persia oil and gas industry development co. · pdf filepersia oil and gas industry development...

12
Persia Oil and Gas Industry Development Co.

Upload: hatram

Post on 20-Feb-2018

217 views

Category:

Documents


2 download

TRANSCRIPT

Persia Oil and Gas IndustryDevelopment Co.

Persia Oil and Gas Industry

Development Co.

3Persia Oil and Gas Industry Development Company

HistoryPersia Oil & Gas Industry

Development Co. (Private Joint-Stock Co.) was registered in Tehran Companies Registration Office as one of the subsidiaries of Tadbir Energy Development Group on 22 Aug 2005 with an authorized capital of 2 billion IRR.

Based on decisions of the The General Assembly of the shareholders of the company, the company’s capital has been increased to 2,000 billion IRR.

MissionPersia oil & gas industry development

co, in order to fulfill the objectives of It’s shareholder (Tadbir Energy Development Co) & provisions of the corporate charter, has the following missions:

* Accomplishment of Oil, Gas and Petrochemical projects within the scheduled time with optimal quality and cost with competitive advantage and ability to do Mega Projects and collection of efficient human resources (HR) by focus on of common oil and gas fields development in order to secure interests of stakeholders.

VisionBeing among the top Iranian companies

in upstream and downstream of oil & gas and petrochemical industries.

Trying to increase the ability of oil & gas derivation and extraction with priority of common fields and attracting financial resources and completion the projects on time.

Main ActivitiesUndertaking upstream and downstream

oil and gas projects, including exploration, drilling, developing oil and gas fields under EPCF/Buy-Back contracts, acting as a operator and contractor in oil, gas, refinery and petrochemical industries, construction of pipeline and other oil and gas transmission facilities, construction and production of oil, gas and petrochemical installations, providing design and engineering services.

According to our experience in Buyback/EPCF Projects in oil & gas industry and our powerful management team, cooperation and investment with individual persons and companies in/out side of Iran are major interests of the company.

Persia Oil and Gas Industry

Development Co.

4 Persia Oil and Gas Industry Development Company

Subsidiary Companies:Pars oil companyPars Oil Co. is as one of the major manufacturers of lubricants

and related products in Iran which 55% of its management stock belongs to Persia Oil & Gas Industry Development Co.

Persia Oil and Gas Industry

Development Co.

5Persia Oil and Gas Industry Development Company

HR:About 150 of direct employees (from 197

employees) have the BS degree or higher and have brilliant backgrounds in oil & gas industry.

These worth human resource are allocated to various disciplines base on their skills, wisdom and educational histories as below:

• Surface Engineering department : 30 persons• Sub-Surface Engineering department : 40 persons• Project Technical Office: 30 Persons• Planning, HSEQ, Procurement and Contract Department: 50 Persons.

Persia Oil and Gas Industry

Development Co.

6 Persia Oil and Gas Industry Development Company

Projects :North Yaran Oil field development project: The North Yaran project is one of the most

important and large projects in progress which has been awarded to POGIDC through a buy back contract on 2012.

This field is situated next to South Azadegan giant oil field and is located near Jufair and Yadavaran Oil fields. The purpose of developing this field is production of 30,000 barrels of crude oil per day.

The contract time schedule for execution of this project is estimated to be 52 and 62 months for oil and gas sections respectively. The project includes the following sectors:

• Subsurface: Work over of one appraisal/producer well

Drilling of 19 pilot and producer wells • Surface facilities:Construction and installing wellhead

facilities and flow lines from wells to clusterConstruction of clusterProcurement and laying oil and gas

transport lines. Power transmission lines.Engineering and procurement of Long

Lead Items including oil transfer pumas, Compressors, Dehydration Packages, Three-phase Separator, Instrumentation Valves , Emergency Shut down systems, Accurate flow metering system.

The oil produced during the Early

Persia Oil and Gas Industry

Development Co.

7Persia Oil and Gas Industry Development Company

Production period is transferred to north cluster of south Azadegan oil field and the oil produced in the Final production phase is transferred to West Karoon integrated production unit and the separated gas will be transported to NGL-3200 Unit.

Main achievements of North Yaran oil field development project are as follows:

This project is the first buy back project carried out by an Iranian Contractor with the minimum deviation from the scheduled plan which will be completed and operated soon.

Financial Resources required for this project is around 700 Million Dollars.

Recruitment approximately 1800 persons directly and 5 times of the same number indirectly in this project is noticeable. In addition to that, the involvement of local manufacturers and suppliers can be achieved.

2012

Dec Jan Feb Mar Apr May Jun Jul Apr Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Apr Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar

1 2 3 4 5 6 7 8 9 10 11 12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

61

62

63

64

Total Plan 58

0/0

0%

2/1

0%

2/8

8%

4/6

9%

7/4

6%

5/3

7%

4/7

5%

2/9

7%

1/7

0%

0/9

3%

0/4

5%

0/0

3%

0/0

0%

0/0

0%

0/0

0%

0/0

0%

0/0

0%

0/0

0%

0/0

0%

Cum.Plan 58

67

/39

%

71

/50

%

75

/85

%

78

/35

%

81

/62

%

85

/20

%

88

/38

%

91

/07

%

92

/84

%

94

/41

%

96

/42

%

98

/43

%

10

0/0

0%

10

0/0

0%

Total Replan 58-catch up

0/0

0%

2/1

0%

2/8

8%

4/6

9%

7/4

6%

5/3

7%

4/7

5%

2/9

7%

1/7

0%

0/9

3%

0/4

5%

0/0

3%

0/0

0%

0/0

0%

0/0

0%

0/0

0%

0/0

0%

0/0

0%

0/0

0%

Cum.Replan 58-catch up

87

/20

%

90

/01

%

93

/60

%

97

/19

%

10

0/0

0%

10

0/0

0%

Total Actual

0/0

0%

0/0

0%

0/5

0%

0/2

5%

0/0

5%

0/5

0%

0/3

0%

0/1

0%

0/2

0%

0/2

0%

0/2

0%

0/2

0%

0/2

0%

0/1

0%

0/1

0%

0/2

0%

0/2

0%

0/1

5%

0/1

6%

0/2

1%

0/0

1%

0/0

2%

0/0

2%

0/3

0%

1/1

4%

2/1

0%

2/3

0%

1/3

4%

3/9

0%

1/0

9%

1/2

2%

2/9

6%

2/6

8%

2/4

2%

3/7

4%

3/0

1%

2/5

5%

2/5

0%

2/5

9%

3/0

0%

3/4

0%

3/7

0%

5/5

0%

3/9

0%

3/7

0%

4/4

9%

4/1

1%

3/1

0%

3/3

0%

1/9

0%

2/5

3%

1/5

5%

1/4

7%

1/8

5%

Cum. Actual

0/00

%

0/00

%

0/50

%

0/75

%

0/80

%

1/30

%

1/60

%

1/70

%

1/90

%

2/10

%

2/30

%

2/50

%

2/70

%

2/80

%

2/90

%

3/10

%

3/30

%

3/45

%

3/61

%

3/82

%

3/83

%

3/85

%

3/87

%

4/17

%

5/30

%

7/40

%

9/70

%

11/0

4%

14/9

4%

16/0

3%

17/2

5%

20/2

1%

22/8

9%

25/3

1%

29/0

5%

32/0

6%

34/6

1%

37/1

1%

39/7

0%

42/7

%

46/1

%

49/8

%

55/3

%

59/2

%

62/9

%

67/4

%

71/5

%

74/6

%

77/9

%

79/8

%

82/3

%

83/9

%

85/3

5%

87/2

0%

2017

Rep

lan

2R

epla

n 2

Act

ual

2013 2014 2015 2016

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

110%

0%1%2%3%4%5%6%7%8%9%

10%11%12%13%14%15%

Dec Jan

Feb

Mar

Apr

May Jun

Jul

Apr

Sep Oct

Nov

Dec Jan

Feb

Mar

Apr

May Jun

Jul

Apr

Sep Oct

Nov

Dec Jan

Feb

Mar

Apr

May Jun

Jul

Aug Sep Oct

Nov

Dec Jan

Feb

Mar

Apr

May Jun

Jul

Aug Sep Oct

Nov

Dec Jan

Feb

Mar

Apr

May Jun

Jul

2012 2013 2014 2015 2016

Yaran-e-Shomali The general trend of project progress

Plan Actual

Persia Oil and Gas Industry

Development Co.

8 Persia Oil and Gas Industry Development Company

Directional drilling of more than 2500 m. in one of the most complicated horizontal wells onshore in Iran.

Appraising and evaluating of reservoir quality in existing channel in the area and a considerable increase in production using the channel good reservoir properties.

High-risk drilling in order to access the south branch of the mentioned channel in well no. 7 (With Production of more than 5000 barrels per day).

Optimizing drilling operation and decreasing drilling time in such a way that the subsequent wells have been drilled and completed with the shortest time compared to other wells drilled and completed in West Karoon area.

A new record has been registered in this project as the best horizontal drilling rate which is 143 m. in 21 hours.

Persia Oil and Gas Industry

Development Co.

9Persia Oil and Gas Industry Development Company

Mansouri Oil field Development Project:The Mansouri Oil Field is located in south west

of Iran, close to Ahwaz Oil field from the North West and Abteimor oil field from the west and Shadegan field from the North East.

The purpose of Mansoury oil field development

in phase 2 is to production of 50,000 bbl. /d of crude oil in surface final production step, the construction of 22 well location, wellhead facilities and flow line for 17 wells, operation and desalting unit for 75,000 bbl. /d and NGL unit and drilling of 21 wells in sub-surface section and maintenance.

South Azadegan Oil Field Developmen Project:

The Azadegan Oil Field is the largest oil field in Iran and third largest oil field in the word after Qavar oil field in Saudi Arabia and Burgan in Kuwait.

The exploration of Azadegan oil field goes back to 1997.

Persia Oil and Gas Industry

Development Co.

10 Persia Oil and Gas Industry Development Company

Standards

Persia Oil and Gas IndustryDevelopment Company

Head Office:Building NO. 253, Between Naft-e-Shomali Ave And Modarres Highway, Mirdamad Blvd, Tehran

P.O.Code : 33931-19189Tel : +9821-26420960Fax : +9821-22278691

E-mail: [email protected]