penny lala johnathan perry clara foshee cristine gowland · penny lala. us 190 background...

56
www.dotd.la.gov Penny Lala Clara Foshee Covington’s US 190 Superstreet Statewide Traffic Engineer’s Meeting 2019 UPERSTREET Johnathan Perry Cristine Gowland

Upload: others

Post on 11-Oct-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Penny Lala Johnathan Perry Clara Foshee Cristine Gowland · Penny Lala. US 190 Background Information Covington, St. Tammany Parish 62,726 ADT in 2017 45mph, six-lane, divided urban

www.dotd.la.gov

Penny Lala

Clara Foshee

Covington’s US 190 SuperstreetStatewide Traffic Engineer’s Meeting 2019

UPERSTREET

Johnathan Perry

Cristine Gowland

Page 2: Penny Lala Johnathan Perry Clara Foshee Cristine Gowland · Penny Lala. US 190 Background Information Covington, St. Tammany Parish 62,726 ADT in 2017 45mph, six-lane, divided urban

www.dotd.la.gov

Introduction

Penny Lala

Page 3: Penny Lala Johnathan Perry Clara Foshee Cristine Gowland · Penny Lala. US 190 Background Information Covington, St. Tammany Parish 62,726 ADT in 2017 45mph, six-lane, divided urban

US 190 Background Information

Covington, St. Tammany Parish

62,726 ADT in 2017

45mph, six-lane, divided urban arterial from I-12 to US 190

Business– Median width ~ 65’

Congested corridor

Large cycle lengths

3

Page 4: Penny Lala Johnathan Perry Clara Foshee Cristine Gowland · Penny Lala. US 190 Background Information Covington, St. Tammany Parish 62,726 ADT in 2017 45mph, six-lane, divided urban

US 190 Background Information

Corridor can be divided into two

sections:– I-12 to the Abita River Bridge

• ~ 2 miles

• 7 traditional signals

• 6 U-turns with yield control

• Dense driveway spacing

• Heavy development

4

Page 5: Penny Lala Johnathan Perry Clara Foshee Cristine Gowland · Penny Lala. US 190 Background Information Covington, St. Tammany Parish 62,726 ADT in 2017 45mph, six-lane, divided urban

US 190 Background Information

Corridor can be divided into two

sections:– Abita River Bridge to US 190 Business

• ~ 1 mile

• 3 full-access, two-way stop controlled

intersections (80’ – 90’ wide)

• 3 U-turns with yield control

• Bordered by signalized corridor to

the north

• Driveways more spaced out

• Less development

5

Page 6: Penny Lala Johnathan Perry Clara Foshee Cristine Gowland · Penny Lala. US 190 Background Information Covington, St. Tammany Parish 62,726 ADT in 2017 45mph, six-lane, divided urban

Previous Capacity Improvements

013-11-0026– Let in January 2004

– Project Limits: I-12 to the Abita River

Bridge

– Widen US 190 from 4-lanes to 6-lanes

– All existing full-access signals

remained

6

Page 7: Penny Lala Johnathan Perry Clara Foshee Cristine Gowland · Penny Lala. US 190 Background Information Covington, St. Tammany Parish 62,726 ADT in 2017 45mph, six-lane, divided urban

Previous Capacity Improvements

H.000490– Let in July 2005

– Project Limits: the Abita River Bridge

to US 190 Business

– Widen US 190 from 4-lanes to 6-lanes

– All existing intersection control

remained the same

– Project constructed a 6-lane road to a

2-lane bridge

7

Page 8: Penny Lala Johnathan Perry Clara Foshee Cristine Gowland · Penny Lala. US 190 Background Information Covington, St. Tammany Parish 62,726 ADT in 2017 45mph, six-lane, divided urban

US 190 Existing Issues

Queuing of northbound and southbound thru traffic

Some left turns over-capacity

6-lane highway to 2-lane bridge

Poor lane utilization

Cannot widen US 190 without impacting many businesses

Traffic predominantly enters or exits US 190 at the

intersections (not a lot of cross traffic)

8

Page 9: Penny Lala Johnathan Perry Clara Foshee Cristine Gowland · Penny Lala. US 190 Background Information Covington, St. Tammany Parish 62,726 ADT in 2017 45mph, six-lane, divided urban

US 190 Superstreet Traffic Study

Headquarters asked for routes to be studied as a Superstreet

We were aware of development coming that was going to further

break the broken roadway

We proposed US 190 Covington

Study was initiated in 2010

Study made recommendations involving both sections of US 190

Wal-Mart Marketplace development was initiated during the

study, so the study incorporated the permit requirements

Study completed in 2012 by Neel-Schaffer

9

Page 10: Penny Lala Johnathan Perry Clara Foshee Cristine Gowland · Penny Lala. US 190 Background Information Covington, St. Tammany Parish 62,726 ADT in 2017 45mph, six-lane, divided urban

US 190 Superstreet Scope Issues

Had to define limits on where the project would stop– Should have considered the signalized corridor immediately

outside the limits

Study assumed the entire corridor would be done at once– Not feasible during construction

– How do you phase in the improvements?

10

Page 11: Penny Lala Johnathan Perry Clara Foshee Cristine Gowland · Penny Lala. US 190 Background Information Covington, St. Tammany Parish 62,726 ADT in 2017 45mph, six-lane, divided urban

US 190 Superstreet Public Meeting

Meeting held June 18th, 2014– DOTD Employees, State Officials and Public in attendance

Received feedback and redesigned for an upcoming

development– Worked with consultant to get trip numbers and include them

in analysis

– Additional intersection at Greengate added

• Dual lefts onto the proposed connection

• Developer had to widen connection to accept the dual lefts

– U-turn locations modified to accommodate

11

Page 12: Penny Lala Johnathan Perry Clara Foshee Cristine Gowland · Penny Lala. US 190 Background Information Covington, St. Tammany Parish 62,726 ADT in 2017 45mph, six-lane, divided urban

www.dotd.la.gov

Plan Development

Clara W. Foshee

Page 13: Penny Lala Johnathan Perry Clara Foshee Cristine Gowland · Penny Lala. US 190 Background Information Covington, St. Tammany Parish 62,726 ADT in 2017 45mph, six-lane, divided urban

Developing The PlanWhat should be done first?

– Should the new signals be installed and activated first, or should all of the

construction work be done first?

– When should the new U-Turns be built and signalized? When should the old

ones be closed?

How will all of these signals be turned on?– 15 intersections where configuration and phasing/timings will change

– 2 signalized intersections where only the equipment will change

– How will all 17 signals, spanning across 3 miles of congested highway, be

activated?

How do we maintain access and flow during construction?– Lane closure restrictions? How tight do we make the restrictions?

13

Page 14: Penny Lala Johnathan Perry Clara Foshee Cristine Gowland · Penny Lala. US 190 Background Information Covington, St. Tammany Parish 62,726 ADT in 2017 45mph, six-lane, divided urban

US 190 at Frontage Rd

EXISTING

What Should Be Done First?

14

SUPERSTREET15

2

12

18

5

26

4

7

Page 15: Penny Lala Johnathan Perry Clara Foshee Cristine Gowland · Penny Lala. US 190 Background Information Covington, St. Tammany Parish 62,726 ADT in 2017 45mph, six-lane, divided urban

How Do We Turn All These Signals On?

Corridor broken into four groups for feasibility– Based on relationship of intersections to each other

• Wanted to keep U-Turns grouped with their respective origin movement

– Group size varied depending on density of signals and locations

15

(7 signals – 1.07 miles)

(4 signals – 0.66 miles)(3 signals – 0.66 miles)

(3 signals – 0.24 miles)

Page 16: Penny Lala Johnathan Perry Clara Foshee Cristine Gowland · Penny Lala. US 190 Background Information Covington, St. Tammany Parish 62,726 ADT in 2017 45mph, six-lane, divided urban

16

7 signals – 1.07 miles long

Holiday Blvd

2 Restricted-Access Intersections

3 U-Turn Only Intersections

2 Restricted-Access & U-Turn Intersections

Page 17: Penny Lala Johnathan Perry Clara Foshee Cristine Gowland · Penny Lala. US 190 Background Information Covington, St. Tammany Parish 62,726 ADT in 2017 45mph, six-lane, divided urban

17

4 signals – 0.66 miles long

2 Restricted-Access Intersections

2 U-Turn Only Intersections

Page 18: Penny Lala Johnathan Perry Clara Foshee Cristine Gowland · Penny Lala. US 190 Background Information Covington, St. Tammany Parish 62,726 ADT in 2017 45mph, six-lane, divided urban

18

3 signals – 0.66 miles long

2 U-Turn Only Intersections

1 Restricted-Access Intersection

Page 19: Penny Lala Johnathan Perry Clara Foshee Cristine Gowland · Penny Lala. US 190 Background Information Covington, St. Tammany Parish 62,726 ADT in 2017 45mph, six-lane, divided urban

19

3 signals – 0.24 miles long

3 U-Turn Only Intersections

1 Unsignalized U-Turn Only Intersection

1 Signalized Restricted-Access Intersection

1 Signalized U-Turn Only Intersection

Page 20: Penny Lala Johnathan Perry Clara Foshee Cristine Gowland · Penny Lala. US 190 Background Information Covington, St. Tammany Parish 62,726 ADT in 2017 45mph, six-lane, divided urban

Wanted to start at North end of project and work our way South – Northern intersections provided more leeway with unexpected issues

– Starting at the North end would make it easier to adjust offsets further

down the corridor

20

Desired Activation Order

(7 signals – 1.07 miles)

(4 signals – 0.66 miles)

(3 signals – 0.66 miles)(3 signals – 0.24 miles)

Page 21: Penny Lala Johnathan Perry Clara Foshee Cristine Gowland · Penny Lala. US 190 Background Information Covington, St. Tammany Parish 62,726 ADT in 2017 45mph, six-lane, divided urban

How Do We Maintain Access & Flow?

21

Lane Closure Restrictions– Need to be very strict

– Need to be in effect at all times

One Exception – US 190 at Park Place Dr– Turn-lane closed for multiple weeks on EB approach

– Cross-connectivity available

– Best solution to undesirable situation

Page 22: Penny Lala Johnathan Perry Clara Foshee Cristine Gowland · Penny Lala. US 190 Background Information Covington, St. Tammany Parish 62,726 ADT in 2017 45mph, six-lane, divided urban

Adjustments During Plan Development

Holiday Blvd Geometrics– Proposed dual right-turns off side-street

22

Corridor Timings – Study Recommended Timings:

• AM: 100 second cycles

• PM: 100 second cycles

– Timings in Field:• AM: 190 second cycles

• PM: 180 second cycles

– New Timings: • AM: 95 second cycles

• PM: 90 second cycles

AB

Page 23: Penny Lala Johnathan Perry Clara Foshee Cristine Gowland · Penny Lala. US 190 Background Information Covington, St. Tammany Parish 62,726 ADT in 2017 45mph, six-lane, divided urban

The Final Plan

23

Page 24: Penny Lala Johnathan Perry Clara Foshee Cristine Gowland · Penny Lala. US 190 Background Information Covington, St. Tammany Parish 62,726 ADT in 2017 45mph, six-lane, divided urban

www.dotd.la.gov

Implementation Issues

Johnathan Perry, P.E.

Page 25: Penny Lala Johnathan Perry Clara Foshee Cristine Gowland · Penny Lala. US 190 Background Information Covington, St. Tammany Parish 62,726 ADT in 2017 45mph, six-lane, divided urban

Issues Discovered During Preconstruction

What order would the contractor activate signals?

When would detection be installed?

There was confusion when ordering the total quantities for

the project– TSIs were provided for two existing intersections that were not fully

accounted for in the Final Plans

– Only the new signal equipment quantities were added to plans for

these intersections (controllers, pods, fiber, etc.)

Travel time studies needed before construction started

25

Page 26: Penny Lala Johnathan Perry Clara Foshee Cristine Gowland · Penny Lala. US 190 Background Information Covington, St. Tammany Parish 62,726 ADT in 2017 45mph, six-lane, divided urban

Direction Range (min.) Avg. (min.)

Period Pre-Construction (4/2018)

AMNB 7-15 10.9

SB 5-15 10.8

PMNB 12-32 17.8

SB 7-19 14.4

During Construction (3/2019)

AMNB - -

SB - -

PMNB 10.5-13.5 12.1

SB 10-13 11.5

Travel Time Studies

26

v

v

v

Page 27: Penny Lala Johnathan Perry Clara Foshee Cristine Gowland · Penny Lala. US 190 Background Information Covington, St. Tammany Parish 62,726 ADT in 2017 45mph, six-lane, divided urban

Issues Discovered During Construction

Adjacent Signalized Corridors

Signal Issues– Timings

– Controllers

– Cabinet Access

– Equipment Placement

– Signal Head Visibility

Sequence of Construction Issues

Signage Issues

Striping Issues

Other Issues

27

Page 28: Penny Lala Johnathan Perry Clara Foshee Cristine Gowland · Penny Lala. US 190 Background Information Covington, St. Tammany Parish 62,726 ADT in 2017 45mph, six-lane, divided urban

Adjacent Corridor Issues

Existing signalized corridors

adjacent to project– Signal system north of the bridge

(3 full-access)

– Signal system coordinated with

superstreet (4 full-access and 2

restricted-access)

28

Page 29: Penny Lala Johnathan Perry Clara Foshee Cristine Gowland · Penny Lala. US 190 Background Information Covington, St. Tammany Parish 62,726 ADT in 2017 45mph, six-lane, divided urban

Signal Issues - Timings

District was responsible for adjustment of signals – Green time adjustments

– Offset coordination (build as we go instead of backtracking later)

District had to time the existing corridor to the north to

match Superstreet timings before activation

29

Page 30: Penny Lala Johnathan Perry Clara Foshee Cristine Gowland · Penny Lala. US 190 Background Information Covington, St. Tammany Parish 62,726 ADT in 2017 45mph, six-lane, divided urban

Signal Issues - Controllers

Controller clocks drifting, AKA “Dirty Power”

Signals did not force off at the correct time – what can we do?– Re-time the entire corridor?

– Adjust the NTCIP Yield Value in all controllers?• Trial-and-Error method to get the internal Easy-Calcs to match the Force-Offs

on the TSIs

30

Page 31: Penny Lala Johnathan Perry Clara Foshee Cristine Gowland · Penny Lala. US 190 Background Information Covington, St. Tammany Parish 62,726 ADT in 2017 45mph, six-lane, divided urban

Signal Issues – Cabinet Access

31

Page 32: Penny Lala Johnathan Perry Clara Foshee Cristine Gowland · Penny Lala. US 190 Background Information Covington, St. Tammany Parish 62,726 ADT in 2017 45mph, six-lane, divided urban

Signal Issue – Equipment Placement

32

Page 33: Penny Lala Johnathan Perry Clara Foshee Cristine Gowland · Penny Lala. US 190 Background Information Covington, St. Tammany Parish 62,726 ADT in 2017 45mph, six-lane, divided urban

Signal Issues – Head Visibility

33

Page 34: Penny Lala Johnathan Perry Clara Foshee Cristine Gowland · Penny Lala. US 190 Background Information Covington, St. Tammany Parish 62,726 ADT in 2017 45mph, six-lane, divided urban

Sequence of Construction Issues

34

Signal work performed before earth work– Lead to damaged equipment

Page 35: Penny Lala Johnathan Perry Clara Foshee Cristine Gowland · Penny Lala. US 190 Background Information Covington, St. Tammany Parish 62,726 ADT in 2017 45mph, six-lane, divided urban

Signage Issues - Lack of Adequate Signage

35

Page 36: Penny Lala Johnathan Perry Clara Foshee Cristine Gowland · Penny Lala. US 190 Background Information Covington, St. Tammany Parish 62,726 ADT in 2017 45mph, six-lane, divided urban

Signage Issues – Conflicting Information

36

Page 37: Penny Lala Johnathan Perry Clara Foshee Cristine Gowland · Penny Lala. US 190 Background Information Covington, St. Tammany Parish 62,726 ADT in 2017 45mph, six-lane, divided urban

Striping Issues – Stop Bar Placement

37

Page 38: Penny Lala Johnathan Perry Clara Foshee Cristine Gowland · Penny Lala. US 190 Background Information Covington, St. Tammany Parish 62,726 ADT in 2017 45mph, six-lane, divided urban

Striping Issues - Lane Utilization

38

Page 39: Penny Lala Johnathan Perry Clara Foshee Cristine Gowland · Penny Lala. US 190 Background Information Covington, St. Tammany Parish 62,726 ADT in 2017 45mph, six-lane, divided urban

Non-Uniform Pavement– 3 different pavements on

one approach

Misleading Traffic Control

Devices– Cones give impression

that inside lane is closed

Lack of Striping– No temporary striping to

guide motorists

Striping Issues - Lane Utilization

39

Page 40: Penny Lala Johnathan Perry Clara Foshee Cristine Gowland · Penny Lala. US 190 Background Information Covington, St. Tammany Parish 62,726 ADT in 2017 45mph, six-lane, divided urban

Other Issues - Environmental Impacts

40

Page 41: Penny Lala Johnathan Perry Clara Foshee Cristine Gowland · Penny Lala. US 190 Background Information Covington, St. Tammany Parish 62,726 ADT in 2017 45mph, six-lane, divided urban

Permitted Movements– Rights-In/Thrus

– Lefts-In/Rights-Out

Illegal Movements– NB & SB U-Turns from

Left-Turn Lanes

Observations at one

intersection:– 2 Hour PM Period

– 52 NB Illegal U-Turns

– 14 SB Illegal U-Turns

Other Issues – Illegal Movements

41

Page 42: Penny Lala Johnathan Perry Clara Foshee Cristine Gowland · Penny Lala. US 190 Background Information Covington, St. Tammany Parish 62,726 ADT in 2017 45mph, six-lane, divided urban

Other Issues – Illegal Movements

42

Page 43: Penny Lala Johnathan Perry Clara Foshee Cristine Gowland · Penny Lala. US 190 Background Information Covington, St. Tammany Parish 62,726 ADT in 2017 45mph, six-lane, divided urban

43

Local News Review

Page 44: Penny Lala Johnathan Perry Clara Foshee Cristine Gowland · Penny Lala. US 190 Background Information Covington, St. Tammany Parish 62,726 ADT in 2017 45mph, six-lane, divided urban

www.dotd.la.gov

Lessons Learned

Cristine Gowland, P.E.

Page 45: Penny Lala Johnathan Perry Clara Foshee Cristine Gowland · Penny Lala. US 190 Background Information Covington, St. Tammany Parish 62,726 ADT in 2017 45mph, six-lane, divided urban

Next Steps and Conclusions

Signal Coordination

Ongoing Public Outreach

Public Opinion

Measures of Success

45

Page 46: Penny Lala Johnathan Perry Clara Foshee Cristine Gowland · Penny Lala. US 190 Background Information Covington, St. Tammany Parish 62,726 ADT in 2017 45mph, six-lane, divided urban

Signal Coordination

Coordination of both

northbound and southbound

traffic simultaneously

Not as efficient as two, one-way

facilities

Controlling full access signal on

north side

Independent coordination of

northbound and southbound

traffic

Too many cabinets to split (17

now versus 29 individual)

Need to try independent rings in

same controller

Pattern Offsets menu allows for

different offsets to be assigned

to each ring

46

Current: Future (Eventually):

Page 47: Penny Lala Johnathan Perry Clara Foshee Cristine Gowland · Penny Lala. US 190 Background Information Covington, St. Tammany Parish 62,726 ADT in 2017 45mph, six-lane, divided urban

Ongoing Public Outreach

MyDOTD notifications issued

Public Meeting was removed from Webpage and had to be re-added

Public Information Group created a graphic of the corridor and

posted it

Numerous phone call and email questions and complaints

Troop L wanted to meet with local businesses on corridor for a

“Safety Meeting”

47

Page 48: Penny Lala Johnathan Perry Clara Foshee Cristine Gowland · Penny Lala. US 190 Background Information Covington, St. Tammany Parish 62,726 ADT in 2017 45mph, six-lane, divided urban

Local Business Outreach - Troop L

DOTD contacted State Police Troop L concerning enforcement of

illegal U-turns

Troop wanted to perform outreach to local businesses before heavy

enforcement

Troop proposed a joint effort with DOTD

– The Troop would talk about safety

– DOTD would speak about Superstreet

48

Page 49: Penny Lala Johnathan Perry Clara Foshee Cristine Gowland · Penny Lala. US 190 Background Information Covington, St. Tammany Parish 62,726 ADT in 2017 45mph, six-lane, divided urban

Local Business Outreach - Troop L

49

The presentation has been given to two separate groups at Cantium

and one large group at Chevron

Most people in the room where there because they wanted to be. . .

Reached 300 corridor drivers so far

Page 50: Penny Lala Johnathan Perry Clara Foshee Cristine Gowland · Penny Lala. US 190 Background Information Covington, St. Tammany Parish 62,726 ADT in 2017 45mph, six-lane, divided urban

Old Five-Phased Signal Timing

180-Second (3-Minute)

Signal Cycles

50

Page 51: Penny Lala Johnathan Perry Clara Foshee Cristine Gowland · Penny Lala. US 190 Background Information Covington, St. Tammany Parish 62,726 ADT in 2017 45mph, six-lane, divided urban

New Two-Phased Signal Timing

90-Second (1.5-Minute)

Signal Cycles

51

Page 52: Penny Lala Johnathan Perry Clara Foshee Cristine Gowland · Penny Lala. US 190 Background Information Covington, St. Tammany Parish 62,726 ADT in 2017 45mph, six-lane, divided urban

Why Are U-Turns Not Allowed Here?

CRASH

CRASH

Potential crashes with right

turners

Delays for right turners because

side street has to brake to avoid

crashes

Delays for left turns because

they have to slow down to make

the U-turn movement

U-turns have separate,

designated areas

52

Page 53: Penny Lala Johnathan Perry Clara Foshee Cristine Gowland · Penny Lala. US 190 Background Information Covington, St. Tammany Parish 62,726 ADT in 2017 45mph, six-lane, divided urban

Public Opinion - Facebook

53

Page 54: Penny Lala Johnathan Perry Clara Foshee Cristine Gowland · Penny Lala. US 190 Background Information Covington, St. Tammany Parish 62,726 ADT in 2017 45mph, six-lane, divided urban

Public Opinion - Resolution

54

Page 55: Penny Lala Johnathan Perry Clara Foshee Cristine Gowland · Penny Lala. US 190 Background Information Covington, St. Tammany Parish 62,726 ADT in 2017 45mph, six-lane, divided urban

Measures of Success

Follow-up travel time studies planned

Before/after crash analysis planned (longterm)

Implementation of adjacent projects

–I-12 widening to south

–US 190 widening of Bogue Falaya Bridge to north

Public Opinion (decline of negative feedback)

One more presentation to discuss results ~ 2024?

55

Page 56: Penny Lala Johnathan Perry Clara Foshee Cristine Gowland · Penny Lala. US 190 Background Information Covington, St. Tammany Parish 62,726 ADT in 2017 45mph, six-lane, divided urban

www.dotd.la.gov

Questions?