phase 1b scope of work west 38th...

1
All drawings and related documents are the property of Acton Ostry Architects Inc and may not be reproduced in whole or in part without the Architect's permission. This drawing should not be used to calculate areas. Do not scale this drawing. All dimensions to be checked on site by the contractor and such dimensions to be their responsibility. All work must comply with the relevant Building Code or Building Bylaw and related documents. Drawing errors and omissions must be immediately reported to the Architect. 111 E 8 Avenue Vancouver BC Canada V5T 1R8 t 604.739.3344 f 604.739.3355 [email protected] Vancouver College Redevelopment Vancouver College 5400 Cartier Street Vancouver BC scale date project code status drawn checked 1:250 02 Jun 2016 VCR DP Submission MB AP A1.02 Site Plan - Phase 1B drawing number issues 29 Mar 2016 Issued for Class C Costing 02 Jun 2016 Issued for Development Permit A B C D E F H J K M N O P Q R S T U V W X Y Z G I L HUDSON STREET CARTIER STREET ex. access ex. let down 7200 (SIDEYARD) 10700 (REARYARD) 7200 (SIDEYARD) 7200 (SIDEYARD) 7200 (SIDEYARD) 7200 (SIDEYARD) 7050 (FRONTYARD) 7050 (FRONTYARD) Existing building to be demolished Existing Playground (green rubber mat) Existing Playground (green rubber mat) Existing Playground (green rubber mat) Existing Playground (black rubber mat) QUADRANGLE NEW MIDDLE SCHOOL (PHASE 1A) Ex. hydro vaults Ex. siamese connection LS LS LS LS LS LS LS 24 Class 'B' bicycle spaces Ex. flag pole Ex. elec. box EXISTING SECONDARY SCHOOL BUILDING TO REMAIN 152.336m 173.309m 173.334m 152.454m WEST 39TH AVENUE WEST 39TH AVENUE CB CB MH CB Existing Running track (red rubber mat) Existing Football field Existing Bleachers Existing Bleachers Existing Bleachers Existing canopy above Sign MH MH MH MH CB CB CB CB CB CB CB CB CB CB CB CB MH Brothers Parking 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 53 54 55 56 57 58 59 60 61 62 63 64 65 sm. car sm. car sm. car sm. car 1 2 3 4 5 6 7 8 9 sm. car 52 East Parking Lot (85 spaces) Class 'B' loading 3000 8500 Class 'A' loading 2700 Garbage & Recycling sm. car Class 'B' loading 3000 8500 Class 'A' loading 2700 New Playground Dining patio below FH FH Relocated Brother Newman Garden WEST 38TH AVENUE Existing hydro sub-station 2500 2300 5500 4600 6100 Site area = 26,401.7m2 13845 9385 23575 3225 13125 5625 4700 3460 18015 24110 6100 19665 46720 4235 34400 7820 18685 3370 5425 60750 2925 8200 17150 1960 10065 5620 29380 10065 5620 2050 8200 17150 1960 275 22230 6100 DG 103.25m DG 102.60m DG 102.60m DG 102.60m DG 102.81m DG 103.53m DG 102.50m DG 103.75m DG 102.73m DG 102.66m DG 102.25m DG 102.02m DG 103.37m DG 102.39m DG 102.43m DG 101.99m DG 101.83m DG 102.00m DG 102.00m DG 101.77m DG 101.83m DG 102.81m Existing chainlink fence Existing chainlink fence 6000 (access route) R 12000 typ. 6000 (access route) 4810 7940 4000 2990 7050 15995 4130 4750 3150 2350 42750 10250 11100 6250 17750 4750 6985 20000 23250 20000 11100 24530 6000 4000 new access new let down Existing letdown to be removed Student drop-off zone Student drop-off zone Student drop-off zone Student drop-off zone 6600 28 Class 'B' bicycle spaces 10 Class 'B' bicycle spaces principal entrance principal entrance New boulevard (refer to landscape arch.) New conc. sidewalk (refer to landscape arch.) Existing let down to remain New covered walkway Line of building below Line of building below loading & fire truck access parking access parking exit New sidewalk @ top of berm (refer to landscape arch.) Line of building below New basketball hoop 7770 20000 15000 20000 10000 15000 10000 20000 20000 20000 19885 10000 10000 20000 20000 20000 20000 20000 20000 12360 12860 20000 10000 15000 20000 10000 10000 20000 10000 10000 20000 10000 9830 NEW ELEMENTARY SCHOOL (PHASE 1B) Brothers residence Chapel Gymnasium Kindergarten Playground New covered walkway New covered walkway New covered walkway DG 103.05m DG 103.25m DG 104.25m T.O. Retain. wall DG 103.25m DG 103.25m DG 103.25m T.O. Retain. wall DG 103.60m DG 103.65m DG 103.65m DG 103.25m DG 103.25m DG 102.60m Relocated McCormack Hall entry arch PARCEL A, BLOCKS 932 & 952, DISTRICT LOT 526 NEW WESTMINSTER DISTRICT PLAN, BCP 19971 Kindergarten principal entrance chapel entrance exit exit bike storage kindergarten entrance Covered walkway below exit exit exit loading entrance bike storage bike storage bike storage bike storage Renovate bike storage room; convert existing learning assistance to 3 new classrooms; renovate existing music room FH (Phase 1A) Siamese connections for Phase 1A and Phase 1B BG 103.85m BG 103.72m BG 103.45m BG 103.18m BG 102.97m BG 102.87m BG 102.74m BG 102.66m BG 102.49m BG 102.32m BG 102.15m BG 105.08m BG 105.04m BG 104.91m BG 104.80m BG 104.61m BG 104.34m BG 104.20m BG 104.04m BG 103.72m BG 103.54m BG 103.28m BG 102.68m BG 102.38m m BG 103.99m BG 104.06m BG 104.21m BG 104.36m BG 104.49m BG 104.64m BG 104.79m BG 104.94m Base Surface EL 102.80m DG 103.39m EL 102.96m Base Surface EL 104.90m Base Surface Base surface EL 102.94m Base Surface EL 103.14m DG 103.29m DG 104.95m Base Surface EL 103.78m PHASE 1B SCOPE OF WORK MH LS Light standard (existing to remain, u.n.o.) FH Fire hydrant (existing to remain, u.n.o.) Man hole (existing to remain, u.n.o.) CB Catch basin (existing to remain, u.n.o.) BG 105.08m Building grade DG 105.08m Interpolated / design grade Proposed new tree Existing tree to remain Existing tree to be removed Disability parking space sm. car Small car parking space Legend

Upload: ngotram

Post on 04-May-2018

216 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: PHASE 1B SCOPE OF WORK WEST 38TH AVENUEdevelopment.vancouver.ca/5400cartier/documents/sitepl1b.pdf · All work must comply with the relevant Building Code or ... EXISTING SECONDARY

All drawings and related documents are the property of Acton Ostry Architects Inc and may not be reproduced in whole or in part without the Architect's permission. This drawing should not be used to calculate areas. Do not scale this drawing. All dimensions to be checked on site by the contractor and such dimensions to be their responsibility. All work must comply with the relevant Building Code or Building Bylaw and related documents. Drawing errors and omissions must be immediately reported to the Architect.

111 E 8 AvenueVancouver BCCanada V5T 1R8t 604.739.3344f [email protected]

Vancouver College RedevelopmentVancouver College5400 Cartier Street Vancouver BC

scale date

project code status

drawn checked

1:250 02 Jun 2016

VCR DP Submission

MB AP

A1.02

Site Plan - Phase 1Bdrawing number

issues

29 Mar 2016 Issued for Class C Costing02 Jun 2016 Issued for Development Permit

A

B

C

D

E

F

H

J

K

M

N

O

P

Q

R

S

T

U

V

W

X

Y

Z

G

I

L

HUDSON STREET

CARTIER STREET

ex. access

ex. let down

7200 (SIDEYARD)

1070

0 (R

EARY

ARD)

7200 (SIDEYARD)

7200 (SIDEYARD)

7200 (SIDEYARD)

7200 (SIDEYARD)

7050

(FRO

NTYA

RD)

7050

(FRO

NTYA

RD)

Existing building to bedemolished

ExistingPlayground

(green rubber mat)

ExistingPlayground

(green rubber mat)

ExistingPlayground

(green rubber mat)

ExistingPlayground

(black rubber mat)

QUADRANGLE

NEW MIDDLESCHOOL

(PHASE 1A)

Ex. hydro vaults

Ex. siameseconnection

LS

LS

LS

LSLS

LS

LS

24 C

lass

'B' b

icycle

spa

ces

Ex. flag pole

Ex. elec. box

EXISTING SECONDARY SCHOOLBUILDING TO REMAIN

152.336m

173.309m

173.334m

152.454m

WEST 39TH AVENUE

WEST 39TH AVENUE

CB

CB MH

CB

ExistingRunning track

(red rubber mat)

ExistingFootball field

ExistingBleachers

ExistingBleachers

ExistingBleachers

Existing canopyabove

Sign

MH

MH

MH

MH

CB

CB CB

CB

CB

CBCB

CBCB

CB

CB

CB

MH

Brot

hers

Par

king

1011

1213

14 1516

1718

1920

2122

2324

2526

27

2829

3031

3233

3435

3637

3839

4041

4243

4445

4647

4849

5051

6667

6869

7071

7273

7475

7677

7879

8081

8283

8485

5354

5556

575859

6061

6263

6465

sm. car

sm. car

sm. car

sm. car

12

34

56

78

9

sm. car

52

East Parking Lot(85 spaces)

Class 'B'loading

3000

8500

Class 'A'loading

2700

Garbage &Recycling

sm. car

Clas

s 'B

'lo

adin

g

3000

8500 Cl

ass

'A'

load

ing

2700

New Playground

Dining patio below

FH

FH

RelocatedBrother Newman

Garden

WEST 38TH AVENUE

Existing hydrosub-station

2500

2300

5500

4600

6100

Site area = 26,401.7m2

1384

593

8523

575

3225

1312

556

2547

00

3460

1801

524

110

6100 1966546720

4235 34400 7820 18685

3370

5425

6075

029

25

8200 17150 1960

1006

556

2029

380

1006

556

20

2050

8200 17150 1960275

2223

0

6100

DG 103.25m

DG 102

.60m

DG 102.60m

DG 102.60mDG 1

02.81

m

DG 103.53m

DG 102.50m

DG 103.75m

DG 102

.73m

DG 102.66m

DG 102.25m

DG 102

.02m

DG 103

.37m

DG 102.39m DG 102

.43m

DG 101

.99m

DG 101

.83m

DG 102

.00mDG 102.00m

DG 101.77m

DG 101

.83m

DG 102

.81m

Existing chainlinkfence

Existing chainlinkfence

6000

(acc

ess

rout

e)

R 12000 typ.

6000

(acc

ess

rout

e)

4810

7940

4000

2990

7050

1599

541

30

47503150 2350 42750 10250 11100

6250

1775

047

5069

85

20000 23250 20000 11100 24530

6000

4000

new access

new let down

Existing letdown to be removed

Student drop-off zone

Student drop-off zone

Student drop-off zone

Student drop-off zone

6600

28 Class 'B' bicycle spaces

10 Class 'B' bicycle spaces

principal

entrance

principal entrance

New boulevard(refer to landscape arch.)

New conc. sidewalk(refer to landscape arch.)

Existing let down to remain

New

cov

ered

wal

kway

Line of building below

Line of building below

loading & firetruck access

parking access

parkingexit

New sidewalk @ top of berm(refer to landscape arch.)

Line of building below

New basketball hoop

777020000

1500020000

1000015000

1000020000

2000020000

19885

10000 10000 20000 20000 20000 20000 20000 20000 12360

1286020000

1000015000

2000010000

1000020000

1000010000

2000010000

9830

NEW ELEMENTARY SCHOOL(PHASE 1B)

Brothers residence

Chapel

Gymnasium

KindergartenPlayground

New covered walkway

New covered walkway

New

cov

ered

wal

kway

DG 103.05m

DG 103.25m

DG 104

.25m

T.O. R

etain.

wall

DG 103

.25m

DG 103.25m

DG 103.25m

T.O. Retain.

wall

DG 103.60m

DG 103

.65mDG 103.65m

DG 103

.25mDG 103.25m

DG 102.60m

RelocatedMcCormack Hall

entry arch

PARCEL A, BLOCKS 932 & 952, DISTRICT LOT 526NEW WESTMINSTER DISTRICT PLAN, BCP 19971

Kindergarten

prin

cipal

en

tranc

e

chap

elen

tranc

e

exit

exit bike

st

orag

e

kindergartenentrance

Covered walkway below

exit

exit

exit

load

ing

entra

nce

bikestorage

bikestorage

bike

stor

age

bike

stor

age

Renovate bike storage room; convert existinglearning assistance to 3 new classrooms;

renovate existing music room

FH (Phase 1A)

Siamese connections forPhase 1A and Phase 1B

BG 103.85m

BG 103

.72m

BG 103

.45m

BG 103

.18m

BG 102

.97m

BG 102

.87m

BG 102

.74m

BG 102

.66m

BG 102

.49m

BG 102

.32m

BG 102

.15m

BG 105

.08m

BG 105

.04m

BG 104

.91m

BG 104

.80m

BG 104

.61m

BG 104

.34m

BG 104

.20m

BG 104

.04m

BG 103

.72m

BG 103

.54m

BG 103

.28m

BG 102

.68m

BG 102

.38m

BG 102

.15m

BG 103

.99m

BG 104

.06m

BG 104

.21m

BG 104

.36m

BG 104

.49m

BG 104

.64m

BG 104

.79m

BG 104

.94m

Base S

urfac

e

EL 102

.80m

DG 103

.39m

EL 102.96m

Base Surface

EL 104

.90m

Base S

urfac

e

Base s

urfac

e

EL 102

.94m

Base

Sur

face

EL 1

03.1

4m

DG 103.29m

DG 104

.95m

Base S

urfac

e

EL 103

.78m

PHASE 1BSCOPE OF WORK

MH

LS Light standard (existing to remain, u.n.o.)

FH Fire hydrant (existing to remain, u.n.o.)

Man hole (existing to remain, u.n.o.)

CB Catch basin (existing to remain, u.n.o.)

BG 105.08m Building grade

DG 105.08m Interpolated / design grade

Proposed new tree

Existing tree to remain

Existing tree to be removed

Disability parking space

sm.car Small car parking space

Legend