pgcm 11

Upload: ams2011

Post on 07-Jan-2016

31 views

Category:

Documents


2 download

DESCRIPTION

Assignment PGCM 11by Ajay

TRANSCRIPT

  • ASSIGNMENT

    NICMAR / SODE OFFICE

    NAME - Ajaykumar Madhubhai Sojitra

    REG. No. - 214-08-11-12287-2161

    Course No. - PGCM 11

    Course Title - Principles and Practices of Management

    Assignment No. -

    Date of Dispatch -

    Last date of receipt

    Of Assignment at SODE office

    -

  • 2

    ASSIGNMENT

    ON

    Principles and Practices of Management

    PGCM 11

    SUBMITTED BY: Ajaykumar Madhubhai Sojitra,

    PGCM,

    REG NO: 214-08-11-12287-2161

  • 3

    ASSIGNMENT:

    Your company has bagged a lucrative contract to construct a housing

    colony for an industrial group to be located in western Maharashtra in

    a coastal belt. You as a project manager have been asked by the

    company to evolve organization structure with following conditions.

    i. Organization should be as lean and thin as possible with bare

    minimum of personal on company roll up to junior level.

    ii. All supervisors to down below will be temporary for project

    duration only to be recruited locally from 100km radius.

    Suggest and discuss an organization structure denoting responsibility,

    authority, communication control for all facets of construction work and

    management functions as visualized by you.

    Housing colony consists of 10 bungalows for senior executives, 20

    apartments in 5 buildings, 100 dwellings for white collar workers and

    300 dwellings for blue collar workers. Colony will have market and

    entertainment complex

  • 4

    ABSTRACT:

    This Project Report is about management in an organization,

    organization here is a construction cum residential project comprising of

    a housing colony having residential blocks for different level

    of personnel based on the hierarchy / and their designation in the

    firm they work for. The project range varies from bungalows for senior

    executives to apartments and dwellings for white collar and blue collar

    workers.

    Succeeding report projects the responsibility and duties of a project

    manager which he has to undertake and subsequently perform for the

    construction project in the due course of time. The responsibilities and

    duties of Project manager mainly encapsulates:-

    Visualizing all key functions to be carried out for the project.

    Framing managerial functions and categorizing them into

    technical and administrative functions.

    Establishing flow of communication.

    Recruitment of required man power.

    Assigning duties to the Authorities along with giving suitable

    jobs to junior staff members.

    Controlling and forming a structure required for the proper

    execution of project.

  • 5

    INTRODUCTION:

    Main pillars on which a construction project is laid are proper, effective

    and efficient planning and management of material flow. Materials right

    from the raw form to semi-finished and then finally in to finished state

    must be planned and managed in such a way that no wastage or misuse

    comes in to scene. The introduction of supply chain management in

    construction is intended to integrate processes, manage interfaces

    between companies in projects, reduce uncertainties and weed out

    inefficiency as much as possible. The elimination of waste and in

    efficiency from the supply chain builds in value in the process.

    All the authorities guiding personnel at different level of construction

    project should be in a perfect sync and well-coordinated. Flow of

    information from the top level of management to bottom and vice-versa

    must be smooth, lucid and clear avoiding any conflict and misguidance.

    Manpower should be as lean as possible avoiding any over numbered

    people situation at project site.

    For planning, managing and executing a construction project following

    key areas are the axis around which a Project manager emphasis and

    concern should revolve:-

    Committed leadership.

    Determining bottlenecks and then methods to get rid from it.

    Framing guideline easy to follow.

  • 6

    Quality driven agenda.

    Making a task schedule clearly indicating start and finish

    date of project along with time taken to complete different

    individual tasks at different levels and stages of project.

    Intelligent planning off finances and cash flow.

    The present assignment paper is done by keeping in mind the above

    factors for attaining the best and profitable output.

    SCOPE OF WORK

    The project is about construction of a housing colony for an industrial

    group in Western Maharashtra along a coastal belt. Following points

    must be strictly considered and followed during the start of project:-

    Maintaining as less no. of people as possible on company rollup to

    junior level.

    This will cut down the cost involved in arranging and

    maintaining man power.

    Avoid over crowded situation on construction site.

    Easy and less hectic management system.

    Less controlling and monitoring required.

  • 7

    Supervisors below junior level will be on temporary job basis and to be recruited locally from 100 km radius.

    No accommodation is must for local workers.

    Only travel arrangements can be made on demand as the people are around 100 km radius from the work site.

    The number of workers can be altered according to work load.

    The Complete colony area can be tentatively divided as indicated in the

    tabulated form given below:-

    BLOCK

    AREA

    (sq.m.)

    PERSONNEL

    NOS

    REMARKS

    A

    120/BLOCK

    Senior Executives

    10

    10 Bungalows

    B

    100

    White Collared

    Workers

    100

    Individual

    House

    C

    80

    Blue Collared

    Workers

    300

    Individual

    House

    A small shopping complex equipped with shops providing daily uses

    items and recreation hubs like multiplex is also proposed to be built

    along with the housing colony at the Centre of the colony. A park for

    children is also been proposed at the entrance.

    Apart from these entire basic infrastructures a small medical dispensary

    will also be an integral part of the residential colony project.

  • 8

    FUNCTIONS

    The key function of construction Project:

    1. Planning and scheduling: Planning involves formulation of number of alternative realistic work plans for achieving specified

    objectives. Finally selecting a plan which is best suited from the

    stand-point of available resources and constraints imposed upon

    the project.

    Scheduling is fitting of the final work plan into a time scale. It

    shows the duration and order of various construction activities.

    2. Organizing: Organizing is concerned with division of total project in to manageable departments/sections and systematically

    arranging various operations by delegating specific task to

    individuals.

    3. Staffing: Organizing involves division of project work into section and Staffing is the provision of people to fill the position so

    created.

    4. Directing: the directing function is concerned with the training to the subordinate t carry out assigned task supervising their work and

    guiding their efforts. The essence of directing lies in the ability to

    motivate people individually and as groups.

    5. Controlling: Controlling is necessary for ensuring effective and efficient working. It involves review of the work plan to check on

    actual achievement and to discover and to rectify deviation through

    appropriate corrective measures.

    6. Co-ordinating: Since authority coverage to the top of the organizational pyramid it is necessary to bring together and

    coordinate the work of various department and sections. This

  • 9

    requires an efficient system of communication so that each

    department and section is aware of its role and assistance to be

    expected from others.

    Based on key functions we can make a management chart

    BREAKDOWN MANAGEMENT

    The above chart is the outline for the breakdown for the management in

    the organization. The top most position in any project is the project

    manager. The orders are executed by the junior engineers through their

    senior engineer who is guided by the construction manager. The

    functions of the personnel are discussed briefly below:

    1. PROJECT MANAGER:

    The project manager is a leader of the team.

    The project manager will have clear idea about the entire process that takes place in the project.

    He should be influencing the team to follow in the achievement of a common goal.

    He should be able to identify the delay if it is occurred and should be able to rectify it. He is answerable to the top level

    management of the firm and to the clients.

    To coordinate the entire construction work on site and with the head office.

    To direct and control the construction work on site.

    To employ work force, hire machinery, engage sub-contractors and material suppliers with or without reference to H.O

  • 10

    depending on the sizes of the project, policy of firm, distance

    from H.O and also his standing within the firm.

    To organize, direct and control men working under him.

    To check the progress of work regularly in orders to avoid delay

    in construction work.

    To call periodical joint meetings of several key personnel working at the site to review progress and to issue instruction

    for speeding up work if required.

    The achievement of these project objectives is closely linked with the

    skill, effectiveness and efficiency of the project management team, and

    how it is organized for conducting its operations. This team consists of

    the functional of heads or the body of manager in a project.

    i. PROJECT COORDINATOR

    The function of a project control manager is to regularize the work flow in the project.

    He forms a planning department under which all the essentials of the project are been maintained and recorded.

    The project control manager being the head of the planning department has to keep up the above mentioned functions. He

    is assisted by:

    SCHEDULERS: prepares the work flow for a project.

    DOCUMENT CONTROLLERS: maintains all the records

    of the project.

  • 11

    COST SPECIALISTS: analysis the day to day change in

    field of construction financially and run the project

    economically.

    ii. DESIGN CONSULTANT:

    The design manager makes the plan and does the design of every single member of a structure that has to come in the

    project.

    As for the residential project, he does prepare the layout of the entire colony with specification of the every single

    apartment and bungalow allocated as per the specification

    proposed by the clients.

    He prepares the drawings which provide all the essentials for the structure.

    QC INSPECTOR: He takes care in examining the quality of the all the products from reinforcement, concrete to a completed

    building.

    SAFETY INSPECTORS: He assures the safe working

    condition prevails in the site to all the people working in the site.

    Thus he assures that the risk factors in the site are minimized and a

    safe working environment is provided.

    2. CONSTRUCTION MANAGER

    He is the head of the execution department.

    The main function of the execution department is to execute the orders received from the planning department.

  • 12

    The most active post in the organization is the construction manager since he decides upon the plans proposed on assumed

    working conditions and executes them under the actual working

    conditions.

    He has a team consisting of engineers ad his sub ordinates for various works in the field.

    The table below gives the outline for the entire assignment as a precise

    for the above all discussions:

  • 13

    SR.NO DESIGNATION QUALIFICATION &

    EXPERIENCE

    NO REMARKS

    1

    Project In-Charge

    Min 15 years of exp in

    the field of construction

    1

    From the head

    of the project

    nominated via

    board of

    members in

    company

    2

    Asst. Project Manager

    Min 10 years of exp in

    the field of construction

    1

    Recommended

    by the project

    in charge

    3

    Account Manager

    Min 10 years of exp in

    the field of accounting

    & auditing

    1

    Takes sole

    responsibility

    for maintain the

    cash flow

    control for the

    entire project

    4

    Construction Manager

    Min 10 years of exp in

    the field of construction

    1

    Makes the

    entire work

    flow operations

    in the project

    5

    Quality Control In-

    Charge

    Min 10 years of exp in

    the field of quality and

    control

    1

    Ensures the

    project works

    are done with

    quality

    6

    Engineers

    Min 0-2 years of exp in

    the field of construction

    5

    For site work

    7

    Foreman & supervisor

    Min 5-20 years of

    experience in the field of

    construction

    20

    For site work

  • 14

    INPUT/COMMUNICATION REQUIRETMENT AND FLOW

    As discussed above the breakdown in an organization can be categorized

    precisely under four departments namely,

    Planning and Infrastructure department,

    Finance and Marketing department,

    Quality department and

    Execution department.

    The functions of all the above departments are explained elaborately below:

    PLANNING AND INFRASTRUCTURE DEPARTMENT:

    The Planning team would work on the Layout, Town Planning and

    Connectivity.

    The Infrastructure team would ensure that the basic infrastructure like

    Water and Electricity is made available to the units.

    The intention to club these two divisions is based on logical

    interpretation of the basic tenets on which the two teams work,

  • 15

    A coordinative effort between these two divisions will ensure that the

    product is ready for the execution team to deliver.

    FINANCE AND MARKETING DEPARTMENT:

    The team will work around the year to ensure that the required cash

    flow is maintained and also to ensure that the work doesnt get

    affected due to the inherent issues of managing the project.

    Employees in the Manager level will ensure that the required books

    are to do the book keeping and also execute the plans of the General

    Managers.

    The General Managers are to ensure that the plans are made keeping

    in mind the vision and direction set by the project manager.

    QUALITY DEPARTMENT

    The Quality Team will have a structure as follows: Quality Control

    Plays a very vital role in a project. Hence, it would be critical to have

    a Quality Team member involved in every critical aspect of the

    project.

    A team member would be involved in the Planning and

    Infrastructure, one team member in Architecture and one in

    Execution.

    A team member of the cadre of an AGM would ensure that the

    Managers who look after the individual portfolios execute the plans

    according to the vision and direction of the Program Manager.

  • 16

    EXECUTION DEPARTMENT

    The primary thing that has to be realized is that execution is a very

    critical team for the success of the organization.

    This team has to be closely monitored and should also be given

    enough flexibility to allow intelligent deviations from the plan and

    also should be flexible enough to incorporate the changing conditions

    in the environment.

    COMMUNICATION FLOW

    Co-ordination of workers their views and finally completion of

    project are the necessary task of manager. He has to collect views of

    various persons at different level and required to execute the job to be

    more correct, realistic and feasible. He is also required to co-ordinate

    various gangs, persons involved in construction. He has also to co-

    ordinate various activities in a project.

    Motivation is very essential in modern management technique. The job

    of managerial person is to motivate the workers for effective working.

    This can be achieved by economic, psychological and sociological

    satisfaction of workers.

    Functional authority is the common thing in organization. It is the power

    which an individual or department may have delegated to it for specific

    processes, practices, policies and related matters. A Managing Director

    may have the complete authority to manage the company subject to the

    superintendence and control of board of Directors. But he is not expert

    in every function in the company and has officer responsible for

    technical, production, finance, personnel matters etc. Theoretically all

    these officers must give advice to managing Director and the latter alone

  • 17

    will issue instructions. However, Managing Director delegates authority

    to these officers to issue instruction directly to the line organization.

    This is called functional authority. Since functional authority is an act

    of delegation, it may create confusion. A project manager reports to the

    managing Director. He may receive instruction from Finance Manager

    who is of equal status. Functional Manager generally lay down the rules,

    procedures, forms, norms, time schedule etc. in regard to the discharge

    of work. Line Managers function within the framework.

    The main objective of any management, i.e. to achieve a time cost

    balance relationship by proper planning and scheduling the project has

    already been explained in previous clauses. Man power and equipment

    have been assumed to be available as and when they are needed, which

    is off course not usual. The basic planning problem is therefore, how to

    decide between alternative ways of using resources such that the best

    profits are obtained. These decision are perhaps more difficult that the

    management has to face.

    The resource analysis report allows a manager to best use all means at

    his disposal. It is a technique to level out the peaks and the valleys that

    prevail in the managers industry. In planning resource requirements,

    therefore, the following key questions have to be answered.

    What are the total requirements of resource for a project over its

    duration? If resource available are insufficient than what is the minimum

    duration by which the completion period of the project can be delayed?

    What is the best utilization of the available resources to carry out the

    project in a fixed time? There are two basic problems involved in

    resource scheduling. Project duration being fixed, to level or to

    smoothen the resource demand avoiding peaks and valleys as far as

    possible. It is called resource aggregation, i.e. unlimited resources are

    available for disposal. With fixed availability of resources, to minimize

  • 18

    the project duration, i.e. Resource allocation. It occurs when there is

    scarcity of resources.

    The above discussion is precisely shown in the flow chart below:

    Client

    Needs

    Use

    Consultant

    Design and

    Studies

    Constructor

    Management

    Site

    Construction

    Subcontractor

    Fabrication

    Capacity

    Suppliers

    Parts production

    Material

    Production

    Information Flow (orders, programs estimates, procedures, etc.)

    Resources Flow (supplies, finished products, equipment, etc.)

    Thus it is very clear from the flow chart that in the field of construction

    there is no unidirectional flow of orders or communication it is a must

    that a for an efficient project there is a must that all should be knowing

    the happenings around them so as that the problems can be discussed

    and hurdles are overcome. So as a result the client is pleased and at the

    same time the work progress is also maintained at the same ratio. As a

    result for the company time efficiency is gained which at the days end

    earns a lot of profit and fame for the concern.

  • 19

    CONCLUSIONS The structure proposed for the organization of the knowledge based on the

    Document, Processes, Elements and Basic Materials trees for a small building

    company has enabled the relation to be made among Materials, services and

    Suppliers. A real example was used based on the quality document obtained from

    one company. Later, other documents used by the company may be included.

    This will allow for the registration of the experiences. The Organized and

    integrated knowledge originated from a classification structure can work as a

    professional habilitation/updating tool, capable of integrating the knowledge of the

    area under consideration. Moreover it can contribute to the strengthening of the

    technical history of the company and work as a channel to disseminate this

    knowledge of its collaborations.

    The Recommendations include:

    Ensuring the early involvement of the key project team member that have

    expert knowledge so that an appropriate level of client satisfaction and

    value can be defined.

    Establishing of subcontractor a supplier relationship by selecting teams

    based on value rather than lowest price.

    Managing the project parameters of cost schedule, quality and H&S in

    unison.

    Working together as a team to agree mutual goals and devise dispute

    resolution mechanisms.

  • 20

    Developing and monitoring continuous improvement program.

    Developing and implementing sound risk management processes.

    Dealing with the risks and rewards by using modem commercial

    arrangements such as collaborative contract forms target cost and open

    book accounting.

    Using non adversarial forms of contract ensuring that contractual

    relationships are appropriate for expected project objectives.

    Using cost plus and design and build forms on contract underemphasizing

    the use of management contracting as well as traditional forms of

    contracting.

    Mobilizing and developing people in order to ensure employee satisfaction

    through integrated teams.

    BIBLOGRAPHY:

    Chapter on Organization Management Koontz Odoneal McGraw Hill

    Publications

    Report of the Committee on the Placing and Management of Contracts

    for Building and Civil Engineering Works - Banwell, H.

    Modeling the Construction Process Using Plans of Work - Hughes, W