Your l e t t e r dated January 10, 1995 requests approval to abandon i n place 15,988 feet (3.03 miles) of 6 5/8-inch pipeline designated as Segment No. 8479 and to relinquish i n i t s entirety, Right-of-Way Grant OCS-G 10105, associated therewith. The subject pipeline originates at PG&E Resources Offshore Company's (PG&E) Platform No. 1 i n Block 427, crosses Block 420, and terminates at a subsea t i e - i n with Transcontinental Gas Pipe Line Corporation's 20-inch pipeline (OCS-G 4967) i n Block 419, a l l i n the Galveston Area.
Pursuant to 30 CFR 250.4(b), approval i s hereby granted to abandon the above-described pipeline, and i n accordance with 30 CFR 250.159(c)(9), the requirement that the pipeline be removed i s hereby waived. However, i n the future should i t be determined that t h i s abandoned pipeline constitutes a hazard to navigation or commercial fishing operations or unduly interferes with other uses of the Outer Continental Shelf, PG&E shall be required to remove i t .
Pursuant to 30 CFR 250.150(b), the relinquishment of the right-of-way grant associated with the pipeline that i s to be abandoned i n place i s hereby accepted effective January 11, 1995, subject to PG&E completing the abandonment operations by December 31, 1995. Additionally, PG&E shall within 30 days a f t e r completion of the abandonment, submit a report to t h i s o f f i c e which includes the date the abandonment was completed and v e r i f i e s that the abandonment was completed as approved.
Sincerely,
(Orig. Sgd.) Kent E. Stauffer
Donald C. Howard Regional Supervisor Field Operations
bcc: /1502-01 (P/L OCS-G 10105) w/enclosures (MS 5232) t'l502-01 (P/L OCS-G 10105) (microfilm) (MS 5033) MS 5421 MS 5270 MS 5232 (Carto)
W/Plat Jk ^ MConner:amm:l/12/95:PG&E.479 \Vv\ \ ^
/
PG&E Resources shore Company '88 N Central Expressway, Suite 1000 ./alias, Texas 75206-3922 Telephone 214/750-3800 FAX 214/750-3883
U. S Department of the Interior Minerals Management Service Gulf of Mexico OCS Region 1201 Elmwood Park Blvd. New Orleans, Louisiana 70123
Attn: Mr. Don C. Howard Regional Supervisor Field Operations
January 10, 1995
Re- Galveston Block 427 Right-of-Way No. 10105 Segment No. 8479
Gentlemen:
In accordance with 30 CFR 250, Subpart J, PG&E Resources Offshore Company (PG&E ROC) respectfully requests authority to abandon in place approximately 15,988' (3.03 miles) of 6-5/8" pipeline and relinquish in its entirety the above referenced Right of-Way.
Enclosed for your review and approval is a pipeline abandonment procedure and associated as-built diagram.
Should additional information be required or if questions arise, please contact Mr. Jim LaFevers at (214)750-3988.
Very truly yours,
PG&E^bsources Offshore Company
DWM/jbl end
Don W. Moore Vice President
m
cc: J. B. LaFevers N C. Inske Central
A PG&E Resources Company
PG&E RESOURCES OFFSHORE COMPANY GALVESTON BLOCK 427 OCS-G-9053
PIPELINE ABANDONMENT PROCEDURE
1. BLEED PIPELINE PRESSURE TO 0 PSI.
2. JUMP DIVERS ON TRANSCO SUB-SEA TIE-IN AND PARTIALLY CLOSE (1/2) SUBSEA VALVE.
3. INSTALL PIG ON RISER END AND PIG PIPELINE WITH 600 BBLS OF INHIBITED SEAWATER
4. REMOVE PG&E ROC PORTION OF TIE-IN ASSEMBLY AND 50' OF 6" PIPELINE.
5. INSTALL "STOPPLE PLUG" IN END OF PIPELINE AND BURY AT LEAST 3' BML.
6. JUMP DIVERS ON RISER END, CUT OFF PIPELINE 20' OUT FROM PLATFORM INSTALL "STOPPLE PLUG" AND BURY AT LEAST 3' BML.
+
AS BUILT 6 - V 8 " GAS WPQJC
BESTAVAILABLE COP
T H » i
•OTI1 a.aa4,Me* 1 a.aaa.aai* 1 *T>.a«s* a>aaa.4M« > ]?S.M»« i .a» .e**« 4 I T S . * ! ? * a.aaa.vea* • 2T*.M»« s .a ia .a* * * • 17*, W a.an.Ma*
2T4.?1»' >,a>i.4*>« • XT* . * * ! ' a .aa i . iM ' t W . W a.aao.aoa* 10 ar>.S4i' >.a>0.14T* l i ar>,M»' a.aav.MT* ia XT*.114* a.aa«,4a»« i> aTt.M** a,aa*.ao4* i« l . tH .M** i» aM.iaa* i . t a a . u i * i * aT * .4» ' a.aar.TM* IT ar»,4T«' a.aar.aia*
!• a*e.ea*« a.aai .M**
1» aM.aM* a <aa» tM4* >0 a«o.«ii« a,aa«,iM* 11 a»i .M»' *,sat.4*44 « aai,>?4* a.aM.OM* t l aa i .«M' >,aa4.M*' J4 a a i . m * i.aa4,a*a* »» aaa.ata* a.aaa.MT* M a»a,»M* ».a»»,4TT» *» a«a.»4T' s .aaa .vn* »• aai.i*4> a.aaa.M** X» aaa,4a4* a.aaa.aM* >0 aai.TM* a.aai.MT*
n c i a aai.Ma* a.m,4n*
ty i i |T| t n . m . i M . l H 1
»• rr*.***' u«. arai«»*.n»* tarn. »r«»'n.i«>-
•mm cr IOTOBM \ N 9 m ^
CORPUS CHRISTI OL ft SAS OOMMNY
AS BUILT 6 - V 8 ' GAS PIPELINE
OALVCSTON AREA
OULF OT MEXICO
United States Department of the Interior MINERALS MANAGEMENT SERVICE
GULF OF MEXICO OCS REGION 1201 ELMWOOD PARK BOULEVARD
NEW ORLEANS, LOUISIANA 70123-2394
In Reply Refer To: MS 5421 N.O. Misc. #582
BEST AVAILABLE COPY
ACTION
PG&E Resources Offshore Company and Gas
ACCEPTANCE OF MERGER
On March 31, 1992, there was f i l e d i n t h i s office for approval evidence of merger of Corpus Christi Oil and Gas Company, a Delaware corporation (N.O. Misc. #538), with and into PG&E Resources Offshore Company , a Delaware corporation (N.O. Misc. #582) , effective December 26, 1991. The name of the surviving corporation i s PG&E Resources Offshore Company and the qualification number assigned thereto i s New Orleans Miscellaneous File Number 582.
In connection with t h i s merger, the following evidence was received:
1. Certificate of Ownership and Merger merging Corpus Christi Oil and Gas Company into PG&E Resources Offshore Company, duly c e r t i f i e d by the Secretary of State of the State of Delaware on December 27, 1991, with additional c e r t i f i c a t i o n by Randall B. Wilson, Assistant Secretary of PG&E Resources Offshore Company, on January 31, 1992;
2. Statement of PG&E Resources Offshore Company, duly sworn by Randall B. Wilson, Assistant Secretary, on January 31, 1992, reflecting the following:
A. PG&E Resources Offshore Company i s incorporated i n the State of Delaware;
B. PG&E Resources Offshore Company i s authorized to hold o i l and gas leases and pipeline rights-of-way on the Outer Continental Shelf;
3. Evidence of authority of persons empowered to execute for and on behalf of PG&E Resources Offshore Corporation, duly c e r t i f i e d by Randall B. Wilson, Assistant Secretary, on March 31, 1992;
fr
BEST AVAILABLE COFY
N.O. Misc. #582 Page 2
4. C e r t i f i c a t e executed by Randall B. Wilson, Assistant Secretary, on January 31, 1992, l i s t i n g persons authorized to execute leases and other documents on behalf of PG&E Resources Offshore Company;
5. C e r t i f i c a t e executed by Randall B. Wilson, Assistant Secretary, on January 31, 1992, l i s t i n g the names and t i t l e s of a l l o f f i c e r s of PG&E Resources Offshore Company;
6. L i s t of pipeline rights-of-way t o be affected by the merger;
7. Outer Continental Shelf Mineral Lessee's and Operator's Bond Number U1870120 i n the amount of $300,000 executed on January 27, 1992, with PG&E Resources Offshore Company as pr i n c i p a l and United Pacific Insurance Company as surety;
8. Outer Continental Shelf Right-of-Way Grant Bond Number U1870119 i n the amount of $300,000 executed on January 27, 1992, with PG&E Resources Offshore Company as p r i n c i p a l and United Pacific Insurance Company as surety.
Since the transfer and vesting of property r i g h t s i n the surviving corporation have been effected by State statutes by operation of law and not by in d i v i d u a l conveyances, the merger i s hereby approved insofar as i t a f f e c t s pipeline rights-of-way under 30 CFR 250. The change i n ownership as t o the pip e l i n e rights-of-way l i s t e d below i s recognized and the records so noted:
PIPELINE RIGHTS-OF-WAY
ocs-q NO. 8277 8593 8607 8616 9350 9374
OCS-G NO?
10105 10528 11191 12310 12719 13414
Regional Directoi
cc: Q u a l i f i c a t i o n F i l e #582
BEST AVAILABLE COPY
In fieply Refer To: HS 5232 N0V 2 1 1990
Corpus Christi Oil and Gas Company Attention: Mr. George Taylor Post Office Box 2928 Corpus Christi, Texas 78403
Gentlemen:
Your lette r dated November 1, 1990, transmitted a hydrostatic test pressure chart and a repair report for the following right-of-way (ROW) pipeline, located in the Galveston Area;
ROW Pipeline No.
Size Length (Inches) (feet) Service From 12
OCS-G 10105 ) 6 15,998 Gas/ Well No. 1 A 20-inch SSTI Condensate Blook 42? Block 419
Lease OCS-G 9053 Lease OCS-G 10249
Tbe data which you provided indicates the maximum allowable operating pressure w i l l remain 1,440 psig.
Sincerely,
(0r:> £ri}D. i. Bourgco:
D. J. Bourgeois Regional Supervisor Field Operations
cc: Department of Transportation 2320 La Branch, Room 2116 Houston, Texas 77004
bcc: |_1502-01 ROW OCS-G 10105 w/orig. appln. (K.Faust) (HS 5232) 1502-01 ROW OCS-G 10105 w/cy of appln (microfilm) (MS 5033) ES 5270
JGordon:ds:11/19/90:WP
r
jKSI AVAILABLE COM Area Code 512
888-9301
CORPUS CHRISTI OIL AND GAS COMPANY THE 600 BUILDING
P.O. BOX 2928
CORPUS CHRISTI, TEXAS 78403
November 1, 1990
Minerals Management Service 1201 Elmwood Park Blvd. New Orleans, LA 70123
Attn: Mr. Frank Torres
Re:
Dear Mr. Torres:
RECEIVED NOVO 6 1830
FIELD OPERATIONS
-Region^
Pipeline Segment-5232-WesJ_Cameron B10C1L-24Z Well No to a sub-sea t i e - i n i n -Block 2
On October 9, 1990, the subject pipeline parted a f t e r apparently being h i t with an anchor. The platform immediately shut i n on the PSL and on October 12, 1990 the pipeline parting was v e r i f i e d with divers.
On October 23, 1990, a repair crew with divers went to the location and over the next three days a 60' section of damaged l i n e was removed and replaced using Big Inch Marine connections at the ends of the new section of pipe. After repairing the l i n e , i t was reburied to 3' below the mud l i n e . The pipeline was tested on October 28, 1990 to 2190 psi and the pipeline placed back i n service. Attached are copies of the test chart and the deadweight gauge readings.
e j m ^ rT "916 mtn (V*/ 7
u*^ Yours very t r u l y ,
e>T7 /it t / t rcin-'l - Yes ^ l
George Taylor (y Vice President - Operations
very t r u l y , J
GT:ah
PIPELINE COMPANY /"oAfds/?dA/S77 10,/ JOB NO:
Aft PIPELINE CONTRACTOR J002> - MtetoMAj //£//>*-
W.O.NO: AFE NO:
TEST SECTION NO.
TEST END: DATE JO-ZB-^O
FROM / f t 6)4 W TO 77U*6& 771 fi
TIME 03 J oo Art. PRESSURE UNIT NO. STATION NO.
TIME //'-So /tH ELEVATION
PIPE DATA: ob-ScU 4o fifieJ/AJL APP«J>K /(>. ooo'.
DEADWEIGHT SERIAL NUMBER PRESSURE RECORDER SERIAL NUMBER CT- / / 7 7 7 TEMPERATURE RECORDED SERIAL NUMBER TEST IS "'ACCEPTED
DATE CERTIFIED "DATE CERTIFIED" "DATE CERTIFIED"
REJECTED I F REJECTED, EXPLAIN
DEADWEIGHT RECORD
TEMPERATURE
TEST FO
TIME PRESSURE
03'. 0 V 3 o
AAll JAIO
0f!3o o + -4r
A3L*1 J>*<H.
06 ' 00 3 2. O f - IS" 0 6'.
OT IOO
O'ZJ IT
PIPE OR GROUND REMARKS
INSPECTOR (SIGNATURE)
R (SIGNATURE)
Page X of 2
PIPELINE COMPANY C*(UP\)\ CtUtlSTI Dt I * GA* JOB NO: W.O.NO:
PIPELINE CONTRACTOR AFE NO:
TEST SECTION NO.
TEST BEGAN: DATE_
TEST END: DATE
FROM6) A 42.T P/F TO T&MSLo TAP <$/i PRESSURE
TIME UNIT NO. STATION NO.
TIME ELEVATION
PIPE DATA: 'fib -Sdli^o fipdjjJ*.. ApPOa*. l^^ooo'.
DEADWEIGHT SERIAL NUMBER I Q 1 2 DATE CERTIFIED PRESSURE RECORDER SERIAL NUMBER J~- I I 111 DATE CERTIFIED TEMPERATURE RECORDED SERIAL NUMBER TEST IS ^ACCEPTED
DATE CERTIFIED REJECTED IF REJECTED, EXPLAIN
DEADWEIGHT RECORD
TEMPERATURE
TEST FO
TIME PRESSURE
O&'DO
Ai 6 0 0&:lo A S 3 o o& : <4G O l 1 0 0
O"f3o
of.** A ^ 1 0 '• PO
10:1*
10 . 3o 10-.**
14.00 JHIO
n ;/C A ito / ) :3o Alt!
PIPE OR GROUND REMARKS
tj^F- rgj r , ~DE PtesStS/i*. fife
(SIGNATURE) INSPECTOR
/ (SIGNATURE)
BEST AVAICABIE COPY
BEST AVAILABLE COPY
INITIAL ORAL REPORT OF PIPELINE ACCIDENT. BREAK. OR LEAK Segment No. ^7- /Gl&ST
Report Received By:
Name: /^•A/f^-Toe^ \
Date: ^Oc^W ( f .
Report Given By:
Name: (^7g^y, TA^V^O
Company: Qj^yi^
Phone #: I « fefti^- q^o>
Time and Date of Break or Leak Discovered: ^ iff n ^ " T l l t ^ l ^ (C^P /f Q
Break or Leak Location:
Size of Pipeline: Lo u Product: GA**
From: Area G l A 4-^7 0^ /
Block_
Lease
To: Area G/^gsfTv-. 4/^ 2 o'' ^ T J :
Blook
Lease
Wind Direction and Speed: 30 -A ZoT
Extent of Slick: "T **-
Current Direction & Speed:
Sea Conditiona: v^~^ 7
Appearance of Oil on Water: Volume of Spill:
Production to Pipeline Shut-in?
Operating Pressure Range?
i f so how(CAuto/fr[anual)
PSL Setting?
Cause: ( W f a / j AA/CIA, J^^^^ I" ^L^L^^ *JX^ ^LrgL^fgA nJtClCk: <jjK[\k
Repair Procedure:
Remarks: GftH u>W- At M&4* v i -J^ i i^J ^rl /v^^-^ £ < ^ A U ^ < L ~ (Jj^ ^ t A ^ w L
Remind Operator to Submit Repair Report [250.158(e)]?
^ ^ H o - ^ uSvyx^t/i^ I d ^ - ^ -
8HSTAVAIUBUCOPY
BEST AVAILABLE COPY
In Reply Refer To: FO-2-2 / Z ^ ^ ^ f f f
Corpus Christ! Oil and Gas Company SEP 2 6 1989 Attention: Mr. George E. Taylor Poat Office Box 2928 Corpus Christi, Texas 78403
Gentleraen:
In accordance with 30 CFR 250.158(b), your lette r dated June 19, 1989, transmitted a pipeline construction report for the following right-of-way pipeline:
Pipeline Right-of-way Size Length Number (inches) (feet) Servioe From To
OCS-G I O I O S N B 5/8 15,998 Gas/ Platform No. 1 A 20-inch SSTI J Condensate Block 427 Block 419
— — Galveston Area Galveston Area Lease OCS-G 9053 Lease OCS-G 10249
^ The data which you provided Indicates the following test information and establishes the assigned maximum allowable operating pressure (MAOP) for this pipeline:
Pipeline Right-of-way Test Pressure Duration MAOP MAOP Number (psig) (hours) (psig) Determination
OCS-G 10105 2,160 8 1,440 Hydrostatic Pressure Test
Tho total length of the "as-built" pipeline right-of-way ia 3.03 miles.
In future correspondence, please refer to the above pipeline by i t s assigned right-of-way number.
Sincerely,
(Orig. Sgd.) A. Donald Giroir
D. J. Bourgeois Regional Supervisor Field Operations
bcc: 11502-01 OCS-G 10105 (w/orig report) (FO-2-2) (K. Faust) T502-01 OCS-G 10105 (FO-2-2) (microfilm w/copy of report) LB-3-1 FO-2-2 Carto (w/oy of location plat) ' *
S Ledet •••ds: 9/20/39:LEXITYPE Disk 4
Area Code 512 888-9301
CORPUS CHRISTI OIL AND GAS COMPANY THE 600 BUILDING
PO. BOX 2928
CORPUS CHRISTI, TEXAS 78403
June 19, 1989
Minerals Management Service 1201 Elmwood Park Blvd. New Orleans, LA 70123
Attn: D. J. Bourgeois Regional Supervisor Field Operations
RE: OCS-G-10105 Pipeline R-O-W Block 427 to 419 Galveston Area
This is to advise you that the above named pipeline has been installed. Attached is a copy of the pressure test chart, the dead weight gauge reading and the "As-Bilt" plat of the line.
Yours very truly,
George E. Taylor Vice President, Operations
/kr enclosures
tmtmmmtmttmtmmtmmmtmmmmtmtmmmmmttmtmmmmmmtmmtmmmmmm Itt DEADWEIGHT RECORD »»»
fl.F.E. NUMBER
LINE MNER C <D r G> . £ 1 ^ -
TEST SECTION FROH STA. SuASg^^>L 4 / f
" PIPE DESCRIPTION &< )
MAX I HUH PIPE ELEVATION 4" ^
JOB NUMBER
GENERAL CONTRACTOR iJ.OtP.r
TO STATION &j#lveirCti £ • 4-27 jtUc/ir/
HINIHUH PIPE ELEVATION — / 0 7
ELEV. DEADWEIGHT TESTER -f-^P
DATE * TINE TEST BEGAN CljOA**
mim TEST PRESSURE Z,Z&0 fS/l? -
DATE & TIME TEST COMPETED
HINIHUH TEST PRESSURE ZtC*0 fsiC*.
tmtmmttmmttmmmmtmtmmtmmmmmttmtmtmmtmttttmttmmttmmmmt TEMPERATURE TEHPERi
TIME DEAD HEIGHT AHBIENT TEST TIHE DEAD HEIGHT AHBIENT READING HEDIUH READING
tmtmmmmmmttmmmmtmmmmttmmtmmmmmmmtmmmtmmmmmtm tea*^_Aif£££JA
f i t *~*-ZLZ1. " 7 ip 3 4vt zz^a
T
eza** \ As 82.
T.t-<rx>
/ora?^- I 2-/3 7 ^s /C
7 > f
7 r ^
2 / 9 2 . ^
wwwwuw iTURE
TEST HEDIUH
ttttuuttu
^ TESTER'S REP.
BEST AVAILABLE COPY
BEST AVAILABLE COPY
mmtmtmtmmmmmmMmmmmtmmmtmmmtmmmmmmttmmtmttmmmtmtmmm tti DEADWEIGHT RECORD til
mmmmmmmmtmtttmmmmmmmmmttmmmtttmmtmitmmmtmttmmmmmmmm
A.F.E. NUHBER
LINE OWNER G • C (D T 6 , - g ^ -
JOB NUHBER
GENERAL CONTRACTOR
TEST SECTION FROH STA. S u A S g ^ . ^ <^,L : 4 / f
" PIPE DESCRIPTION 6 ( ( 0 S<=-0
HAXIHUH PIPE ELEVATION
TO STATION ^jnlveirV^ T . 4-27 Ct.-tS*/
HINIHUH PIPE ELEVATION — I Ol '
aEV. DEADWEIGHT TESTER + 6 " "
DATE 4 TIHE TEST BEGAN k[<tSf8c}& CHOAIL*
HAXIHUH TEST PRESSURE fSiX*?-
DATE & TIHE TEST COMPETED
HINIHUH TEST PRESSURE ZtCrQ fis/G.
mmtmmtmmtttmtmmmtttmttmtmmmmtmtmmmmmtmtmmmmmmmtm TEHPERATURE TEHPERi
TIHE DEAD WEIGHT AHBIENT TEST TIHE DEAD WEIGHT AHBIENT READING HEDIUH READING
mttmmmmmmmmtmtmmmmmmmtmmmmmimmmmmtmmtmmmmm
7 k> 3 «»*t 2.z^> 7 ^
71*
1A%
Z-Z-CTO '
/g.'CD^ t 2.15 7 PZtQ.X /O'.jeA^X
RESULTS OF TEST:
lMo tot x &r>r i * <
» 7^*F I / : o / j f f i \ X
ZJ87 ZJ © 7 xi/op-
Z-.SV&^t 2.tg,(£> Z»o fiv X x \
UNACCEPTABLE
CONTRACTOR'S REP./C g?>,
DURATION OF TEST
OWNER'S REP./
/s$/fA/6«*<<'" TESTER'S REP.
tttttttttttt iTURE
TEST HEDIUH
mmmm
BEST AVAILABLE COPV
OCS - 6-905/
1
CORPUS CHRISTI BLK 427.11 WELL X=3,234t 390' Y- 274,599' LAT. 28* 31'57.B79,,
m m . 95'>09'13.241,1
TIE
1 2 3 4 5 6
VALVE 8 9 10 11 12 13 14 15 16 17 IS 19 20 21 22 23 24 25 26 27 28 29 30
TIE-IN
274 275 275 275 275 276 276 276 276 277 277 277 278 278 278 279 279 279 280 280 280 281 281 281 281 282 282 282 283 283 283 283
V. J' J ' 003 ' 285' 569' 837' 069' 363 ' 715' 962' 207' 541' 845' 214 ' 528' 820' 122' 425' 67 8' 023 ' 315' 611' 073 ' 374 ' 665' 971' 262' 558' 847' 154' 434' 736' 948'
X
234 233 233 233 232 232 231 231 231 230 230 229 229 229 228 228 227 227 226 226 226 225 225 224 224 223 223 223 222 222 221 221
J 'j 0
831 488 064 703 367 963 483 158 802 347 947 425 004 588 181 762 412 95G 534 119 494 094 689 293 887 477 077 649 268 867 421
/
2
/ /
V
OCS - G -9053 MMS Seq, No, 8479
C E R T I F I E D CORRECT AS TO HORIZONTAL POSITION OF A5 B U I L T P I P E L I N E
A L L COORDINATES ARE BASED ON THE TEXAS (LAMBERT) PLANE COORDINATE SYSTEM, SOUTH CENTRAL ZONE
REGISTERED LAtJD SURVEYOR N O . U 3 3 5 STATE OF L O U I S I A N A JOHN E . CHANCE & ASSOCIATES, I N C .
CORPUS CHRISTI OIL a GAS COMPANY
AS BUILT e -S /a" GAS PIPELINE
GALVESTON AREA
GULF OF MEXICO
JOHN E. CHANCE % ASSOCIATES, INC. gIVll ENGINEERS a LANG SURVEYORS
LAFAYETTE, LOU5SIANA
DATE JUNE 12, 1 9 8 9
JClB '•Ji;, 0 9 09 G 9
MAP NO, 1373 - B
W-2-2 (OCS-G 10105) SEt' 6 1 1988 ^*c^^i In Reply Refer To: PO-2-2 (OCS-G 10105)
Corpus Christi Oil and Gas Company BEST AVAILABLE COPY Attention: Mr. George E. Taylor Post Office Box 2928 Corpus Christi, Texas 78403
Gentlemen:
Pursuant to the authority granted by 43 U.S.C. 1334(e) and 30 CFR 250.150(d), your application dated August 2, 1988, for a pipeline right-of-way two-hundred feet (200') in width for the installation, operation, and maintenance of a 6 5/8-inch pipeline, 3.03 miles in leagth, is hereby approved, as proposed.
The proposed pipeline w i l l transport natural gas and condensate from Corpus Christi Oil and Gas Company's Platform No. 1 in Block 427, Galveston Area, across Block 420, Galveston Area, to a subsea connection with Transcontinental Gas Pipe Line Corporation's existing 20-inch pipeline (OCS-G 4967) in Block 419, Galveston Area.
This approval is subject to the following condition:
Our analyses indicate that the following anomaly ie located within the seafloor disturbance area of the proposed a c t i v i t i e s . Should this anomaly represent a hazard to your a c t i v i t i e s , precautions as outlined in Notice to Lessees and Operators No. 83-3, Section IV.B.l. shall be taken prior to conducting operations.
Area Block Line NQ, Shot; Ppipt Iptensity (Ramnas)
Galveston 427 4 45.4 44
Based on our analysis of your application, the maximum allowable operating pressure for this pipeline w i l l be 1,440 psig.
Sincerely yours.
lQrig.Sgd.l D.J. Bourgeois D. J . Bourgeois Regional Supervisor Field Operations
cc: Department of Transportation 2320 La Branch, Room 2116 Houston, Texas 77004 (w/enclosure)
bcc: ^j.502-01 (P/L OCS-G 10105) (w/attch) (K. Faust) (FO-2-2) 1502-01 (P/L OCS-G 10105) (FO-2-2) FO-7 LE-5 LE-3-1 (w/attch) / b^^l^ $ OPS-6 (w/cy of plat) * f t y
ABritton:lr:9/19/88:LEXITYPE
\
UNITED STATES GOVERNMENT MEMORANDUM
September 8, 1988
To: Regional Supervisor, Field Operations, GOM XS Region (FO)
From: Regional Supervisor, Leasing and Environment, GOM XS Region (LE)
Subject: National Environmental Policy Act Review for Pipeline Right-of-Way Application XS-G 1 0 1 0 5
Our National Environmental Policy Act (NEPA) review of the subject action 1s ;
complete. Environmental protective measure(s), 1f any. Identified to avoid or
mitigate potential Impacts associated with the action were Included as part of
the NEPA analysis and are shown on the attached Categorical Exclusion Review
(CER).
V
P. Sieverding
Attachment
cc: Pipeline File XS-G 1 0 1 0 5 (LE-5)
BEST AVAILABLE COPY Action No. OCS-G 10105
United States Department of the Interior Minerals Management Service Gulf of Mexico OCS Region
NEPA CATEGORICAL EXCLUSION REVIEW
The Categorical Exclusion Review (CER) evaluated the proposed action and determined that i t meets the categorical exclusion criteria as defined by 516 DM 2.3A(1) which states "(a) The action or group of actions would have no significant effect on the quality of the human environment, and (b) The action or group of actions would not involve unresolved conflicts concerning alternative uses of available resources." The analysis of potential impacts by environmental and resource specialists was based on the assumption that the following mitigative measure(s) will be Imposed.
Environmental Protective Measures
The following measure was Identified 1n the plan/application by the lessee/operator submitting the proposal: None.
The measure identified by MMS during the plan/application review or in the lease stipulation was:
Our analyses indicate that the following anomalies and/or side-scan sonar contacts are located within the seafloor disturbance area of the proposed activities. Should any of these anomalies and/or contacts represent a hazard to their activities, precautions as outlined in NTL No. 83-3, Section IV.B., will be taken prior to conducting operations.
Blocks Line No. Shot Point Remarks
Galveston 427 4 45.4
Exclusion Determination
44 gammas in intensity
The proposed action was evaluated and reviewed against the CER exception criteria defined by 516 DM 2.3.A(3). With inclusion of the above mitigation, i t does not represent an exception to the categorical exclusions. Therefore, preparation of an EA is not required.
Date Preparer
I concur.
T 'bate
Environmental ons Section
3r Regional Supervisor, Leasing and Environment
'-'r.r'CPA; VJJV BESTAVAILABLE COPY
Date, / 7 ^ ^ ^
To: Right-of-Way Pipeline File OCS-G U ^ H ^ o
Through: Supervisor, Platform/Pipeline Unit, Plans, Platform and Pipeline Section, Field Operations, Gulf of Mexico OCS Region (FO-2-2)
From: Petroleum Engineer, Platform/Pipeline Unit, Plans, Platform and Pipeline Section, Field Operations, Gulf of Mexico OCS Region (FO-2-2)
Subject: Pipeline Right-of-Way Application, Technical Review, ^ Q ^ P P S
Size Length
(Inch9si (feet? Servic? / From la
Glock.¥d7 Alack
Recommendations:
^-^ 1. The technical aspects of the proposed pipeline are acceptable 1n accordance with appropriate Regulations and Standards.
2. Advise applicant of Notice to Lessees and Operators No. 83-3.
3. Valve protection cover shall not protrude above the level of the mud line.
4. Subsea valves and taps associated with this pipeline shall be provided with a minimum of three feet of cover, either through burial, with sandbags, or other acceptable method.
int^p-^ (fro P^'-Q
a. A. B r i t t o n
cc: 1502-01 OCS-G / 0 f O S (w/or ig appln) (Seg. ^ f * ? * ? ) (FO-2-2)
OPS-/*(w/cy of p l a t )
ABr i t ton: j j :LEXITYPE Disk 6
BEST AVAILABLE COPY
PIPEUNE RIGHT-OF-WAY APPUCATION "ENGINEERING CBECKUST ^
' M S A Description of pipeline tnd location of piopowd toate (Le.4 rize of pipe, prodnet to be
transported, from where Jp where, pjilfonn nnbCT, name, block aiu^rr. area, and distance in feet and i
D. Safety Flow Schematic - Verify that the infonnatkm Aown on the aafety flow achematic diagram contains the foOowing:
1. Presuit source is drswa into the schematic with the foOowiqg:
a. aourct (LeMname).
b. design woridn| prtmre
dirt U f a / Z M / ^ 50 c. higMow presuit sensor settings ML^^LL^^ ^ /
2. "ANSr ntings of all vahes, flanges, and fittinp between the aonice and the connecting pipeline are shown.
Pressure relief vaKes, where applicable, are shown with the aetting set BO higher than the maxfanum working preasure (MWP) of the vessel
If the maxfanum input source pressure is greater than the maxfamnn allowable operating pressure (MAOP) of the pipeline, redundant aafety equipment is
uired.
5. MAOP of proposed pipeline does aot exceed MAOP of connecting pipeline.
The pipeline leaving the platfonn receKing production from the platform is equipped with high-low pressure aenson to directly or indirectly shut-in the weD or weDs on the platfonn.
7. The pipeline delKering production to the production facilities on the platfonn is equipped with an automatic faD-close vaKe tied into the automatic and remote shut-in system.
The pipeline crossing the platform which does not delKer production to the platfoim, but which may or may not receKe production from the platfonn, is equipped with high-low pressure senson connected to an eutomatk faD-close vaKe located in the upstream portion of the pipeline at the pbtform. In addition, the senson are tied into either the platform's automatic and icmote shut-in system or an independent remote shut-in system.
BEST AVAILABLE COPY
equipped with e check eilve.
Tie pipeline leeffag the pbtfonn fa equipped wilh e check eehe.
J l . The h%h4ew pienue aenion on the depafUm plp^ne h located apstraan ef flie check TaKe.
^ / ^ M . Where appHcable, higMow aemon are located downstream of the hack pmnite itgulitor.
13. If there is Bquid igje tion into the Une, are pumps associated with the ii\fectkm? (Yes or No)
.14. Direction of flow indicated.
.15. Pipe specifications (Le., size, grade, weight, and wall thickness).
.16. Total length of proposed pipefine (feet and mBes).
.17. MAOPofconnectingpipdine. i tVO C 0 ^ ^
.18. Stalement thst design meets or exceeds DOT Regubtions 192 or 195, es applicable, and/or applicable OCS orders, registered engineer's aeal, registration number, date, and signature.
.19. Area and block number of proposed pipeline pbtform.
JO. Cathodic protection specifications.
C Design Information • Verify dial die pipeline design information gKen in the application and/or on the dab sheet is complete and correct: .
"CProduct to be transported: 7 1 ^ ^ G ^ ^ ^ G - J ^ ^
2. Pipeline, riser, and subsea vaKe assembly specifications:
(1) Size AffTwaD Thickness r-~*' ^ w^t I9^1t^ftt
(2) Sbe WaO Thickness Gnde Weight Ibs/ft.
(3) Sbe WaO Thickness Grade Weight Ibs/ft.
b. Riser:
( , , £ „ & w.n Hiickness j£S.Gnde-12—Weigh! ^ ' f 7 Ibs/ft.
(2) Sbe WaO Thickness Gnde Weight Ibs/ft.
(3) Sbe WaO Thickness Grade Weight Ibs/ft.
c. Subsea vaKe assembly:
(I) Sbe WaO Thickness Gnde Weight Ibs/ft.
(21 Sue WaO Thickness Gnde Weight Ibs/ft.
• BEST AVAILABLE COPY
3. Water depth: Maxfamm ' ~ ^ Mininram
4. Type of conosion protection:
a. Impretted cmrcnt aytfcm
b. Sacrificial anode ayatem
(1) Type of anode A / ^ ^ ^ fitl*^
(2) Spadns faterval ^OT) f t
(3) Weight of onit anode gKen by applicant _ 2 2 ^ _ B > a . ea.
c. If platform anodes are nsed, are diey considered adequate?
Yes No
d. If pipdine anodes are aaed:
Where: W<> - Weight of Anode anit (lbs) D "Dia. of pipe (inches) I • Separation between anodes (ft.) R »the followini_lbs/amp/year (Rite of Consumption)
- ^Aimfeam or GaKiJunLE-JL6-— Zinc -26 Magnesium * 17.S
Does the cdculatedlife expectancy equal or exceed 20 years?
Y e s _ 4 ^ _ . No
5. Description of protective coating: r
..Pipdine— e^usi+t T&^-l* c ^ e f s > ^ b. Riser _ ^l^Ufhr^ ^ e f ^ t^l^jf ^ ^ J ^ L ^ ^
c. Subsea vaKe assembly
—LL 6. Description of weighted coating:
a. Preconcrete coating.
b. Density of concrete PCF
c. Thickness of concrete _ _ _ _
d. Thickness of asphalt _ _ _ _ _
7. Calculate the specific gravity (one of the following formulae may be used)
BEST AVAILABLE COPY
k. Ocadty corapaxfaon witb flaid materid: BG - W f A R
c Uses whh a fpedTic thkknes of i
SC«RC4 K-> m^y-Rg R a-Ks^yKj R
d. lines havfaf two coatings of cnamd and a fdt wrap, or only asphahmastk coating:
SG-W+P
^3
Where: SG« specific gravity RC " density of concrete (Ib/cn. ft) K i, K j , K3 • coefficients T " thKkness of concrete coating (inches) W • weight of bare pipe (lb/ft) P" weight of coating R • density of fluid material (lb/cu. ft); Le^ aea water • 64 Ibs/cu. ft. D • diameter of pipe (inches)
, A • cro**ectioni] area
8. Given specific gravity
9. Gravity or density of produces).
.10. D e s i g n c a p ^ i t y o f p i p e l i n e J ^ S ^ ^ /
11. Given Hydroststk Test Presnre: line ^r * Hold Time u hrs.
Preinstallation Test Riser P / ^ ^ 3 Time hrs.
Recommended maximum hydroststk body test for ANSI vaKes, flanges, and fittings are as foOows:
ANSI 300 -1,100 psig ANSI 400 • 1,450 psig ANSI 600-3,175 psig ANSI 900-3,250 psig ANSI 1,500 • 5,400 psig
BEST AVAILABLE COPY
Note: Minfantun hold times:
line Pipe* Shis. 4 his.* 125% of MOP G u - Riser - 4 hn. (pretest) liquid- nus4hfs.€ 110% If leak tepee-
or DOT 192.507(c) Hon Is aot visable dudag lest
J2. Maximum Allowable Opentinf Pressure (MAOP) of line pipe: .
MAOP-2stxFxExT Note: F-.72;E-1;T« 1
• L M A 0 P * — — / o t
b. MAOP-
c. MAOP *
.13. MAOP of riser pipe. Note: F • .50 for risen on natural ps transmission Unes. Note: F • .60 for risen on liquid pipelines.
a. MAOP • t ^ ^ ^ X . S d _ - / V 7 T / S b. MAOf • 6 . 0 ? - 5
14. MAOP of flanges, fittings, and valves:
ANSIndng. ^rfO Si^
15. M AOP of proposed pipeline as detennmed in accordance with Title 49 CFR Part 195 or 192. as applicable, is _ Z ^ x £ ^ _ p B g .
.16. Items 12, 13, and 14 above are equal to or more than the maximum allowable working pressure (MAWP) of source.
.17. Verify: 1:25 maximum source pressure (MSP) < hydrostatic test pressure (HTP) < .95 (smaller IP £ SMYS of items 12 or 13 above)
Note: The recommended limit of test as a percentage of internal pressure £ specificed minimum yield strength is equal to 95'*:
IP* SMYS»2xsxl« — ($ -9 5 D
.18. Verify MAOP does not exceed the lowest of the following: y
a. Suomerged components. HTP/1.25 •
b. Riser: HTP/1.5 • / ^ 0 5 l§
BEST AVAILABLE COPY
Vrivesnardsaad: Y e s — N o .
D. bstallatio:
AS p eHnes wffl be fctstaHed or bid fo a mininram of three feet below fbe fere) of the modline ont to end faichidins the 300 foot wafer depth, except et pipeline crossings. Any devbtion must bejustified at the time of application.
AD tahes and taps most be provided with a mfaifanum of three feet of acfnal cover either with sofl or sandbags or Jetted to a mfaifannm of three feet below die mudline. If *im $ approved vahe protection coven are nsed, the vahes md taps are NOT required to have a minimum of three feet of actaal com or Jetted three feet below die mudline. However, die fop of die vahe protection com shaO not protrude above the level of the modline. Any devbtion most bejustified at the tfane of application.
E. Pipeline Crossings:
it.
1. AO pipeline crossings hi wafer depths ap fo and including 300 feet shaD be cement-bagged with a minimum of 18 inches between die Unes with die apper-most Une having a minimum of 3 feet of cover in the form of cement bags installed so as to provide a three foot horizontal to a one foot vertical (3:1) dope with a crown width that is one and one-half (1 Vi) ffanes the pipe diameter. Any devbtion must bejustified at the time of application.
2. AO pipeline crossings fai water depths greater dian 300 feet diaD be cement bagged with a minimum of 18 inches between die Unes and installed ao as to provide a thiee foot horizontd to a one foot verticd (3:1) slope. Any devbtion must be justified at the tfane of application.
F. Constniction Infonnation:
1. Proposed construction commencement date —
2. Method of constmction
3. Method of burial
'A. Tfane required toby pipe — - £ ( j j - Z J J 0 ^ —
5. Time required to comjillete project - — ^ 0 X f r * * ^ - -
C. Applicant complies with current OCS pipdine guidelines
Y e s _ _ i ^ l l N o
CORPUS CHRISTI OIL AND GAS COMPANY THE 600 BUILDING
P.O. BOX 2928
CORPUS CHRISTI, TEXAS 78403
Area Code 512 888-9301
BEST AVAILABLE COPY
Au8ust 2' l^jgssssar^ I AUG1 1 19881'%
FIELD ^ OPERATIONS'^
OCSRegioft."'
RECEIVED ^ \ 1 1988 ^
FIELD OPERATIONS
U. S. Department of the I n t e r i o r Minerals Management Service Gulf of Mexico OCS Region 1201 Elmwood Park Blvd. New Orleans, LA 70123
Attn: Mr. D. J. Bourgeois Regional Supervisor Field Operations
RE: Application for Pipeline Right-of-Way Proposed 6.625" OD Natural Gas Pipeline i n and/or through Blocks A19, 420 & 427, Galveston Area Gulf of Mexico, Federal Waters
Pursuant to the authority granted i n 43 USC 1331, Section 1334(e) and i n compliance with the regulations contained i n T i t l e 30, CFR, Part 250, Subpart J Corpus C h r i s t i O i l aid Gas Company i s f i l i n g the application i n quadruplicate for a Right-of-Way two hundred feet (200') i n width for the . construction, maintenance and operation of an 6.625" OD Interstate Natural Gas Transmission Pipeline i n the Galveston Area, Gulf of Mexico. Corpus Ch r i s t i O i l and Gas Company agrees that said Right-of-Way, i f approved, w i l l be subject to the terms and conditions of said regulations.
In support of our application and for your review and use, the following maps, drawings and documents have been enclosed herewith and made a p a r t hereof:
1. Index or v i c i n i t y map. Drawing No. 001 (four copies).
2. Engineering and Hazard Survey Plat (See attached Gulf Oceans Report Booklet).
3. P r o f i l e Map, Drawing No. 003 (four copies).
4. Route Map, Drawing No. 002 (four copies).
5. Schematic, Drawing No. 004 (four copies).
6. Pipe Specifications and General Information, Drawing No. 005 (four copies).
Pipeline Right-of-Way Corpus Christ i Oil and Gas Company BEST AVAILABLE COPY August 2, 1988 Page 2
This 6.625 inch O.D. l i n e w i l l be used to transport natural gas from Corpus C h r i s t i O i l and Gas Company's No. 1 Platform i n the Galveston Area, Block 427 to an existing Transco 20 inch pipeline located i n Galveston Area, Block 419. The l i n e w i l l depart Corpus C h r i s t i O i l and Gas Company's Platform i n Block 427 i n a northwesterly d i r e c t i o n and go 15,987' (3.03 miles) to the existing underwater tap on Transco 20 inch pipeline i n Block 419, a l l being i n the Gulf of Mexico, Federal Waters, Offshore Texas. The proposed construc t i o n commencement date i s September 20, 1988 with the time required to lay the pipeline being estimated at two weeks with an overall completion of project time being estimated at 30 days.
This application (and any amendments made hereto) i s made with our f u l l knowledge and concurrence with the OCS Lands Act (43 U.S.C. 1331, et. seq.), as amended (P. L. 95-372), including the following: Sec. 5(e) addressing pipel i n e Right-of-Ways, requirements of the Federal Energy Regulatory Commission r e l a t i n g to notice of hearing, transportation and purchase of o i l and gas without discrimination; Sec. 5 ( f ) ( 1 ) addressing operation of pipelines i n accordance with competitive pr i n c i p l e s , including open and non-discriminatory access to both owner and non-owner shippers; Sec. ( f ) ( 2 ) which may allow exemption of the requirements i n Sec. 5 ( f ) ( 1 ) , Sec. 5(e) addressing the assuring of maximum enviromental protection, including the safest practices for pipeline i n s t a l l a t i o n ; Sec. 5(f)(1)(B) which may require expansion of throughput capacity of any pipeline except for the Gulf of Mexico or the Santa Barbara Channel.
Additionally, we expressly agree that i f any s i t e , structure, or object of h i s t o r i c a l or archaeological significance should be discovered during the conduct of any operations with i n the permitted Right-of-Way, we s h a l l report immediately such findings to the Manager, Gulf of Mexico OCS Region, and make reasonable e f f o r t to preserve and protect the c u l t u r a l resource from damage u n t i l said Manager has given directions as to i t s preservation.
In accordance with applicable regulations, we have delivered a l e t t e r requesting a statement of "No Objection" with a Plat showing the proposed pipeline route by c e r t i f i e d mail, return receipt requested, to each Lessee of Right-of-Way or Easement Holder whose Lease, Right-of-Way or Easement i s so affected. A l i s t of such Lessees or Right-of-Way or Easement Holders i s attached (See Attachment "A") and copies of the return receipts showing the date and signature as evidence of service upon such Lessees or Right-of-Way or Easement Holders are attached. A l e t t e r from the Lessee, Right-of-Way or Easement Holder expressing "No Objection" to the proposed project i s enclosed from those parties who have responded. Additional l e t t e r s w i l l be forwarded when received. The proposed route of the Right-of-Way does not adjoin or subsequently cross state submerged lands.
Applicant agrees to be bound by the foregoing regulations, and further agrees to comply with the applicable stipulations as set f o r t h i n the OCS Pipeline Procedures Guidebook dated March, 1984 and revised September, 1984.
Pipeline Right-of-Way BEST AVAILABLE COPY Corpus C h r i s t i O i l and Gas Company August 2, 1988 Page 3
Additional Design C r i t e r i a Data i s as follows:
1. Water depth along route of proposed pipeline and pipeline i n r e l a t i o n ship to natural bottom i s set f o r t h on attached Drawing No. 003.
2. The description of the pipe and coating i s as follows:
A. Line Pipe: 6.625 inch O.D. x 0.280 inch WT, API 5L Grade B; Bare weight i s 18.9#/ft. coated with TGF-3 coating or i t s equivalent. Specific gravity of the pipe i n sa l t water i s 1.24.
B. Riser Pipe: 6 5/8 inch O.D. x 0.280 inch O.D. WT, API 5L Grade B. Bare weight i s 18.97#/ft. The area passing through the wave zone w i l l be coated with Splashtron or i t s equivalent. Specific gravity of the pipe i n sa l t water i s 1.24.
C. Internal Coating: The analysis of the transported products w i l l be monitored and preventative measures such as pigging or i n h i b i t i n g w i l l be used as necessary.
3. Valves and Flanges:
A. Below water valves and flanges w i l l be ANSI 600 Series with a rated working pressure of 1440 PSI.
B. Above water valves and flanges w i l l be ANSI 600 Series with a rated working pressure of 1440 PSI.'
4. The specific gravity of the product being transported i s anticipated to be 0.60 (Air = 1.0), T = 60OF.
5. Corrosion Protection
A. Lif e expectancy of the proposed l i n e i s i n d e f i n i t e .
B. The s a c r i f i c i a l anodes are designed for a f o r t y (40) year l i f e and are to be replaced as necessary to extend the l i f e of the Pipeline.
C. Anode Type: 32 lbs. Aluminum Alloy Semi-Cylindrical bracelets.
D. Anode Spacing: Every 500 feet.
6. The design of the proposed pipeline i s i n accordance with the "Minimum Federal Safety Standards (Department of Transportation) T i t l e 49 CFR Part 192."
Pipeline Right-of-Way "Corpus Chris t i Oi l and Gas Company BEST AVAILABLE COPY August 2, 1988 Page 4
7. Maximum Allowable Operating Pressure (MAOP) = 1440 PSI
Maximum Capacity: Design Capacity: 40,000 MCF/D
Maximum Operating Pressure: High Sensor Setting = 1200 PSI
Maximum Operating Pressure: 500 PSI
Calculations: see enclosed "Engineering Checklist"
8. Producer's F a c i l i t i e s are rated for 1440 PSIG working pressure.
9. The twenty- (20) inch Transco Pipeline that the proposed l i n e w i l l t i e i n t o w i l l have an assigned MAOP of 1250 PSI.
10. Originally signed copy of Non-Descrimination i n Employment Stipulation i s attached to each copy of the application.
11. Company contact on technical points or other information:
George E. Taylor Vice President, Operations Corpus C h r i s t i O i l and Gas Company P. 0. Box 2928 Corpus C h r i s t i , Texas 78403
12. Draft/Check No. 88081143 i n the amount of $160.00 of which $100.00 covers the application fee and $60.00 covers the f i r s t year's rent a l on 3.03 miles of Right-of-Way i s also enclosed.
13. The l i n e w i l l be pressure tested to 2160 PSIG for eight (8) hours.
Corpus C h r i s t i O i l and Gas Company hereby agrees to keep open at a l l reasonable times for inspection by the Minerals Management Service, the area covered by t h i s Right-of-Way and a l l improvements, structures and fi x t u r e s thereon and a l l records r e l a t i v e to the design, construction, operation, maintenance and repairs or investigations on or with regard to such area.
Please refer to your New Orleans Miscellaneous F i l e No. 538 for a copy of a resolution approved by the Board of Directors authorizing the undersigned to sign for and on behalf of Corpus C h r i s t i O i l and Gas Company.
Pipeline Right-of-Way BEST AVAILABLE COPY Corpus C h r i s t i O i l and Gas Company August 2, 1988 Page 5
I f the above information meets with your approval, we would appreciated your issuing the necessary decision for the Right-of-Way at your e a r l i e s t convenience. Inquiries concerning t h i s application should be directed to the applicant at Post Office Box 2928, Corpus C h r i s t i , Texas, 78403 to the attention of Mr. George E. Taylor.
Very t r u l y yours.
Leslie W. Dunn President
JCH/bh end.
ATTACHMENT "A "A't BEST AVAILABLE COPY
The following Lessees and Right-of-Way Holders on even date with t h i s application were furnished a copy of t h i s application by Ce r t i f i e d Mail, Return Receipt Requested (Note: The status of Blocks l i s t e d below was current as of July 28, 1988 per Jim Herring, Corpus C h r i s t i O i l and Gas Company, i n telephone conversation with Autry B r i t t o n and Debbie Armond)'.
WEST CAMERON AREA
Block 427:
Corpus C h r i s t i Exploration Company
Open
OCS-G-9053 Oi l and Gas Lease
Pipeline Right-of-Way
Block 420:
/ Anadarko Petroleum Company OCS-G-9051
(/Transcontinental Gas Pipeline Company OCS-G-4967
O i l and Gas Lease
Pipeline Right-of-Way
Block 419:
Open
/Transcontinental Gas Pipeline Company OCS-G-4967
Oi l and Gas Lease
Pipeline Right-of-Way
Area Code 512 888-9301
CORPUS CHRISTI EXPLORATION COMPANY THE 600 BUILDING
P O Box 2928
CORPUS CHRISTI, TEXAS 78403
August 1, 1988
Mr. Joe Eskew Corpus C h r i s t i O i l and Gas Company P. 0. Box 2928 Corpus C h r i s t i , Texas 78403
Dear Mr. Eskew:
Re: OCS-G-9053
This i s to advise that Corpus C h r i s t i Exploration Company, lessee of Block 427, Galveston Area, has no objection to Corpus C h r i s t i O i l and Gas Company i n s t a l l i n g a 6 5/8" pipeline i n Block 427 along the route shown on your Drawing No. 002, dated August 1, 1988.
Very t r u l y yours,
Z s T & x ^ —
Leslie W. Dunn President
LWD/lm
Area Code 512 888-9301
CORPUS CHRISTI OIL AND GAS COMPANY THE 600 BUILDING
P.O. BOX 2928 CORPUS CHRISTI, TEXAS 78403
August 2, 1988
Transcontinental Gas Pipeline Corporation P. 0. Box 1396 Houston, Texas 77251
Attn: E. L. Wibner
RE: Proposed Pipeline Tie-in Block 419-427 Galveston Area
Attached is a plat of our proposed 6 5/8" pipeline from Block 427 to a tie-in point on your 20" pipeline in Block 419. Please furnish this office with a letter of "No Objection" for our submission to the Minerals Management Service.
Yours very truly,
Ua&E. Eskew, Jr. Vice President, Operations
JCH/bh e n d .
to * S EL
° £ ru o 43
Pi i l l
i l
«
c o u to
IS > u
vO
TJ
cv
vn oo
& i
o ON s
i1 V AUQ V 8 :
* *
S861 aunp '009G UJ'
Area Code 512 8884301
CORPUS CHRISTI OIL AND GAS COMPANY THE 600 BUILDING
P.O. BOX 2928
CORPUS CHRISTI, TEXAS 78403
August 2, 1988
Anadarko Petroleum Corporation 16801 Greenpoint Park Dr. Houston, Texas 77060
Attn: Charles Kana
RE: Pipeline Right-of-Way Block 429-419 Galveston Area
l if 0W-"o„" fo'r our submission to the Minerals Hanagement
Service.
Your very t r u l y ,
George E. Taylox Vice President, Operations
JCH/bh e n d .
to <
Q !
• cc
* §
UJ Q. O
UJ oc
1152. Cfl t -
o n o
o 4-J
<u PL,
o •a ca
i-c
>-
4-C
• t -
o D e 0)
? ^ « o
o o
o 0) £ H
OT to • 3
o o 0.PS
i n oo o
Ov
so ° » u c £ Q
| |
I S
9961 aunp 'OOW uiior'
REST AVAILABLE COPY NOTE: This foim must be executed as an original.
UNITED STATES DEPARTMENT OF THE INTERIOR
MINERALS MANAGEMENT SERVICE
NONDISCRIMINATION IN EMPLOYMENT
As a condition precedent to die approval of die granting of the subject pipeline right-of-way, the grantee Corpus Christ Qftl ^4 Ga? CQmPftM hereby agrees and consents to the following stipulation which is to be incorporated into the application for said right-of-way.
During the performance of this grant the grantee agrees as follows:
During the performance under this grant, the grantee shall fully comply with paragraphs (1) through (7) of section 202 of Executive Order 11246, as amended, (reprinted in 41 CFR 60-1.4 (a)), which are for the purpose of preventing discrimination against persons on the basis of race, color, religion, sex or national origin. Paragraphs (1) through (7) of section 202 of Executive Order 11246, as amended, are incorporated in this grant by reference.
Signature of Grantee L e s l i e W. Dunn President
Date: August 1, 1988
YM 3341-1 (July 1982)
GALVESTON AREA BEST AVAILABLE COPY
397 396 399 ' 3*4 393 392 391
416 417 419 419 490
\
421 422
4SI 490 489 489 497 426 429
0 BLOCK 427 WELL NQ I
X * 3,234,390.95 Ys 274,599.54
VICINITY MAP ( D BLOCK 419 EXISTING
X ' 3,221,422.0 Y ' 293,947.0
* LOCATION OF RIGHT OF WAY HAS BEEN ACCURATELY DELINIATED UPON THIS MAP ANO DESIGN COMPLIES WITH DOT REGULATION.
CORPUS CHRISTI OIL AND GAS COMPANY
PROPOSED 6" P/L
FLOW LINE GALVESTON AREA
DRWN> A O. CHKO.
DATE' 8 - 3 - 8 8 DATE'
SCALE> NONE DWQ. NO. 001
419
09LOCK 4S7 WELL NO. I X « 3,994,390.90 ^ Y » 274,999.54 ^
<E) BLOCK 419 EXISTING VALVE X : 3,221,422.0 Y » 263,947.0
420
bEST AVAILABLE COPY
9L0CKLINE CROSSING K • 3,222,355.61
rlr « 283^73.57
429 427
9L0C*L»NE CROSSING K * 3,990,792.82 V« 277,200.00
FIELD ; PLAN
"LOCATION Of RIGHT OF WAY HAS BEEN ACCURATELY DEUNIATED UPON THI9 MAP AND DESIGN COMPLIES WITH DOT REGULATION.
9URIED
NOTES <
I. PIPE IN THE GULF OF MEXICO WLL BY JETTING WHERE BY THERE WILL BE A MINIMUM DISPLACEMENT OF THE BED AND NO SPOIL DEPOSITS WILL REMAIN.
2fi0UNDINGS AND ELEVATIONS ARC IN FEET AND REFER TO MEAN SEA LEVEL DATUM.
3CO0RDINATES ARE BASED ON THE LOUISIANA SOUTH ZONE OF THE LAMBERT GRID
4PR0DUCT- NATURAL OAS B.TOTAL LENGTH OF 6" P /L « 15996.95
CORPUS CHRISTI OIL AND GAS COMPANY
BLOCK 427 TO 419 GALVESTON AREA
DRWN: A. G.
DATE: AUG. I, '86
SCALE : 1" = OOCf
DWG. NO. 002 BWTB-"
•Oak
BEST AVAILABLE COPY
o o
0' r —
5' t .
9 5'
10 0*
10 5'
I 10' I —
to
N N
5
V MSL 0 . 0 0
- ! £ l i ! 5 A L _ B 0 T T 0 M
PROPOSED TTTT, 0 P I P E U H E
^ ». CD
O +
J » . IO
UJ -—I 0
9 5'
I 00'
105'
110'
PROFILE NORTH 1" = 3000* VERT. l" - 10'
* LOCATION OF RIGHT WAY HAS BEEN ACCURATELY DELINIATED UPON THIS MAP AND DESIGN COMPLIES WITH DOT REGULATION.
NOTES' I.PIPE IN THE GULF OF MEXICO WILL BE BURIED
BY JETTING WHERE BY THERE WILL BE A MINIMUM DISPLACEMENT OF THE BED AND NO SPOIL DEPOSITS WILL REMAIN.
2.S0UNDINGS AND ELEVATIONS ARE IN FEET AND REFER TO MEAN SEA LEVEL DATUM.
^COORDINATES ARE BASED ON THE LOUISIANA SOUTH ZONE OF THE LAMBERT GRID SYSTEM.
4.PRODUCT' NATURAL GAS
& TOTAL LENGTH OF 6" P/L - 15996.99
CORPUS CHRISTI OIL AND GAS COMPANY
DATE'9 -3 -98
PROPOSED 6" PIPELINE
BLOCK 427 TO BLOCK 419 GALVESTON AREA
DWG. NO. 003 DRAWN BY' A G .
> PSV
Lv; RFST AVAILABLE COPV
FROM PROCESSING
TO SHUTDOWN SYSTEM
FROM SHUTDOWN SYSTEM
BLOCK VALVE
SEPARATOR SALES WP»|440 METER
BLOCK VALVE
TO SHUTDOWN SYSTEM
CORPUS CHRISTI OIL 8 GAS BLOCK 427 P L A T F O R M N O I
cx-BLOCK VALVE
-SUBSEA T I E - I N WITH TRANSCO PIPELINE
IN BLOCK 419
SAFETY SCHEMATIC
•THE DESIGN CHARACTERISTICS OF THE PROPOSED PIPELINE EQUAL OR EXCEED THE REQUIREMENTS OF DOT TITLE 49, CFR PART 192 OR 195 AND DO! 30, CFR PART 256, SUBPART N.
NOTE' ALL VALVES FLANGES, AND FITTINGS ARE A.N.ai. 600 SERIES.
x eve" PIPE 1440 PSI - WORKING PRESSURE 2160 PSI - T/CJ5T £RES£U9E
J CORPUS CHRISTI OIL AND GAS COMPANY
PROPOSED 6" P / L BLOCK 4 2 7 TO 419 GALVESTON AREA
DRWN- A. G. DATE' 3 / 2 3 / 8 7 SCALE' NONE
CHKD. DATE" AUG. 3, '88 DW6. NO. 004
3.
4.
Line Pipe Specifications;
O.D. W.T. Grade
R£$T AVAILABLE COPY
6.625" 0.280" B
Length
15,986.52
MAOP Test
1440 2160PSI for 8 hours
2. Riser Pipe Specifications:
O.D. W.T. Grade MAOP
6.625" 0.280" B 1440
Line Pipe Coating:
T.G.F.-3, Pritec or Equivalent
Transcontinental Gas Pipline Company
O.D.
26"
5. Name of Product:
Natural Gas and Condensate
6. Class Location:
Class I
7. Governing Code:
Part 192, T i t l e 49 of the Code of Federal Regulations
8; A l l coordinates shown are based on the Louisiana (Lambert) Plane Coordinate System, South Zone.
9. Sand bags may be used to obtain 3' minimum cover for t i e - i n i f required,
Application by: Corpus C h r i s t i O i l and Gas Company