pete 411 well drilling

44
1 PETE 411 Well Drilling Lesson 35 Wellbore Surveying Methods

Upload: neylan

Post on 06-Jan-2016

78 views

Category:

Documents


4 download

DESCRIPTION

PETE 411 Well Drilling. Lesson 35 Wellbore Surveying Methods. Wellbore Surveying Methods. Average Angle Balanced Tangential Minimum Curvature Radius of Curvature Tangential Other Topics Kicking off from Vertical Controlling Hole Angle. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: PETE 411 Well Drilling

1

PETE 411

Well Drilling

Lesson 35

Wellbore Surveying Methods

Page 2: PETE 411 Well Drilling

2

Wellbore Surveying Methods

Average Angle Balanced Tangential Minimum Curvature Radius of Curvature Tangential

Other Topics Kicking off from Vertical Controlling Hole Angle

Page 3: PETE 411 Well Drilling

3

Read:

Applied Drilling Engineering, Ch.8 (~ first 20 pages)

Projects:

Due Monday, December 9, 5 p.m.

( See comments on previous years’ design projects )

Page 4: PETE 411 Well Drilling

4

Homework Problem #18

Balanced Cement Plug

Due Friday, December 6

Page 5: PETE 411 Well Drilling

5

I, A, MD

Page 6: PETE 411 Well Drilling

6

Example - Wellbore Survey Calculations

The table below gives data from a directional survey.

Survey Point Measured Depth Inclination Azimuth along the wellbore Angle Angle

ft I, deg A, deg

A 3,000 0 20 B 3,200 6 6 C 3,600 14 20 D 4,000 24 80

Based on known coordinates for point C we’ll calculate the coordinates of point D using the above information.

Page 7: PETE 411 Well Drilling

7

Example - Wellbore Survey Calculations

Point C has coordinates:

x = 1,000 (ft) positive towards the east

y = 1,000 (ft) positive towards the north

z = 3,500 (ft) TVD, positive downwards

z

E (x)

N (y)C

Dz

N

D

C

yx

Page 8: PETE 411 Well Drilling

8

Example - Wellbore Survey Calculations

I. Calculate the x, y, and z coordinates of points D using:

(i) The Average Angle method

(ii) The Balanced Tangential method

(iii) The Minimum Curvature method

(iv) The Radius of Curvature method

(v) The Tangential method

Page 9: PETE 411 Well Drilling

9

The Average Angle Method

Find the coordinates of point D using

the Average Angle Method

At point C, x = 1,000 ft

y = 1,000 ft

z = 3,500 ft

80 A 24I

20 A 14I

DD

CC

ft 400MD D, to C from depth Measured

Page 10: PETE 411 Well Drilling

10

The Average Angle Method

80 A 24I

20 A 14I

ft 400MD D, to C from depth Measured

DD

CC

z

E (x)

N (y)

C

D

zN

D

C

yx

Page 11: PETE 411 Well Drilling

11

The Average Angle Method

Page 12: PETE 411 Well Drilling

12

The Average Angle Method

This method utilizes the average of I1 and I2 as an inclination, the average of A1 and A2 as a direction, and assumes the entire survey interval (MD) to be tangent to the average angle.

From: API Bulletin D20. Dec. 31, 1985

2

III 21AVG

AVGAVG AsinIsinMDEast

AVGIcosMDVert

2

AAA 21

AVG

AVGAVG AcosIsinMDNorth

Page 13: PETE 411 Well Drilling

13

192

2414

2

III DCAVG

The Average Angle Method

502

8020

2

AAA DC

AVG

AVEAVG AsinIsinMDEast

50sinsin19400x

ft76.99x

Page 14: PETE 411 Well Drilling

14

The Average Angle Method

AVGIcos400Vert cos19400z

AVGAVG AcosIsinMDNorth

ft 71.83y

50cossin19400y

ft21.378z

Page 15: PETE 411 Well Drilling

15

The Average Angle Method

At Point D,

x = 1,000 + 99.76 = 1,099.76 ft

y = 1,000 + 83.71 = 1,083.71 ft

z = 3,500 + 378.21 = 3,878.21 ft

Page 16: PETE 411 Well Drilling

16

The Balanced Tangential Method

This method treats half the measured distance (MD/2) as being tangent to I1 and A1 and the remainder of the measured distance (MD/2) as being tangent to I2 and A2.

From: API Bulletin D20. Dec. 31, 1985

2211 AsinIsinAsinIsin2

MDEast

2211 AcosIsinAcosIsin2

MDNorth

12 IcosIcos2

MDVert

Page 17: PETE 411 Well Drilling

17

The Balanced Tangential Method

DDCC AsinIsinAsinIsin2

MDEast

oooo 80sin24sin20sin14sin2

400

ft66.96x

Page 18: PETE 411 Well Drilling

18

The Balanced Tangential Method

DDCC AcosIsinAcosIsin2

MDNorth

oooo 80cos24sin20cos14sin2

400

ft59.59y

Page 19: PETE 411 Well Drilling

19

The Balanced Tangential Method

CD IcosIcos2

MDVert

oo 14cos24cos2

400

ft77.376z

Page 20: PETE 411 Well Drilling

20

The Balanced Tangential Method

At Point D,

x = 1,000 + 96.66 = 1,096.66 ft

y = 1,000 + 59.59 = 1,059.59 ft

z = 3,500 + 376.77 = 3,876.77 ft

Page 21: PETE 411 Well Drilling

21

Minimum Curvature Method

Page 22: PETE 411 Well Drilling

22

Minimum Curvature Method

This method smooths the two straight-line segments of the Balanced Tangential Method using the Ratio Factor RF.

(DL= and must be in radians)2tan

2RF

RFAcosIsinAcosIsin2

MDNorth 2211

RFAsinIsinAsinIsin2

MDEast 2211

RFIcosIcos2

MDVert 21

Page 23: PETE 411 Well Drilling

23

Minimum Curvature Method

)AAcos(1IsinIsinIIcoscos CDDCCD

)2080cos(124sin14sin1424cos o00ooo

cos = 0.9356

= 20.67o = 0.3608 radians

The Dogleg Angle, , is given by:

Page 24: PETE 411 Well Drilling

24

Minimum Curvature Method

The Ratio Factor,

2tan

2RF

2

67.20tan

3608.0

2RF

o

0110.1RF

Page 25: PETE 411 Well Drilling

25

Minimum Curvature Method

RFAsinIsinAsinIsin2

MDEast DDCC

0110.180sin24sin20sin14sin2

400 oooo

ft72.97x

ft72.97011.1*66.96

Page 26: PETE 411 Well Drilling

26

Minimum Curvature Method

RFAcosIsinAcosIsin2

MDNorth DDCC

ft25.60y

ft25.60011.1*59.59

0110.180cos24sin20cos14sin2

400 oooo

Page 27: PETE 411 Well Drilling

27

Minimum Curvature Method

RFIcosIcos2

MDVert CD

0110.114cos24cos2

400 oo

ft91.380z

ft91.3800110.1*77.376

Page 28: PETE 411 Well Drilling

28

Minimum Curvature Method

At Point D,

x = 1,000 + 97.72 = 1,097.72 ft

y = 1,000 + 60.25 = 1,060.25 ft

z = 3,500 + 380.91 = 3,880.91 ft

Page 29: PETE 411 Well Drilling

29

The Radius of Curvature Method

2

CDCD

DCDC 180

AAII

AcosAcosIcosIcosMDEast

2oooo 180

20801424

80cos20cos24cos14cos400

ft 14.59 x

Page 30: PETE 411 Well Drilling

30

The Radius of Curvature Method

2

CDCD

CDDC 180

)AA()II(

)AsinA(sin)IcosI(cosMDNorth

2180

)2080)(1424(

)20sin80)(sin24cos400(cos14

ft 79.83 y

Page 31: PETE 411 Well Drilling

31

The Radius of Curvature Method

180

II

)IsinI(sinMDVert

CD

CD

ft 73.773 z

180

1424

)14sin24(sin400 oo

Page 32: PETE 411 Well Drilling

32

The Radius of Curvature Method

At Point D,

x = 1,000 + 95.14 = 1,095.14 ft

y = 1,000 + 79.83 = 1,079.83 ft

z = 3,500 + 377.73 = 3,877.73 ft

Page 33: PETE 411 Well Drilling

33

The Tangential Method

ft 400MD D, to C from depth Measured

80 A 24I

20 A 14I

DD

CC

80sinsin24400

DD AsinIsinMDEast

ft 22.160x

Page 34: PETE 411 Well Drilling

34

The Tangential Method

DIcosMDVert 24cos400

ft 42.365z

DD AcosIsinMDNorth

ft 25.28y

oo 80cos24sin400

Page 35: PETE 411 Well Drilling

35

The Tangential Method

ft 3,865.42365.423,500z

ft 1,028.2528.251,000 y

ft 1,160.22160.221,000x

D,Point At

Page 36: PETE 411 Well Drilling

36

Summary of Results (to the nearest ft)

x y z

Average Angle 1,100 1,084 3,878

Balanced Tangential 1,097 1,060 3,877

Minimum Curvature 1,098 1,060 3,881

Radius of Curvature 1,095 1,080 3,878

Tangential Method 1,160 1,028 3,865

Page 37: PETE 411 Well Drilling

37

Page 38: PETE 411 Well Drilling

38

Page 39: PETE 411 Well Drilling

39

Building Hole Angle

Page 40: PETE 411 Well Drilling

40

Holding Hole Angle

Page 41: PETE 411 Well Drilling

41

Page 42: PETE 411 Well Drilling

42

CLOSURE

LEAD ANGLE

(HORIZONTAL) DEPARTURE

Page 43: PETE 411 Well Drilling

43

Page 44: PETE 411 Well Drilling

44

Tool Face Angle