1 PETE 411 Drilling Engineering Lesson 16 - Lifting Capacity of Drilling Fluids - - Slip Velocity -

Upload: nguyenanh

Post on 20-Aug-2018

217 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Petroleum Engineering 405 Drilling Engineering · PPT file · Web view2004-02-10 · PETE 411 Drilling Engineering Lesson 16 - Lifting Capacity of Drilling Fluids - - Slip Velocity

1

PETE 411Drilling Engineering

Lesson 16 - Lifting Capacity of Drilling Fluids -

- Slip Velocity -

Page 2: Petroleum Engineering 405 Drilling Engineering · PPT file · Web view2004-02-10 · PETE 411 Drilling Engineering Lesson 16 - Lifting Capacity of Drilling Fluids - - Slip Velocity

2

Lifting Capacity of Drilling Fluids - Slip Velocity -

Fluid Velocity in Annulus Particle Slip Velocity Particle Reynolds Number Friction Coefficient Example Iterative Solution Method Alternative Solution Method API RP 13D Method

Page 3: Petroleum Engineering 405 Drilling Engineering · PPT file · Web view2004-02-10 · PETE 411 Drilling Engineering Lesson 16 - Lifting Capacity of Drilling Fluids - - Slip Velocity

3

Read:Applied Drilling Engineering, Ch. 4 - all

HW #8:On the Web - due 10-14-02

Page 4: Petroleum Engineering 405 Drilling Engineering · PPT file · Web view2004-02-10 · PETE 411 Drilling Engineering Lesson 16 - Lifting Capacity of Drilling Fluids - - Slip Velocity

4

Messages from Darla-Jean Weatherford

The seniors were supposed to have submitted the drafts of their papers for the Student Paper Contest to me last Friday; a few more than half did. Will you please remind the rest that I need those papers to complete their grades for 485?

We also are looking for recruiters for the fairs in Houston, which will be 18 to 22 November this year. If they can go with us any evening or Friday morning, they need to let Larry Piper know soon so we can get t-shirts and transportation (and meals!) arranged.

Page 5: Petroleum Engineering 405 Drilling Engineering · PPT file · Web view2004-02-10 · PETE 411 Drilling Engineering Lesson 16 - Lifting Capacity of Drilling Fluids - - Slip Velocity

5

Lifting Capacity of Drilling Fluids

Historically, when an operator felt that the hole was not being cleared of cuttings at a satisfactory rate, he would:

Increase the circulation rate

Thicken the mud (increase YP/PV)

Page 6: Petroleum Engineering 405 Drilling Engineering · PPT file · Web view2004-02-10 · PETE 411 Drilling Engineering Lesson 16 - Lifting Capacity of Drilling Fluids - - Slip Velocity

6

Lifting Capacity of Drilling Fluids

More recent analysis shows that:

Turbulent flow cleans the hole better.

Pipe rotation aids cuttings removal.

With water as drilling fluid, annular velocities of 100-125 ft/min are generally adequate (vertical wells)

Page 7: Petroleum Engineering 405 Drilling Engineering · PPT file · Web view2004-02-10 · PETE 411 Drilling Engineering Lesson 16 - Lifting Capacity of Drilling Fluids - - Slip Velocity

7

Lifting Capacity of Drilling Fluids

A relatively “flat” velocity profile is better than a highly pointed one.

Mud properties can be modified to obtain a flatter profile in laminar flow e.g., decrease n

Page 8: Petroleum Engineering 405 Drilling Engineering · PPT file · Web view2004-02-10 · PETE 411 Drilling Engineering Lesson 16 - Lifting Capacity of Drilling Fluids - - Slip Velocity

8

Drilled cuttings typically have a density of about 21 lb/gal.

Since the fluid density is less than 21 lb/gal the cuttings will tend to settle, or ‘slip’ relative to the drilling mud.

slipfluidparticle VVV

Density & Velocity

slipV

particleVfluid

_

V

Page 9: Petroleum Engineering 405 Drilling Engineering · PPT file · Web view2004-02-10 · PETE 411 Drilling Engineering Lesson 16 - Lifting Capacity of Drilling Fluids - - Slip Velocity

9

Velocity Profile

The slip velocity can be reduced by modifying the mud properties such that the velocity profile is flattened:

Increase the ratio (YP/PV) (yield point/plastic viscosity) or

Decrease the value of n

Page 10: Petroleum Engineering 405 Drilling Engineering · PPT file · Web view2004-02-10 · PETE 411 Drilling Engineering Lesson 16 - Lifting Capacity of Drilling Fluids - - Slip Velocity

10

Plug Flow

Plug Flow is good for hole cleaning. Plug flow refers to a “completely” flat velocity profile.

The shear rate is zero where the velocity profile is flat.

Page 11: Petroleum Engineering 405 Drilling Engineering · PPT file · Web view2004-02-10 · PETE 411 Drilling Engineering Lesson 16 - Lifting Capacity of Drilling Fluids - - Slip Velocity

11

Participle Slip Velocity

Newtonian Fluids:The terminal velocity of a small spherical particle settling (slipping) through a Newtonian fluid under Laminar flow conditions is given by STOKE’S LAW:

2

sfss

d)(138v

Page 12: Petroleum Engineering 405 Drilling Engineering · PPT file · Web view2004-02-10 · PETE 411 Drilling Engineering Lesson 16 - Lifting Capacity of Drilling Fluids - - Slip Velocity

12

Particle Slip Velocity - small particles

Where

cp viscosity, fluidin particle, of diameterd

lbm/gal fluid, of densitylbm/gal particle, solid of density

ft/s velocity, slipv

s

f

s

s

2

sfss

d)(138v

Page 13: Petroleum Engineering 405 Drilling Engineering · PPT file · Web view2004-02-10 · PETE 411 Drilling Engineering Lesson 16 - Lifting Capacity of Drilling Fluids - - Slip Velocity

13

Particle Slip Velocity

Stokes’ Law gives acceptable accuracy for a particle Reynolds number < 0.1

For Nre > 0.1 an empirical friction factor

may be used.

ssfRe

dv928N

Page 14: Petroleum Engineering 405 Drilling Engineering · PPT file · Web view2004-02-10 · PETE 411 Drilling Engineering Lesson 16 - Lifting Capacity of Drilling Fluids - - Slip Velocity

14

What forces act on a settling

particle?

Non-spherical particles

experience relatively

higher drag forces

Page 15: Petroleum Engineering 405 Drilling Engineering · PPT file · Web view2004-02-10 · PETE 411 Drilling Engineering Lesson 16 - Lifting Capacity of Drilling Fluids - - Slip Velocity

15

Sphericities for Various Particle Shapes Shape Sphericity

0.58 20rh 0.87 2rh 0.83 rh 0.59 r/3h 0.25 r/15h

Cylinders0.73 3*2* 0.77 2**

Prism0.81 Cube0.85 Octahedron1.00 Sphere

Sphericity =

surface area of sphere of same

volume as particle

surface area of particle

Page 16: Petroleum Engineering 405 Drilling Engineering · PPT file · Web view2004-02-10 · PETE 411 Drilling Engineering Lesson 16 - Lifting Capacity of Drilling Fluids - - Slip Velocity

16

Page 17: Petroleum Engineering 405 Drilling Engineering · PPT file · Web view2004-02-10 · PETE 411 Drilling Engineering Lesson 16 - Lifting Capacity of Drilling Fluids - - Slip Velocity

17

Particle Reynolds Number, fig. 4.46

)d104.4.(Eq...........1f

d89.1vf

sss

In field units,

Based on real cuttings

Page 18: Petroleum Engineering 405 Drilling Engineering · PPT file · Web view2004-02-10 · PETE 411 Drilling Engineering Lesson 16 - Lifting Capacity of Drilling Fluids - - Slip Velocity

18

Slip Velocity Calculation using Moore’s graph (Fig. 4.46)

1. Calculate the flow velocity.

2. Determine the fluid n and K values.

3. Calculate the appropriate viscosity (apparent viscosity).

4. Assume a value for the slip velocity.

5. Calculate the corresponding Particle Reynolds number.

Page 19: Petroleum Engineering 405 Drilling Engineering · PPT file · Web view2004-02-10 · PETE 411 Drilling Engineering Lesson 16 - Lifting Capacity of Drilling Fluids - - Slip Velocity

19

Slip Velocity Calculation (using Moore’s graph)

6. Obtain the corresponding drag coeff., f, from the plot of f vs. Nre.

7. Calculate the slip velocity and compare with the value assumed in step 4 above.

8. If the two values are not close enough, repeat steps 4 through 7 using the calculated Vs as the assumed slip velocity in step 4.

Page 20: Petroleum Engineering 405 Drilling Engineering · PPT file · Web view2004-02-10 · PETE 411 Drilling Engineering Lesson 16 - Lifting Capacity of Drilling Fluids - - Slip Velocity

20

Example

Use (the modified) Moore’s method to calculate the slip velocity and the net particle velocity under the following assumptions:

Well depth: 8,000 ft Yield point: 4 lbf/100ft2

Drill pipe: 4.5”, 16.6 #/ft Density of Particle: 21 lbm/gal

Mud Weight: 9.1 #/gal Particle diameter: 5,000 m

Plastic viscosity: 7 cp Circulation rate: 340 gal/min

Hole size: 7-7/8”

Page 21: Petroleum Engineering 405 Drilling Engineering · PPT file · Web view2004-02-10 · PETE 411 Drilling Engineering Lesson 16 - Lifting Capacity of Drilling Fluids - - Slip Velocity

21

Solution - Slip Velociy Problem

1. Calculate the flow velocity

2. Determine the fluid n and K values

1174 300300y pyp

18117 300600300600p p

ft/sec 3.325

)5.4875.7(448.2340

)dd(448.2qv 222

12

2

_

Page 22: Petroleum Engineering 405 Drilling Engineering · PPT file · Web view2004-02-10 · PETE 411 Drilling Engineering Lesson 16 - Lifting Capacity of Drilling Fluids - - Slip Velocity

22

(18/11)log3.32log32.3n300

600

7101.0n

2. Determine the fluid n and K values - cont’d

Solution - Slip Velociy Problem - cont’d

cp.eq 94.66K

51111)510(

511)510(K 7101.0n

300

(ADE)

Page 23: Petroleum Engineering 405 Drilling Engineering · PPT file · Web view2004-02-10 · PETE 411 Drilling Engineering Lesson 16 - Lifting Capacity of Drilling Fluids - - Slip Velocity

23

7101.0

7101.01

a

nn1

_12

a

0208.0

)7101.012(

325.35.4875.7

14494.66

(4.107) Eq. .......... 0208.0

)n12(

v

dd144K

3. Calculate the appropriate viscosity

Solution - Slip Velociy Problem - cont’d

cp eq 94.66

7 94.17 p

K

cpcpa

Page 24: Petroleum Engineering 405 Drilling Engineering · PPT file · Web view2004-02-10 · PETE 411 Drilling Engineering Lesson 16 - Lifting Capacity of Drilling Fluids - - Slip Velocity

24

sec/ 663.12325.3

2VV ___

s ft

4. Assume a value for the slip velocity

Solution - Slip Velociy Problem - cont’d

5. Calculate the corresponding Particle Reynolds No.

17.94

cm2.54in

m10cmm5000.663)928(9.1)(1

dv928N

4

a

ssfRe

μμ

μρ

}in 1969.0{d v92.8 154N ssRe

Page 25: Petroleum Engineering 405 Drilling Engineering · PPT file · Web view2004-02-10 · PETE 411 Drilling Engineering Lesson 16 - Lifting Capacity of Drilling Fluids - - Slip Velocity

25

From graph, f = 2.0

Solution - Slip Velociy Problem - cont’d

6. Obtain the drag coeff., f, from the plot of f vs. Nre.

1.663 ft/s 0.678vf

0.959 19.1

21.02.0

0.19691.89

(4.104d) Eq. 1f

d1.89v

s

f

sss

ρρ

Page 26: Petroleum Engineering 405 Drilling Engineering · PPT file · Web view2004-02-10 · PETE 411 Drilling Engineering Lesson 16 - Lifting Capacity of Drilling Fluids - - Slip Velocity

26

4 (ii) Assume

5 (ii) Particle

6 (ii) From graph,

7 (ii)

Subsequent iterations yield 0.56 ft/s and 0.56 ft/s again…...

678.0vs

9.62678.0*7.92NRe

7.2f

.etc.....s/ft 58.07.2

959.0vs

Solution - Slip Velocity Problem - cont’d

Page 27: Petroleum Engineering 405 Drilling Engineering · PPT file · Web view2004-02-10 · PETE 411 Drilling Engineering Lesson 16 - Lifting Capacity of Drilling Fluids - - Slip Velocity

27

1. Fully Laminar:

Slip Velocity - Alternate Method

1

fd1.89v

f

sss ρ

ρ fsa

2s

s

_

Re

Re

d82.87v

;N40f

:3N

ρρμ

Page 28: Petroleum Engineering 405 Drilling Engineering · PPT file · Web view2004-02-10 · PETE 411 Drilling Engineering Lesson 16 - Lifting Capacity of Drilling Fluids - - Slip Velocity

28

2. Intermediate;

;N22f

:300N3

Re

Re

1/3af

2/3fss

s

_

)()(d2.90

v μρ

ρρ

Slip Velocity - Alternate Method

Page 29: Petroleum Engineering 405 Drilling Engineering · PPT file · Web view2004-02-10 · PETE 411 Drilling Engineering Lesson 16 - Lifting Capacity of Drilling Fluids - - Slip Velocity

29

3. Fully Turbulent:

f

fsss

Re

ρ)ρ(ρd1.54 v

1.5;f

:300N

Slip Velocity - Alternate Method

NOTE: Check NRe

Page 30: Petroleum Engineering 405 Drilling Engineering · PPT file · Web view2004-02-10 · PETE 411 Drilling Engineering Lesson 16 - Lifting Capacity of Drilling Fluids - - Slip Velocity

30

For the above calculations:

d) q.(4.104.........E 1f

d1.89v

dv928N

f

sss

a

ssfRe

ρρ

μρ

Slip Velocity - Alternate Method

NOTE: Check NRe

Page 31: Petroleum Engineering 405 Drilling Engineering · PPT file · Web view2004-02-10 · PETE 411 Drilling Engineering Lesson 16 - Lifting Capacity of Drilling Fluids - - Slip Velocity

31

Slip Velocity - Alternate Method_2

If the flow is fully laminar, cuttings transport is not likely to be a problem.

Method: 1. Calculate slip velocity for Intermediate

mode 2. Calculate slip velocity for Fully Turbulent

Mode. 3. Choose the lower value.

Page 32: Petroleum Engineering 405 Drilling Engineering · PPT file · Web view2004-02-10 · PETE 411 Drilling Engineering Lesson 16 - Lifting Capacity of Drilling Fluids - - Slip Velocity

32

(i) Intermediate:

ft/sec545.017.94)*(9.1

9.1)(21*0.1969*2.90v

)()(2.90dv

1/3

2/3

s

_

1/3af

2/3fss

s

_

μρρρ

(ii) Fully Turbulent:

ft/sec 0.7819.1

9.1)(210.19691.54v

ρ)ρ(ρd1.54v

s

_

f

fsss

_

Example

Page 33: Petroleum Engineering 405 Drilling Engineering · PPT file · Web view2004-02-10 · PETE 411 Drilling Engineering Lesson 16 - Lifting Capacity of Drilling Fluids - - Slip Velocity

33

Example - cont’d

Intermediate: Vs = 0.545 ft/sec

Fully Turbulent: Vs = 0.781 ft/sec

The correct slip velocity is 0.545 ft/sec

{ agrees reasonably well with iterative method on p.12 }

5194.17

1969.0*545.0*1.9*928N :Check Re

Range OK

Page 34: Petroleum Engineering 405 Drilling Engineering · PPT file · Web view2004-02-10 · PETE 411 Drilling Engineering Lesson 16 - Lifting Capacity of Drilling Fluids - - Slip Velocity

34

Slip Velocity - API RP 13D

Iterative ProcedureCalculate Fluid Properties, n & KCalculate Shear RateCalculate Apparent ViscosityCalculate Slip VelocityExample

Page 35: Petroleum Engineering 405 Drilling Engineering · PPT file · Web view2004-02-10 · PETE 411 Drilling Engineering Lesson 16 - Lifting Capacity of Drilling Fluids - - Slip Velocity

35

Settling Velocity of Drilled Cuttings in Water

From API RP 13Dp.24

Page 36: Petroleum Engineering 405 Drilling Engineering · PPT file · Web view2004-02-10 · PETE 411 Drilling Engineering Lesson 16 - Lifting Capacity of Drilling Fluids - - Slip Velocity

36

Calculation Procedure

1. Calculate ns for the settling particle

2. Calculate Ks for the particle

3. Assume a value for the slip velocity, Vs

4. Calculate the shear rate, s

5. Calculate the corresponding apparent viscosity, es

6. Calculate the slip velocity, Vs

7. Use this value of Vs and repeat steps 4-6 until the assumed and calculated slip velocities ~“agree”

Page 37: Petroleum Engineering 405 Drilling Engineering · PPT file · Web view2004-02-10 · PETE 411 Drilling Engineering Lesson 16 - Lifting Capacity of Drilling Fluids - - Slip Velocity

37

Slip Velocity - Example

ASSUMPTIONS:

3 RPM Reading R3 3 lbf/100 ft2

100 RPM Reading R100 20 lbf/100 ft2 Particle Density p 22.5 lb/galMud Density 12.5 lb/gal

Particle Dia. = Dp 0.5 in

Page 38: Petroleum Engineering 405 Drilling Engineering · PPT file · Web view2004-02-10 · PETE 411 Drilling Engineering Lesson 16 - Lifting Capacity of Drilling Fluids - - Slip Velocity

38

Slip Velocity - Example

1. Calculate ns for the settling particle

2. Calculate Ks for the particle

2

n

5413.0S cmsecdyne336.6

2.17020*11.5K

5413.0320log657.0nS

3

100S R

Rlog657.0n

sn100

S 2.170R11.5K

Page 39: Petroleum Engineering 405 Drilling Engineering · PPT file · Web view2004-02-10 · PETE 411 Drilling Engineering Lesson 16 - Lifting Capacity of Drilling Fluids - - Slip Velocity

39

Slip Velocity - Example

3. Assume a value for the slip velocity, Vs

Assume Vs = 1 ft/sec

4. Calculate the shear rate, s

p

SS D

V12 1

S sec0.245.01*12

Page 40: Petroleum Engineering 405 Drilling Engineering · PPT file · Web view2004-02-10 · PETE 411 Drilling Engineering Lesson 16 - Lifting Capacity of Drilling Fluids - - Slip Velocity

40

Slip Velocity - Example

5. Calculate the corresp. apparent viscosity:

6. Calculate the slip velocity, Vs

1nsses

sK100

cp5.14724*336.6*100 15413.0es

1D

1De790,920(1D

e0002403.0V2

es

ppp

03.5

p

es03.5s

Page 41: Petroleum Engineering 405 Drilling Engineering · PPT file · Web view2004-02-10 · PETE 411 Drilling Engineering Lesson 16 - Lifting Capacity of Drilling Fluids - - Slip Velocity

41

Slip Velocity - Example

6. Calculate the slip velocity, Vs

If then:

Vs = 0.8078 ft/sec Repeat steps 4-6

1D

1D465,161D

01344.0V2

es

ppp

p

ess

1

48.1475.12*5.01

5.125.225.0*465,161

5.12*5.048.14701344.0V

2

s

Page 42: Petroleum Engineering 405 Drilling Engineering · PPT file · Web view2004-02-10 · PETE 411 Drilling Engineering Lesson 16 - Lifting Capacity of Drilling Fluids - - Slip Velocity

42

Slip Velocity - ExampleVs = 0.8078 ft/sec

4. Shear rate: s = 19.386 sec-1

5. Apparent viscosity: es = 162.65 cp 6. Slip velocity: Vs = 0.7854 ft/sec

Second Iteration - using

4. Shear rate: s = 18.849 sec-1

5. Apparent viscosity: es = 164.75 cp 6. Slip velocity: Vs = 0.7823 ft/sec

Third Iteration - using Vs = 0.7854 ft/sec

Page 43: Petroleum Engineering 405 Drilling Engineering · PPT file · Web view2004-02-10 · PETE 411 Drilling Engineering Lesson 16 - Lifting Capacity of Drilling Fluids - - Slip Velocity

43

Slip Velocity - ExampleVs = 0.7823 ft/sec

4. Shear rate: s = 18.776 sec-1

5. Apparent viscosity: es = 165.04 cp 6. Slip velocity: Vs = 0.7819 ft/sec

Fourth Iteration - using

Slip Velocity, Vs = 0.7819 ft/sec

{ Vs = 1.0, 0.808, 0.782, 0.782 ft/sec }

Page 44: Petroleum Engineering 405 Drilling Engineering · PPT file · Web view2004-02-10 · PETE 411 Drilling Engineering Lesson 16 - Lifting Capacity of Drilling Fluids - - Slip Velocity

44

Transport Ratio

? Efficiency Transport ft/min 120 velocity Fluid

ft/min 90 velocity Particle :Example

100%*velocity fluid

velocity particleEfficiency Transport

velocity fluidvelocity particle Ratio Transport

Page 45: Petroleum Engineering 405 Drilling Engineering · PPT file · Web view2004-02-10 · PETE 411 Drilling Engineering Lesson 16 - Lifting Capacity of Drilling Fluids - - Slip Velocity

45

Transport Ratio

%75

%100*)120/90(

efficiency Transport

A transport efficiency of 50% or higher is desirable!

Note: Net particle velocity = fluid velocity - slip velocity. In example, particle slip velocity = 120 - 90 = 30 ft/min

With a fluid velocity of 120 ft/min a minimum particle velocity of 60 ft/min is required to attain a transport efficiency of 50%

Page 46: Petroleum Engineering 405 Drilling Engineering · PPT file · Web view2004-02-10 · PETE 411 Drilling Engineering Lesson 16 - Lifting Capacity of Drilling Fluids - - Slip Velocity

46

Potential Hole-Cleaning Problems

1. Hole is enlarged. This may result in reduced fluid velocity which is lower than the slip velocity.

2. High downhole temperatures may adversely affect mud properties downhole. [ We measured these at the surface.]

Page 47: Petroleum Engineering 405 Drilling Engineering · PPT file · Web view2004-02-10 · PETE 411 Drilling Engineering Lesson 16 - Lifting Capacity of Drilling Fluids - - Slip Velocity

47

Potential Hole-Cleaning Problems

3. Lost circulation problems may preclude using thick mud or high circulating velocity. Thick slugs may be the answer.

4. Slow rate of mud thickening - after it has been sheared (and thinned)

through the bit nozzles, where the shear rate is very high.

Page 48: Petroleum Engineering 405 Drilling Engineering · PPT file · Web view2004-02-10 · PETE 411 Drilling Engineering Lesson 16 - Lifting Capacity of Drilling Fluids - - Slip Velocity

48

The End

Lesson 16 - Lifting Capacity of Drilling Fluids -

- Slip Velocity -