Performance Analysis in
Manufacturing System–
Little’s Law
![Page 2: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/2.jpg)
2
Performance analysis
Performance analysis (or monitoring) related to a system composed of independent resources, (e.g. manufacturing system that produces a set of different pieces, each of them asking for system resources on the basis of its own cycle), is the analysis of the relationships among the differentperformance variables of the system, given the boundaries conditions.
Performance analysis is used both for making predictions on new systembehaviour, or for checking the performances for existing systems.
There are different performance analysis methods, depending on theircomplexity and approximation level. For example simulation is very precise and detailed, but very expensive to apply.
Little’s Law and Throughput Diagrams (or analysis) are two of the mostsimple methods.
![Page 3: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/3.jpg)
Performance analysis
Define the main performance of the system
By monitoring it is possible:
To obtain real-time information on the system
To make an analysis on system behaviour history
To compute and analyse the trand of performance index
3
Area i Area i+1
Production flow
Monitoring results
MONITORING
![Page 4: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/4.jpg)
Performance analysis
4
b) Diagramma di Throughput
Ordini in arrivo
Ordini completati
a) Funnel model
Massima capacità Tasso di
output effettivo
Ordini in coda
(WIP)
Contenuto di lavoro
dell’ordine
[ ore standard ]
Tempo [ giorni a calendario ]
Curva di Output
Output
Input
WIP iniziale Tasso di output medio
Periodo di riferimento
Curva di Input
Tasso di carico (input) medio
WIP finale Funnel Model
![Page 5: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/5.jpg)
5
Base relationship
Critical WIP (WIP*): it is the WIP level
that allows to a manufacturing system to
reach the maximum throughput (THmax)
and the minimum lead time (LTmin)
WIP* = THmax x LTmin
![Page 6: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/6.jpg)
6
The Penny Fab
Characteristics:
4 identical machines (flow shop)
Manufacturing time equal to 2 h/penny for each machine
Fixed time
The pieces are loaded into the system in order to maintain a constant WIP level (CONWIP)
When a penny is released by the system, another one can be loaded
Parameters:
THcb = 0,5 penny/h
LTmin = 8 h
Critical WIP - WIP*= 0,5 penny/h x 8 h = 4 penny
![Page 7: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/7.jpg)
7
The Penny Fab
Factory Physics, Wallace J. Hopp and Mark L. Spearman, Irwin/McGraw-Hill, 1996
Penny Fab represents a simple production line that makes giant one-cent pieces used
extensively in Fourth of July parades
The line consists of four machines in sequence
The first machine is a punch press that cuts penny blanks, the second stamps Lincoln’s face on one
side and the Lincoln Memorial on the back, the third puts a rim on the penny, and the fourth cleans
away any burrs
After each penny is processed, it is moved immediately to the next machine
The line runs 24 hours per day, with breaks and lunches covered by spare operators
The market for giant pennies is assumed to be unlimited, so that all product made is sold;
thus, more throughput is unambiguously better for this system
![Page 8: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/8.jpg)
8
The Penny Fab (WIP=1)
Time = 0 hours
![Page 9: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/9.jpg)
9
The Penny Fab (WIP=1)
Time = 2 hours
![Page 10: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/10.jpg)
10
The Penny Fab (WIP=1)
Time = 4 hours
![Page 11: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/11.jpg)
11
The Penny Fab (WIP=1)
Time = 6 hours
![Page 12: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/12.jpg)
12
The Penny Fab (WIP=1)
Time = 8 hours
![Page 13: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/13.jpg)
13
The Penny Fab (WIP=1)
Time = 10 hours
![Page 14: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/14.jpg)
14
The Penny Fab (WIP=1)
Time = 12 hours
![Page 15: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/15.jpg)
15
The Penny Fab (WIP=1)
Time = 14 hours
![Page 16: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/16.jpg)
16
2
4
6
8
10
12
14
16
2 MONETE IN 16
MINUTI = 2/16 = 0,125
![Page 17: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/17.jpg)
17
Performance with WIP = 1
WIP[pz]
TH [pz/h]
LT[h]
THxLT[pz]
1 0,125 8 1
2
3
4
5
6
![Page 18: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/18.jpg)
18
The Penny Fab (WIP=2)
Time = 0 hours
![Page 19: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/19.jpg)
19
The Penny Fab (WIP=2)
Time = 2 hours
![Page 20: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/20.jpg)
20
The Penny Fab (WIP=2)
Time = 4 hours
![Page 21: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/21.jpg)
21
The Penny Fab (WIP=2)
Time = 6 hours
![Page 22: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/22.jpg)
22
The Penny Fab (WIP=2)
Time = 8 hours
![Page 23: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/23.jpg)
23
The Penny Fab (WIP=2)
Time = 10 hours
![Page 24: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/24.jpg)
24
The Penny Fab (WIP=2)
Time = 12 hours
![Page 25: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/25.jpg)
25
The Penny Fab (WIP=2)
Time = 14 hours
![Page 26: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/26.jpg)
26
2
4
6
8
10
12
14
16
Dopo la fase di transitorio
(riempimento del
sistema)
2 MONETE IN 8 MINUTI
= 2/8 = 0,250
![Page 27: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/27.jpg)
27
Performance with WIP = 2
WIP[pz]
TH [pz/h]
LT[h]
THxLT[pz]
1 0,125 8 1
2 0,250 8 2
3
4
5
6
![Page 28: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/28.jpg)
28
The Penny Fab (WIP=3)
Time = 0 hours
![Page 29: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/29.jpg)
29
The Penny Fab (WIP=3)
Time = 2 hours
![Page 30: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/30.jpg)
30
The Penny Fab (WIP=3)
Time = 4 hours
![Page 31: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/31.jpg)
31
The Penny Fab (WIP=3)
Time = 6 hours
![Page 32: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/32.jpg)
32
The Penny Fab (WIP=3)
Time = 8 hours
![Page 33: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/33.jpg)
33
The Penny Fab (WIP=3)
Time = 10 hours
![Page 34: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/34.jpg)
34
The Penny Fab (WIP=3)
Time = 12 hours
![Page 35: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/35.jpg)
35
2
4
6
8
10
12
14
16
Dopo la fase di transitorio
(riempimento del
sistema)
3 MONETE IN 8 MINUTI
= 3/8 = 0,375
![Page 36: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/36.jpg)
36
Performance with WIP = 3
WIP[pz]
TH [pz/h]
LT[h]
THxLT[pz]
1 0,125 8 1
2 0,250 8 2
3 0,375 8 3
4
5
6
![Page 37: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/37.jpg)
37
The Penny Fab (WIP=4)
Time = 0 hours
![Page 38: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/38.jpg)
38
The Penny Fab (WIP=4)
Time = 2 hours
![Page 39: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/39.jpg)
39
The Penny Fab (WIP=4)
Time = 4 hours
![Page 40: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/40.jpg)
40
The Penny Fab (WIP=4)
Time = 6 hours
![Page 41: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/41.jpg)
41
The Penny Fab (WIP=4)
Time = 8 hours
![Page 42: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/42.jpg)
42
The Penny Fab (WIP=4)
Time = 10 hours
![Page 43: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/43.jpg)
43
The Penny Fab (WIP=4)
Time = 12 hours
![Page 44: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/44.jpg)
44
Performance with WIP = 4
WIP[pz]
TH [pz/h]
LT[h]
THxLT[pz]
1 0,125 8 1
2 0,250 8 2
3 0,375 8 3
4 0,500 8 4
5
6
![Page 45: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/45.jpg)
45
The Penny Fab (WIP=5)
Time = 0 hours
![Page 46: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/46.jpg)
46
The Penny Fab (WIP=5)
Time = 2 hours
![Page 47: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/47.jpg)
47
The Penny Fab (WIP=5)
Time = 4 hours
![Page 48: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/48.jpg)
48
The Penny Fab (WIP=5)
Time = 6 hours
![Page 49: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/49.jpg)
49
The Penny Fab (WIP=5)
Time = 8 hours
![Page 50: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/50.jpg)
50
The Penny Fab (WIP=5)
Time = 10 hours
![Page 51: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/51.jpg)
51
The Penny Fab (WIP=5)
Time = 12 hours
![Page 52: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/52.jpg)
52
The Penny Fab (WIP=5)
Time = 14 hours
![Page 53: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/53.jpg)
53
The Penny Fab (WIP=5)
Time = 16 hours
![Page 54: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/54.jpg)
54
Performance with WIP = 5
WIP[pz]
TH [pz/h]
LT[h]
THxLT[pz]
1 0,125 8 1
2 0,250 8 2
3 0,375 8 3
4 0,500 8 4
5 0,500 10 5
6
![Page 55: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/55.jpg)
55
The Penny Fab (WIP=6)
Time = 0 hours
![Page 56: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/56.jpg)
56
The Penny Fab (WIP=6)
Time = 2 hours
![Page 57: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/57.jpg)
57
The Penny Fab (WIP=6)
Time = 4 hours
![Page 58: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/58.jpg)
58
The Penny Fab (WIP=6)
Time = 6 hours
![Page 59: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/59.jpg)
59
The Penny Fab (WIP=6)
Time = 8 hours
![Page 60: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/60.jpg)
60
The Penny Fab (WIP=6)
Time = 10 hours
![Page 61: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/61.jpg)
61
The Penny Fab (WIP=6)
Time = 12 hours
![Page 62: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/62.jpg)
62
The Penny Fab (WIP=6)
Time = 14 hours
![Page 63: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/63.jpg)
63
The Penny Fab (WIP=6)
Time = 16 hours
![Page 64: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/64.jpg)
64
The Penny Fab (WIP=6)
Time = 18 hours
![Page 65: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/65.jpg)
65
Performance with WIP = 6
WIP[pz]
TH [pz/h]
LT[h]
THxLT[pz]
1 0,125 8 1
2 0,250 8 2
3 0,375 8 3
4 0,500 8 4
5 0,500 10 5
6 0,500 12 6
![Page 66: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/66.jpg)
66
TH vs. WIP
0
0,1
0,2
0,3
0,4
0,5
0,6
0 1 2 3 4 5 6 7 8 9 10 11 12
WIP
TH
THmax
= THcb
WIP*
1/LTmin
![Page 67: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/67.jpg)
67
LT vs. WIP
02468
101214161820222426
0 1 2 3 4 5 6 7 8 9 10 11 12
WIP
LT
LTmin
WIP*
1/THcb
![Page 68: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/68.jpg)
68
THmax and LTmin
Minimum LT (LTmin) given the WIP level
is
Maximum throughput (THmax) given the
level WIP is
otherwise
* if
,/
,LT
max
min
WIPwip
THwip
Tprocess
otherwise
* if
,
,/TH
min
max
WIPwip
TH
LTwip
bn
LTmin is the sum of effort
(time) for each machine in
order to realize a single
penny
THmax is the TH of
the system
bottleneck (the
slowest resource)
![Page 69: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/69.jpg)
69
THmax and LTmin
Penny Fab, THcb = 0.5 and LTmin = 8
WIP* = 0.5 8 = 4,
otherwise
4 if
,2
,8LTmin
wip
wip
otherwise
4 if
,5.0
,8/THmax
wipwip
![Page 70: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/70.jpg)
70
Little’s Law
The main relationship among WIP, LT and
Th is
LT = WIP/TH
LTTHWIP hh
pcspcs
![Page 71: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/71.jpg)
71
Penny Fab Two
10 h
2 h
5 h 3 h
![Page 72: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/72.jpg)
72
Penny Fab Two
DepartmentNumber ot
machinesWork time [h]
Department TH
[job/h]
1 1 2 0,5
2 2 5 0,4
3 6 10 0,6
4 2 3 0,67
THcb = LTmin = WIP* = 0.4 p/h 20 h 8 penny
![Page 73: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/73.jpg)
73
Penny Fab Two Simulation
(Time=0)
10 hr
2 hr
5 hr 3 hr
2
![Page 74: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/74.jpg)
74
Penny Fab Two Simulation
(Time=2)
10 hr
2 hr
5 hr 3 hr
4
7
![Page 75: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/75.jpg)
75
Penny Fab Two Simulation
(Time=4)
10 hr
2 hr
5 hr 3 hr
6
7
9
![Page 76: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/76.jpg)
76
Penny Fab Two Simulation
(Time=6)
10 hr
2 hr
5 hr 3 hr
8
7
9
![Page 77: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/77.jpg)
77
Penny Fab Two Simulation
(Time=7)
10 hr
2 hr
5 hr 3 hr
8
12
9
17
![Page 78: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/78.jpg)
78
Penny Fab Two Simulation
(Time=8)
10 hr
2 hr
5 hr 3 hr
10
12
9
17
![Page 79: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/79.jpg)
79
Penny Fab Two Simulation
(Time=9)
10 hr
2 hr
5 hr 3 hr
10
12
14
17
19
![Page 80: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/80.jpg)
80
Penny Fab Two Simulation
(Time=10)
10 hr
2 hr
5 hr 3 hr
12
12
14
17
19
![Page 81: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/81.jpg)
81
Penny Fab Two Simulation
(Time=12)
10 hr
2 hr
5 hr 3 hr
14
17
14
17
19
22
![Page 82: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/82.jpg)
82
Penny Fab Two Simulation
(Time=14)
10 hr
2 hr
5 hr 3 hr
16
17
19
17
19
22
24
![Page 83: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/83.jpg)
83
Penny Fab Two Simulation
(Time=16)
10 hr
2 hr
5 hr 3 hr
17
19
17
19
22
24
![Page 84: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/84.jpg)
84
Penny Fab Two Simulation
(Time=17)
10 hr
2 hr
5 hr 3 hr
22
19
27
19
22
24
20
![Page 85: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/85.jpg)
85
Penny Fab Two Simulation
(Time=19)
10 hr
2 hr
5 hr 3 hr
22
24
27
29
22
24
20
22
![Page 86: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/86.jpg)
86
Penny Fab Two Simulation
(Time=20)
10 hr
2 hr
5 hr 3 hr
22
24
27
29
22
24 22
22
Note: the job will arrive to the
bottleneck just in time to avoid
starvation
![Page 87: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/87.jpg)
87
Penny Fab Two Simulation
(Time=22)
10 hr
2 hr
5 hr 3 hr
27
24
27
29
32
24
25
24
Note: the job will arrive to the
bottleneck just in time to avoid
starvation
![Page 88: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/88.jpg)
88
Penny Fab Two Simulation
(Time=24)
10 hr
2 hr
5 hr 3 hr
27
29
27
29
32
34
25
27
And so on… The bottleneck will
be always busy, while the other
resources will have idle periods
(starvation)
![Page 89: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/89.jpg)
89
tgb
tga
I/LTmin
I/THmax
Little’s diagram
LTmin
LT
LT
Wip*
THmax
TH
TH
THmin
1Wip
Real form
![Page 90: Performance Analysis in Manufacturing Systemmy.liuc.it/MatSup/2017/N91328/Lez 01 - Little Law.pdf · 2 Performance analysis Performance analysis (or monitoring) related to a system](https://reader031.vdocuments.us/reader031/viewer/2022022708/5be72b4809d3f2db738bf371/html5/thumbnails/90.jpg)
90
Conclusions In real cases, also for low level of WIP, the different pieces concurr in order to obtain
system resources (not only machines, but also operators, transporters, tools) and, for this reason, the real form of the LT and TH diagrams is not exactly the one describedby Little’s Law.
Penny Fab is only an ideal case with fixed time and balanced line
Wip* is equal to stations number and TH grows to the maximum value with LT = LTmin; from that point on LT grows without advantages.
In a non-ideal case (not balanced line) Wip* is less than stations number (e.g. Penny FabTwo).
Also for balaced line, in case of non-fixed times, a wating time can occurr
In all these cases, the specific form of diagrams should be evaluated case by case, for example with simulation
On the basis of Little’s Law, in order to reduce the LT of a system the Wip valueshould be reduced in order to mantain a constant TH
For this reason, if a system is characterized by the presence of queues, it should be possibleto reduce LT and WIP.