philip_aj_cv_short

3
PHILIP ANJELIVELIL JOHN, P.G. Dip., B.E. 1 of 3 (Permanent Resident) +61-451601553 23 McCowan St, email:mailto:[email protected] Kenwick, WA 6107 mailto:[email protected] OBJECTIVE A professionally qualified Mechanical Engineer with an overall experience of over 7+ years, seeking a suitable position where I can prove my credentials and my professional knowledge which will meet the organizational as well as personal objectives. EDUCATION A. ACADEMIC Postgraduate Diploma (PG Dip. - Engineering Design) (June 2007) University Of Strathclyde, Glasgow, UK Bachelors of Engineering (B.E Mechanical) (April 2004) University of Madras, Chennai, India B. TECHNICAL 1. CERTIFICATIONS Quality Management Systems Auditor/Lead Auditor (IRCA Approved; ISO 9001:2008) OH&S Management Systems Auditor/Lead Auditor (IRCA Approved; BS OHSAS 18001:2007) 2. SOFTWARE SKILLS CAD using CATIA (November 2004) AU-FRG CAD Centre, Anna University, Chennai, Tamil Nadu , India CAD using PRO-ENGINEER (August 2004) AU-FRG CAD Centre, Anna University, Chennai, Tamil Nadu, India ANSYS AutoCAD FHC 05 Full Hydraulic Calculation of Sprinkler/Water Spray/ Foam Systems Elite Ver. 6.0Hydraulic Calculation of Fire Sprinkler/ Water Spray/ Foam Systems Kidde GX20 - FM200 Flow Calculation Software Ver.GX3.01 SAP (ERP) 3. CODES AND STANDARDS NFPA (National Fire Protection Association) Codes LPC (Loss prevention Council) Codes (BS 5306) Under Writer’s Laboratory (UL)/Factory Mutual (FM) Standards KNPC/KOC Standards/Shell Standards Code regulations applicable to piping design like ASME B31.1, ASME B31.3 & API 4. SYSTEMS DESIGNED : (as per NFPA & LPC) Wet Sprinkler System Stand Pipe Systems Hydrant System Deluge Foam System Pre-Action System Fire Extinguishers Fire Alarm System a b Fixed Spray Systems FM-200 (Clean Agent System) Argonite (Clean Agent System) Inergen System CO2 System Novec1230 Foam Pourers Foam Chambers Foam Monitor Systems High Expansion Foam a Conventional, b Addressable 5. TRAININGS Viking Water & Foam Systems (November 2012) The Viking Corporation, Kuwait City, Kuwait.

Upload: philip-john

Post on 17-Aug-2015

17 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Philip_AJ_CV_short

PHILIP ANJELIVELIL JOHN, P.G. Dip., B.E. 1 of 3

(Permanent Resident) +61-451601553

23 McCowan St, email:mailto:[email protected]

Kenwick, WA 6107 mailto:[email protected]

OBJECTIVE A professionally qualified Mechanical Engineer with an overall experience of over 7+ years, seeking a suitable position where I can prove my credentials and my professional knowledge which will meet the organizational as well as personal objectives.

EDUCATION

A. ACADEMIC

Postgraduate Diploma (PG Dip. - Engineering Design) (June 2007)

University Of Strathclyde, Glasgow, UK

Bachelors of Engineering (B.E – Mechanical) (April 2004) University of Madras, Chennai, India

B. TECHNICAL

1. CERTIFICATIONS

Quality Management Systems Auditor/Lead Auditor (IRCA Approved; ISO 9001:2008)

OH&S Management Systems Auditor/Lead Auditor (IRCA Approved; BS OHSAS 18001:2007)

2. SOFTWARE SKILLS

CAD using CATIA (November 2004)

AU-FRG CAD Centre, Anna University, Chennai, Tamil Nadu , India

CAD using PRO-ENGINEER (August 2004)

AU-FRG CAD Centre, Anna University, Chennai, Tamil Nadu, India

ANSYS

AutoCAD

FHC 05 – Full Hydraulic Calculation of Sprinkler/Water Spray/ Foam Systems

Elite Ver. 6.0– Hydraulic Calculation of Fire Sprinkler/ Water Spray/ Foam Systems

Kidde GX20 - FM200 Flow Calculation Software Ver.GX3.01

SAP (ERP)

3. CODES AND STANDARDS

NFPA (National Fire Protection Association) Codes

LPC (Loss prevention Council) Codes (BS 5306)

Under Writer’s Laboratory (UL)/Factory Mutual (FM) Standards

KNPC/KOC Standards/Shell Standards Code regulations applicable to piping design like ASME B31.1, ASME B31.3 & API

4. SYSTEMS DESIGNED: (as per NFPA & LPC)

Wet Sprinkler System

Stand Pipe Systems

Hydrant System

Deluge Foam System

Pre-Action System

Fire Extinguishers

Fire Alarm System a b

Fixed Spray Systems

FM-200 (Clean Agent System)

Argonite (Clean Agent System)

Inergen System

CO2 System

Novec1230

Foam Pourers

Foam Chambers

Foam Monitor Systems

High Expansion Foam a Conventional, b Addressable

5. TRAININGS

Viking Water & Foam Systems (November 2012) The Viking Corporation, Kuwait City, Kuwait.

Page 2: Philip_AJ_CV_short

PHILIP ANJELIVELIL JOHN, P.G. Dip., B.E. 2 of 3

(Permanent Resident) +61-451601553

23 McCowan St, email:mailto:[email protected]

Kenwick, WA 6107 mailto:[email protected]

EMPLOYMENT HISTORY

A. Design Engineer Employer: Bader Al Mulla & Bros.Co., Safat, Kuwait. (www.almullagroup.com)

Duration: July 2010 – December 2014 (4+ years)

B. Design & Estimation Engineer Employer: Aikah Establishment, Dubai, UAE. (www.aikah.com)

Duration: February 2008 – May 2010 (2 years & 4 months).

C. Business Development Lead Employer: Orion Pvt. Ltd, Kerala, India.

Duration: May 2004-May 2005: (1+ years).

Key Responsibilities: Inspected and surveyed new sites, existing facilities including factories and buildings,

reviewed design plans and ensured that necessary regulations of Authority Having Jurisdiction (AHJ) were followed.

Provided technical support to the consultants by assisting in the preparation of tender stage specifications for active and passive fire protection systems.

Prepared compliance statements based on technical specifications prior to consultant approval of submittals.

Designed and developed fire protection systems from conceptual to detailed designs.

Instructed a team of draughtsman to carry out detail design by making P&I diagrams, isometric drawing, shop drawings and as-built drawings.

Ensured that water delivery systems met the demand even in worst fire scenarios.

Reviewed and performed automated hydraulic calculations for the analysis of water supply and distribution systems in order to finalize the system piping.

Prepared material take off list and Bill of Material as per project schedule.

Reviewed vendor quotations, compared and selected vendors. Prepared Technical Bid Evaluation (TBE) of vendors.

Prepared material requisitions and conducted project planning using SAP ERP.

Coordinated with consultants/clients and Authority Having Jurisdiction (AHJ) for system approval prior to installation.

Prioritized the project schedule to aid planning engineers to identify critical areas.

Verified the installations at site prior to Testing & Commissioning.

Coordinated interdisciplinary engineering activities.

Prepared fire risk assessment, based on HAZID and HAZOP study of the protected hazards and developed contingency plan to prevent fire outbreaks.

Designed means of egress and the produced master exit diagrams.

Designed various Fire Protection Systems for Oil and Gas Refineries, LPG Bottling Plants, Bulk Handling facilities of Petrochemical industry, Power Generation, Distillation plants, Substations, Aircrafts Hangers, Helipads, Hospitals, Airport infrastructure, High Rise Buildings, Warehouses and Assembly Halls.

As a Business Development Lead, identified growth opportunities and areas of improvement in the company. Developed business development plans to the manager for gaining footage in the assigned area - including activity breakdowns, performance

Page 3: Philip_AJ_CV_short

PHILIP ANJELIVELIL JOHN, P.G. Dip., B.E. 3 of 3

(Permanent Resident) +61-451601553

23 McCowan St, email:mailto:[email protected]

Kenwick, WA 6107 mailto:[email protected]

milestones, resource requirements and expense budget. Made outbound phone calls to prospective clients within the target market to set appointments for senior management. Kept updated with the changing market trends. Kept abreast of industry issues through third party resources.

Key Projects Handled:

1. Designed fire suppression system for Kuwait International Airport Expansion Plan - New Passenger Terminal Two for Directorate General of Civil Aviation (DGCA), State of Kuwait and was promoted as the Project Engineer in-charge for installation, testing and commissioning and handing over of Foam Systems, Water Spray System for the main diesel tanks and day tanks, FM 200 Systems for radar rooms, control rooms, South Power Building, MCCR rooms for the entire project.

2. Estimated and quoted successfully for Jaber Al Ahmed Al Sabah Hospital at South Surra for Ministry of Health and Public Works – State of Kuwait. Once awarded, I was responsible for the detailed design and was promoted as the Project Engineer responsible for the installation, testing, commissioning of the different specialized systems like FM-200 Systems for Control Rooms, IT Center Room, LT Rooms, Foam Monitor for the helipads and the Deluge Foam for protecting the Diesel Generators.

3. Estimated and quoted for Installation of Effluent Water Disposal System at GC-15 & GC-25 And Injection Pumps at CIPF-at North Kuwait for Kuwait Oil Company, which is in the design phase with different fire suppression system like Deluge Water Spray systems, Foam Chamber System, Foam Pourer System, Foam Monitors & Hydrant Systems, for protecting the tank in the gathering center area containing wet crude and Inergen Systems for protecting electrical rooms in the CIPF area.

4. Estimated and quoted for Foam Monitor System, High Expansion Foam System, Foam, Sprinkler system and detection systems for the following projects:

i) Amiri Terminal, Kuwait International Airport for Amiri Diwan, Kuwait. ii) Hanger for F16 Fighter Jets for Ministry of Defense, State of Kuwait.

5. Detailed design of FM 200, Deluge Foam, Sprinkler, Stand Pipe, Fire Hydrant Fixed and Water Spray Systems for Shuaiba North Co-Generation of Power and Distillation Plant for the Ministry of Electricity and Water (MEW), Kuwait.

6. Estimated and quoted for various fire systems like Sprinkler and Wet Riser Systems. Responsible for the design approval from Dubai Civil Defense for projects:

i) Bay Square at Business Bay, Dubai, U.A.E. ii) Grosvenor House 2 - Jumeirah Lakes Towers, Dubai ,U.A.E.

iii) Trident Tower, Dubai, U.A.E. iv) Celestial Heights – Dubai, U.A.E. v) Al Rostamani Tower (4B+G+4P+55), Sheikh Zayed Road, Dubai, U.A.E.

vi) Al Fattan Tower - Palm Jumeirah, Dubai, U.A.E. vii) Dubai Metro - Al Qusais Depot, Dubai, U.A.E.

viii) Khailifa Lake Fountain - Burj Khalifa Dubai, Dubai, U.A.E. ix) Dubai Cinemas at Dubai Mall, Dubai, U.A.E. x) New Exhibition Hall - World Trade Centre, Dubai, U.A.E.

xi) NTDE Warehouse - Dubai Logistic City, Dubai, U.A.E.

REFERENCES:

Mr. Prakash George Hospital Chaplain St John of God Subiaco Hospital, Perth, Western Australia. Contact: +61-433 437 371 (GMT+8:00)

Mr. Barry Williams General Manager Bader Al Mulla & Bro.s Co., Safat, Kuwait. Contact: +965-6901 5662 (GMT+3:00)