PETE 411 Well Drilling. Lesson 25 Well Control, cont’d. Well Control, cont’d. Shut-in Procedures after Taking a Kick Kick Occurs While Drilling Kick Occurs While Tripping Casing Pressures During Well Control Operations Kick on Bottom Kick at surface - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: PETE 411 Well Drilling](https://reader033.vdocuments.us/reader033/viewer/2022061610/56815966550346895dc6a2fe/html5/thumbnails/1.jpg)
1
PETE 411Well Drilling
Lesson 25
Well Control, cont’d
![Page 2: PETE 411 Well Drilling](https://reader033.vdocuments.us/reader033/viewer/2022061610/56815966550346895dc6a2fe/html5/thumbnails/2.jpg)
2
Well Control, cont’d
Shut-in Procedures after Taking a Kick Kick Occurs While Drilling Kick Occurs While Tripping
Casing Pressures During Well Control Operations
Kick on Bottom Kick at surface
Kick Migration During Shut-in Conditions Kicks on Trips/ Wellbore Fillup
![Page 3: PETE 411 Well Drilling](https://reader033.vdocuments.us/reader033/viewer/2022061610/56815966550346895dc6a2fe/html5/thumbnails/3.jpg)
3
Read:
Applied Drilling Engineering, Ch.4
HW #14Well Control – Driller’s
due November 11, 2002
![Page 4: PETE 411 Well Drilling](https://reader033.vdocuments.us/reader033/viewer/2022061610/56815966550346895dc6a2fe/html5/thumbnails/4.jpg)
4
Controlling A Kick when On Bottom
Procedure:
1. Raise the kelly to clear the tool jointabove the rotary
2. Shut down the pump
3. Check for well flow
![Page 5: PETE 411 Well Drilling](https://reader033.vdocuments.us/reader033/viewer/2022061610/56815966550346895dc6a2fe/html5/thumbnails/5.jpg)
5
Controlling A Kick when On Bottom
4. If well is flowing, immediately close the blowout preventer and shut in the well completely, (except on shallow gas kicks).
5. Notify supervisory personnel.
6. Read and record the stabilized shut-in drill-pipe pressure. (SIDPP)
![Page 6: PETE 411 Well Drilling](https://reader033.vdocuments.us/reader033/viewer/2022061610/56815966550346895dc6a2fe/html5/thumbnails/6.jpg)
6
Controlling A Kick When On Bottom
7. Read and record the stabilized shut-in casing pressure (SICP)
8. Read and record the pit gain (pit-level increase = kick size)
9. Record the time
10. Record depth
11. Record mud weight
![Page 7: PETE 411 Well Drilling](https://reader033.vdocuments.us/reader033/viewer/2022061610/56815966550346895dc6a2fe/html5/thumbnails/7.jpg)
7
Controlling A Well Kick While Making A Trip
1. Stop trip operations. Set slips with tool joint at rotary.
2. Install inside blowout preventer and release valve stem or close the valve if drill-stem valve is employed.
![Page 8: PETE 411 Well Drilling](https://reader033.vdocuments.us/reader033/viewer/2022061610/56815966550346895dc6a2fe/html5/thumbnails/8.jpg)
8
Controlling A Well Kick While Making A Trip
3. Immediately close the blowout preventer and shut in the well completely (except on shallow gas kicks).
4. Install kelly, open drill-pipe valve, or pump through back-pressure valve.
![Page 9: PETE 411 Well Drilling](https://reader033.vdocuments.us/reader033/viewer/2022061610/56815966550346895dc6a2fe/html5/thumbnails/9.jpg)
9
Controlling a Well Kick While Making A Trip
5. Notify supervisory personnel
6. Read and record the stabilized shut-in drill-pipe pressure or equivalent (SIDPP)
7. Read and record the stabilized shut-in casing pressure (SICP)
![Page 10: PETE 411 Well Drilling](https://reader033.vdocuments.us/reader033/viewer/2022061610/56815966550346895dc6a2fe/html5/thumbnails/10.jpg)
10
Controlling A Well Kick While Making A Trip
8. Read and record the pit gain (Kick Size)
9. Record the time
10. Record the current well depth
11. Record the current mud weight
![Page 11: PETE 411 Well Drilling](https://reader033.vdocuments.us/reader033/viewer/2022061610/56815966550346895dc6a2fe/html5/thumbnails/11.jpg)
11
Variable Geometry
Kick On Bottom
- Well Shut In
4,000’
9,500’
10,000’
400 psi 200 psi
PB = 5,700 psi
hB = 445’
![Page 12: PETE 411 Well Drilling](https://reader033.vdocuments.us/reader033/viewer/2022061610/56815966550346895dc6a2fe/html5/thumbnails/12.jpg)
12
1. Calculate new BHP:
2. Calculate height of kick (check geometry).
3. Calculate density of kill mud:
SIDPP)depth**052.0(P oldB
depth*052.0
PBkill
depth*052.0
SIDPP
Variable Geometry
![Page 13: PETE 411 Well Drilling](https://reader033.vdocuments.us/reader033/viewer/2022061610/56815966550346895dc6a2fe/html5/thumbnails/13.jpg)
13
4. Calculate the density of kick fluid:
How would you derive this equation?
Variable Geometry
BMUDOLDKICK HeightKick*052.0
SIDPPSICP
BMUDOLDKICK HeightKick*052.0
SIDPPSICP
![Page 14: PETE 411 Well Drilling](https://reader033.vdocuments.us/reader033/viewer/2022061610/56815966550346895dc6a2fe/html5/thumbnails/14.jpg)
14
Engineer’s Method -
Gas Kick at surface
SIDPP)depth**052.0(P oldB PB = const = 0.052 * kill * depth
Gas Bubble
10.0 lb/gal
10.38 lb/gal
ho
D*
![Page 15: PETE 411 Well Drilling](https://reader033.vdocuments.us/reader033/viewer/2022061610/56815966550346895dc6a2fe/html5/thumbnails/15.jpg)
15
1. Calculate expansion
of gas bubble
B
x
B
x
x
BBx Z
Z
T
T
P
PVV
kill,mold,mKICKx PPPPBHP
Annulus PHYD, kick of at top PressBHP .2
2. BHP = Press at top of kick + P HYD,Annulus
3. Solve the resulting quadratic equation to get the pressure
![Page 16: PETE 411 Well Drilling](https://reader033.vdocuments.us/reader033/viewer/2022061610/56815966550346895dc6a2fe/html5/thumbnails/16.jpg)
16BHP = PTOP + gi * hi gi = 0.052 * i
![Page 17: PETE 411 Well Drilling](https://reader033.vdocuments.us/reader033/viewer/2022061610/56815966550346895dc6a2fe/html5/thumbnails/17.jpg)
17
Bubble Rise
Velocity?
GasBubble
Will Rise
!
Well is Shut In
![Page 18: PETE 411 Well Drilling](https://reader033.vdocuments.us/reader033/viewer/2022061610/56815966550346895dc6a2fe/html5/thumbnails/18.jpg)
18
20 bbl kick
50 bbl kick
10 bbl kick
1,998 psi
1,266 psi
989 psi
CA
SIN
G P
RE
SS
UR
E,
psi
BARRELS OF KILL MUD PUMPED
![Page 19: PETE 411 Well Drilling](https://reader033.vdocuments.us/reader033/viewer/2022061610/56815966550346895dc6a2fe/html5/thumbnails/19.jpg)
19
Well Control
Avoid kicks if possible
Catch them early if they do occur
Know how to control kicks if they do occur
![Page 20: PETE 411 Well Drilling](https://reader033.vdocuments.us/reader033/viewer/2022061610/56815966550346895dc6a2fe/html5/thumbnails/20.jpg)
20
Avoiding Kicks While Tripping:
Keep the hole full.
Avoid excessive surge pressures.
Avoid excessive swab pressures
![Page 21: PETE 411 Well Drilling](https://reader033.vdocuments.us/reader033/viewer/2022061610/56815966550346895dc6a2fe/html5/thumbnails/21.jpg)
21
Tripping Out of Hole
A good drilling engineer will always stay on the rig floor during the first 20 stands of a trip.
1. Make sure pipe is not pulled too fast.
2. Make sure annulus is kept full.
e.g. fill every 5 stands, and measure volume required to fill hole.
![Page 22: PETE 411 Well Drilling](https://reader033.vdocuments.us/reader033/viewer/2022061610/56815966550346895dc6a2fe/html5/thumbnails/22.jpg)
22
Tripping Out Of Hole
If well is not taking enough fluid to replace volume of steel pulled from hole, fluid may have been swabbed into well.
Measure fluid volume to fill hole:
1. By counting pump strokes, or
2. By direct measurement from trip tank.
Note: The second method is best.
![Page 23: PETE 411 Well Drilling](https://reader033.vdocuments.us/reader033/viewer/2022061610/56815966550346895dc6a2fe/html5/thumbnails/23.jpg)
23
Annular Fill-Up On Trips
Example 1
How much fill-up is required after pulling 5 stands of 5” OD, 19.5 #/ft drillpipe with extrahole tool joints?
[ Each stand is 93 ft long ].
![Page 24: PETE 411 Well Drilling](https://reader033.vdocuments.us/reader033/viewer/2022061610/56815966550346895dc6a2fe/html5/thumbnails/24.jpg)
24
Annular Fill-Up On Trips
(i) Mud drains out through nozzles ………bbls
(steel only)
(ii) Nozzles are plugged ……… bbls (steel + mud)
![Page 25: PETE 411 Well Drilling](https://reader033.vdocuments.us/reader033/viewer/2022061610/56815966550346895dc6a2fe/html5/thumbnails/25.jpg)
25
![Page 26: PETE 411 Well Drilling](https://reader033.vdocuments.us/reader033/viewer/2022061610/56815966550346895dc6a2fe/html5/thumbnails/26.jpg)
26
Example
(i) Vol. of steel only: (nozzles not plugged)
From Table 1.6, actual weight in air is 20.60 lb/ft.
lbs 9,579
stds. 5*.std
ft93*
ft
lb20.60stds 5 of wt.
![Page 27: PETE 411 Well Drilling](https://reader033.vdocuments.us/reader033/viewer/2022061610/56815966550346895dc6a2fe/html5/thumbnails/27.jpg)
27
Example
mud of bbls 3.48required up-Fill
bbls 3.48
gal 146.36
lbs/gal 45.65
lbs 579,9
density
wt.steel of Volume
![Page 28: PETE 411 Well Drilling](https://reader033.vdocuments.us/reader033/viewer/2022061610/56815966550346895dc6a2fe/html5/thumbnails/28.jpg)
28
Example
Check: From Table 1.6,
)enough! (close
bbls 3.51
bbls stds 5 ft 90
ft 93 68.0ntDisplaceme
![Page 29: PETE 411 Well Drilling](https://reader033.vdocuments.us/reader033/viewer/2022061610/56815966550346895dc6a2fe/html5/thumbnails/29.jpg)
29
Example
(ii) Nozzles are plugged:
From Halliburton book, internal capacity of 19.50 #/ft, 5” O.D. drillpipe is 0.01776 bbl/ft.
bbls 26.8
stds 5*std
ft93
ft
bbl0.01776capacity Total
![Page 30: PETE 411 Well Drilling](https://reader033.vdocuments.us/reader033/viewer/2022061610/56815966550346895dc6a2fe/html5/thumbnails/30.jpg)
30
Example
Volume of fill-up req’d = 3.48 + 8.26
= 11.74 bbls
How much did the fluid level drop?
How much did the BHP drop?
![Page 31: PETE 411 Well Drilling](https://reader033.vdocuments.us/reader033/viewer/2022061610/56815966550346895dc6a2fe/html5/thumbnails/31.jpg)
31
Recommendations
Fill hole after each 5 stands of drill pipe when coming out of hole.
Fill hole after each stand of drill collars when coming out of hole.
When GIH after an extended period of time, break circulation gradually, at several different depths...
![Page 32: PETE 411 Well Drilling](https://reader033.vdocuments.us/reader033/viewer/2022061610/56815966550346895dc6a2fe/html5/thumbnails/32.jpg)
32
Recommendations
Do not break circulation with bit and BHA just above the casing seat.
When breaking circulation, Start the pumps slowly, Rotate the drill string, Pick up on the drillstring at the same time
This will reduce the initial pressure required to get the mud moving
![Page 33: PETE 411 Well Drilling](https://reader033.vdocuments.us/reader033/viewer/2022061610/56815966550346895dc6a2fe/html5/thumbnails/33.jpg)
33
MultiMedia Training Programs
To View these Programs on any Departmental Networked Computer:
1. Go to Network Neighbourhood
2. Select the computer marked “Juvkam-wold2”
3. The folder “Multimedia” contains TWELVE Multimedia Programs
Let me know if there are problems.