Translation by Translatinki Oy MAP 4 – SUSTAINABLE WATER RESOURCES MANAGEMENT, ENVIRONMENTAL HEALTH AND TECHNICAL MAINTENANCE Strategic Master Plan for Tampe- re’s City Centre, approved by the City Council on 18 January 2016. approx. 1:60 000 LOCAL MASTER PLANNING Pia Hastio Head of Master Planning Local master plan for the inner city 2040 Proposal 1 February 2017, revised on 12 April 2017

Upload: others

Post on 06-Oct-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Pia Hastio Head of Master Planning MAP 4 – SUSTAINABLE ......Pia Hastio Head of Master Planning Local master plan for the inner city 2040 Proposal 1 February 2017, revised on 12

Translation by Translatinki Oy

MAP 4 – SUSTAINABLE WATER RESOURCES MANAGEMENT, ENVIRONMENTAL HEALTH AND TECHNICAL MAINTENANCE

Strategic Master Plan for Tampe-re’s City Centre, approved by the City Council on 18 January 2016.

approx. 1:60 000

LOCAL MASTER PLANNINGPia HastioHead of Master Planning

Local master plan for the inner city 2040 Proposal 1 February 2017, revised on 12 April 2017

Page 2: Pia Hastio Head of Master Planning MAP 4 – SUSTAINABLE ......Pia Hastio Head of Master Planning Local master plan for the inner city 2040 Proposal 1 February 2017, revised on 12

SUSTAINABLE WATER RESOURCES MANAGEMENT

pv GROUNDWATER AREAThe measures for the area must be planned

and implemented in such a way that they do not weaken the quality of the groundwater or reduce the yield of the groundwater. Functions that may cause groundwater contamination may not be located to the area. In order to ensure the formation of groundwater, the clean stormwaters must be infiltrated into the soil and permeable surfaces must be favoured. The stormwaters must be conveyed away from the traffic areas that are located in groundwater areas.

CATCHMENT AREASRegulations by catchment area: The Härmälänoja catchment area / The volume of stormwater flows must be restricted before con-veying them into Härmälänoja, Myllyoja or into a ditch between Herrainsuo Mire and Peltolammi Pond. The generation of stormwaters in the Lah-desjärvi–Lakalaiva area must be prevented. The state of Peltolammi Pond and Lake Vähäjärvi must be preserved. The conveyance of good-quality water into Lake Vähäjärvi must be ensured.

The Lake Höytämönjärvi catchment area / Storm-waters must be detained and the quality of storm-waters must be improved before conveying them into ditches. The state of Lakes Särkijärvi, Lahdes-järvi, Suolijärvi, Hervantajärvi, Koukkujärvi, as well the state of Pieni-Virolainen Pond and Vuorek-senlammi Pond, must be preserved. The state of Iso-Virolainen Pond must be improved.

The city centre catchment area / The volume of stormwater flows must be restricted by favouring permeable surfaces and surfaces that slow down stormwater flows.

The Lake Näsijärvi direct catchment area / The state of Lake Halimasjärvi and Lake Niihamanjär-vi must be preserved. The state of Ryydynpohja Bay, Siivikkalanlahti Bay, Olkahistenlahti Bay and Lielahti Bay must be improved.

The Lake Pyhäjärvi direct catchment area / The state of Lake Tohloppi must be preserved. The state of Vaakkolammi Pond must be improved.

The Vihioja catchment area / The volume of storm-water flows must be restricted. The state of Lake Ahvenisjärvi and Vihilahti Bay must be improved.

The Lake Vihnusjärvi catchment area / The activities in the area may not cause any contamination of the waterbody. It must be ensured that the natural values of Myllypuro, which belongs to the Natura 2000 network, will not be weakened significantly. The water quality of Lake Vihnusjärvi, which functions as a raw water resource, must be kept good. The state of Lake Tesomajärvi must be preserved.

The Viinikanoja catchment area / The volume of stormwater flows must be restricted. The state of Lake Kaukajärvi must be preserved, and the state of Lake Iidesjärvi and Lake Alasjärvi must be improved. Infiltration takes place from the shore of Lake Kaukajärvi into the Aakkulanharju Esker groundwater area and the water quality must remain good.

A SIGNIFICANT DITCH OR WATER ROUTEA water route or ditch that must be kept open.

STORMWATER MANAGEMENT AREA THAT MUST BE TAKEN INTO ACCOUNT

In the area, space must be reserved for a route for flooding stormwaters and for a stormwater detention area. The levelling of the area and the elevations of the buildings must be planned in such a way that the flooding waters do not harm them. The stormwater management structures must be implemented on the basis of a plan that adheres to the stormwater report. The indexing refers to the list that has been appended to the plan report.

w AN INDICATIVE AREAL DETENTION BASIN The area must be reserved for a wetland,

a sedimentation basin or a pond that will be implemented for stormwater treatment. The areal stormwater treatment measures must be implemented before construction can be started.

ENVIRONMENTAL HEALTH

kv

a CONSULTING ZONE OF A CHEMICAL PLANT In local detailed planning, a statement of the Finnish Safety and Chemicals Agency (Tukes)

and a statement from the rescue authorities must be required. The indexing refers to the list that has been appended to the plan report.

sv-1 SAFETY ZONEIt is not allowed to build daycare centres or medical care institutions in the area.

saa AREA TO BE CLEANED/RENOVATEDThe contamination of the area must be

investigated and the area must be renovated in a way required by its use.

Saa-2 CONTAMINATED SOIL AREAThe habitats of the Directive species in the area

must not be destroyed or deteriorated.

AREA WHERE A NEED FOR CARRYING OUT A NOISE AND AIR QUALITY SURVEY MUST BE CONSIDERED

An area where a need for carrying out a noise and air quality survey must be considered, in conjunction with local detailed planning.

lm AIRCRAFT NOISE AREAAn area where the level of aircraft noise (Lden) has been assessed to exceed 55 dB in 2040. New functions that are sensitive to noise may not be designated to the area. It is possible to preserve, renovate or carry out minor infills in the existing housing and in the other functions that are sensitive to noise.

REGULATIONThe treatment and conveyance of stormwaters must adhere to the following order of principles presented in the City of Tampere’s stormwater management programme: 1. The generation of stormwaters must be prevented, 2. the stormwaters must be infiltrated into the soil, 3. the stormwaters must be utilised and cleaned and 4. the stormwaters must be detained in the place where they were generated before conveying them into an open channel, a waterbody or a stormwater sewer. In local detailed planning and in other projects, stormwater management must be investigated and a space for stormwater treatment must be reserved, if necessary. In conjunction with the building permit, an implementation plan for the stormwater system, as well as a plan for the management of the stormwaters during construction, must be drawn up. The areal stormwater management structures must be implemented simultaneously with the other municipal engineering in the area.

BOUNDARY OF THE LOCAL MASTER PLAN AREA

TECHNICAL MAINTENANCEENERGY SUPPLY

E-vl POWER PLANT

E-vl NEW POWER PLANT

E-lä HEATING PLANT

E-lä NEW HEATING PLANT

E-lä AN AREA WHERE A NEW HEATING PLANT IS REQUIRED

E-ge GEOTHERMAL HEAT COLLECTION ZONEThe soil and the bedrock in the area can

be utilised in the heat collection of a centralised geothermal power plant.

k GAS PIPELINE

ELECTRICITY DISTRIBUTION

E-sä SUBSTATION

E-sä NEW SUBSTATION

E-sä AREA WHERE A NEW SUBSTATION IS RE-QUIRED

Z 110-400 kV POWER LINE

Z POWER LINE TO BE DEVELOPEDIn the renovation of the power line or when changes are carried out in the land use of the adjacent area, the possibility to install underground cables must be studied.

WATER SUPPLY

E-jv NEW WASTEWATER TREATMENT PLANT

E-vo WATER INTAKE STRUCTURE

E-vk WATER TREATMENT PLANT

E-vs WATER TANK

vj A NEW INDICATIVE WATER PIPE

vv A NEW INDICATIVE GRAVITY SEWER

pv A NEW INDICATIVE PRESSURE SEWER

WASTE MANAGEMENT

REGULATIONWhen the plot ratio exceeds e=0.8 in infill development, block-specific collection points for household waste should be created.

E-jä WASTE STATION

E-jä AN AREA WHERE A NEW WASTE STATION IS REQUIRED

A location must be reserved for a station that accepts hazardous household waste in the area.

E-pu WASTE MANAGEMENT DEVELOPMENT AREA

The possibility of establishing a pipeline-based system must be investigated for collecting household waste in the area.

MAINTENANCE OF PUBLIC AREAS

E-lv DUMPING OF SNOW

E-pmSURVEY AREA FOR THE RECEPTION OF CLEAN SOIL

E-mv THE RECEPTION AND RECYCLING OF SOIL

ta PLANT NURSERY

Local master plan markings and regulations

MAP 4 – SUSTAINABLE WATER RESOURCES MANAGEMENT, ENVIRONMENTAL HEALTH AND TECHNICAL MAINTENANCEPia HastioHead of Master Planning

Local master plan for the inner city 2040 Proposal 1 February 2017, revised on 12 April 2017

LOCAL MASTER PLANNING

Translation by Translatinki Oy