PermaDri Spray Demonstration Training
Fresno Facility Spray DemonstrationsPlus Field Application Pictures
![Page 2: Perma Training Demonstrations 11 05 09](https://reader037.vdocuments.us/reader037/viewer/2022110301/541440ec8d7f72046a8b459f/html5/thumbnails/2.jpg)
Set Up Information Facing spray machine open A and B regulator located
on pump by turning plastic gray lever handle ½ turn from left to right.
Allow pressure to build in regulator.
Use the red line on regulator gauge to determine pressure setting.
Adjust pressure setting on regulator by turning the gray knob on regulator left (up) or right (down) to adjust pressure higher or lower to desired setting.
![Page 3: Perma Training Demonstrations 11 05 09](https://reader037.vdocuments.us/reader037/viewer/2022110301/541440ec8d7f72046a8b459f/html5/thumbnails/3.jpg)
Start Up Start Spray Machine and let material circulate. Make sure
both A and B sides are mixed well before spraying.
‘B’ Side
![Page 4: Perma Training Demonstrations 11 05 09](https://reader037.vdocuments.us/reader037/viewer/2022110301/541440ec8d7f72046a8b459f/html5/thumbnails/4.jpg)
Hoses
Green + Yellow Supply Hoses Wrapped in an optional protective Skin for Wear and Tear Protection.
Inlet and Return Hoses “A” Side (Rubber) with field fabricated screen filter on intake
Inlet and Return Hoses “B” Side (Salt) includes in-line filter
![Page 5: Perma Training Demonstrations 11 05 09](https://reader037.vdocuments.us/reader037/viewer/2022110301/541440ec8d7f72046a8b459f/html5/thumbnails/5.jpg)
B SideA Side
Pressure Gauge Follow Red Line
![Page 6: Perma Training Demonstrations 11 05 09](https://reader037.vdocuments.us/reader037/viewer/2022110301/541440ec8d7f72046a8b459f/html5/thumbnails/6.jpg)
Gray Pressure Adjustment Valve
![Page 7: Perma Training Demonstrations 11 05 09](https://reader037.vdocuments.us/reader037/viewer/2022110301/541440ec8d7f72046a8b459f/html5/thumbnails/7.jpg)
Single Gun Set Up – Green “A” side and Yellow “B” Side
![Page 8: Perma Training Demonstrations 11 05 09](https://reader037.vdocuments.us/reader037/viewer/2022110301/541440ec8d7f72046a8b459f/html5/thumbnails/8.jpg)
Skid Mount Pump Raised on Pallets
![Page 9: Perma Training Demonstrations 11 05 09](https://reader037.vdocuments.us/reader037/viewer/2022110301/541440ec8d7f72046a8b459f/html5/thumbnails/9.jpg)
Salt Side “B” Inlet and Return to stir barrel
“B” Line 1 salt supply used with single gun
Line 2 for Two Gun Set Up
![Page 10: Perma Training Demonstrations 11 05 09](https://reader037.vdocuments.us/reader037/viewer/2022110301/541440ec8d7f72046a8b459f/html5/thumbnails/10.jpg)
Cart Mount with reel and Electric Drive
![Page 11: Perma Training Demonstrations 11 05 09](https://reader037.vdocuments.us/reader037/viewer/2022110301/541440ec8d7f72046a8b459f/html5/thumbnails/11.jpg)
Spray Pattern
Take spray gun and in a container spray A side only to make sure you have a good spray fan and do same with B side.
Then spray both A and B side simultaneously making sure that both the A and B side spray fans come together approximately 12-18 inches from end of spray wand tips.
![Page 12: Perma Training Demonstrations 11 05 09](https://reader037.vdocuments.us/reader037/viewer/2022110301/541440ec8d7f72046a8b459f/html5/thumbnails/12.jpg)
Complete Skid Mount Set-up
![Page 13: Perma Training Demonstrations 11 05 09](https://reader037.vdocuments.us/reader037/viewer/2022110301/541440ec8d7f72046a8b459f/html5/thumbnails/13.jpg)
Turning plastic gray lever on regulator ½ turn from left to right
![Page 14: Perma Training Demonstrations 11 05 09](https://reader037.vdocuments.us/reader037/viewer/2022110301/541440ec8d7f72046a8b459f/html5/thumbnails/14.jpg)
Take spray gun and in a container spray A side only to make sure you have a good spray fan and repeat with B side.
![Page 15: Perma Training Demonstrations 11 05 09](https://reader037.vdocuments.us/reader037/viewer/2022110301/541440ec8d7f72046a8b459f/html5/thumbnails/15.jpg)
Spray into Trash Barrel to check spray pattern: Spray both A and B sides simultaneously to check “spray fan”
![Page 16: Perma Training Demonstrations 11 05 09](https://reader037.vdocuments.us/reader037/viewer/2022110301/541440ec8d7f72046a8b459f/html5/thumbnails/16.jpg)
Complete gun assembly attached hose
![Page 17: Perma Training Demonstrations 11 05 09](https://reader037.vdocuments.us/reader037/viewer/2022110301/541440ec8d7f72046a8b459f/html5/thumbnails/17.jpg)
Brass Valve Seat properly positioned
![Page 18: Perma Training Demonstrations 11 05 09](https://reader037.vdocuments.us/reader037/viewer/2022110301/541440ec8d7f72046a8b459f/html5/thumbnails/18.jpg)
Adjusting spray tips vertically
![Page 19: Perma Training Demonstrations 11 05 09](https://reader037.vdocuments.us/reader037/viewer/2022110301/541440ec8d7f72046a8b459f/html5/thumbnails/19.jpg)
Attaching wands
![Page 20: Perma Training Demonstrations 11 05 09](https://reader037.vdocuments.us/reader037/viewer/2022110301/541440ec8d7f72046a8b459f/html5/thumbnails/20.jpg)
Wands securely attached
![Page 21: Perma Training Demonstrations 11 05 09](https://reader037.vdocuments.us/reader037/viewer/2022110301/541440ec8d7f72046a8b459f/html5/thumbnails/21.jpg)
Spray Application Practise
Beginning at the lowest point of substrate, start spraying substrate by leading with the A side (emulsion) followed by the B side (calcium chloride) going from right to left covering the desired area and immediately spraying directly back over applied material from left to right to starting point.
![Page 22: Perma Training Demonstrations 11 05 09](https://reader037.vdocuments.us/reader037/viewer/2022110301/541440ec8d7f72046a8b459f/html5/thumbnails/22.jpg)
Wands must be perpendicular to substrate
![Page 23: Perma Training Demonstrations 11 05 09](https://reader037.vdocuments.us/reader037/viewer/2022110301/541440ec8d7f72046a8b459f/html5/thumbnails/23.jpg)
Feathering at end of spray pattern to avoid ridges in applied membrane
![Page 24: Perma Training Demonstrations 11 05 09](https://reader037.vdocuments.us/reader037/viewer/2022110301/541440ec8d7f72046a8b459f/html5/thumbnails/24.jpg)
50% overlap-leading with A side followed by B side from right to left
![Page 25: Perma Training Demonstrations 11 05 09](https://reader037.vdocuments.us/reader037/viewer/2022110301/541440ec8d7f72046a8b459f/html5/thumbnails/25.jpg)
Immediately spraying directly back over applied material from left to right
![Page 26: Perma Training Demonstrations 11 05 09](https://reader037.vdocuments.us/reader037/viewer/2022110301/541440ec8d7f72046a8b459f/html5/thumbnails/26.jpg)
Spray application “WRONG “Too much angle to the Spray pattern
![Page 27: Perma Training Demonstrations 11 05 09](https://reader037.vdocuments.us/reader037/viewer/2022110301/541440ec8d7f72046a8b459f/html5/thumbnails/27.jpg)
“Good” Spray Angle 90 Degrees/Perpendicular to the substrate
![Page 28: Perma Training Demonstrations 11 05 09](https://reader037.vdocuments.us/reader037/viewer/2022110301/541440ec8d7f72046a8b459f/html5/thumbnails/28.jpg)
Good angle and excellent 50% overlap
![Page 29: Perma Training Demonstrations 11 05 09](https://reader037.vdocuments.us/reader037/viewer/2022110301/541440ec8d7f72046a8b459f/html5/thumbnails/29.jpg)
Building Coverage Start next pass by moving spray gun towards
applicator ½ the width of applied material (point wands at the closest edge of applied material) and start covering 50% of applied material and 50% of substrate leading with A side followed by the B side going from right to left the complete distance of the applied material and immediately spraying directly back over applied material from left to right to starting point.
![Page 30: Perma Training Demonstrations 11 05 09](https://reader037.vdocuments.us/reader037/viewer/2022110301/541440ec8d7f72046a8b459f/html5/thumbnails/30.jpg)
Spraying workable size areas
![Page 31: Perma Training Demonstrations 11 05 09](https://reader037.vdocuments.us/reader037/viewer/2022110301/541440ec8d7f72046a8b459f/html5/thumbnails/31.jpg)
Good distance from substrate
![Page 32: Perma Training Demonstrations 11 05 09](https://reader037.vdocuments.us/reader037/viewer/2022110301/541440ec8d7f72046a8b459f/html5/thumbnails/32.jpg)
Wands vertical to substrate
![Page 33: Perma Training Demonstrations 11 05 09](https://reader037.vdocuments.us/reader037/viewer/2022110301/541440ec8d7f72046a8b459f/html5/thumbnails/33.jpg)
Comfortable working distance from body
![Page 34: Perma Training Demonstrations 11 05 09](https://reader037.vdocuments.us/reader037/viewer/2022110301/541440ec8d7f72046a8b459f/html5/thumbnails/34.jpg)
Draping hose over shoulder takes weight off arm and wrist
![Page 35: Perma Training Demonstrations 11 05 09](https://reader037.vdocuments.us/reader037/viewer/2022110301/541440ec8d7f72046a8b459f/html5/thumbnails/35.jpg)
Good spray pattern-observe lines
![Page 36: Perma Training Demonstrations 11 05 09](https://reader037.vdocuments.us/reader037/viewer/2022110301/541440ec8d7f72046a8b459f/html5/thumbnails/36.jpg)
Immediate walk-ability-however it leaves footprints for first 30 minutes or so at 20C or 70F
![Page 37: Perma Training Demonstrations 11 05 09](https://reader037.vdocuments.us/reader037/viewer/2022110301/541440ec8d7f72046a8b459f/html5/thumbnails/37.jpg)
Building thickness on vertical substrate
![Page 38: Perma Training Demonstrations 11 05 09](https://reader037.vdocuments.us/reader037/viewer/2022110301/541440ec8d7f72046a8b459f/html5/thumbnails/38.jpg)
Over 2 inches in thickness ( Note: Do not spray this thick on a project!) w/o any sag
![Page 39: Perma Training Demonstrations 11 05 09](https://reader037.vdocuments.us/reader037/viewer/2022110301/541440ec8d7f72046a8b459f/html5/thumbnails/39.jpg)
Dust mask and goggles
![Page 40: Perma Training Demonstrations 11 05 09](https://reader037.vdocuments.us/reader037/viewer/2022110301/541440ec8d7f72046a8b459f/html5/thumbnails/40.jpg)
Reviewing thickness
![Page 41: Perma Training Demonstrations 11 05 09](https://reader037.vdocuments.us/reader037/viewer/2022110301/541440ec8d7f72046a8b459f/html5/thumbnails/41.jpg)
2 prong moisture meter
![Page 42: Perma Training Demonstrations 11 05 09](https://reader037.vdocuments.us/reader037/viewer/2022110301/541440ec8d7f72046a8b459f/html5/thumbnails/42.jpg)
Checking Thickness 60 – 80 mils for corrosion, wear and impact
Note Water Streaming out of Instant Set Water Based Coating
![Page 43: Perma Training Demonstrations 11 05 09](https://reader037.vdocuments.us/reader037/viewer/2022110301/541440ec8d7f72046a8b459f/html5/thumbnails/43.jpg)
Before Application of Rubber Spray or LRI “Vezlar”
![Page 44: Perma Training Demonstrations 11 05 09](https://reader037.vdocuments.us/reader037/viewer/2022110301/541440ec8d7f72046a8b459f/html5/thumbnails/44.jpg)
After Coating Applied
![Page 45: Perma Training Demonstrations 11 05 09](https://reader037.vdocuments.us/reader037/viewer/2022110301/541440ec8d7f72046a8b459f/html5/thumbnails/45.jpg)
Van Haus Crew preparing the floor in areas of Peeling Previous Coating
![Page 46: Perma Training Demonstrations 11 05 09](https://reader037.vdocuments.us/reader037/viewer/2022110301/541440ec8d7f72046a8b459f/html5/thumbnails/46.jpg)
Upper Left picture of A+B membrane over A side only – Bottom Left Sun coming up RH Job
finished
![Page 47: Perma Training Demonstrations 11 05 09](https://reader037.vdocuments.us/reader037/viewer/2022110301/541440ec8d7f72046a8b459f/html5/thumbnails/47.jpg)
Preparation ahead of fabric embedment
![Page 48: Perma Training Demonstrations 11 05 09](https://reader037.vdocuments.us/reader037/viewer/2022110301/541440ec8d7f72046a8b459f/html5/thumbnails/48.jpg)
Three Coursing for Strength in Corners with dis-similar materials of concrete and steel
![Page 49: Perma Training Demonstrations 11 05 09](https://reader037.vdocuments.us/reader037/viewer/2022110301/541440ec8d7f72046a8b459f/html5/thumbnails/49.jpg)
![Page 50: Perma Training Demonstrations 11 05 09](https://reader037.vdocuments.us/reader037/viewer/2022110301/541440ec8d7f72046a8b459f/html5/thumbnails/50.jpg)
“3 Coursing” in Critical Angle Change
![Page 51: Perma Training Demonstrations 11 05 09](https://reader037.vdocuments.us/reader037/viewer/2022110301/541440ec8d7f72046a8b459f/html5/thumbnails/51.jpg)
![Page 52: Perma Training Demonstrations 11 05 09](https://reader037.vdocuments.us/reader037/viewer/2022110301/541440ec8d7f72046a8b459f/html5/thumbnails/52.jpg)
![Page 53: Perma Training Demonstrations 11 05 09](https://reader037.vdocuments.us/reader037/viewer/2022110301/541440ec8d7f72046a8b459f/html5/thumbnails/53.jpg)
![Page 54: Perma Training Demonstrations 11 05 09](https://reader037.vdocuments.us/reader037/viewer/2022110301/541440ec8d7f72046a8b459f/html5/thumbnails/54.jpg)
![Page 55: Perma Training Demonstrations 11 05 09](https://reader037.vdocuments.us/reader037/viewer/2022110301/541440ec8d7f72046a8b459f/html5/thumbnails/55.jpg)
![Page 56: Perma Training Demonstrations 11 05 09](https://reader037.vdocuments.us/reader037/viewer/2022110301/541440ec8d7f72046a8b459f/html5/thumbnails/56.jpg)
![Page 57: Perma Training Demonstrations 11 05 09](https://reader037.vdocuments.us/reader037/viewer/2022110301/541440ec8d7f72046a8b459f/html5/thumbnails/57.jpg)
![Page 58: Perma Training Demonstrations 11 05 09](https://reader037.vdocuments.us/reader037/viewer/2022110301/541440ec8d7f72046a8b459f/html5/thumbnails/58.jpg)
![Page 59: Perma Training Demonstrations 11 05 09](https://reader037.vdocuments.us/reader037/viewer/2022110301/541440ec8d7f72046a8b459f/html5/thumbnails/59.jpg)
![Page 60: Perma Training Demonstrations 11 05 09](https://reader037.vdocuments.us/reader037/viewer/2022110301/541440ec8d7f72046a8b459f/html5/thumbnails/60.jpg)
![Page 61: Perma Training Demonstrations 11 05 09](https://reader037.vdocuments.us/reader037/viewer/2022110301/541440ec8d7f72046a8b459f/html5/thumbnails/61.jpg)
![Page 62: Perma Training Demonstrations 11 05 09](https://reader037.vdocuments.us/reader037/viewer/2022110301/541440ec8d7f72046a8b459f/html5/thumbnails/62.jpg)
![Page 63: Perma Training Demonstrations 11 05 09](https://reader037.vdocuments.us/reader037/viewer/2022110301/541440ec8d7f72046a8b459f/html5/thumbnails/63.jpg)
“A” Side Only Application took less than 50 minutes on 15,000 sq ft or
1,500 Sq M
![Page 64: Perma Training Demonstrations 11 05 09](https://reader037.vdocuments.us/reader037/viewer/2022110301/541440ec8d7f72046a8b459f/html5/thumbnails/64.jpg)
A + B Side Spraying to build a Membrane in the Thickener
![Page 65: Perma Training Demonstrations 11 05 09](https://reader037.vdocuments.us/reader037/viewer/2022110301/541440ec8d7f72046a8b459f/html5/thumbnails/65.jpg)
![Page 66: Perma Training Demonstrations 11 05 09](https://reader037.vdocuments.us/reader037/viewer/2022110301/541440ec8d7f72046a8b459f/html5/thumbnails/66.jpg)
LP Gauging the Thickness of the membrane
![Page 67: Perma Training Demonstrations 11 05 09](https://reader037.vdocuments.us/reader037/viewer/2022110301/541440ec8d7f72046a8b459f/html5/thumbnails/67.jpg)
![Page 68: Perma Training Demonstrations 11 05 09](https://reader037.vdocuments.us/reader037/viewer/2022110301/541440ec8d7f72046a8b459f/html5/thumbnails/68.jpg)
Thickener Concrete Bottom Spray Primed with “A” Side Only
![Page 69: Perma Training Demonstrations 11 05 09](https://reader037.vdocuments.us/reader037/viewer/2022110301/541440ec8d7f72046a8b459f/html5/thumbnails/69.jpg)
Thickener Walls Prepared and Bottom Concrete Primed Ready for Mine Spray