Phase III Proposed Early Restoration Project Alabama • Florida • Louisiana • Mississippi • Texas NOAA • Department of the Interior • U.S. Environmental Protection Agency • U.S. Department of Agriculture PROJECT DESCRIPTION e proposed Swiſt Tract Living Shoreline Project would construct approximately 1.6 miles of breakwaters covered with oyster shell to reduce shoreline erosion, protect salt marsh habitat, and restore ecosystem diversity and productivity in Mobile Bay. e Trustees also expect that over time, the breakwaters would develop into reefs, providing added reproductive and foraging habitat and shelter from predators. e 615-acre state-owned Swiſt Tract site is located in Bon Secour Bay and is part of the Weeks Bay National Estuarine Research Reserve. Shorelines are oſten stabilized with hardened structures, such as bulkheads and concrete seawalls. Ironically, these structures oſten increase the rate of coastal erosion, removing the ability of the shoreline to carry out natural processes, and providing little habitat for estuarine species. A “living shoreline” uses more natural bank stabilization techniques that maintain valuable habitat. By protecting this salt marsh and increasing the cover of reef habitat, the Trustees would be protecting a rich source of food for shrimp, crabs, and sport fishes such as red drum which feast on annelid worms and other organisms that are abundant around salt marshes and reefs. As a result of the spill, Alabama experienced a loss to salt marsh habitat and secondary “benthic” (bottom habitat) productivity, including oyster reefs. Completion of this project would reduce shoreline erosion and restore benthic productivity. ESTIMATED COST $5,000,080. Deepwater Horizon Oil Spill Natural Resource Damage Assessment Swift Tract Living Shoreline Project FOR MORE INFORMATION CONTACT Renata Lana Senior Communications Specialist NOAA’s Office of Habitat Conservation [email protected] 301-427-8656 Living Shoreline Breakwater at low tide at Swiſt Tract, Alabama. Photo courtesy of e Nature Conservancy - Mary Kate Brown.

Upload: others

Post on 09-Oct-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Phase III Proposed Early Restoration Project · 2013. 12. 3. · Living Shoreline Breakwater at low tide at Swift Tract, Alabama. Photo courtesy of The Nature Conservancy - Mary Kate

Phase III Proposed Early Restoration Project

Alabama • Florida • Louisiana • Mississippi • TexasNOAA • Department of the Interior • U.S. Environmental Protection Agency • U.S. Department of Agriculture

PROJECT DESCRIPTION

The proposed Swift Tract Living Shoreline Project would construct approximately 1.6 miles of breakwaters covered with oyster shell to reduce shoreline erosion, protect salt marsh habitat, and restore ecosystem diversity and productivity in Mobile Bay. The Trustees also expect that over time, the breakwaters would develop into reefs, providing added reproductive and foraging habitat and shelter from predators.

The 615-acre state-owned Swift Tract site is located in Bon Secour Bay and is part of the Weeks Bay National Estuarine Research Reserve.

Shorelines are often stabilized with hardened structures, such as bulkheads and concrete seawalls. Ironically, these structures often increase the rate of coastal erosion, removing the ability of the shoreline to carry out natural processes, and providing little habitat for estuarine species. A “living shoreline” uses more natural bank stabilization techniques that maintain valuable habitat.

By protecting this salt marsh and increasing the cover of reef habitat, the Trustees would be protecting a rich source of food for shrimp, crabs, and sport fishes such as red drum which feast on annelid worms and other organisms that are abundant around salt marshes and reefs.

As a result of the spill, Alabama experienced a loss to salt marsh habitat and secondary “benthic” (bottom habitat) productivity, including oyster reefs. Completion of this project would reduce shoreline erosion and restore benthic productivity.

ESTIMATED COST $5,000,080.

Deepwater Horizon Oil Spill Natural Resource Damage Assessment

Swift Tract Living Shoreline Project

FOR MORE INFORMATION CONTACT

Renata LanaSenior Communications SpecialistNOAA’s Office of Habitat [email protected]

Living Shoreline Breakwater at low tide at Swift Tract, Alabama. Photo courtesy of The Nature Conservancy - Mary Kate Brown.

Page 2: Phase III Proposed Early Restoration Project · 2013. 12. 3. · Living Shoreline Breakwater at low tide at Swift Tract, Alabama. Photo courtesy of The Nature Conservancy - Mary Kate

Winter 2013/2014www.gulfspillrestoration.noaa.gov

Proposed location for the Swift Tract Living Shoreline Project

Swift Tract Living Shoreline Project