Pile Installation & Driving By Desmond D’sa

Upload: karun-das

Post on 12-Dec-2015

221 views

Category:

Documents


11 download

TRANSCRIPT

Page 1: Pile Driving

Pile Installation & DrivingPile Installation & Driving

By Desmond D’sa

Page 2: Pile Driving

Table Of ContentsTable Of Contents

Introduction Components

Piles. Lifting Tools. Hammers.

Installation Checks GRL WEAP Assessment of Pile Stick-up Length. Pile Upending Check. Stabbing Guide Check. Pile Stopper Check.

Page 3: Pile Driving

IntroductionIntroduction

What is a Pile?

What do we mean by pile driving?

Page 4: Pile Driving

IntroductionIntroduction

Importance of Piling

On-Bottom Stability.

Resilience to lateral

loading.

Page 5: Pile Driving

Components - PilesComponents - Piles

Jacket Leg Skirt Pile

Page 6: Pile Driving

Components - PilesComponents - Piles

Contingency Piles

Insurance Piles. Damage. Shortage.

Insert Piles. Refusal. Annulus Grouting.

Chaser Piles.

Page 7: Pile Driving

Components – Lifting ToolsComponents – Lifting Tools

Padeyes.

Internal Lifting Tool

& Belly Support Sling.

Page 8: Pile Driving

Components – HammersComponents – Hammers

Steam Hammer Hydraulic Hammer

Page 9: Pile Driving

Installation Checks – GRL WEAPInstallation Checks – GRL WEAP

Hammer.

Driving Stress.

Blows / Unit

Depth.

Time Required.

Page 10: Pile Driving

Installation Checks - Assessment of Pile Stick-up Length

Installation Checks - Assessment of Pile Stick-up Length

Criteria for Pile Stick-up Length

Static Stress + Dynamic Stress < Yield Stress Dynamic Stress < 90% of Yield Stress

Static Stress = Bending Moment + Weight of Hammer

Soil Conditions.

Cut off Allowances.

Barge Length.

Page 11: Pile Driving

Installation Checks - Assessment of Pile Stick-up Length

Installation Checks - Assessment of Pile Stick-up Length

Actual Stick-Up Length

Page 12: Pile Driving

Installation Checks - Assessment of Pile Stick-up Length

Installation Checks - Assessment of Pile Stick-up Length

Inputs:

Page 13: Pile Driving

Installation Checks - Assessment of Pile Stick-up Length

Installation Checks - Assessment of Pile Stick-up Length

Inputs:

Page 14: Pile Driving

Installation Checks - Assessment of Pile Stick-up Length

Installation Checks - Assessment of Pile Stick-up Length

Outputs

Page 15: Pile Driving

Installation Checks – Pile Upending Checks

Installation Checks – Pile Upending Checks

Inputs:

If Belly Support is required

Page 16: Pile Driving

Installation Checks – Pile Upending Checks

Installation Checks – Pile Upending Checks

Outputs:

Page 17: Pile Driving

Installation Checks – Stabbing Guide Checks

Installation Checks – Stabbing Guide Checks

Inputs:

Page 18: Pile Driving

Installation Checks – Stabbing Guide Checks

Installation Checks – Stabbing Guide Checks

Inputs:

Page 19: Pile Driving

Installation Checks – Stabbing Guide Checks

Installation Checks – Stabbing Guide Checks

Outputs:

Page 20: Pile Driving

Installation Checks – Pile Stopper CheckInstallation Checks – Pile Stopper Check

Inputs:

Page 21: Pile Driving

Installation Checks – Pile Stopper CheckInstallation Checks – Pile Stopper Check

Inputs:

Page 22: Pile Driving

Installation Checks – Pile Stopper CheckInstallation Checks – Pile Stopper Check

Inputs:

Page 23: Pile Driving

Outputs:

Page 24: Pile Driving

The EndThe End