Never work on live circuits without authorization or permit Never put a 110V plug into a 230V socket Never repair damaged cables Never do it yourself always refer faulty or damaged equipment to an electrician Never overload an appliance Always inspect power tools and cables before use-report any damage or defects Wherever possible always use 100V equipment If a piece of equipment blows a fuse or trips a breaker call an electricianDo not reset breakers without permission or replace a fuse with a piece of metal Always run cables along the sides of rooms and corridors or better yet hang them up Never place bare wires directly into a socket fitting CONGRATULATIONS! Mr. Chitra Kumar - the newly appointed HSE Manager for Qatar Operations Unit. He managed the HSE for KARAHMAA Projects since 2006 under the direction of Mr. Jeremy Lai (HLG Executive General Manager - Qatar) Electrical Safety Top 10 Pointers Special points of interest: Electrical Safety Pointers New HSE Manager - Qatar Operations Unit Heat Stress Drills Safety Week ‘14 Celebrations. Bed Bug Problem??? Why do we miss safety hazards??? Prepare a fire emergency plan at home and office Site 901 - DOHA CITY CENTRE EXPANSION PROJECTS PHASES IIIA & IIIB HLG SAFETY NEWSLETTER Monthly Edition - 15 April 2014 Volume 1, Issue 1 HEAT STRESS DRILLS The summer season is fast approaching in the entire region. On April 6, 2014 Phase 3 project safety department provided continuous actual trainings to all site operatives for familiarization and awareness to help them identify an extreme heat hazard and react to emergency procedures . SAFETY WEEK 2014 CELEBRATIONS On March 1621, 2014, Site operatives of HLG and Subcontractors from Phase 3 and Site 907 have joined and enjoyed the yearly safety week celebration with more fun, games and Q&A’s contest related to safety issues and culture change. Gifts were provided to all the winners and participants. Bed Bug Problem (Surot)??? Here’s the remedy… 1. Washing powder2 tsp (table spoon) 2. Dettol or any Disinfectant liquid - 2 tsp 3. Drinking or tap water - 500ml Mix thoroughly. Put it in the spray bottle Ready for use!!! HAPPY HUNTING!!! Why do we miss safety hazards??? “We miss hazards in the workplace due to focus on other outcomes”. PREPARE A FIRE EMERGENCY PLAN Prepare a fire emergency plan at home or at office, Know your escape route and where to evacuate in cases of fire. Know the contact number of your local fire authorities. “FIRE SAFETY TIPS”

Upload: jay-galvan

Post on 15-Sep-2015

225 views

Category:

Documents


2 download

DESCRIPTION

Safety

TRANSCRIPT

  • Never work on live circuits without

    authorization or permit

    Never put a 110V plug into a 230V socket

    Never repair damaged cables

    Never do it yourself always refer faulty or

    damaged equipment to an electrician

    Never overload an appliance

    Always inspect power tools and cables

    before use-report any damage or defects

    Wherever possible always use 100V

    equipment

    If a piece of equipment blows a fuse or trips a breaker call an electricianDo not reset breakers without permission or replace a

    fuse with a piece of metal

    Always run cables along the sides of rooms

    and corridors or better yet hang them up

    Never place bare wires directly into a

    socket fitting

    CONGRATULATIONS!

    Mr. Chitra Kumar - the

    newly appointed HSE

    Manager for Qatar

    Operations Unit. He

    managed the HSE for

    KARAHMAA Projects

    since 2006 under the

    direction of Mr. Jeremy Lai (HLG Executive

    General Manager - Qatar)

    Electrical Safety Top 10 Pointers Special points of interest:

    Electrical Safety Pointers

    New HSE Manager - Qatar

    Operations Unit

    Heat Stress Drills

    Safety Week 14

    Celebrations.

    Bed Bug Problem???

    Why do we miss safety

    hazards???

    Prepare a fire emergency

    plan at home and office

    Site 901 - DOHA CITY CENTRE EXPANSION PROJECTS PHASES IIIA & IIIB

    HLG SAFETY NEWSLETTER

    Monthly Edition - 15 April 2014 Volume 1, Issue 1

    HEAT STRESS DRILLS

    The summer season is fast approaching in the entire region. On April 6, 2014 Phase 3 project safety department provided continuous actual trainings to all site operatives for familiarization and awareness to help them identify an extreme heat hazard and react to emergency procedures .

    SAFETY WEEK 2014 CELEBRATIONS

    On March 1621, 2014, Site operatives of HLG and Subcontractors from Phase 3 and Site 907 have joined and enjoyed the yearly safety week celebration with more fun, games and Q&As contest related to safety issues and culture change. Gifts were provided to all the winners and participants.

    Bed Bug Problem (Surot)???

    Heres the remedy

    1. Washing powder2 tsp (table spoon)

    2. Dettol or any Disinfectant liquid - 2 tsp

    3. Drinking or tap water - 500ml

    Mix thoroughly. Put it in the spray bottle Ready for use!!! HAPPY HUNTING!!!

    Why do we miss safety hazards??? We miss hazards in the workplace due to focus on other outcomes.

    PREPARE A FIRE EMERGENCY PLAN Prepare a fire emergency plan at home or at office, Know your escape route and where to evacuate in cases of fire. Know the contact number of your local fire authorities.

    FIRE SAFETY TIPS