlor Arabian Chlor Vinyl Company Vinyl Company
DAELIMDAELIM KOREAKOREASCOPE OF SUPPLY: FLANGES (WN, BLIND,…….), SIZE RANGE: ½” up to 60”, RATING: 150-2500, MATERIALS: Carbon steel , Low temp, Low Alloy, High Yield, SS, DSS, SDSS
9. Recently awarded major projects
PROJECT NAMEPROJECT NAME YEARYEAR END USEREND USER EPC CONTRACTOREPC CONTRACTOREPC EPC
COUNTRYCOUNTRY
QUEENSLAND CURTIS LNG QUEENSLAND CURTIS LNG PLANT (Australia)PLANT (Australia)
20102010 BG GroupBG Group BECHTEL OIL & GASBECHTEL OIL & GAS USAUSA
Gassi Touil Gas Project (Algeria)Gassi Touil Gas Project (Algeria) 20102010 SonatrachSonatrach JGCJGC JAPANJAPAN
EPIC FOR PRODUCED WATER EPIC FOR PRODUCED WATER TREATMENT & INJECTION TREATMENT & INJECTION --
PHASEPHASE-- 22 (Qatar)(Qatar)20102010 Qatar PetroleumQatar Petroleum BLACKCATBLACKCAT QATARQATAR
RUWAIS RUWAIS –– IGD Project (UAE)IGD Project (UAE) 20102010 GASCOGASCO TOYO KANETSU TOYO KANETSU -- DAEWOODAEWOOJAPAN JAPAN --KOREAKOREA
KXL Pipeline Project KXL Pipeline Project 20102010 TRANSCANADATRANSCANADA
BECHTEL / WORLEY BECHTEL / WORLEY USAUSA
KXL Pipeline Project KXL Pipeline Project (Canadian Package)(Canadian Package)
20102010 TRANSCANADATRANSCANADABECHTEL / WORLEY BECHTEL / WORLEY
PARSONSPARSONSUSAUSA
TMP Project (Malaysia)TMP Project (Malaysia) 20102010Tokuyama Tokuyama
Malaysia Sdn. BhdMalaysia Sdn. BhdCHIYODA CorporationCHIYODA Corporation JAPANJAPAN
KOC Pipeline (Kuwait)KOC Pipeline (Kuwait) 20112011 KOCKOC PETROFAC E&C Int.PETROFAC E&C Int. SHARJAHSHARJAH
BOROUGE 3 (UAE)BOROUGE 3 (UAE) 20112011 BOROUGEBOROUGESAMSUNG E&C (JV SAMSUNG E&C (JV
Tecnimont)Tecnimont)KOREAKOREA
Rabigh Refinery and Rabigh Refinery and Petrochemical Complex (KSA)Petrochemical Complex (KSA)
20112011Saudi Aramco Saudi Aramco
Sumitomo Chem. Sumitomo Chem. JGCJGC JAPANJAPAN
HABSHAN V (UAE)HABSHAN V (UAE) 20112011 GASCOGASCO TECNIMONT TECNIMONT -- JGCJGC ITALY ITALY -- JAPANJAPAN
Gorgon LNG Gorgon LNG –– (Australia)(Australia) 20112011 CHEVRONCHEVRON CB&ICB&I SHARJAHSHARJAH
SCOPE OF SUPPLY: FLANGES (WN, BLIND,…….), SIZE RANGE: ½” up to 60”, RATING: 150-2500, MATERIALS: Carbon steel , Low temp, Low Alloy, High Yield, SS, DSS, SDSS
9. Recently awarded major projects
PROJECT NAMEPROJECT NAME YEARYEAR END USEREND USER EPC CONTRACTOREPC CONTRACTOREPC EPC
COUNTRYCOUNTRY
SOUTH YOLOTEN PROJECTSOUTH YOLOTEN PROJECT 20112011 TURKMENGASTURKMENGAS PETROFAC E&C Int.PETROFAC E&C Int. SHARJAHSHARJAH
EFFLUENT WATER PROJECTEFFLUENT WATER PROJECT 20112011 KOCKOC PETROFAC E&C Int.PETROFAC E&C Int. SHARJAHSHARJAH
DONGGI SENORODONGGI SENORO 20112011PT. DONGGIPT. DONGGI--SENORO LNGSENORO LNG
JGCJGC JAPANJAPAN
SCOPE OF SUPPLY: FLANGES (WN, BLIND,…….), SIZE RANGE: ½” up to 60”, RATING: 150-2500, MATERIALS: Carbon steel , Low temp, Low Alloy, High Yield, SS, DSS, SDSS
10. Why choose ULMA?
DEMONSTRATED RELIABILITYDEMONSTRATED RELIABILITY
�� OVER 45 YEARS EXPERIENCE. OVER 45 YEARS EXPERIENCE.
Serving our customers since 1962.Serving our customers since 1962.
��COMPETITIVE PRICING AND DELIVERY. COMPETITIVE PRICING AND DELIVERY.
Efficiency through fully automated production.Efficiency through fully automated production.
��PROJECT MANAGEMENT. PROJECT MANAGEMENT. ��PROJECT MANAGEMENT. PROJECT MANAGEMENT.
Best communication structure,Best communication structure,
attention to detail and documentation support.attention to detail and documentation support.
��APPROVALS & CERTIFICATES. APPROVALS & CERTIFICATES.
All the major End Users and Standards.All the major End Users and Standards.
��STOCKISTS IN OVER 70 COUNTRIES. STOCKISTS IN OVER 70 COUNTRIES.
Leadership throughout the world marketLeadership throughout the world market
10. Why choose ULMA?
SIMPLY THE BEST SERVICESIMPLY THE BEST SERVICE
�� SERVICE YOU CAN DEPEND ON THROUGHOUT YOUR PROJECT CYCLE:SERVICE YOU CAN DEPEND ON THROUGHOUT YOUR PROJECT CYCLE:
-- Direct personal contact: your area manager is your project managerDirect personal contact: your area manager is your project manager
-- Clear comunication from start to finishClear comunication from start to finish
-- FullFull--time staff dedicated to project documentationtime staff dedicated to project documentation
�� EFFICIENT CUSTOMIZATION AND FAST TURNAROUNDEFFICIENT CUSTOMIZATION AND FAST TURNAROUND�� EFFICIENT CUSTOMIZATION AND FAST TURNAROUNDEFFICIENT CUSTOMIZATION AND FAST TURNAROUND
-- Allowing us to meet tight deadlines up to your last MTOAllowing us to meet tight deadlines up to your last MTO
�� LEADINGLEADING--EDGE MANUFACTURINGEDGE MANUFACTURING
-- Design, forge & machine a full range of flanges at our own plant in SpainDesign, forge & machine a full range of flanges at our own plant in Spain
-- Plant fully automated and robotizedPlant fully automated and robotized
-- Unrivalled capacity and lead timesUnrivalled capacity and lead times
-- Quality unbeatableQuality unbeatable
10. Why choose ULMA?
COMMENDATION LETTERSCOMMENDATION LETTERS
•• YEAR:YEAR: 20072007--20092009
•• EPC CONTRACTOR:EPC CONTRACTOR:
•• PROJECT:PROJECT:
KHURSANIYAH GAS PLANTKHURSANIYAH GAS PLANT(Kingdom of Saudi Arabia)(Kingdom of Saudi Arabia)
•• END USER:END USER:
•• YEAR:YEAR: 20072007--20092009
•• EPC CONTRACTOR:EPC CONTRACTOR:
•• PROJECTS:PROJECTS:
MORON FERTILIZER PROJECT (Venezuela)MORON FERTILIZER PROJECT (Venezuela)
ETHANE CRACKER PROJECTETHANE CRACKER PROJECT-- 1000 KMTA ETHYLENE PLANT (Thailand)1000 KMTA ETHYLENE PLANT (Thailand)
YANBU ETHYLENE GLYCOL PLANT (Kingdom of Saudi Arabia)YANBU ETHYLENE GLYCOL PLANT (Kingdom of Saudi Arabia)
•• END USERS:END USERS:•• END USERS:END USERS:
10. Why choose ULMA?
COMMENDATION LETTERSCOMMENDATION LETTERS
•• YEAR:YEAR: 20092009--20102010
•• EPC CONTRACTOR:EPC CONTRACTOR:
•• PROJECT:PROJECT:
GAZ DE FRANCEGAZ DE FRANCECOMPRESSION STATIONSCOMPRESSION STATIONS
•• END USER:END USER:
•• YEAR:YEAR: 20082008--20092009
•• EPC CONTRACTOR: EPC CONTRACTOR:
•• PROJECTS:PROJECTS:
MOBIL NIGERIA PIPELINE PROJECTS (Nigeria)MOBIL NIGERIA PIPELINE PROJECTS (Nigeria)
BAPCO BAPCO –– BAGRU PROJECT (Baharain)BAGRU PROJECT (Baharain)
ANGOLA LNG ANGOLA LNG –– Tank Package (Angola)Tank Package (Angola)
•• END USERS:END USERS:•• END USERS:END USERS: