phyto83n02 153 · 2018-12-16 · chloride pipe fitting was placed in each jar to support the...

5

Upload: others

Post on 23-Mar-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Phyto83n02 153 · 2018-12-16 · chloride pipe fitting was placed in each jar to support the plastic mesh at a height about 1.3 cm above the glycerol solution. Lids were placed on
Page 2: Phyto83n02 153 · 2018-12-16 · chloride pipe fitting was placed in each jar to support the plastic mesh at a height about 1.3 cm above the glycerol solution. Lids were placed on
Page 3: Phyto83n02 153 · 2018-12-16 · chloride pipe fitting was placed in each jar to support the plastic mesh at a height about 1.3 cm above the glycerol solution. Lids were placed on
Page 4: Phyto83n02 153 · 2018-12-16 · chloride pipe fitting was placed in each jar to support the plastic mesh at a height about 1.3 cm above the glycerol solution. Lids were placed on
Page 5: Phyto83n02 153 · 2018-12-16 · chloride pipe fitting was placed in each jar to support the plastic mesh at a height about 1.3 cm above the glycerol solution. Lids were placed on