performance measurement and monitoring, and ... - fkk.uitm · pdf filedocument document code...
TRANSCRIPT
Document Document code OSH.UiTM.FKK(P.08)
OSHMS Management
Procedures Version 2.0
Revision 5.0
Chapter Page 1 of 7
Performance measurement and
monitoring and evaluation of
compliance procedures
PIC Dr Siti Nurul ‘Ain Yusop
Dr Azil Bahari Alias
Dr Nik Raikhan Nik Him
En Abd Jamil Lam
This document is a controlled document and a copy right of FKK UiTM. Any hardcopy of OSHMS documentation issued or printed by any individuals are considered as
uncontrolled copy. Any reference and usage by external parties must get written permission from the management of FKK UiTM.
External distribution of this document is strictly prohibited without permission. FKK UiTM
FAKULTI
KEJURUTERAAN
KIMIA
SALINAN DOKUMEN TERKAWAL
PERFORMANCE MEASUREMENT AND
MONITORING, AND EVALUATION OF
COMPLIANCE PROCEDURES
OSH.UiTM.FKK(P.08)
Prepared by Reviewed by Approved by
Signature SNAY ZAR NAR
Name Dr Siti Nurul ‘Ain
Yusop
Dr. Zulkifli Ab
Rashid
Prof Dr Norazah Abd
Rahman
Position SOSHCo OSHMR Dean
Date 16/08/2017 16/08/2017 21/08/2017
Document Document code OSH.UiTM.FKK(P.08)
OSHMS Management
Procedures Version 2.0
Revision 5.0
Chapter Page 2 of 7
Performance measurement and
monitoring and evaluation of
compliance procedures
PIC Dr Siti Nurul ‘Ain Yusop
Dr Azil Bahari Alias
Dr Nik Raikhan Nik Him
En Abd Jamil Lam
This document is a controlled document and a copy right of FKK UiTM. Any hardcopy of OSHMS documentation issued or printed by any individuals are considered as
uncontrolled copy. Any reference and usage by external parties must get written permission from the management of FKK UiTM.
External distribution of this document is strictly prohibited without permission. FKK UiTM
FAKULTI
KEJURUTERAAN
KIMIA
SALINAN DOKUMEN TERKAWAL
DOCUMENT CHANGE RECORD
It is a responsibility to Person in Charge of this document to record any changes as follows
Re
v
Approve
d by
Revision
Date
Effective
Date Summary of Revision Page
0.0 Dean 22.04.201
1
22.04.201
1
Newly established document All
1.0 Dean 05.11.201
2
5.11.2012 Addressing Stage 1 Audit areas of
concern
All
2.0 Dean 06.09.201
4
17.09.201
4
Updating revision number of all
forms
All
3.0 Dean 28.04.201
5
08.05.201
5
Reauthorizing and re-dating due to
appointment of a new Dean
All
4.0 Dean 25/11/201
6
30/11/201
6
Reauthorizing and re-dating due to
appointment new person in charge
All
5.0 Dean 16.06.2017 21.08.2017 - Revised the monitoring record of
OSH management programs
implementation (adding the
frequency of data collection)
- updating the manhour calculation
sheet in OSH.UiTM.FKK(P.08).PMR_rev0
1 to
OSH.UiTM.FKK(P.08).PMR_rev0
2
All
Attachmen
t
Document Document code OSH.UiTM.FKK(P.08)
OSHMS Management
Procedures Version 2.0
Revision 5.0
Chapter Page 3 of 7
Performance measurement and
monitoring and evaluation of
compliance procedures
PIC Dr Siti Nurul ‘Ain Yusop
Dr Azil Bahari Alias
Dr Nik Raikhan Nik Him
En Abd Jamil Lam
This document is a controlled document and a copy right of FKK UiTM. Any hardcopy of OSHMS documentation issued or printed by any individuals are considered as
uncontrolled copy. Any reference and usage by external parties must get written permission from the management of FKK UiTM.
External distribution of this document is strictly prohibited without permission. FKK UiTM
FAKULTI
KEJURUTERAAN
KIMIA
SALINAN DOKUMEN TERKAWAL
1 Objectives
1.1 To monitor, measure and record FKK UiTM OSH performance on a regular basis.
1.2 To evaluate compliance with legal requirements.
2 Scope
This procedure is applicable for activities and jobs in chemical engineering laboratories in level 5
and 6 FKK UiTM.
3 Abbreviations
4 Definition
FKK UiTM Fakulti Kejuruteraan Kimia, Universiti Teknologi MARA.
OSH Occupational Safety and Health
OSHMR Occupational Safety and Health Management Representative.
OSHAMR Occupational Safety and Health Assistant Management Representative
OSHMS Occupational Safety and Health Management System.
SOSHCo Sub Occupational Safety and Health Committee
Reactive performance
indicator
Measurable loss result of the OSH management system
related to FKK UiTM control of OSH risks/hazards
Proactive performance
indicator
Measurable implemented OSH programs related to the FKK
UiTM control of OSH risks/hazards
Document Document code OSH.UiTM.FKK(P.08)
OSHMS Management
Procedures Version 2.0
Revision 5.0
Chapter Page 4 of 7
Performance measurement and
monitoring and evaluation of
compliance procedures
PIC Dr Siti Nurul ‘Ain Yusop
Dr Azil Bahari Alias
Dr Nik Raikhan Nik Him
En Abd Jamil Lam
This document is a controlled document and a copy right of FKK UiTM. Any hardcopy of OSHMS documentation issued or printed by any individuals are considered as
uncontrolled copy. Any reference and usage by external parties must get written permission from the management of FKK UiTM.
External distribution of this document is strictly prohibited without permission. FKK UiTM
FAKULTI
KEJURUTERAAN
KIMIA
SALINAN DOKUMEN TERKAWAL
5 References
6 Procedures
No Steps Responsibility/When Output
Reactive performance monitoring and measurement procedures
6.1
Review all records of reported and
investigated incidents. SOSHCo
Performance Monitoring &
Measurement Record
OSH.UiTM.FKK(P.08).PMR_rev02
6.2
Compute the frequency rate for the all
types of incidents. SOSHCo
Performance Monitoring &
Measurement Record
OSH.UiTM.FKK(P.08).PMR_rev02
6.3
Present the computed reactive
performance in Management Review
Meeting.
OSHMR
SOSHCo minutes of meeting
OSH-UiTM.FKK(P.04).SMM_rev01
6.4
Record any comments, feedbacks or
suggestions.
SOSHCo
SOSHCo minutes of meeting
OSH-UiTM.FKK(P.04).SMM_rev01
Proactive performance monitoring and measurement procedures
6.5
Review all records of OSH management
programs implementation.
SOSHCo - quarterly
Performance Monitoring &
Measurement Record
Title Doc Code
Performance measurement and
monitoring and Evaluation of
compliance.
OHSAS 18001:2007 clause 4.5.1 and
clause 4.5.2
Performance monitoring and
measurement. MS1722:2011 clause 3.4.1
OSH objectives, targets and management
programs OSH.UiTM.FKK(M)
Legal register OSH.UiTM.FKK(P.02).LR
Incident register OSH.UiTM.FKK(P.09).IR
Document Document code OSH.UiTM.FKK(P.08)
OSHMS Management
Procedures Version 2.0
Revision 5.0
Chapter Page 5 of 7
Performance measurement and
monitoring and evaluation of
compliance procedures
PIC Dr Siti Nurul ‘Ain Yusop
Dr Azil Bahari Alias
Dr Nik Raikhan Nik Him
En Abd Jamil Lam
This document is a controlled document and a copy right of FKK UiTM. Any hardcopy of OSHMS documentation issued or printed by any individuals are considered as
uncontrolled copy. Any reference and usage by external parties must get written permission from the management of FKK UiTM.
External distribution of this document is strictly prohibited without permission. FKK UiTM
FAKULTI
KEJURUTERAAN
KIMIA
SALINAN DOKUMEN TERKAWAL
OSH.UiTM.FKK(P.08).PMR_rev02
No Steps Responsibility/When Output
6.6
Compute the year-to-date percentage of
OSH management programs
implementation (actual versus planned)
– refer to Chapter 7 of OSHMS
Management Manual.
SOSHCo Performance Monitoring &
Measurement Record
OSH.UiTM.FKK(P.08).PMR_rev02
6.7
Determine causes for not achieving the
objectives/targets of implementation of
OSH management programs.
SOSHCo SOSHCo minutes of meeting
OSH-UiTM.FKK(P.04).SMM_rev01
6.8
Present the computed proactive
performance. OSHMR
SOSHCo minutes of meeting
OSH-UiTM.FKK(P.04).SMM_rev01
6.9
Record any comments, feedbacks or
suggestions. SOSHCo
SOSHCo minutes of meeting
OSH-UiTM.FKK(P.04).SMM_rev01
Work area monitoring procedures
6.10
Survey all work areas for the following
potential occupational health hazards, if
required; Indoor air quality
Ventilation fumehood
SOSHCo Work Area Monitoring Report OSH.UiTM.FKK(P.08).WAMR_rev01
6.11 Present the report findings. OSHMR during
SOSHCo Meeting
SOSHCo minutes of meeting
OSH-UiTM.FKK(P.04).SMM_rev01
6.12
Correct the work place conditions
through appropriate measures.
Action Party Corrective/preventive action form
OSH.UiTM.FKK(P.09).CPA_rev02
Equipment/instrument calibration monitoring procedure
6.13
Identify equipment/instrumentation
used to measure OSH related hazards,
which require periodical calibration.
SOSHCo. Equipment Calibration record
OSH.UiTM.FKK(P.08).ECR_rev01
6.14
Carry-out equipment/instrument
calibration (internally or externally).
SOSHCo Equipment Calibration record
OSH.UiTM.FKK(P.08).ECR_rev01
Document Document code OSH.UiTM.FKK(P.08)
OSHMS Management
Procedures Version 2.0
Revision 5.0
Chapter Page 6 of 7
Performance measurement and
monitoring and evaluation of
compliance procedures
PIC Dr Siti Nurul ‘Ain Yusop
Dr Azil Bahari Alias
Dr Nik Raikhan Nik Him
En Abd Jamil Lam
This document is a controlled document and a copy right of FKK UiTM. Any hardcopy of OSHMS documentation issued or printed by any individuals are considered as
uncontrolled copy. Any reference and usage by external parties must get written permission from the management of FKK UiTM.
External distribution of this document is strictly prohibited without permission. FKK UiTM
FAKULTI
KEJURUTERAAN
KIMIA
SALINAN DOKUMEN TERKAWAL
No Steps Responsibility/When Output
Evaluation of compliance procedures
6.17 Conduct compliance with legal and
other requirements, and OSHMS
arrangement monitoring. SOSHCo- yearly
Evaluation of compliance report
OSH.UiTM.FKK(P.08).ECRT_rev
01
Legal Register
OSH.UiTM.FKK(P.02).LR_rev01
6.21 Evaluate OSH legal compliance and
OSHMS compliance SOSHCo- yearly
Evaluation of compliance report
OSH.UiTM.FKK(P.08).ECRT_rev
01
Legal Register
OSH.UiTM.FKK(P.02).LR_rev01
6.23 Present the report findings.
OSHMR
SOSHCo minutes of meeting
UiTM.FKK(P.04).SMM_rev01
6.24 Correct the non-compliance with
appropriate measures. Action parties
Corrective/preventive action form
OSH.UiTM.FKK(P.09).CPA_rev02
6.25 Follow-up the implementation of non-
compliance. SOSHCo
Corrective/preventive action form
OSH.UiTM.FKK(P.09).CPA_erv02
Document Document code OSH.UiTM.FKK(P.08)
OSHMS Management
Procedures Version 2.0
Revision 5.0
Chapter Page 7 of 7
Performance measurement and
monitoring and evaluation of
compliance procedures
PIC Dr Siti Nurul ‘Ain Yusop
Dr Azil Bahari Alias
Dr Nik Raikhan Nik Him
En Abd Jamil Lam
This document is a controlled document and a copy right of FKK UiTM. Any hardcopy of OSHMS documentation issued or printed by any individuals are considered as
uncontrolled copy. Any reference and usage by external parties must get written permission from the management of FKK UiTM.
External distribution of this document is strictly prohibited without permission. FKK UiTM
FAKULTI
KEJURUTERAAN
KIMIA
SALINAN DOKUMEN TERKAWAL
7 Records
No Records File number File location Retention
time
7.1
SOSHCo Minutes of Meeting
OSH.UiTM.FKK(P.04).SMM_rev01
Records of
OSH.UiTM.FKK(P.04)
OHSAS
meeting room 7 years
7.2
Performance Monitoring &
Measurement Record
OSH.UiTM.FKK(P.08).PMR_rev02
Records of
OSH.UiTM.FKK(P.08)
OHSAS
meeting room 5 years
7.3 Work Area Monitoring Report
OSH.UiTM.FKK(P.08).WAMR_rev01
OHSAS
meeting room 5 years
7.4
Equipment Calibration record
OSH.UiTM.FKK(P.08).ECR_rev01
OHSAS
meeting room 5 years
7.5
Evaluation of compliance report
OSH.UiTM.FKK(P.08).ECRT_rev01
OHSAS
meeting room 5 years
7.6 Legal Register
OSH.UiTM.FKK(P.02).LR_rev01
Records of
OSH.UiTM.FKK(P.02)
OHSAS
meeting room 5 years
7.7 Corrective/preventive action form
OSH.UiTM.FKK(P.09).CPA_rev02
Records of
OSH.UiTM.FKK(P.09)
OHSAS
meeting room
5 years
8 Attachment
8.1 OSH.UiTM.FKK(P.08).PMR_rev02-Performance Monitoring & Measurement Record
8.2 OSH.UiTM.FKK(P.08).WAMR_rev01-Work Area Monitoring Report
8.3 OSH.UiTM.FKK(P.08).ECRT_rev01-Evaluation of compliance report
8.4 OSH.UiTM.FKK(P.08).ECR_rev01- Equipment Calibration record
OSH.UiTM.FKK(P.08).PMR_rev02
PERFORMANCE MONITORING & MEASUREMENT RECORD
Year Lost time
injury case
Medical
treatment
case
First aid
case
Near miss
incident
Property
damage
incident
Fire incident Chemical
spills
Others
Total recordable = Lost time + more than first aid = __
FKK UiTM inj/ill = Lost time + more than first aid + first aid = ___
Rate (ANSI) = No (cases) × 1,000,000 / manhours YTD = ___
Rate (OSHA) = No (cases) × 200,000 / manhours YTD = ___
OSH.UiTM.FKK(P.08).WAMR_rev01
WORK AREA MONITORING REPORT
Work Area : _________________________________________
Date : _________________________________________
Potential occupational health hazards
MEASURE Standard Actual REMARKS
Authorized Person:
( )
Name:
Position:
OSH.UiTM.FKK(P.08).ECRT_rev01
EVALUATION OF COMPLIANCE REPORT
1) Incidents evaluation actual vs planned
MEASURE TARGET REMARKS
Number of lost time injuries
Number of medical treatment case
Number of first aid case
Number of near miss
Number of property damage
Fire incidents
Chemical spills
2) Local Exhaust Ventilation System (LEV)
LOCATION REMARKS
FKK UiTM - Level 5 Laboratories
FKK UiTM - Level 6 Laboratories
3) Equipment calibrations
NO EQUIPMENT SERIAL
NUMBER
CALIBRATION
DATE
CALIBRATION
EXPIRED DATE
REMARKS
OSH.UiTM.FKK(P.08).ECR_rev01
EQUIPMENT WITH PERIODICAL CALIBRATION
NO EQUIPMENT SERIAL
NUMBER
LABORATORY/LOCATION/
PERSON IN CHARGE
REMARKS