peter ironmonger & hemant padale - austrade - exporting australian heavy haul rail expertise:...
DESCRIPTION
Peter Ironmonger & Hemant Padale delivered the presentation at the 2014 Heavy Haul Rail Conference. The 2014 Heavy Haul Rail Conference had a focus on driving efficiency with smarter technology. Australasia’s only heavy haul rail event is the annual meeting place for professionals interested in the latest projects, technologies and innovation in this dynamic sector. For more information about the event, please visit: http://bit.ly/hhroz14TRANSCRIPT
International Opportunities for
Australia’s Heavy Haul Sector and
Austrade Assistance Peter Ironmonger – rail sector lead & Trade Manager,
Infrastructure
Heavy Haul Conference Newcastle 2014
Australia Unlimited
Agenda
• Global HH Opportunities and Growth Areas
• How to Assess and Pursue the Opportunities
• Austrade’s role and assistance
• India freight rail snapshot
Australia Unlimited
Is there an Australian “brand” in HH rail?
• Feasibility and design, simulation modelling, systems integration
• EPCM
• Operations and asset management, remote condition monitoring, automation
• Training & Education
• Environmental sustainability, safety
• Regulation
• Innovation, R&D, niche equipment and technologies
• Flexible solutions for making things work reliably, efficiently in extreme conditions, high temperatures, remote locations, with longest and heaviest trains
Australia Unlimited
Opportunities and areas of growth – matched
with Australian capability
• GCC – UAE, Saudi Arabia, Oman
- harsh, remote conditions, greenfields, Aussie expats, capacity bldg
• South Asia – India and Pakistan
- little or no HH experience and expertise, positive re Aust
• SE Asia – incl. Indonesia, Thailand
- proximity to Australia, road freight congestion, capacity constraints
• Latin America – Brazil, Chile
- seeking operational and cost efficiencies, need for flexible
regulation model, resources focus
• Africa
- need for infrastructure, harsh conditions, resources focus
But Australian strategy, capacity and appetite to
compete is the key...
Australia Unlimited
- $15-25 billion
- Linking 6 GCC
members West to
East: Kuwait,
Bahrain, Qatar,
KSA, UAE, and
Oman via 2,177km
of railway
Australia Unlimited
GCC rail opportunities
Picture provided by Saudi Railway Company
Australia Unlimited
Assessing and Pursuing global rail opportunities
• Research and understand your global competitors and recognise what global markets truly value
• Utilise and cross-check diverse sources of intelligence and avoid taking anything on face value
• Partner where possible – understand where you fit in the global value chain and don’t try to go it alone – maybe start here in Aust
• Develop a strategy and deliver a tailored “pitch” re your competitive offering
• Be focused, persistent and be proactive
• Join missions and other initiatives to benefit from “Australia Inc”
• Allocate sufficient people and budget to global marketing and business development
• Seek help from others with relevant capabilities – consultants, ARA, ICN, State Govts, other more experienced companies, Austrade
Australia Unlimited
How Austrade can assist Australia’s rail sector • By knowing your (and the industry’s) capabilities and interests
are
• Global network, diplomatic status, to connect you with projects, decision-makers, partners – not only in rail, but infrastructure, resources, manufacturing, research, education and training, energy efficiency
• Through our relationships – e.g. in Japan, Korea, Turkey, Europe – for third-market projects
• Promoting and profiling Australia’s HH rail in partnership with other parts of govt, industry – e.g. HH capability brochure
• Information on opportunities, market dynamics and practices – rail market profiles – GCC, Brazil, India, Thailand, Turkey, etc
• Export Market Development Grants http://www.austrade.gov.au/Export/Export-Grants
• Introduction to Efic – SME and structured financial assistance - www.efic.gov.au
• Many other things – just ask and we will either assist or refer you to others who can
Australia Unlimited
Austrade’s global network
Peter Ironmonger, rail sector lead,
Trade Manager - Infrastructure
Phone: 02 9392 2784
Mobile: 0434 650 404
Email: [email protected]
For further information
India Freight Rail & Heavy Haul
Sector – Focus on DFC
Hemant Padale - Business Development Manager
Australian Trade Commission, India
Heavy Haul Conference 2014, Newcastle
Australia Unlimited
Indian Rail Market-
Abundant Challenges & Opportunities
Australia Unlimited
Overview on Indian Railways
• Owned and operated by Government
– Budget CAPEX for FY 2014-15 is $10 billion
– Annual procurement $ 5 billion (Import- $ 500 million)
• Fourth largest network & Second largest freight carrier
• 64,000 kms, 19,000 trains, 25 million passengers/day,
2.65 million tonnes freight/day
• Owns and Operates various manufacturing facilities
Australia Unlimited
Indian Rail Sector
• Dedicated Freight Corridor (DFC) Projects
• Urban Metrorail Projects
• Indian Rail Expansion & Modernisation Programs
• High Speed Rail Programs
Australia Unlimited
The Current Freight Scenario…
$14 Billion
Freight
Revenue
$43/tonne
$5 Billion
Passenger
Revenue
Australia Unlimited
Dedicated Freight Corridor (DFC) Project
• DFCCIL* – an SPV
• Length: 3,300 Km
• Cost: $16.7 billion
• Complete: FY 2018-19
• Funding Arrangement:
Government, JICA*,
World Bank and under
PPP
DFCCIL- Dedicated Freight Corridor Corporation of India Limited
JICA- Japanese International Co-operation Agency
Australia Unlimited
Dimensions for DFC Feature Existing On DFC
Moving Dimension
s
Height
7.1 m for Western DFC 5.1 m for Eastern DFC
Width
Container Stack
Single Stack
Double Stack
Train length
Train Load
Australia Unlimited
Design features of DFC Heavier Axle Loads
Axle Load 22.9t/25t
32.5t/25t for Track Superstructure
Track Loading Density
Maximum Speed
Single Stack
Double Stack
Grade Up to 1 in 100 1 in 200
Curvature Up to 10 degree Up to 2.4 degree
Traction Electrical(25 KV) Electrical(2x25 KV)
Station Spacing 7-10 Km 40 Km
Signalling Absolute/Automatic with 1 Km spacing
Automatic with 2 Km spacing
Communication Emergency
Sockets/Mobile Train Radio Mobile Train Radio
Existing On DFC
Australia Unlimited
DFC Project- Contracting Strategy
• FIDIC yellow book customized for Design – Build railway infrastructure works
• Slice and Package system – Enhanced competition
• PQ followed by one/two stage bidding – Pre-Qualification followed by two stage bidding – Eastern
Corridor
– Pre-Qualification followed by single stage bidding – Western Corridor
– Engagement of consultant through Quality-Cum-Cost-Based- System (QCBS)
• New Technology encouraged
Australia Unlimited
Future Plan for Dedicated Freight Corridors
Australia Unlimited
Impact on Bulk Commodity Transport
Pre DFC Post DFC
Australia Unlimited
What’s in it for Australia ?
Australia Unlimited
Global Collaboration with Indian Railways
• Recognition of Australian expertise in Heavy Haul
• Broader engagement strategy with Indian Railways
(Heavy Haul Rail)
• Current MOU with countries;
– Japan, China, Germany, France, Spain, Belgium, Austria, Czech
Republic
– Common areas of collaboration
o Development and Modernisation of assets
o High speed rail and improving speed on existing network
o Operation and Maintenance
o Safety and Station redevelopment
o Freight Rail
Australia Unlimited
Engagement Opportunities for Australia
• Collaborative Research with Indian Railways research
arm and Universities (Centre of Railway Research)
• Sharing of expertise on Rail Technologies
• Sharing expertise in Financing models and PPP
methodologies
• Engaging in common interest markets (Australia, Africa,
Middle East)
• Engaging with first & last mile connectivity project (private
port operator, private miners)
Australia Unlimited
Specific Opportunities for Australian Rail
Industry
• Consultancy Services – Project Management
– Quality/Safety Audit
– Freight Pricing; Marketing
– Capacity building; Earthworks; Energy efficiency
• Construction & Systems – Consultancy and design services
• Equipment and Technology – Technologies for condition monitoring
– Technologies for higher axle load and speed
• Education Services & Skills training – Development of Heavy Haul Research Institute & Rail University
– Training in areas of Heavy Haul operations
Australia Unlimited
Challenges and Mitigation Strategies
• Managing Business Risk
• Contracting Process
• Relationship Management
• Lack of Information
Partnership & Research
• Uncertainty
• Longer Gestation
• Human Resources
Long Term Approach
Within Control Limited Control
Australia Unlimited
Austrade Support in India
• Dedicated Rail & Transport Initiative team
• Profiling of Australian Rail capability
• Strong engagement with Ministry of Railways, DFCCIL, &
Other key players
• Opportunity identification
• Market Insights
• Partner search
• Market visit program
Australia Unlimited
Austrade Contact Points for India
Grayson Perry
Trade Commissioner
Email:[email protected]
Ankur Bhatia
Business Development Manager
(Infrastructure)
Email:[email protected]
Hemant Padale
Business Development Manager
(Infrastructure)
Email:[email protected]
Peter Ironmonger- [email protected]
Australia Unlimited
Australia Unlimited
Back Slides
Australia Unlimited
Key Challenges & Mitigation – Indian Market
• Managing of Risk
• Bureaucracy & Project delays
• Tendering Process
• Lack of Transparency
• Financial constraints
• Relationship management
• Need of an agent /partner
• Lack of skilled manpower
Australia Unlimited
Strategies to tackle the challenges
• Partnership
• Research
• Patience & long term approach
• Relationships