Petroleum Company of Trinidad and Tobago Limited Trinidad and Tobago Energy Conference Hyatt Regency Hotel and Conference Centre, Trinidad 2017 January 23-25 Energy Based, People Powered UPSTREAM OPERATIONS

Upload: others

Post on 20-Oct-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

  • Petroleum Company of Trinidad and Tobago Limited

    Trinidad and Tobago Energy Conference

    Hyatt Regency Hotel and Conference Centre,

    Trinidad

    2017 January 23-25

    Energy Based, People Powered

    UPSTREAM OPERATIONS

  • • Crude oil Production averaged 43,388 BOPD for FY 2016 (Includes JV/LO/FO/IPSC)

    • Land: 84 MMBO (proved reserves 2015)

    • Marine: 46.6 MMBO (proved reserves 2015)

    • 203.9 BSCF (proved gas reserves 2015)

    Production and Reserves

    • 189,004 acres Onshore

    • 810,892 acres Offshore

    Net Acreage (2016 September 30)

    • Onshore and offshore Joint Ventures (JV) – Twenty-three (23)

    • Lease Operatorships (LOs) – Twenty-four (24)

    • Incremental Production Service Contracts (IPSCs) – Seven (7)

    • Farmouts (FOs) – Ten (10)

    Partnerships

    Upstream Operations

    2

  • Upstream

    3

    KEY STATISTICS FY 2015 FY 2016Unaudited

    FY 2017Forecast

    WTI (US$/BBL)

    56.54 41.54 52.08

    Net Income/(Loss)(TT$ Million)

    440.0 (87.2) 266.0

    CAPEX (TT$Million)

    1,246 1,143 460

    Crude Production (Bopd)(Incl LO/FO/IPSC)

    45,960 43,338 43,494

    Gas Production (mmcfd)

    150.7 131.5 105.1

    Government Take (TT$Million)

    1,430 517 891

    3

  • 4

    2016 Update - Own Operations

    Onshore Drilling

    Drilled and completed eighteen (18) wells on Land : Nine(9) primary and nine (9) EOR

    Offshore Drilling

    Five (5) wells drilled and completed in the SoldadoAcreage

    Trinmar OBC 3D Seismic Survey

    In Fiscal 2014, acquired 540 km2 of full fold Ocean BottomSensor/Cable 3D Seismic in Trinmar. Final processing inprogress:

    Phase 1 Depth migration - completed

    Phase 2 Depth migrated seismic data completed and a copyof the volume was submitted to the MEEI as required by ourLicense obligation to do so by December 31st, 2016

    Phase 3 Converted Wave processing continues, expectedcompletion date: End 1st Quarter 2017

    South West Soldado(SWS)

    Continued drilling and reactivation activities, along withrequisite upgrade and installation of facilities andinfrastructure in these fields

    4

  • 5

    2016 Update - Partnerships

    Joint Ventures (JV) Drilled one (1) Appraisal well Ruby 3 in Block

    3(a)

    Lease Operatorship (LO) Blocks

    Eight (8) development wells drilled

    Farmout (FO) Blocks Three (3) development wells drilled

    Incremental Production Service Contracts (IPSC)

    Twenty (20) development wells drilled

    5

    * Wells drilled in FY2016 (LO, FO and IPSC Blocks) as per Minimum WorkObligations

  • 2017 PLANS

    6

  • 7

    2017 Plans - Upstream

    Asset Integrity Robust Asset Integrity Programme in all E&Poperations in conformance with InternationalStandards (incl. Abandonments)

    Drilling Onshore: Drill ten (10) wells (three (3) primary andseven (7) EOR)

    Offshore: No Drilling is proposed for Fiscal 2017

    Workovers

    (ETWs/NRTs/Convs/Abd)

    Onshore: Fifty-six (56)

    Offshore: Sixty-three (63)

    South West SoldadoProject (SWS)

    Key activities include:

    New Pipelines and Infrastructure – In progress

    Workovers (NRTs & Reactivations) – On-going

    Reviewing progress and way forward to complete Phase 1

    The existing Eagle II will be utilized for a further one yearfrom August 2016, during which time, efforts willcontinue on procurement of a suitable Production andCompression Facility

    7

  • 8

    2017 Plans – Upstream (Cont’d)

    Joint Ventures (JV)

    Continue exploration/development MWOactivities and production/maintenanceactivities; commence development drilling inBlock 1(a) during 2H’2017

    Lease Operatorship (LO) Blocks

    Eight (8) development wells to be drilled *

    Farmout (FO) Blocks Five (5) development wells to be drilled *

    Incremental Production Service Contracts (IPSC)

    Ten (10) development wells to be drilled *

    (* Work plans for FY2017 LO, FO and IPSC Blocks are based on the Minimum WorkObligations)

    8

  • Upstream Challenges

    9

    Upstream Challenges

    Declining production

    and reserves Increasing

    operating and capital

    costs

    Aged and non-optimal

    infrastructure, inadequate for

    significant production

    increase

    License Obligations (Exploration Drilling) due in 2017 and

    2018

    Insufficient cash generated

    to fund investment

    requirements due to low

    crude prices

    9

  • Upstream Initiatives

    10

    Upstream Initiatives

    Manage Old Oil Decline

    Build/ Improve

    Capacity & Reduce Costs

    New Oil

    Increase 3rd Party

    Participation in existing asset base

    South West

    Soldado/

    Jubilee

  • 11

    Capital Expenditure Forecast

  • 12

    Crude Oil and Gas Production Forecast

    (BOEPD)

  • Given the current volatile economic environment, we will continueto aim for operational excellence and beyond compliance in HSEand Asset Integrity performance

    Exercise greater discipline in the management of our capitalinvestment and operating costs, with periodic reviews of theseexpenses especially in relation to price volatility

    Implement sustaining strategic initiatives with the desired resultsof maintaining our natural production decline, increasing newproduction and reserves, reducing unit operating and lifting costsand improving asset reliability

    Remain focused on our commitment to our workforce by re-engineering our development strategy to ensure that all ouremployees are proficiently trained, motivated and committed toincreasing productivity and thus securing the sustainability ofPetrotrin.

    Way Forward

    13

  • Presented By:

    Stephen Awah

    Vice President, Exploration & Production

    Energy Based, People Powered

    THANK YOU

    Trinidad and Tobago Energy Conference