Page 1: PETERBOROUGH LANDFILL GAS GENERATION PROJECTAssets/Generation/Documents/Seco… · Proposed Location of the Peterborough Landfill Gas Generation Project. 9 ... • Brittania Road

1

PETERBOROUGH LANDFILL GAS

GENERATION PROJECT

Peterborough Utilities Inc.

Page 2: PETERBOROUGH LANDFILL GAS GENERATION PROJECTAssets/Generation/Documents/Seco… · Proposed Location of the Peterborough Landfill Gas Generation Project. 9 ... • Brittania Road

2

Project Proponent• Peterborough Utilities Inc. (PUI) will be the owner and operator of the proposed

landfill gas generation project.

• PUI has a long history of renewable energy (electricity generation) projects.

• PUI sees electrical generation as a key area of growth and is pursuing projects with a focus on renewable and clean energy resources including solar, hydropower, and landfill gas.

• Since 2000, PUI has managed electrical generation and retail services under the umbrella of the Peterborough Utilities Group of companies.

• PUI currently owns and operates three hydroelectric generating stations (London Street GS, Campbellford-Seymour GS and the recently completed Robert G. Lake GS) and the recently commissioned Lily Lake solar farm.

Page 3: PETERBOROUGH LANDFILL GAS GENERATION PROJECTAssets/Generation/Documents/Seco… · Proposed Location of the Peterborough Landfill Gas Generation Project. 9 ... • Brittania Road

3

Page 4: PETERBOROUGH LANDFILL GAS GENERATION PROJECTAssets/Generation/Documents/Seco… · Proposed Location of the Peterborough Landfill Gas Generation Project. 9 ... • Brittania Road

4

Making Ontario Greener

The Green Energy and Green Economy Act (2009) was created to support these targets and has made it possible to more quickly replace coal-based electricity with renewable sources. Peterborough Utilities Inc. has obtained a contract for the sale of electricity from landfill gas with the Ontario Power Authority (OPA) through the Province’s Feed-in-Tariff (FIT) program (enabled by the Green Energy and Green Economy Act).

Ontario has firm targets to reduce greenhouse gas (GHG) emissions to 6% below 1990 levels by 2014, 15% by 2020 and 80% by 2050. Ontario is the only jurisdiction to regulate a phase-out of coal-fired electricity. This bold action represents one of the largest single GHG reduction measures in North America and will reduce our carbon footprint from electricity generation by 75%.

Page 5: PETERBOROUGH LANDFILL GAS GENERATION PROJECTAssets/Generation/Documents/Seco… · Proposed Location of the Peterborough Landfill Gas Generation Project. 9 ... • Brittania Road

5

PUI has entered into agreements with the Corporations of the County of Peterborough and the City of Peterborough to lease lands within the Peterborough

Landfill site to generate electricity from landfill gas.

The Proposed LFG Project

Where Does It Go?

Currently, at the Peterborough Landfill, only a portion of the LFG is collected and burned

using an on-site flare. This is to reduce odours and contribution to Greenhouse Gas (GHG)

emissions.

(Note: when burned, methane converts to carbon dioxide, which is about 22 times less

effective than methane in causing a greenhouse effect).

What is Landfill Gas?

Landfill gas (LFG) consists primarily of methane (45-60%) and carbon dioxide (40-

60%) and is produced in three ways:

•Bacterial decomposition of organic wastes• Volatilization of liquids/solids to gas

• Various chemical reactions

Page 6: PETERBOROUGH LANDFILL GAS GENERATION PROJECTAssets/Generation/Documents/Seco… · Proposed Location of the Peterborough Landfill Gas Generation Project. 9 ... • Brittania Road

6

The facility will use landfill gas from the South Fill Area to generate 15,000 MWhof electricity annually, which meets the electricity needs of 1,500 homes a year.

The Proposed LFG Project

When will the Project Start?What is the Proposed Plan?As much LFG will be captured as possible and turned into useful energy in the form of electricity. Benefits include:

• Reducing odourous emissions and improving general air quality in the area

• Generating power from an otherwise waste stream

• Displacing approximately 2MW of electricity that may otherwise have come from coal generation thus helping to improve regional air quality.

It is expected that the construction phase would start in early 2012 and continue for a duration of 6-9 months.

Page 7: PETERBOROUGH LANDFILL GAS GENERATION PROJECTAssets/Generation/Documents/Seco… · Proposed Location of the Peterborough Landfill Gas Generation Project. 9 ... • Brittania Road

7

Proposed Location

Proposed Location of the Peterborough Landfill Gas G

eneration Project

Page 8: PETERBOROUGH LANDFILL GAS GENERATION PROJECTAssets/Generation/Documents/Seco… · Proposed Location of the Peterborough Landfill Gas Generation Project. 9 ... • Brittania Road

8

Proposed LocationThe proposed project site is located w

ithin the existing active landfill between the scale

house and the new north fill area, adjacent to the existing LFG

flare. The facility w

ould be situated on only 0.051 hectares of the total 25.7 hectare landfill.

Proposed Location of the Peterborough Landfill Gas G

eneration Project

Page 9: PETERBOROUGH LANDFILL GAS GENERATION PROJECTAssets/Generation/Documents/Seco… · Proposed Location of the Peterborough Landfill Gas Generation Project. 9 ... • Brittania Road

9

View of the Project Site

Page 10: PETERBOROUGH LANDFILL GAS GENERATION PROJECTAssets/Generation/Documents/Seco… · Proposed Location of the Peterborough Landfill Gas Generation Project. 9 ... • Brittania Road

10

1. Landfill gas is extracted from within the Peterborough County/City Landfill and transferred through a series of pipes to the LFG Generation Facility.

2. The collected gas is treated to remove moisture. The condensate is discharged to the existing landfill leachate collection system.

3. The treated gas is fed into two reciprocating engines that are directly coupled to a generator that will produce electricity at 600 V. Total capacity is 2 MW.

4. Additional flare capacity burns excess gas as needed.

5. A transformer steps up the electrical energy from 600 V to 27.6 kV for distribution.

6. A short length of new 27.6 kV line will connect the generating facility to the Hydro One distribution system.

7. The operation of the facility will be monitored 24x7 at the Peterborough Utilities’operations control centre.

Technology and Process

Cooling System

Source: GE Jenbacher GmbH & Co OHG, 2008

Page 11: PETERBOROUGH LANDFILL GAS GENERATION PROJECTAssets/Generation/Documents/Seco… · Proposed Location of the Peterborough Landfill Gas Generation Project. 9 ... • Brittania Road

11

Representative Projects

• Beare Road Landfill, Toronto (1996, 5.7 MW)• Waterloo Landfill (1999, 4.6 MW)• Brittania Road Landfill, Mississauga (5.5 MW)• Aurora Landfill (2005, 1.1 MW)• Trail Road Landfill, Ottawa (2006, 5.3 MW)• Eastview Landfill, Guelph (2006, 2.4 MW)• Halton Region Landfill (2007, 2.1 MW)• Blackwell Road Landfill, Sarnia (2007, 1.6 MW)• Sudbury Landfill (2007, 1.6 MW)• East Landfill, Niagara Falls (2007, 1.0 MW)

Landfill Gas (LFG) generation projects use proven technology and are common in Europe and North America. Projects in Ontario that are similar to the proposed LFG generation project include:

Page 12: PETERBOROUGH LANDFILL GAS GENERATION PROJECTAssets/Generation/Documents/Seco… · Proposed Location of the Peterborough Landfill Gas Generation Project. 9 ... • Brittania Road

12

Representative Projects

2.1 MW Halton Region LFG Project1.6 MW Sudbury LFG Project

2.4 MW Eastview LFG Project

Page 13: PETERBOROUGH LANDFILL GAS GENERATION PROJECTAssets/Generation/Documents/Seco… · Proposed Location of the Peterborough Landfill Gas Generation Project. 9 ... • Brittania Road

13

The REA Approval ProcessOntario’s Green Energy and Green Economy Act (2009) has changed the way renewable energy projects are approved.

Renewable energy projects are now subject to the Renewable Energy Approvals (REA) process - Ontario Regulation 359/09 - under Part V.0.1 of the Environmental Protection Act. This new process coordinates approvals across government ministries to encourage renewable energy while ensuring that the environment, health and natural resources are protected.

REA applications are submitted to the MOE and will be posted on the Environmental Registry (www.ebr.gov.on.ca) for public review and comment.

For more information on REA visit:

http://www.ene.gov.on.ca/en/business/green-energy

http://www.mei.gov.on.ca/en/energy/renewable

Page 14: PETERBOROUGH LANDFILL GAS GENERATION PROJECTAssets/Generation/Documents/Seco… · Proposed Location of the Peterborough Landfill Gas Generation Project. 9 ... • Brittania Road

14

(we

are

here

)

Page 15: PETERBOROUGH LANDFILL GAS GENERATION PROJECTAssets/Generation/Documents/Seco… · Proposed Location of the Peterborough Landfill Gas Generation Project. 9 ... • Brittania Road

15

REA Requirements

Project Description ReportConstruction Plan ReportDesign and Operations ReportDecommissioning Plan ReportConsultation ReportOdour Study ReportNoise Study Report

The complete REA submission package to the MOE for the Peterborough LFG Generation Project includes the following reports:

Draft versions of the reports (excluding the Consultation Report) were made available to the public 60 days prior to the second public information centre on the project website and via hard copies for review at the Township and County offices, Peterborough Library and PUI’s Head Office. Review copies are available on the display table.

Emission Summary and Dispersion Modelling ReportNatural Heritage AssessmentWater AssessmentArchaeological AssessmentCultural Heritage ScreeningLetters of Confirmation from the MNR and MTC

Page 16: PETERBOROUGH LANDFILL GAS GENERATION PROJECTAssets/Generation/Documents/Seco… · Proposed Location of the Peterborough Landfill Gas Generation Project. 9 ... • Brittania Road

16

Page 17: PETERBOROUGH LANDFILL GAS GENERATION PROJECTAssets/Generation/Documents/Seco… · Proposed Location of the Peterborough Landfill Gas Generation Project. 9 ... • Brittania Road

17

Facility DesignFacility Design

and Components

Page 18: PETERBOROUGH LANDFILL GAS GENERATION PROJECTAssets/Generation/Documents/Seco… · Proposed Location of the Peterborough Landfill Gas Generation Project. 9 ... • Brittania Road

18

Facility OperationDaily OperationThe renewable energy facility is designed for unmanned operation. The operating staff will be able to monitor the equipment remotely (start, shutdown, and modulation of load) and will be able to receive event alarms via pager or smart phones.

The LFG facility will operate continuously to consume the maximum generation of LFG at the Peterborough County and City Waste Management Facility. If the production of LFG is greater than the facility can consume (not expected), the flare will burn the excess. When the engines are down for maintenance the flare will assist in burning the excess LFG. The rest will be stored or transferred to the existing flare.

MaintenanceAn operator will visit the site once per day to take readings and complete inspections. A truck will visit the site approximately every 3 months for replacement of used oil with fresh oil. The majority of the maintenance activities are associated with the gensets.

Vegetation control around the site fence will be done at least twice during the growing season.

Inspection of all underground piping, which includes the LFG supply pipe and the condensate drains, will be done annually.

The stormwater drainage system will be inspected for any changes or obstructions during the daily routine inspections.

Stormwater ManagementAn existing Stormwater Management Plan (SWM) for the landfill covers the portion of the landfill that will be occupied by the LFG Generation Facility. A small increase in stormwater runoff can be expected in this area as a result of soil compaction during construction and the addition of some impermeable surfaces (e.g., concrete foundations for the gensets).

Stormwater will drain into the existing ditch that currently transfers stormwater runoff to the stormwater pond located south of the proposed facility. Calculations based on information in the existing SWM plan conclude that even if the entire area occupied by the LFG facility were impervious, the existing stormwater management pond is adequately sized. No additional equipment will be installed.

The concentration of key contaminants in the stormwater is expected to be similar to that currently collected. Once the stormwater enters the existing stormwater management system it will be treated as per the requirements of the Peterborough County and City Waste Management Facility.

Page 19: PETERBOROUGH LANDFILL GAS GENERATION PROJECTAssets/Generation/Documents/Seco… · Proposed Location of the Peterborough Landfill Gas Generation Project. 9 ... • Brittania Road

19

Construction Plans• Site Mobilization, Preparation and Clearing – 2 weeks • Construction of Access Roads – 2 weeks• Construction of Equipment Foundations – 4 weeks• Installation of Landfill Gas and Leachate Lines – 2 weeks• Installation of Equipment (generators, transformer, etc.) – 5 weeks• Construction of Transmission Line – 8 weeks• Interconnection of Wiring and Piping – 5 weeks• Final Site Grading – 2 weeks• Testing/Commissioning of Systems/Equipment – 2 weeks• Waste Management and Site Remediation – 1 week

Construction activities will take approximately 3 - 6 months and will involve the following:

In general, the raw materials for construction include standard building materials: concrete, wood, aggregate, and metal. To theextent possible, these materials will be procured from local and/or regional sources where they are available in sufficient quality and quantity, at competitive prices.

Excavation and fill requirements for the Project are minimal. Any excavated materials that cannot be reused on the construction site will be reused by the landfill operator. The landfill can reuse the material as landfill cover or for the adjustment of existing grades. The landfill operator will designate the location for depositing excess excavated soil and management of this resource will fall under the care of the landfill.

Construction equipment and vehicles, including those that transport materials, will access the sites via existing or constructed roads. It is expected that 10-15 yard dump trucks will transport all materials and equipment to the site. All construction activities that result in noise will be conducted in accordance with the municipality’s noise by–law.

Page 20: PETERBOROUGH LANDFILL GAS GENERATION PROJECTAssets/Generation/Documents/Seco… · Proposed Location of the Peterborough Landfill Gas Generation Project. 9 ... • Brittania Road

20

Noise StudyThe dominant noise sources at the Peterborough Landfill are the generator sets, landfill gas flare system, landfill gas blower and transformer.

A detailed noise impact assessment assumed a worst-case noise emission scenario and modelled noise levels at eight nearby noise receptors.

Results indicate that upon implementation of noise mitigation measures, the predicted receptor sound levels will be less than the minimum performance limit of 40 decibels for a Class 3 Area (defined as a rural area with an acoustical environment that is dominated by natural sounds and having little or no road traffic).

The Peterborough Landfill Gas Generation Facility will be in compliance with the MOE noise requirements at all times

The Project

Page 21: PETERBOROUGH LANDFILL GAS GENERATION PROJECTAssets/Generation/Documents/Seco… · Proposed Location of the Peterborough Landfill Gas Generation Project. 9 ... • Brittania Road

21

Odour StudyOdourous emissions from the landfill are mainly a result of hydrogen sulphide and mercaptans at levels that can be detected by the human nose. They are typically from fugitive emissions.

The proposed facility will capture and thermally treat the landfill gas, including gas that would otherwise have been released as fugitive emissions.

A screening level assessment of odour in a worst-case scenario was conducted for the nearby receptors and indicates levels that are approximately two order of magnitude (i.e. 100 times) less than the odour criterion set by the MOE.

Therefore it is not anticipated that there will be any odour impacts at the receptors associated with the operation of the proposed facility. In fact, the proposed project will significantly reduce fugitive emissions and reduce odour impact from the landfill.

Identified Odour Receptors Relative to Peterborough Landfill

Page 22: PETERBOROUGH LANDFILL GAS GENERATION PROJECTAssets/Generation/Documents/Seco… · Proposed Location of the Peterborough Landfill Gas Generation Project. 9 ... • Brittania Road

22

Emissions StudyThe proposed waste-to-energy project will use landfill gas as its sole fuel source for generating electricity. The gensets and flare system will mainly emit conventional air contaminants associated with fuel combustion. These include:

• NOx – Nitrogen oxides• CO – Carbon monoxide• SO2 – Sulphur dioxide• PM – Particulate Matter• CH4 – Methane• Other minor contaminants

To assess the air quality impacts of the proposed facility, the maximum point of impingement (POI) concentrations for relevant contaminants were determined using MOE-developed dispersion modelling.

A total of 49 contaminants were assessed for maximum predicted off-property concentrations associated with the operation of the proposed project for pollutants over a ½ hour averaging period.

A worst-case operating scenario was used, resulting in the maximum emission rates of relevant contaminants from the two generators and the flare system and maximum landfill gas flow rates.

Results show that predicted concentrations are below their corresponding criteria, limits and guidelines at and beyond the property line of the facility.

Page 23: PETERBOROUGH LANDFILL GAS GENERATION PROJECTAssets/Generation/Documents/Seco… · Proposed Location of the Peterborough Landfill Gas Generation Project. 9 ... • Brittania Road

23

Archaeology and Cultural HeritageO. Reg. 359/09, Sections 19 and 20 require that the proponent determine whether:

• the project location is on or abuts a protected property as designated by the Ontario Heritage Act or whether any protected property may be negatively impacted by the project regardless of distance from the project location

• engaging in the project may have an impact on a heritage resource at a location other than a protected property

If, as a result of an initial screening, there is no possibility of impact on a resource or a protected property, the proponent is not required to conduct a full Cultural Heritage Assessment.

The screening for the proposed landfill gas facility, which involved site visits, aerial photos and consultation with the Township, Ontario Heritage Trust and Ministry of Culture did not reveal the presence of any cultural heritage features or protected properties that could be impacted by the project and a full Cultural Heritage Assessment was not conducted.

In 1999, a Stage 2 Archaeological Assessment was conducted for the Peterborough County Landfill. Based on the mapping provided in this assessment, the landfill gas project would be located within the lands assessed for archaeological and cultural resource potential. The assessment determined:

“A total of 57 artifacts, all representative of the late historic period, was retrieved from a small locus, Operation 1, within the northwest corner of the site. This assemblage is considered to represent an undetermined

scatter or dump subsequently dispersed by ploughing activities. No further cultural material or other evidence of archaeological significance

was identified in this assessment…… No further archaeological investigation of the subject property is required.”

Given that the landfill gas project will be located within the existing landfill, for which a Stage 2 Archaeological Assessment has been conducted, no further studywas deemed necessary. The original assessment and Ministry of Culture confirmation letter have been included in the draft REA package.

Page 24: PETERBOROUGH LANDFILL GAS GENERATION PROJECTAssets/Generation/Documents/Seco… · Proposed Location of the Peterborough Landfill Gas Generation Project. 9 ... • Brittania Road

24

Page 25: PETERBOROUGH LANDFILL GAS GENERATION PROJECTAssets/Generation/Documents/Seco… · Proposed Location of the Peterborough Landfill Gas Generation Project. 9 ... • Brittania Road

25

Natural Heritage Assessment• Natural Features within 120 m of the project location were assessed and evaluated according to the MNR’s Natural Heritage Assessment Guide (2010).

• A 37.7 hectare Significant Woodland associated with the CrystalSprings non-provincially significant wetland complex is located within 120m of the project location (see previous panel).

• There are no other significant features (e.g., ANSIs, valleylands, wetlands, wildlife habitats, provincial parks, conservation reserves, etc.) as defined by Ontario Regulation 359/09, within 120 m of the project location.

• There is no water body (e.g. lake, permanent/ intermittent stream and seepage area), as defined by Ontario Regulation 359/09, located within 120m of the project location.

• The project will not involve direct effects to the Significant Woodland south of the project location. The project will not alter the ecological connectivity within the natural heritage system.

Page 26: PETERBOROUGH LANDFILL GAS GENERATION PROJECTAssets/Generation/Documents/Seco… · Proposed Location of the Peterborough Landfill Gas Generation Project. 9 ... • Brittania Road

26

Potential Negative Effects – Construction PhaseNatural Environment Construction activities have the potential to negatively impact the natural environment. Dust created from soil excavation has limited potential to deposit on the edge vegetation of the woodland. Exposed soils could erode and cause an increase in the suspended sediments that are released to the woodland through overland flow, resulting in dieback of vegetation. The potential release ofcontaminants such as oils, gasoline, grease or other materials could contaminate a headwater area. Surface water could be impacted by the migration of storm water during the construction phase. Mitigation measure to minimize / eliminate such impacts are provided on the next panel.

Air, Odour and DustEmissions associated with construction activities are dust and typical exhaust emissions from construction equipment such as CO, PM, NOx and SO2. No odour is expected from construction activities with the exception of localized diesel fumes from construction equipment.

NoiseDuring the construction phase noise will be generated from construction equipment including excavator, transport trucks and contractor vehicles.

Provincial and Local Infrastructure Local and provincial roads may experience additional wear from heavy construction loads. Connection of the 27kV electrical line with Hydro One’s existing distribution line along Bensfort Road may result in some temporary power outages of short duration to local customers. Periodic traffic disruptions are possible.

No impact is expected to the following: • Cultural heritage and archaeological resources• Land uses and resources• Public health and safety • Areas protected under provincial plans and policies

Page 27: PETERBOROUGH LANDFILL GAS GENERATION PROJECTAssets/Generation/Documents/Seco… · Proposed Location of the Peterborough Landfill Gas Generation Project. 9 ... • Brittania Road

27

Mitigation, Monitoring and SafetyEmergencies and CommunicationPrior to construction, PUI will establish a detailed Emergency Response Plan (ERP) for the Landfill Gas Generation Facility that is consistent with the Emergency Response Plan of the County and Municipal Emergency Plan of the Township. The ERP will then be submitted for review and comment to the Township of Otonabee-South Monaghan, the County of Peterborough and the Otonabee Region Conservation Authority. A final version of the plan will be prepared and posted on the project website (www.pui.ca).

An Emergency Communications Plan will be included in the Emergency Response Plan. It will contain a description of the chain of communications between PUI and relevant responders under emergency scenarios applicable to the project.

Environmental Mitigation & Monitoring PlansMitigation measures during construction activities will include silt fencing to control the flow of suspended solids, the collection of stormwater through existing drainage ditches and the stormwater pond, minimizing the area and duration of soil exposure, wetting exposed soils and access roads to control dust and restricting construction activities tospecified locations.

Based on the separation distance between natural features and the Peterborough LFG Generation Facility, no direct or long-term adverse environmental effects are anticipated during the operation phase. Secondary containment will be built to reduce potential negative environmental effects from any possible contaminant leaks. As such, ongoing mitigation measures or a post-construction environmental effects monitoring plan will not be required.

The Emergency Response and Communication Planprepared for the Peterborough LFG Generation Facility will include provisions for mitigating the potential negative effects associated with the potential release of contaminants to the environment through the implementation of an Emergency Spill Response Plan.

Construction Noise and Dust

The hours of construction will conform to the City of Peterborough Noise By-Law and will occur during daytime hours.

Dust suppression methods will be used such as on-site watering, sweeping of paved areas, limiting travel speeds on nearby roads,etc.

Page 28: PETERBOROUGH LANDFILL GAS GENERATION PROJECTAssets/Generation/Documents/Seco… · Proposed Location of the Peterborough Landfill Gas Generation Project. 9 ... • Brittania Road

28

Next StepsWe will respond to your comments, questions and concerns and these will be incorporated into the Consultation Report, which will be finalized.

All draft REA reports presented here today will be finalized. No significant changes will be made to the documents.

A complete REA submission will be made to the MOE (expected date: July 2011).

The MOE will review the submission for completeness and once accepted, will begin the 6-month approvals review period by posting all documents on the Environmental Registry: www.ebr.gov.on.ca.

PUI will publish a newspaper notice within 10 days of the EBR posting to notify the public of the MOE’s review of the application. You can download all final reports from the EBR.

Final MOE approval and a Notice to Proceed from the OPA is expected by March 2012.

Page 29: PETERBOROUGH LANDFILL GAS GENERATION PROJECTAssets/Generation/Documents/Seco… · Proposed Location of the Peterborough Landfill Gas Generation Project. 9 ... • Brittania Road

29

Thank You for Attending this Information Centre

Before you leave:Please help yourself to handouts on the information tableSign the attendance sheetAsk any questions you may have about this project (just look for someone with a nametag).

We would like to hear from you!Comment sheets are available at the sign in table. Please fill in your thoughts, ideas, concerns and questions about this project and information night.

If you would like to be included in our mailing list please leave us with the necessary information on the comment sheet and/or sign-in sheet.

Please provide all comments by June 25th.

Kevin McKeownProject Manager, Generation

Peterborough Utilities Inc.

1867 Ashburnham Drive Peterborough, ON, K9J 6Z5

Phone: (705) 748-9301 ext 1309 Email: [email protected]

Amir IravaniREA Project Manager

Dillon Consulting Ltd.

235 Yorkland Blvd, Suite 800 Toronto, ON, M2J 4Y8

Phone: (416) 229-4647 ext. 2320Email: [email protected]

Contact Information