Technical Evaluation of Project Proposals
Pre-project Study: The Industrial Utilization and Marketing of Eucalyptus Plantations of the Province of
Loja
Pre-project Study: Feasibility of a Promotion Center for Furniture Manufacturing in Ecuador
Fellowships and Grants Approved
PCI(VIII)/11
page 4
ev.1
and for successfully convening in Africa and Latin America the first two regional training workshops on Planning Forest Industries in Developing Countries.
The Committee decided to recommend to the Council to discontinue consideration of implementation of project PD 80/90 (I) "Second Consultation on the Wood and Wood Products Industry", as the consultation was convened in January 1991.
The Committee reiterated the view that the process and operations related to evaluation and monitoring of projects under implementation must be improved and strengthened.
9. Report on Completed re-Projects ,
The Committee took note of the executive summary of the pre-project study on "Appropriate Supply of Wood Raw Materials in Producing Countries with Dwindling Forest Resources: The Case of the Philippines"
(Philippines). The Government of the Philippines informed that it has prepared and submitted to ITTO a project proposal based on the Pre-project Study findings. The proposal will be considered by the Committee at its next session.
10. eport on re-Proiect Work in rogress ,
The Committee took note and reviewed the progress of work on the following pre-project studies:
(i) Industrial Processing of Rubber Wood Timber in Africa (Cameroon, Ote d'Ivoire, Ghana, Liberia)
(ii) Tropical Timber in Construction and Harmonization of Stress Grading Rules
(iii) Development ork to Phase Out Trade on Unsustainably Produced Timber: I - Assessment of Future Mahogany Supply
and Alternative Industrial Operations for Sustainable Production;
(iv) Institutional Strengthening of IBAMA's Forest Products Laboratory;
(v) Manpower Development of the Sarawak Forest Sector.
11. onsideration of Protect Proposals
Taking into account the Report of the Panel of Experts for Technical Appraisal of Project Proposals, the Committee appraised and evaluated nineteen proposals:
PROJECT NUMBER
PD 94/90 Rev.2 (I)
PD 109/90 Rev.1 (I)
PD 121/91 Rev.1 (I)
PD 122/91 Rev.1 (I)
PD 123/91 Rev.1 (I)
PD 133/91 Rev.1 (I)
PD 134/91 Rev.l (M,I)
PD 137/91 Rev.1 (I)
PD 143/91 Rev.1 (I)
PD 145/91 Rev.1 (I)
PD 146/91 Rev.1 (I)
PD 150/91 ev.l (I)
PROJECT TITLE
Integration of Forest-Based Development in the Western Amazon - Phase II - Technology for Sustainable Utilization of Raw Forest Materials
Assistance to Modernization, Restructuring and evelopment. of Wood-Based Industries in
Ote d'Ivoire
Entrepreneurship Development in the Furniture Industry
Furniture Export Marketing Programme for the EEC
Training Programme on Furniture Production
Technological and Dendrological Study on Schinopsis (Anacardiaceae) in Chiquitania and the Bolivian Chaco
Selection and Introduction of Lesser-Known and Lesser-Used Species for Specific End-Uses - Phase II
Strategy for a Sustainable Wood Industry Sector n
Ecuador
Non-Wood Tropical orest. Products: Processing, Trade and Collection
Research, Training and Demonstration Activities in the Use of Eucalyptus
Establishment of a National Timber Furniture Design Center
Identification and Nomenclature of Commercial Tropical Timber Species in the Andean Sub-Region
PCI(VIII)/11 Rev
page
.1
5
SUBMITTING
GOVERNMENT
Government of
Brazil
Government of
C8te d'Ivoire
Government of
Malaysia
Government of
Malaysia
Government of
Malaysia
Government of
Bolivia
Government of
Netherlands
Government of
Ecuador
Government of
Brazil
Government of
Ecuador
Government of
Ecuador
Government of
Peru
the
...
PCI(VIII)/11 Rev.1
page 6
PD 151/91 ev.1 (I)
PD 152/91 ev.1 (I)
Selection of Lesser-Known
Tropical Timber Species of the
Andean Sub-Region for Specific
End-Uses
Harmonization and Promotion of
Technical Tropical Timber
Standards in the Andean Sub-
Region
Government of
Peru
Government of
Peru
PD 153/91 ev.1 (I)
PD 154/91 ev.1 (I)
PD 155/91 ev.1 (I)
PD 160/91 ev.1 (I)
PD 163/91 ev.1 M,I)
Feasibility Study to Establish an Andean Sub-Region Center for the Development of Sustained Forest Management and Support to the Timber Industry
Integrated Development of Timber and Timber Product Marketing Structure in Ecuador
Sustained Forest Industry Development in the Andean Group Countries
International Workshop on
Improved Utilization of Timber Resources in Southeast Asia
Technical Assistance in (a) Marketing Information Set-Up and Techno-Economics (b) Wood Processing Technology
Government of Peru
Government of
Ecuador
Government of
Ecuador
Government of
Malaysia
Government of Malaysia
The Committee expressed the view that some of the project proposals considered were not appropriately prepared and did not contain all needed information to allow proper consideration and technical appraisal. However, the Committee recognized that the Panel mechanism set by the Council has contributed significantly to improve most of the project
proposals and that it seems to be an effective tool to assist the Committee with the technical appraisal of projects.
The Committee also considered two project ideas:
UMBERTITLESUBMITTED BY
PCI(VIII)/7Utilization, Market Research, Government of International Trade andBolivia
Promotion of Non-Conventional Tropical Timber Species for
Different Industrial Uses
...
PCI(VIII)/11 Rev
page
.1
7
PCI(VIII)/8 Providing Consultancy Services to the Timber Industry on
Production Technology and
Industrial Organization
Government of
Bolivia
The detailed results of the Committee's evaluation and appraisal of project proposals, pre-projects and ideas are presented in Appendix I.
12. Decision on Pre-Proiect Work
The Committee decided to implement a pre-project study on "Technical and Economic Feasibility of Large-Scale Construction of Wooden House in Brazil", submitted by the Brazilian Government. The proposal describing the approved pre-project is reproduced in document PCI(VIII)/6. The Committee further decided to implement two pre-projects to assist the Ecuadorian Government and the country's National Association of the Small Scale imber Industrialists to review and redraft their respective project
proposals numbered PD 145/91 Rev.1 and PD 146/91 ev.l. The respective approved pre-projects are entitled "The Industrial Utilization and Marketing of Eucalyptus Plantations of the Province of Loja, Ecuador" and "Feasibility of a Promotion Center for Furniture Manufacturing in
Ecuador". The terms of reference for these two pre-projects are reproduced in Appendix II and III, respectively. The detailed results of the Committee's evaluation and decision on this pre-project proposal is presented in Appendix I.
13. ecision on ellowship pplications Under roiect PD 60/89 M.F.Il
The Committee authorized the establishment of a Selection Panel to evaluate fellowship application submitted in time for the Eighth Session and select the successful candidates. The selection panel was composed by: Mr. David Boulter, Chairman (Canada), Mr. Eric ammerts van Bueren (The Netherlands), Dr. Gary R. Lindell (U.S.A.), Dato' Baharuddin Haji Ghazali (Malaysia), Dr. Amantino Ramos de Freitas (Brazil), and Prof. Nils-Erik Nilsson (Sweden). The applications approved are listed in Appendix IV.
14. Dates and Venue of the Tenth Session
The Committee decided that the date and venue will be agreed upon by ITTC in its Tenth Session.
15. Any Other Business
The Committee recommended that documents for
printed and copied in recycled paper using as far of paper sheets.
16. Recommendations to the International Tronical
of its Tenth Session
its future sessions be
as possible both sides
Timber Council
The Committee made
1. To approve for
the following recommendations:
implementation by ITTO the project proposals:
...
PCI(VIII)/11 Rev.1
page 25
APPENDIX II
Pre-Project Study: The Industrial Utilization and Marketing of Eucalyptus Plantations of the Province of Loja, Ecuador
erms of Reference:
1. Assess the potential options and feasibility of industrial use of small logs from Eucalyptus plantations in Loja. The assessment shall
take into account:
(i) existing experiences and knowledge in Eucalyptus processing and utilization;
(ii) determination of production capability Loja;
(iii) sites for pilot or demonstration processing units;
(iv) plantation management systems and logging methods;
(v) markets and marketing possibilities; and
(vi) community organization and training requirements.
2. Prepare a proposal to assist local indigenous Loja communities to mange and utilize their Eucalyptus plantations. Such a proposal
shall be designed centered on training, extension and demonstration activities.
re-Pro ect Cost:US$
International consultancy: 2 man/months (includes honorarium, travel and DSA costs)16,000
National consultants: 4 man/months16,000
Study tour to Brazil, Chile and New Zealand (2 Ecuadorian)12,000
Honorarium and other costs during the study tour6,000
Local travel2,000
Printing reports and miscellaneous5,000
TOTAL .............................................57,000
mplementing ncyL