Penny Bay and Disneyland Theme Park A brief review of the development process Raymond Wong City University of Hong Kong Penny Bay and Disneyland Theme Park - Some fast fact: 1. Reclaimed area: 200 hectares (Stage 1), 80 hectares (Stage 2) 2. Contract period for Stage 1 reclamation: May 2000 to Dec 02 3. Contract sum: - $4 billion (reclamation stage 1) - $6.5 billion (reclamation stage 2 and other associated infrastructure works) 4. Other work quantity: - Dredging of unwanted material – 42 million cu meter, with 0.1 million cu meter contaminated material - imported fill – 70 million cu meter - total length of sloped and vertical seawall – about 3500m

Upload: others

Post on 05-Jun-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Penny Bay and Disneyland Theme Park - Const-Infobank.org · Penny Bay and Disneyland Theme Park - Some fast fact: 5. Other Infrastructure and Associated works: - Infrastructure works:

Penny Bay and Disneyland Theme Park

A brief review of the development process

Raymond WongCity University of Hong Kong

Penny Bay and Disneyland Theme Park - Some fast fact:

1. Reclaimed area: 200 hectares (Stage 1), 80 hectares (Stage 2)

2. Contract period for Stage 1 reclamation: May 2000 to Dec 02

3. Contract sum:

- $4 billion (reclamation stage 1)

- $6.5 billion (reclamation stage 2 and other associated infrastructure works)

4. Other work quantity:

- Dredging of unwanted material – 42 million cu meter, with 0.1 million cu meter contaminated material

- imported fill – 70 million cu meter

- total length of sloped and vertical seawall – about 3500m

Page 2: Penny Bay and Disneyland Theme Park - Const-Infobank.org · Penny Bay and Disneyland Theme Park - Some fast fact: 5. Other Infrastructure and Associated works: - Infrastructure works:

Penny Bay and Disneyland Theme Park - Some fast fact:

5. Other Infrastructure and Associated works:

- Infrastructure works: road construction (total 8.8 km), slope cutting and stabilization, slope vegetation, drainage and sewage network, storm water discharge system (4.5 km box-culvert) fresh and salt water supply facilities, construction of a water recreation centre, public transport interchange, other hard and soft landscaping works

- Decommissioning of the former Choy Lee Shipyard and the related soil decontamination works

- Construction of a public pier

- Essential GIC facilities

- Stage 2 reclamation and the associated works

Various phases of reclamation

Page 3: Penny Bay and Disneyland Theme Park - Const-Infobank.org · Penny Bay and Disneyland Theme Park - Some fast fact: 5. Other Infrastructure and Associated works: - Infrastructure works:

Major work locations

Layout of Phase 1 infrastructure works

Page 4: Penny Bay and Disneyland Theme Park - Const-Infobank.org · Penny Bay and Disneyland Theme Park - Some fast fact: 5. Other Infrastructure and Associated works: - Infrastructure works:
Page 5: Penny Bay and Disneyland Theme Park - Const-Infobank.org · Penny Bay and Disneyland Theme Park - Some fast fact: 5. Other Infrastructure and Associated works: - Infrastructure works:
Page 6: Penny Bay and Disneyland Theme Park - Const-Infobank.org · Penny Bay and Disneyland Theme Park - Some fast fact: 5. Other Infrastructure and Associated works: - Infrastructure works:

Penny Bay in 1999 before the carrying out of Reclamation

Early stage of reclamation in early 2001

Page 7: Penny Bay and Disneyland Theme Park - Const-Infobank.org · Penny Bay and Disneyland Theme Park - Some fast fact: 5. Other Infrastructure and Associated works: - Infrastructure works:

Early stage of reclamation in early 2001 with the old Choy Lee Shipyard still in view

Reclamation work as seen in early 2002

Page 8: Penny Bay and Disneyland Theme Park - Const-Infobank.org · Penny Bay and Disneyland Theme Park - Some fast fact: 5. Other Infrastructure and Associated works: - Infrastructure works:

Reclamation work as seen in early 2002

Practically completed Stage 1 reclamation work as seen in early 2003

Page 9: Penny Bay and Disneyland Theme Park - Const-Infobank.org · Penny Bay and Disneyland Theme Park - Some fast fact: 5. Other Infrastructure and Associated works: - Infrastructure works:

Sand filling using rainbow jetting by dredger ships

Silt curtain

Page 10: Penny Bay and Disneyland Theme Park - Const-Infobank.org · Penny Bay and Disneyland Theme Park - Some fast fact: 5. Other Infrastructure and Associated works: - Infrastructure works:

Forming of a channel to reserve portion of the sea coast on the east side of Penny Bay

Pile forming for some of the advanced works

Page 11: Penny Bay and Disneyland Theme Park - Const-Infobank.org · Penny Bay and Disneyland Theme Park - Some fast fact: 5. Other Infrastructure and Associated works: - Infrastructure works:

Forming of the vertical seawall

Forming of the vertical seawall

Page 12: Penny Bay and Disneyland Theme Park - Const-Infobank.org · Penny Bay and Disneyland Theme Park - Some fast fact: 5. Other Infrastructure and Associated works: - Infrastructure works:

Pipe work for sand jetting

Consolidate the newly reclaimed land by surcharging method

Page 13: Penny Bay and Disneyland Theme Park - Const-Infobank.org · Penny Bay and Disneyland Theme Park - Some fast fact: 5. Other Infrastructure and Associated works: - Infrastructure works:

Consolidation by vibro-compaction

Final stage of reclamation and the commencement of other civil works

Page 14: Penny Bay and Disneyland Theme Park - Const-Infobank.org · Penny Bay and Disneyland Theme Park - Some fast fact: 5. Other Infrastructure and Associated works: - Infrastructure works:

Construction of the roadway linking to the North Lantau Expressway

Northern part of Penny Bay seeing the linking roadway and the Water Recreation Centre

Water Recreation Centre

Surface channel supplying water to the WRC

Preserved coastline

Page 15: Penny Bay and Disneyland Theme Park - Const-Infobank.org · Penny Bay and Disneyland Theme Park - Some fast fact: 5. Other Infrastructure and Associated works: - Infrastructure works:

The preserved CLP power station

The preserved CLP power station merged into the theme park by earth bund and landscaping provisions

Page 16: Penny Bay and Disneyland Theme Park - Const-Infobank.org · Penny Bay and Disneyland Theme Park - Some fast fact: 5. Other Infrastructure and Associated works: - Infrastructure works:

Drainage works in the newly reclaimed land

Storm discharge system by box culvert

Page 17: Penny Bay and Disneyland Theme Park - Const-Infobank.org · Penny Bay and Disneyland Theme Park - Some fast fact: 5. Other Infrastructure and Associated works: - Infrastructure works:

Road works and service laying

The newly formed water channel seeing the original coastline

Page 18: Penny Bay and Disneyland Theme Park - Const-Infobank.org · Penny Bay and Disneyland Theme Park - Some fast fact: 5. Other Infrastructure and Associated works: - Infrastructure works:

Marine piling for the public pier

Provision of rows of earth berm with green vegetation forms an importation part of vision–impression design in the theme park

Page 19: Penny Bay and Disneyland Theme Park - Const-Infobank.org · Penny Bay and Disneyland Theme Park - Some fast fact: 5. Other Infrastructure and Associated works: - Infrastructure works:

Site of the resort hotel as seen from the landscape berm

Landscaping works and vegetation provided in the public areas

Page 20: Penny Bay and Disneyland Theme Park - Const-Infobank.org · Penny Bay and Disneyland Theme Park - Some fast fact: 5. Other Infrastructure and Associated works: - Infrastructure works:

Forming the hard landscaping works at the Water Recreation Centre

Partially completed hard landscaping works at the Water Recreation Centre

Page 21: Penny Bay and Disneyland Theme Park - Const-Infobank.org · Penny Bay and Disneyland Theme Park - Some fast fact: 5. Other Infrastructure and Associated works: - Infrastructure works:

Water Recreation Centre with the soft landscaping work in place

Entrance to the Central Pedestrian Walkway near the Coach parking square

Page 22: Penny Bay and Disneyland Theme Park - Const-Infobank.org · Penny Bay and Disneyland Theme Park - Some fast fact: 5. Other Infrastructure and Associated works: - Infrastructure works:

The fountain square at the entrance outside the theme park pay-area

External frame in galvanized steel for the function/retail buildings

Page 23: Penny Bay and Disneyland Theme Park - Const-Infobank.org · Penny Bay and Disneyland Theme Park - Some fast fact: 5. Other Infrastructure and Associated works: - Infrastructure works:

Final touch-up of the European-styled town houses

Final decoration the town house

Page 24: Penny Bay and Disneyland Theme Park - Const-Infobank.org · Penny Bay and Disneyland Theme Park - Some fast fact: 5. Other Infrastructure and Associated works: - Infrastructure works:
Page 25: Penny Bay and Disneyland Theme Park - Const-Infobank.org · Penny Bay and Disneyland Theme Park - Some fast fact: 5. Other Infrastructure and Associated works: - Infrastructure works:
Page 26: Penny Bay and Disneyland Theme Park - Const-Infobank.org · Penny Bay and Disneyland Theme Park - Some fast fact: 5. Other Infrastructure and Associated works: - Infrastructure works:
Page 27: Penny Bay and Disneyland Theme Park - Const-Infobank.org · Penny Bay and Disneyland Theme Park - Some fast fact: 5. Other Infrastructure and Associated works: - Infrastructure works:

Final touch-up work at the Courtyard of the Disneyland Castle

Final touch-up works to the Disneyland Castle towers

Page 28: Penny Bay and Disneyland Theme Park - Const-Infobank.org · Penny Bay and Disneyland Theme Park - Some fast fact: 5. Other Infrastructure and Associated works: - Infrastructure works:

External decoration to façade of themed buildings

Page 29: Penny Bay and Disneyland Theme Park - Const-Infobank.org · Penny Bay and Disneyland Theme Park - Some fast fact: 5. Other Infrastructure and Associated works: - Infrastructure works:

Final touch-up works at the entrance of Disneyland Castle

Ceiling installation to the function and retail areas

Page 30: Penny Bay and Disneyland Theme Park - Const-Infobank.org · Penny Bay and Disneyland Theme Park - Some fast fact: 5. Other Infrastructure and Associated works: - Infrastructure works:

Interior decoration to the function and retail areas

Forming of various games centre inside the theme park

Page 31: Penny Bay and Disneyland Theme Park - Const-Infobank.org · Penny Bay and Disneyland Theme Park - Some fast fact: 5. Other Infrastructure and Associated works: - Infrastructure works:

The Space Mountain

Cladding detail of the Space Mountain Dome

Page 32: Penny Bay and Disneyland Theme Park - Const-Infobank.org · Penny Bay and Disneyland Theme Park - Some fast fact: 5. Other Infrastructure and Associated works: - Infrastructure works:

Track of the Space Wagon as seen inside the Space Mountain Dome

Setting of the mechanized games in the theme park

Page 33: Penny Bay and Disneyland Theme Park - Const-Infobank.org · Penny Bay and Disneyland Theme Park - Some fast fact: 5. Other Infrastructure and Associated works: - Infrastructure works:

Setting of the mechanized games in the theme park

Forming of the American Street

Page 34: Penny Bay and Disneyland Theme Park - Const-Infobank.org · Penny Bay and Disneyland Theme Park - Some fast fact: 5. Other Infrastructure and Associated works: - Infrastructure works:

The American Street in the theme park at its final touch-up stage

Façade of the buildings in the American Street

Page 35: Penny Bay and Disneyland Theme Park - Const-Infobank.org · Penny Bay and Disneyland Theme Park - Some fast fact: 5. Other Infrastructure and Associated works: - Infrastructure works:

Paving works

Soft landscape and greening items

Page 36: Penny Bay and Disneyland Theme Park - Const-Infobank.org · Penny Bay and Disneyland Theme Park - Some fast fact: 5. Other Infrastructure and Associated works: - Infrastructure works:

Forming the hard landscape facilities

The Disneyland after its completion for operation

Page 37: Penny Bay and Disneyland Theme Park - Const-Infobank.org · Penny Bay and Disneyland Theme Park - Some fast fact: 5. Other Infrastructure and Associated works: - Infrastructure works:
Page 38: Penny Bay and Disneyland Theme Park - Const-Infobank.org · Penny Bay and Disneyland Theme Park - Some fast fact: 5. Other Infrastructure and Associated works: - Infrastructure works:
Page 39: Penny Bay and Disneyland Theme Park - Const-Infobank.org · Penny Bay and Disneyland Theme Park - Some fast fact: 5. Other Infrastructure and Associated works: - Infrastructure works:

Other association works

Page 40: Penny Bay and Disneyland Theme Park - Const-Infobank.org · Penny Bay and Disneyland Theme Park - Some fast fact: 5. Other Infrastructure and Associated works: - Infrastructure works:

Train wagon encircling the theme part as one of the mechanized games

Construction of Disneyland Hotels

Page 41: Penny Bay and Disneyland Theme Park - Const-Infobank.org · Penny Bay and Disneyland Theme Park - Some fast fact: 5. Other Infrastructure and Associated works: - Infrastructure works:

The Disneyland Hotels

Page 42: Penny Bay and Disneyland Theme Park - Const-Infobank.org · Penny Bay and Disneyland Theme Park - Some fast fact: 5. Other Infrastructure and Associated works: - Infrastructure works:

Trackwork of the MTRC Disneyland Resort Line in Penny Bay

Page 43: Penny Bay and Disneyland Theme Park - Const-Infobank.org · Penny Bay and Disneyland Theme Park - Some fast fact: 5. Other Infrastructure and Associated works: - Infrastructure works:

Over-run track of the Disneyland Station

Interior view of the MTRC Disneyland Station

Page 44: Penny Bay and Disneyland Theme Park - Const-Infobank.org · Penny Bay and Disneyland Theme Park - Some fast fact: 5. Other Infrastructure and Associated works: - Infrastructure works:

Public bus station at the entrance to the theme park

Disneyland Resort Line Sunny Bay Station connecting the MTRC Tung Chung Line with the new Theme Park

Page 45: Penny Bay and Disneyland Theme Park - Const-Infobank.org · Penny Bay and Disneyland Theme Park - Some fast fact: 5. Other Infrastructure and Associated works: - Infrastructure works:

Detail look of the Sunny Bay Station

Page 46: Penny Bay and Disneyland Theme Park - Const-Infobank.org · Penny Bay and Disneyland Theme Park - Some fast fact: 5. Other Infrastructure and Associated works: - Infrastructure works:

Connecting carriageway linking the public transport center at Sunny Bay with the Theme Park

North Lantau Expressway

Public pier at Penny Bay

Page 47: Penny Bay and Disneyland Theme Park - Const-Infobank.org · Penny Bay and Disneyland Theme Park - Some fast fact: 5. Other Infrastructure and Associated works: - Infrastructure works:

Paving work

Stage 2 Reclamation

Page 48: Penny Bay and Disneyland Theme Park - Const-Infobank.org · Penny Bay and Disneyland Theme Park - Some fast fact: 5. Other Infrastructure and Associated works: - Infrastructure works:

Brand name of Disneyland

End of presentation

for the Disneyland Theme Park