Application of Geotextiles in Waterfront Protection
Maritime Navigation Commission Working Group 56
![Page 3: PIANC USA Annual Meeting 2008 Maritime Navigation Commission Working Group 56](https://reader035.vdocuments.us/reader035/viewer/2022062619/551556a0550346a1418b46e9/html5/thumbnails/3.jpg)
PIANC USA Annual Meeting 2008
Mar Com WG 56
• Objective of the Study– Produce a guideline for application of
geotextiles in waterfront protection
• Expand from "geotextiles" to "geosynthetics"
• Glossary of Terms based on the Coastal Engineering Manual
![Page 4: PIANC USA Annual Meeting 2008 Maritime Navigation Commission Working Group 56](https://reader035.vdocuments.us/reader035/viewer/2022062619/551556a0550346a1418b46e9/html5/thumbnails/4.jpg)
PIANC USA Annual Meeting 2008
Mar Com WG 56
• Three meetings so far– Kick-off meeting September '07 Brussels– January '08 Brussels– May '08 Antwerp– October '08 Rotterdam
• Framework / Table of contents
![Page 5: PIANC USA Annual Meeting 2008 Maritime Navigation Commission Working Group 56](https://reader035.vdocuments.us/reader035/viewer/2022062619/551556a0550346a1418b46e9/html5/thumbnails/5.jpg)
PIANC USA Annual Meeting 2008
Mar Com WG 56
• Offshore Foundation Structures– Pipelines, weirs, sills and barriers
• Coastal Zone– Dune/beach, groins, breakwaters, revetments
• Flood Protection– Dikes, levees
![Page 6: PIANC USA Annual Meeting 2008 Maritime Navigation Commission Working Group 56](https://reader035.vdocuments.us/reader035/viewer/2022062619/551556a0550346a1418b46e9/html5/thumbnails/6.jpg)
PIANC USA Annual Meeting 2008
Mar Com WG 56
• Emphasis on Applications
• Product types– Geotextile bags and tubes– Soil reinforcement
geotextiles– Marine mattresses– Seabed scour control– Fabric Grout forms and
containers
![Page 7: PIANC USA Annual Meeting 2008 Maritime Navigation Commission Working Group 56](https://reader035.vdocuments.us/reader035/viewer/2022062619/551556a0550346a1418b46e9/html5/thumbnails/7.jpg)
PIANC USA Annual Meeting 2008
Mar Com WG 56
• Proper Use of Geosynthetics
• Range of permissible loads – Waves, currents, etc.
• Durability– Aging, vandalism, UV, etc.
• Environmental Aspects
![Page 8: PIANC USA Annual Meeting 2008 Maritime Navigation Commission Working Group 56](https://reader035.vdocuments.us/reader035/viewer/2022062619/551556a0550346a1418b46e9/html5/thumbnails/8.jpg)
PIANC USA Annual Meeting 2008
Mar Com WG 56
• Needs– More information on uses in waterfront
applications– Pictures, case studies, cross sections,
durability evaluations, lessons learned