System Process Document Performing Material Debrief on a Non-IB Part
Last changed on: 8/31/2011 1:16:00 PM Page 1
Performing Material Debrief on a Non-IB Part
Scope Try It! mode
Select "Try It!" to play the training topic. Follow the directions to advance to the next step
(frame).
NOTE: Use Action link in bubble for topic navigation (next step, previous step, restart).
To print the training
Select "Print It!" - This will open the topic into a PDF document that you may save and print.
Distribution GCSSRM Service Request Management
GCSGCH Global Customer HUB
Ownership The service manager is responsible for ensuring that this document is necessary and that
it reflects actual practice. To submit a change request and/or comments and feedback for
GCS business practices and processes, systems or documentation, please submit a
‘change request’ via the Oracle iSupport tool (refer to Logging GCS Service Requests
[RECGM001]).
Activity Preface These tasks are performed by the following:
Support or GRID Engineer Role [REROL007]
Global Customer HUB Engineer Role [REROL103]
ACS (Expert Services) - User Role [REROL086]
Applications and Privileges My Oracle Support:
ROLE: Orion GCS Support Engineer
PRIV: Orion GCS Call Center Worker
PRIV: Orion GCS Dashboards Analytics
System Process Document
Performing Material Debrief on a Non-IB Part
Page 2 Last changed on: 8/31/2011 1:16:00 PM
Work Instruction
Simulation training. No audio is included.
Step Action
1. Debrief now includes a section for Material Debrief to debrief parts. This topic
will focus on Non Install Base(IB) trackable parts. Oracle only tracks Serial
Numbers for IB trackable parts, including parent systems and SPARC boards.
When debriefing either a SuperFRU (a whole system replacement) or a SPARC
board, we must include the accurate serial numbers of both the part and the parent
during the debrief process.
In FSTP, find the task to perform Debrief on.
Press [Enter].
System Process Document Performing Material Debrief on a Non-IB Part
Last changed on: 8/31/2011 1:16:00 PM Page 3
Step Action
2. Click the Debrief button.
System Process Document
Performing Material Debrief on a Non-IB Part
Page 4 Last changed on: 8/31/2011 1:16:00 PM
Step Action
3. Ensure Assignment Status is transitioned properly. We have set it to Completed
Pending.
Click the Apply button.
System Process Document Performing Material Debrief on a Non-IB Part
Last changed on: 8/31/2011 1:16:00 PM Page 5
Step Action
4. To begin Debrief, answer the current set of ATR questions.
Press [Enter].
System Process Document
Performing Material Debrief on a Non-IB Part
Page 6 Last changed on: 8/31/2011 1:16:00 PM
Step Action
5. For training purposes only, we will set the Context Value to No ATR.
Continue with current process to debrief Labor.
Click the + button.
System Process Document Performing Material Debrief on a Non-IB Part
Last changed on: 8/31/2011 1:16:00 PM Page 7
Step Action
6. Expand the Material section.
Click the + graphic.
System Process Document
Performing Material Debrief on a Non-IB Part
Page 8 Last changed on: 8/31/2011 1:16:00 PM
Step Action
7. There are two sections for Material:
Install
Return
First, create the debrief line for the install part.
Click the Assigned Parts (9) button.
System Process Document Performing Material Debrief on a Non-IB Part
Last changed on: 8/31/2011 1:16:00 PM Page 9
Step Action
8. The fields should be pre-populated with a default value.
If multiple parts are ordered against this task, multiple debrief lines must be created
for each part number (multiple quanities of the same part number may be entered
on the same line).
Press [Enter].
System Process Document
Performing Material Debrief on a Non-IB Part
Page 10 Last changed on: 8/31/2011 1:16:00 PM
Step Action
9. Other options available for Usage field are:
Defective On Arrival (if part is being returned and is bad)
Unused (if part is being returned unused)
Used
NOTE: PRT(Part Return Tag) data will only be completed on the Return debrief
line unless the part is being returned Unused or DOA. If this is the case, fill in all
required fileds to the right of UOM, starting with Serial Number and continuing to
the right. We'll cover these in detail in the return line.
Click the Usage list.
System Process Document Performing Material Debrief on a Non-IB Part
Last changed on: 8/31/2011 1:16:00 PM Page 11
Step Action
10. Business Process should be set to:
Onsite Support
Service Activity should be set to:
Install Part
Press [Enter].
System Process Document
Performing Material Debrief on a Non-IB Part
Page 12 Last changed on: 8/31/2011 1:16:00 PM
Step Action
11. Click the Apply button.
System Process Document Performing Material Debrief on a Non-IB Part
Last changed on: 8/31/2011 1:16:00 PM Page 13
Step Action
12. To Post the Install line
Click the Select option.
System Process Document
Performing Material Debrief on a Non-IB Part
Page 14 Last changed on: 8/31/2011 1:16:00 PM
Step Action
13. Click the Post Debrief button.
System Process Document Performing Material Debrief on a Non-IB Part
Last changed on: 8/31/2011 1:16:00 PM Page 15
Step Action
14. For a return part, a new debrief line must be created.
NOTE: Exception: No line is required for consumable parts. Reason for Missing
Returnable Parts should be set to Consumable.
To enter the Return line for the Material Debrief,
Click the Add Another Row button.
System Process Document
Performing Material Debrief on a Non-IB Part
Page 16 Last changed on: 8/31/2011 1:16:00 PM
Step Action
15. Context Value should be set to Material Return.
Business Process, Service Activity, and Subinventory should be pre-populated.
In Item, enter the part number of the return part.
Press [Enter].
System Process Document Performing Material Debrief on a Non-IB Part
Last changed on: 8/31/2011 1:16:00 PM Page 17
Step Action
16. Enter the quantity of the return item.
Enter the desired information into the Quantity field. Enter "1".
System Process Document
Performing Material Debrief on a Non-IB Part
Page 18 Last changed on: 8/31/2011 1:16:00 PM
Step Action
17. All additional data on the Return debrief line is associated with PRT(Part Return
Tag) data. Required fields must be completed for all returned parts. For DOA and
Unused parts, this data is captured on the Install debrief line.
Enter the actual Serial Number of the return part.
Enter the desired information into the Serial Number field. Enter "BB212121".
System Process Document Performing Material Debrief on a Non-IB Part
Last changed on: 8/31/2011 1:16:00 PM Page 19
Step Action
18. Enter the DOA type. To see all available values
Click the Magnifying Glass graphic.
System Process Document
Performing Material Debrief on a Non-IB Part
Page 20 Last changed on: 8/31/2011 1:16:00 PM
Step Action
19. Select the correct DOA value.
Click the NOT DOA option.
System Process Document Performing Material Debrief on a Non-IB Part
Last changed on: 8/31/2011 1:16:00 PM Page 21
Step Action
20. Click the Select button.
System Process Document
Performing Material Debrief on a Non-IB Part
Page 22 Last changed on: 8/31/2011 1:16:00 PM
Step Action
21. Click the Search for Detection Code button.
System Process Document Performing Material Debrief on a Non-IB Part
Last changed on: 8/31/2011 1:16:00 PM Page 23
Step Action
22. Select the correct Detection Code.
Click the N/A option.
System Process Document
Performing Material Debrief on a Non-IB Part
Page 24 Last changed on: 8/31/2011 1:16:00 PM
Step Action
23. Click the Select button.
System Process Document Performing Material Debrief on a Non-IB Part
Last changed on: 8/31/2011 1:16:00 PM Page 25
Step Action
24. Click the Search for Fault Type button.
System Process Document
Performing Material Debrief on a Non-IB Part
Page 26 Last changed on: 8/31/2011 1:16:00 PM
Step Action
25. Select the correct Fault Type.
Click the N/A option.
System Process Document Performing Material Debrief on a Non-IB Part
Last changed on: 8/31/2011 1:16:00 PM Page 27
Step Action
26. Click the Select button.
System Process Document
Performing Material Debrief on a Non-IB Part
Page 28 Last changed on: 8/31/2011 1:16:00 PM
Step Action
27. To select Field Sympton Code
Click the Search for Field Symptom Code button.
System Process Document Performing Material Debrief on a Non-IB Part
Last changed on: 8/31/2011 1:16:00 PM Page 29
Step Action
28. Select the correct Field Sympton Code.
NOTE: Select Next 10 to see additional values.
Click the B28 option.
System Process Document
Performing Material Debrief on a Non-IB Part
Page 30 Last changed on: 8/31/2011 1:16:00 PM
Step Action
29. Click the Select button.
System Process Document Performing Material Debrief on a Non-IB Part
Last changed on: 8/31/2011 1:16:00 PM Page 31
Step Action
30. Storage FSC, Fault Detail, CPAS #, and FCO # should only be populated if
required by a specific business process. For instance, if a CPAS is being performed
on this part, you must capture the CPAS # here.
Press [Enter]
System Process Document
Performing Material Debrief on a Non-IB Part
Page 32 Last changed on: 8/31/2011 1:16:00 PM
Step Action
31. Waybill information will be provided in the shipment return kit and should be
entered in the Waybill field.
Click the Carrier list.
System Process Document Performing Material Debrief on a Non-IB Part
Last changed on: 8/31/2011 1:16:00 PM Page 33
Step Action
32. Carrier should be set to FSC.
Click the FSC list item.
System Process Document
Performing Material Debrief on a Non-IB Part
Page 34 Last changed on: 8/31/2011 1:16:00 PM
Step Action
33. Enter the desired information into the To Subinventory field. Enter "BAD".
System Process Document Performing Material Debrief on a Non-IB Part
Last changed on: 8/31/2011 1:16:00 PM Page 35
Step Action
34. To Subinventory should be set to BAD.
Press [Enter].
Step Action
35. The Shipment Number should be given to you in the shipment kit.
NOTE: For training purposes only we are using the task number - but you will use
the shipment kit shipment number.
Click the Apply button.
System Process Document
Performing Material Debrief on a Non-IB Part
Page 36 Last changed on: 8/31/2011 1:16:00 PM
Step Action
36. Click the Select option.
System Process Document Performing Material Debrief on a Non-IB Part
Last changed on: 8/31/2011 1:16:00 PM Page 37
Step Action
37. Click the Post Debrief button.
System Process Document
Performing Material Debrief on a Non-IB Part
Page 38 Last changed on: 8/31/2011 1:16:00 PM
Step Action
38. Set the Assignment Status to Closed.
Click the Closed list item.
System Process Document Performing Material Debrief on a Non-IB Part
Last changed on: 8/31/2011 1:16:00 PM Page 39
Step Action
39. Click the Apply button.
System Process Document
Performing Material Debrief on a Non-IB Part
Page 40 Last changed on: 8/31/2011 1:16:00 PM
Step Action
40. NOTE: If an error message is displayed saying, "The number of returned parts is
not equal to the number of used returnable parts on the Material Debrief," you will
need to either:
1) Enter the additional part in the correct Debrief line
2) If the part is DDR (Data Device Retention)--you will have a note in your task
notes if so--you will need to select a reason for missing returnable parts. Select the
correct reason (i.e. DDR.)
Then you may set the task status to Closed.