pentagon corridor 8 - national capital planning … facility at the corridor 8 entrance to the...
TRANSCRIPT
PEPEPEPPPPPPPPEPEPEEENENTAGTAGONONEEEMMMMMMMEMMM ORIORIALALALMMM
NORTHPARKING
SOUTHPARKING
LAGOON
HAYES STREET BUS TERMINAL
110
27
0 100' 250' 500' 1000'
Concept Design NarrativeConstruction of a new permanent employee and visitor’s
screening facility at the Corridor 8 Entrance to the Pentagon to
replace the existing antiquated, inadequate, and substandard
screening and security system.
The existing employee screening system was installed as a
temporary solution to increased security requirements post
9/11, and the present conditions are inadequate and substandard
and do not meet current security, safety, surveillance, screening,
detection , AT/FP, pedestrian throughput capacity requirements,
and protection of the Pentagon tenants and attending police
officer against unauthorized entry and threats.
The new facility will replace the existing screening process to
comply with current security, life safety, throughput capacity,
AT/FP, HSPD-12 and ISMP criteria.
Virginia
Maryland
District of ColumbiaRegional Map
Districtof
Columbia
3 November 2017
1
Pentagon Reservation Concept - Bike & Pedestrian Circulation
PENTAGON EMPLOYEE FITNESS ROUTE
MULTI-USE TRAIL
FUTURE MULTI-USE TRAIL
SIGNED ON-STREET BIKE ROUTE
FUTURE BIKE ROUTE (ARLINGTON COUNTY)
PENTAGON EMPLOYEE BIKE ROUTE
BIKE ONLY LANE
STUDY AREA
PENTAGON BIKE PARKING
PUBLIC BIKE PARKING
LEGEND
Site Analysis
3 November 2017
3
1
Corridor 8 PACP Site - Existing Conditions
2
Proposed PedestrianAccess Control Point Location
1
2
Site Analysis
4
3 November 2017
Arlington HouseTomb of the Unknown Soldier
US Air Force Memorial
View Shed from US Air Force Memorial, Tomb of the Unknown Soldier and Arlington House
Site Analysis
6
3 November 2017
Proposed site
Existing View Toward Pentagon Corridor 8 PACP from
Arlington House
Site Analysis
3 November 2017
7
Existing View Toward Pentagon Corridor 8 PACP from
Tomb of the Unknown Soldier
Proposed site
Site Analysis
8
3 November 2017
Existing View Toward Pentagon Corridor 8 PACP from
Air Force Memorial
Proposed site
Site Analysis
3 November 2017
9
Aerial View - Corridor 8 PACP
Future Canopy
View Shed from Route 110
Site Analysis
3 November 2017
11
Corridor 8 PACP - Site Plan
21
16
12.0
24
15
22
20
17
18
19
23
20
35
SAND
20
16
15
15
21
16
12.0
24
15
22
20
17
18
19
23
20
35
SAND
20
16
15
15
35
15
20
2525
25
30
30
30
35
15
20
2525
25
30
30
30
20 20
23
22
21
22
23
24
26
27
2829
29
28
27
26
24
3132
33
34
11
11
16
1718
1921 22 23 24
24
23
22
23
2322
2425
26
25
23
22
21
22
23
24
26
27
2829
29
28
27
26
24
3132
33
34
11
11
16
1718
1921 22 23 24
24
23
22
23
2322
2425
26
25
To North Parking
To North Parking
To Pentagon
Library
Route 110
Fence
Fence
0 20'
SCALE
10' 40'
Proposed Site Design & Architecture
14
3 November 2017
Site Section
Boundary Channel Route 110
New Corridor 8 PACP
Pentagon Library & Conference Center
Corridor 8 Bridge
Pentagon
Proposed Site Design & Architecture
3 November 2017
15 16
Corridor 8 PACP - Pedestrian Circulation & Egress Plan
To North Parking
ADA
ADA
To North Parking
To Pentagon
Library
Fence
Fence
Fence
21'-
1"
63'-
7"
21'-
3"
87'- 0"
19'- 7"
4'- 0"
30'- 0" 37'- 5"
21'-
3"
0 20'
SCALE
10' 40'
Proposed Site Design & Architecture
3 November 2017
17
17' -
0"
Top of Wall17' - 0"
Top of Roof Deck13' - 1"
North Elevation
Proposed Site Design & Architecture
18
3 November 2017
Corridor 8 PACP - Elevations
Top of Wall17' - 0"
17' -
0"
Top of Wall17' - 0"
Top of Roof Deck13' - 1"
17' -
0"
1' -
6"2'
- 3"
10' -
3" 14
' - 0
"
East Elevation
South Elevation
Proposed Site Design & Architecture
3 November 2017
19