LOCATION RESTRICTION DATE CONTRACTOR COST PHILADELPHIA *I-95 N & S Test Borings: LANE CLOSURE, SHOULDER CLOSURE between Aramingo Ave. & Bridge St./ Harbison Ave Interchanges. 9 PM - 5 AM. 2/25/18-3/2/18 TRC Solutions *US 1 N & S (Roosevelt Extension) Drain Cleaning/Debris Removal: INTERMITTENT LANE RESTRICTIONS between I-76 & 9th St. 9:30 AM - 2 PM. 3/5/18-3/8/18 Maintenance *I-676 E & W Drain Cleaning/Debris Removal: INTERMITTENT LANE RESTRICTIONS between I-76 & I-95. 9:30 AM - 2 PM. 3/5/18-3/8/18 Maintenance *I-95 N & S Drain Cleaning/Debris Removal: INTERMITTENT LANE RESTRICTIONS between Phila. Int. Airport & PA 63 (Woodhaven Rd.). 9:30 AM - 2 PM. 3/5/18-3/8/18 Maintenance *I-76 E & W Drain Cleaning/Debris Removal: INTERMITTENT LANE RESTRICTIONS between US 1 (City Ave.) & 26th St. 9:30 AM - 2 PM. 3/5/18-3/8/18 Maintenance Passyunk Ave. Bridge Rehabilitation: RIGHT LANE CLOSED on Hon. Robert C. Donatucci Memorial Bridge over Schuylkill River 9 AM - 3 PM. 2/26/18-3/2/18 Buckley & Company, Inc. $33.5 million Walnut Lane Debris Removal & Concrete Repair: LANE CLOSURES between Magdelena St. & Park Lane Drive. Weekdays. 9 AM - 3 PM. 2/26/18-3/2/18 Buckley & Company, Inc. $14 million DATE: 03-01-2018 PENNSYLVANIA DEPARTMENT OF TRANSPORTATION ENGINEERING DISTRICT 6-0 PHILADELPHIA REGION TRAFFIC BULLETIN NOTE: SCHEDULES ARE SUBJECT TO CHANGE PENNDOT ROADWAY MAINTENANCE HOTLINE 1-800-FIX-ROAD TO CHECK REAL-TIME HIGHWAY CONDITIONS VISIT 511PA.COM ; DOWNLOAD THE 511PA APP; OR CALL 5-1-1 3/1/2018 Page 1 of 22

Upload: others

Post on 01-Jun-2022

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PENNSYLVANIA DEPARTMENT OF TRANSPORTATION …

LOCATION RESTRICTION DATE CONTRACTOR COST

PHILADELPHIA

*I-95 N & S Test Borings: LANE CLOSURE, SHOULDER

CLOSURE between Aramingo Ave. & Bridge St./

Harbison Ave Interchanges. 9 PM - 5 AM.

2/25/18-3/2/18 TRC Solutions

*US 1 N & S (Roosevelt Extension) Drain Cleaning/Debris Removal: INTERMITTENT

LANE RESTRICTIONS between I-76 & 9th St. 9:30

AM - 2 PM.

3/5/18-3/8/18 Maintenance

*I-676 E & W Drain Cleaning/Debris Removal: INTERMITTENT

LANE RESTRICTIONS between I-76 & I-95. 9:30 AM -

2 PM.

3/5/18-3/8/18 Maintenance

*I-95 N & S Drain Cleaning/Debris Removal: INTERMITTENT

LANE RESTRICTIONS between Phila. Int. Airport &

PA 63 (Woodhaven Rd.). 9:30 AM - 2 PM.

3/5/18-3/8/18 Maintenance

*I-76 E & W Drain Cleaning/Debris Removal: INTERMITTENT

LANE RESTRICTIONS between US 1 (City Ave.) &

26th St. 9:30 AM - 2 PM.

3/5/18-3/8/18 Maintenance

Passyunk Ave. Bridge Rehabilitation: RIGHT LANE CLOSED on Hon.

Robert C. Donatucci Memorial Bridge over Schuylkill

River 9 AM - 3 PM.

2/26/18-3/2/18 Buckley & Company,

Inc.

$33.5 million

Walnut Lane Debris Removal & Concrete Repair: LANE

CLOSURES between Magdelena St. & Park Lane

Drive. Weekdays. 9 AM - 3 PM.

2/26/18-3/2/18 Buckley & Company,

Inc.

$14 million

DATE: 03-01-2018

PENNSYLVANIA DEPARTMENT OF TRANSPORTATION

ENGINEERING DISTRICT 6-0

PHILADELPHIA REGION TRAFFIC BULLETIN

NOTE: SCHEDULES ARE SUBJECT TO CHANGE

PENNDOT ROADWAY MAINTENANCE HOTLINE 1-800-FIX-ROAD

TO CHECK REAL-TIME HIGHWAY CONDITIONS VISIT 511PA.COM; DOWNLOAD THE 511PA APP; OR CALL 5-1-1

3/1/2018 Page 1 of 22

Page 2: PENNSYLVANIA DEPARTMENT OF TRANSPORTATION …

LOCATION RESTRICTION DATE CONTRACTOR COST

Lewis St./Wheatsheaf Lane Shared Pathway: PARKING LANE CLOSED between

Aramingo Ave. & Delaware Ave. 7 AM - 4 PM.

2/26/18-3/2/18 James J. Anderson $869,700.00

JFK Blvd. East Bridge Rehabilitation: CLOSED & DETOURED

between 20th St. & Schuylkill Ave. 7 AM - 5 PM.

DETOUR POSTED.

2/26/18-3/2/18 Abbonizio

Contractors, Inc.

$15.8 million

*US 1 (Roosevelt Blvd.) ITS Fiber Cable & Duct Installation: LANE CLOSURE

between Comly Rd. & Old Trevose Rd. 9 AM - 3 PM.

2/26/18-3/2/18 Miller Bros. $15 million

Woodhaven Rd. (PA 63) ITS Fiber Cable Splicing: LANE CLOSURE between

Bristol Pike & Knights Rd. 9 AM- 3 PM.

2/26/18-3/2/18 Miller Bros. $15 million

*I-95 South Sign Structure Maintenance: LANE CLOSURES

between Columbus Blvd. & I-76. 9 PM - 5 AM.

2/26/18-3/2/18 J.D. Eckman, Inc. $2.7 million

*I-95 North Sign Structure Maintenance: LANE CLOSURES

between S. Broad St. & Packer Ave. 9 PM - 5 AM

2/26/18-3/2/18 J.D. Eckman, Inc. $2.7 million

Ridge Ave. Road Work: INTERMITTENT LANE CLOSURE

between Spring Garden St. & Jefferson St. 9 AM - 3

PM

2/26/18-3/2/18 Armour & Sons $1.7 million

Richmond St. Utility Installation: LANE RESTRICTIONS between

Ann St. & Allegheny Ave. 7 AM -3:30 PM.

2/26/18-3/2/18 Philadelphia Gas

Works

*I-95 S Bridge Inspection: RIGHT LANE CLSOURE between

Walt Whitman Bridge & Enterprise Ave 9 AM - 3 PM

3/1/18 Pickering, Corts &

Summerson

*I-95 N Bridge Inspection: LEFT LANE CLOSURE between

Broad St/Pattison Ave & Walt Whitman Bridge 9 AM -

12 PM

3/1/18 Pickering, Corts &

Summerson

PA 291 (Penrose Ave) Bridge Inspection: RIGHT LANE CLOSURE between

26th St. & I-95. 9 AM - 3 PM

3/4/18-3/7/18 Specialty

Engingeering, Inc

3/1/2018 Page 2 of 22

Page 3: PENNSYLVANIA DEPARTMENT OF TRANSPORTATION …

LOCATION RESTRICTION DATE CONTRACTOR COST

*I-95 N & S Test Borings: LANE CLOSURE, SHOULDER

CLOSURE between Aramingo Ave. & Bridge St./

Harbison Ave Interchanges. 9 PM - 5 AM.

3/4/18-3/10/18 TRC Solutions

*I-76 E & W Viaduct Construction: REDUCED TO ONE LANE

between I-676 & South St. interchanges. 9 PM - 5

AM.

3/5/18-3/8/18 Buckley & Company,

Inc.

$103.6 million

Richmond St. Utility Installation: LANE RESTRICTIONS between

Ann St. & Allegheny Ave. 7 AM -3:30 PM.

3/5/18-3/9/18 Philadelphia Gas

Works

*U.S.1 (Roosevelt Blvd) Roadway and Sidewalk Restoration: SINGLE TRAVEL

LANE & SHOULDER CLOSURE between Comly St. &

Old Trevose Rd. 9 AM - 3 PM

3/5/18-3/9/18 Wampole-Miller, Inc. $15.4 million

*I-95 South Road Work: SHOULDER CLOSURE between Market

St. & South St. 6:03 AM - 4:30 PM

3/5/18-3/9/18 PFK Mark III, Inc.

*I-95 South VMS Board Placement: SHOULDER CLOSURE

between Market St. & South St. 7 AM - 3:30 PM

2/19/18-3/05/18 PFK Mark III, Inc.

Holme Ave. Bridge Rehabilitation: RIGHT LANE CLOSED between

Longford St. & Arthur St. 24-HOUR RESTRICTIONS.

2/12/18-6/15/18 Road-Con, Inc. $1.3 million

Aramingo Ave. Road Work: NORTHBOUND LANE CLOSURES

between Wheatsheaf Lane & I-95 interchange. 24-

HOUR CLOSURES.

12/2/17-5/1/18 A.P. Construction,

Inc.

$87 million

JFK Blvd. East Bridge Rehabilitation: CLOSED & DETOURED

between 20th St. & Schuylkill Ave. 24-HOUR

DETOUR. DETOUR POSTED.

11/20/17-8/2018 Abbonizio

Contractors, Inc.

$15.8 million

Schuylkill Ave. Bridge Rehabilitation: TRAFFIC SWITCH WITH NO

RIGHT TURN at Walnut onto Schuylkill. 24-HOUR

RESTRICTIONS.

8/28/17-7/2018 Buckley & Company,

Inc.

$103 million

I-676 West Ramp to 22nd St. Bridge Construction: RAMP REDUCED TO ONE

LANE 24-HOUR

7/21/17-4/30/18 Buckley & Company,

Inc.

$64.8 million

3/1/2018 Page 3 of 22

Page 4: PENNSYLVANIA DEPARTMENT OF TRANSPORTATION …

LOCATION RESTRICTION DATE CONTRACTOR COST

Aramingo Ave. Utility Installation: LANE CLOSURES between

Wheatsheaf Lane & I-95 interchange. 9 AM - 3 PM.

7/20/17-4/1/18 A.P. Construction,

Inc.

$87 million

Palmer St. Overhead Bridge Construction: CLOSED &

DETOURED between Wildey St. & Delaware Ave. 24-

HOUR DETOUR. DETOUR POSTED.

6/15/16-5/1/18 James J. Anderson $211 million

Montgomery Ave. Bridge Demoliltion: CLOSED & DETOURED between

Wildy St. & Delaware Ave. 24-HOUR DETOUR.

DETOUR POSTED.

6/15/17-5/1/18 James J. Anderson $211 million

18th St. Roadwork: CLOSED & DETOURED between Vine St.

Local E/B & Vine St. Local W/B. 24-HOUR

CLOSURE. DETOUR POSTED.

5/15/17-4/2018 Buckley & Company,

Inc.

$64.8 million

22nd St. Bridge Construction: TRAFFIC PATTERN CHANGE

on bridge over I-676 between Ben Franklin Parkway &

Race St.

11/7/16-11/30/18 Buckley & Company,

Inc.

$64.8 million

21st St. Bridge Construction: TRAFFIC PATTERN CHANGE

on bridge over I-676 between Ben Franklin Parkway &

Race St.

11/7/16-11/30/18 Buckley & Company,

Inc.

$64.8 million

Sergeant St. Bridge Work: CLOSED & DETOUR between Salmon

St. & Richmond St. 24-HOUR DETOUR. DETOUR

POSTED.

12/28/15-12/2018 James J. Anderson $211 million

Huntingdon St. Bridge Work: CLOSED & DETOUR between Salmon

St. & Richmond St. 24-HOUR DETOUR. DETOUR

POSTED.

12/28/15-12/2018 James J. Anderson $211 million

Somerset St. Bridge Work: CLOSED & DETOUR between Salmon

St. & Richmond St. 24-HOUR DETOUR. DETOUR

POSTED.

12/28/15-12/2018 James J. Anderson $211 million

Delaware Ave. Reconstruction: NEW TRAFFIC PATTERN between

Columbia Ave. & Aramingo Ave. 24-HOUR

RESTRICTIONS.

4/1/15-10/2018 James J. Anderson $211.7 million

BUCKS COUNTY

PA 563 (North Ridge Rd.), East

Rockhill Twp.

Core Boring: LANE RESTRICTIONS between Tunnel

Rd. & Callow Hill Rd. 9 AM - 3 PM.

2/26/18-2/27/18 Penn Ridge

Development

Enterprises, Inc.

3/1/2018 Page 4 of 22

Page 5: PENNSYLVANIA DEPARTMENT OF TRANSPORTATION …

LOCATION RESTRICTION DATE CONTRACTOR COST

PA 611 South, Doylestown Twp. Line Painting: RIGHT LANE CLOSED between N.

Broad St. & W. State St. 9 AM - 3 PM.

2/26/18-3/2/18 Rohm & Haas

Chemicals LLC

PA 232 (Second Street Pike),

Wrightstown Twp.

Bridge Rehabilitation: CLOSED & DETOURED

between PA 413 (Durham Rd.) & Cherry Ln

Weekdays 7 AM - 4 PM. DETOUR POSTED

2/26/18-6/15/18 J.D. Eckman, Inc. $7.5 million

*I-95 North, Bensalem, Bristol Twps. Bridge Inspection: RIGHT LANE CLOSED between

PA 132 (Street Rd.) & PA 413 (Veterans Highway)

Interchanges. 9 AM - 3 PM.

2/28/18 AECOM

*I-95 South, Bensalem, Bristol Twps. Bridge Inspection: RIGHT LANE CLOSED between

PA 413 (Veterans Highway) & PA 132 (Street Rd.)

Interchanges. 9 AM - 3 PM.

3/1/18 AECOM

US 1 N & S (Lincoln Hwy.), Falls

Twp.

Barrier Replacement: LEFT LANE CLOSED between

US 13 (Bristol Pike) & Pennsylvania Ave. 9 PM - 12

AM.

3/1/18 Long Fence $2.7 million

Bordentown Rd., Falls Twp. Bridge Inspection: LANE CLOSURE between Main St.

& Dike Rd. 9 AM - 3 PM.

3/2/18 AECOM

New Rodgers Rd., Bensalem, Bristol

twps.

New Drainage Crossing: CLOSE AND DETOUR

between Bath Road and New Falls Road. 8 PM - 6

AM. DETOUR POSTED.

3/2/18-3/4/18 Pennsylvania

Turnpike Commission

$118.80

*U.S. 1 Falls, Lower Makefield, and

Middletown twps.

Beam Repair: ROAD CLOSURE at the Oxford Valley

Rd.interchange 9 PM - 6 AM

3/5/18

PA 413 (New Rodgers Rd.),

Bensalem, Bristol twps.

New Drainage Crossing: LANE SHIFTS between Bath

Road and New Falls Road. 7 AM - 5 PM.

3/5/18-3/9/18 Pennsylvania

Turnpike Commission

$142 million

PA 332 (Newtown Bypass) Newtown

Twp.

Guide Rail Repair: LEFT LANE CLOSED between

Woodbourne Rd. & Newtown Yardley Rd. 9 AM - 12

PM

3/6/18 Long Fence $2.2 million

Buck Rd., Northampton Twp. Utility Installation: LANE CLOSURE at Rolling Hills

Drive. Weekdays. 9 AM - 3 PM.

3/6/18-3/13/18 PECO Energy

3/1/2018 Page 5 of 22

Page 6: PENNSYLVANIA DEPARTMENT OF TRANSPORTATION …

LOCATION RESTRICTION DATE CONTRACTOR COST

Bristol Rd., Northampton, Upper

Southampton Twps.

Utility Installation: LANE RESTRICTIONS between

Churchville Rd. & Bustleton Pike 9 AM - 3 PM

3/7/18 PECO Energy

PA 413 (New Rodgers Rd.),

Bensalem, Bristol twps.

New Drainage Crossing: CLOSED & DETOURED

between Bath Road and New Falls Road. 8 PM - 6

AM. DETOUR POSTED

3/9/18-3/11/18 Pennsylvania

Turnpike Commission

$118 million

Bristol Rd., Northampton Twp. Utiltiy Installation: LANE CLOSURE between Whitney

Rd. & Cherry Blossom Dr. 9 AM - 3 PM

3/12/18-3/16/18 PECO Energy

Bid Oak Rd., Lower Makefield Twp. Utiltiy Installation: LANE CLOSURE between Sandy

Dr. & Daleview Dr. Weekdays 9 AM - 3 PM

3/13/18-3/20/18 PECO Energy

U.S 1 N, Middletown, Lower

Makefield Twp.

Barrier Setting: RIGHT LANE CLOSURE, SHOULDER

CLOSURE between I-95 & Oxford Valley Rd.

interchnages 9 AM - 3 PM

3/16/18 James D. Morrissey,

Inc.

$2.3 million

PA 113 (Souderton Rd.), Hilltown

Twp.

Arch Bridge Reconstruction: CLOSED & DETOURED

between Bethlehem Pike & Keystone Drive. 24-

HOUR DETOUR. DETOUR POSTED.

1/2/18-4/1/18 Loftus Construction $11.7 million

State Rd., Springfield Twp. Bridge Reconstruction: CLOSED & DETOURED

between Richlandtown Pike & Quarry Rd. 7 AM - 3

PM. DETOUR POSTED.

1/2/18-4/1/18 Loftus Construction $11.7 million

Main St., Sellersville Bor. Bridge Replacement: INTERMITTENT LANE

RESTRICTIONS WITH FLAGGING between Park

Ave. & Elm St. 9 AM - 3 PM.

1/8/18-3/2/18 J.D. Eckman, Inc. $4.6 million

Rocky Ridge Rd., Richland Twp. Bridge Replacement: CLOSED & DETOURED

between Rock Hill Rd. & Paletown Rd. 24-HOUR

DETOUR. DETOUR POSTED.

11/27/17-4/13/18 Loftus Construction,

Inc.

$11.7 million

Walnut St., Perkasie Bor. Bridge Replacement: CLOSED & DETOURED

between PA 152 & Constitution Ave. 24-HOUR

DETOUR. DETOUR POSTED.

9/25/17-11/25/18 H&K Group, Inc.

Sugan Rd., Solebury Twp. Bridge Rehabilitation: CLOSED & DETOURED

between Creamery Rd. & Paxson Rd. 24-HOUR

CLOSURE. DETOUR POSTED.

10/2/17-5/5/18 J.D. Eckman, Inc. $7,407,987.00

3/1/2018 Page 6 of 22

Page 7: PENNSYLVANIA DEPARTMENT OF TRANSPORTATION …

LOCATION RESTRICTION DATE CONTRACTOR COST

*I-95 North, Lower Makefield Twp. Roadwork: LANE CLOSURES between PA 332

(Yardley-Newtown Rd.) & NJ state line. 24-HOUR

RESTRICTIONS POSSIBLE.

9/16/17-Indef. Delaware River Joint

Toll Bridge

Commission

*I-95 South, Lower Makefield Twp. Roadwork: LANE CLOSURES between NJ state line &

PA 332 (Yardley-Newtown Rd.). 24-HOUR

RESTRICTIONS POSSIBLE.

9/16/17-Indef. Delaware River Joint

Toll Bridge

Commission

PA 32 (River Rd.), Lower Makefield

Twp.

Roadwork: LANE RESTRICTIONS between Woodside

Rd. & I-95. 24-HOUR RESTRICTIONS POSSIBLE.

9/16/17-Indef. Delaware River Joint

Toll Bridge

Commission

Woodside Rd., Lower Makefield

Twp.

Roadwork: ALTERNATING TRAFFIC between River

Rd. & Mt. Eyre Rd. 24-HOUR RESTRICTIONS

POSSIBLE.

9/16/17-Indef. Delaware River Joint

Toll Bridge

Commission

Taylorsville Rd., Lower Makefield

Twp.

Roadwork: LANE CLOSURES between Woodside Rd.

& Highland Drive. 24-HOUR RESTRICTIONS

POSSIBLE.

9/16/17-Indef. Delaware River Joint

Toll Bridge

Commission

PA 413 (New Rodgers Rd.), Bristol

Twp.

Bridge Rehabilitation: CLOSED & DETOURED

between Plumbridge Drive & Bath Rd./Durham Rd. 8

PM - 5 AM. DETOUR POSTED.

8/20/17-5/25/18 Pennsylvania

Turnpike Commission

$142 million

PA 413 (New Rodgers Rd.), Bristol

Twp.

Bridge Rehabilitation: LANE RESTRICTIONS & 15-

MINUTE STOPPAGES between Plumbridge Drive &

Bath Rd./Durham Rd. 7 AM - 3 PM & 8 PM - 5 AM.

8/20/17-5/25/18 Pennsylvania

Turnpike Commission

$142 million

Durham Rd., Bristol Twp. Roadwork: LANE RESTRICTIONS between PA 413 &

New Falls Rd. 7 AM - 3 PM.

8/20/17-5/25/18 Pennsylvania

Turnpike Commission

$142 million

Durham Rd., Bristol Twp. Roadwork: CLOSED & DETOURED between PA 413

& New Falls Rd. 8 PM - 5 AM. DETOUR POSTED.

8/20/17-5/25/18 Pennsylvania

Turnpike Commission

$142 million

Loux Covered Bridge over Cabin

Run, Bedminster Twp.

CLOSED & DETOURED INDEFINITELY: Due to

structural damage sustained from an oversized vehicle

DETOUR POSTED

8/1/17-Indef.

3/1/2018 Page 7 of 22

Page 8: PENNSYLVANIA DEPARTMENT OF TRANSPORTATION …

LOCATION RESTRICTION DATE CONTRACTOR COST

County Line Rd., Warrington,

Horsham, Montgomery twps.

Utility Installation: LANE RESTRICTIONS between

East Kulp Rd. & Stump Rd. 7 AM - 3 PM.

3/7/16-9/2018 James D. Morrissey,

Inc.

$14.8 million

Headquarters Rd., Tinicum Twp. Bridge Damage: CLOSED & DETOURED between

Red Hill Rd. & Tankhannen Rd. DETOUR POSTED.

3/2/11-Indef.

CHESTER COUNTY

Baltimore Pike, New Garden Twp. Guide Rail Repair: MOVING SHOULDER CLOSURE

between Newark Rd. & Chambers Rd. 9 AM - 3 PM

2/26/18-3/2/18 J. Fletcher Creamer &

Son, Inc

$1.8 million

Buck Run Rd., East Fallowfield Twp. Guide Rail Repair: MOVING SHOULDER CLOSURE

between Doe Run Station Rd. & Wilmington Rd. 9 AM -

3 PM

2/26/18-3/2/18 J. Fletcher Creamer &

Son, Inc

$1.8 million

PA 841 (Chatham Rd.) London

Grove Twp.

Guide Rail Repair: MOVING SHOULDER CLOSURE

between U.S 1 & Woodview Rd. 9 AM - 3 PM

2/26/18-3/2/18 J. Fletcher Creamer &

Son, Inc

$1.8 million

PA 926 (W.Street Rd.) East

Marlborough Twp.

Guide Rail Repair: MOVING SHOULDER CLOSURE

between Mill Rd. & Unionville Rd. 9 AM - 3 PM

2/26/18-3/2/18 J. Fletcher Creamer &

Son, Inc

$1.8 million

Ewing Rd. Penn Twp Guide Rail Repair: MOVING SHOULDER CLOSURE

between Jennersville Rd. & Woodcrest Rd. 9 AM - 3

PM

2/26/18-3/2/18 J. Fletcher Creamer &

Son, Inc

$1.8 million

PA 162 (Embreeville Rd.) Newlin

Twp.

Guide Rail Repair: MOVING SHOULDER CLOSURE

between Brandywine Creek Rd. & Stargazer Rd. 9 AM

- 3 PM

2/26/18-3/2/18 J. Fletcher Creamer &

Son, Inc

$1.8 million

East Baltimore Pike, London Grove

Twp

Guide Rail Repair: MOVING SHOULDER CLOSURE

between Chatham Rd. & PA 41 (Gap Newport Pike) 9

AM - 3 PM

2/26/18-3/2/18 J. Fletcher Creamer &

Son, Inc

$1.8 million

Surgartown Rd. Willistown Twp. Tree Removal: LANE RESTRICTIONS between

Firethorn Ln & Spring Road 9 AM - 3 PM

2/26/18- 3/2/18 Knight Brothers

US 202 South, Westtown Twp. Utility Installation: LANE CLOSURE between Robin's

Nest Lane & Old Wilmington Pike. Weeknights. 8 PM

- 6 AM.

2/26/18-3/8/18 Westtown Township

Authority

3/1/2018 Page 8 of 22

Page 9: PENNSYLVANIA DEPARTMENT OF TRANSPORTATION …

LOCATION RESTRICTION DATE CONTRACTOR COST

PA 100 N & S, S. Coventry, W.

Vincent, E. Nantmeal, Uwchlan twps.

Clearing: SINGLE LANE CLOSURE between

Blackhorse Rd. and PA 23. 9 AM - 3 PM.

2/26/18-3/30/18 Allan Myers $5.6 million

PA 372 (Valley Road), Sadsbury

Twp.

Utility Installation: LANE CLOSURE between

Belvedare Ave & Eastern Ave. Weekdays. 9 AM - 3

PM.

2/28/18-3/7/18 PECO Energy

*US 422, Lower Pottgrove Twp. Guide Rail Repair: LEFT LANE CLOSED between

Evergreen Rd & Armand Hammer Blvd. 9 AM to 3 PM

2/29/18 Maintenance

Newark Rd., New Garden Twp. Core Boring: LANE RESTRICTIONS at Airport Way.

9 AM - 3 PM.

3/1/18-3/2/18 New Garden

Township Authority

Newark Rd., New Garden Twp. Core Boring: LANE RESTRICTIONS at Church St. 9

AM - 3 PM.

3/1/18-3/2/18 New Garden

Township Authority

Baltimore Pike, New Garden Twp. Core Boring: LANE RESTRICTIONS between Newark

Rd. & Reese St. 9 AM - 3 PM.

3/1/18-3/2/18 New Garden

Township Authority

Baltimore Pike, New Garden Twp. Core Boring: LANE RESTRICTIONS between Newark

Rd. & Center St. 9 AM - 3 PM.

3/1/18-3/2/18 New Garden

Township Authority

PA 82 (Strode Rd.), Valley Twp. Utility Installation: LANE CLOSURE between Federal

St. & Newlinville Rd. Weekdays. 9 AM - 3 PM.

3/1/18-3/8/18 PECO Energy

PA 340 (West Kings Hwy) West Caln

Twp.

Utility Installation: LANE CLOSURE between Schraks

Creamery Rd. & Bonsall Rd. Weekdays. 9 AM - 3 PM.

3/1/18-3/8/18 PECO Energy

*U.S 202 (Wilmington Pike) N East

and West Whiteland Twps.

Lane Realignment: LANE CLOSURES between Boot

Rd. & US 30 interchanges 8 PM - 5 AM M-Th PM -10

AM Fri

3/5/18-3/9/18 Allan Myers

*U.S 30 (Coatesville-

Downington/Exton Bypass),

Sadsbury,West Cal,Caln,Valley,

West Whiteland Twps, Coatesville

City

Guide Rail Repair: MOVING SHOULDER CLOSURES

between PA 10 & Ship Road. 10 PM - 5 AM

3/5/18-3/9/18 J.Fletcher Creamer &

Son

$1.8 million

3/1/2018 Page 9 of 22

Page 10: PENNSYLVANIA DEPARTMENT OF TRANSPORTATION …

LOCATION RESTRICTION DATE CONTRACTOR COST

*U.S 30 E on ramp to US 202 N,

East and West Whiteland Twps.

Overhead Bridge Construction: RAMP CLOSURE US

30 E on ramp to US 202 N 8 PM - 5 AM M-Th, 8 PM -

10 PM Fri

3/5/18- 3/9/18 Allan Meyers

*U.S 202 N ramp to Business U.S.

30., East and West Whiteland Twps.

Lane Realignment: RAMP CLOSED & DETOURED 8

PM - 5 AM M-Th 8 PM -10 AM Fri DETOUR POSTED

3/5/18-3/9/18 Allan Myers

PA 724 (W.Schuykil Rd)., North

Coventry Twp.

Tree Removal: LANE RESTRICTIONS between Berks

County Line & Sheep Hill Road. 9 AM - 3 PM

3/5/18-3/9/18 Knight Brothers

*U.S. 1 (Township Line Rd.) Upper

Darby Twp.

Utility Installation: LANE RESTRICTIONS between

Rolling Rd & State Rd. Weekdays 9 AM - 3 PM

3/6/18-3/16/18 Aqua Pennsylvania

North Valley Rd., Tredyffrin Twp. Tree Removal: CLOSED & DETOURED between East

Central Ave. & Hawthorn Place. 9 AM - 3 PM.

DETOUR POSTED.

3/6/18 Davey Tree Expert

Company

*U.S. 202 N West Goshen Twp ITS Installation: LEFT LANE CLOSURE between

Route 3 & Route 100. 9 AM - 3 PM

3/7/18 Kuharchik $3.5 million

*U.S 30 (Lancaster Pike) West

Whiteland Twp.

Utility Installation: LANE RESTRICTIONS between

Pottstown Pike & Whitford Rd. 9 AM - 3 PM

3/8/18-3/9/18 PECO Energy

PA 401 (Conestoga Rd.), Tredyffrin

Twp.

Utility Installation: LANE RESTRICTIONS between W.

Lancaster Ave. & Upper Gulph Rd. Weekdays. 9 AM -

3 PM.

2/12/18-3/2/18 PECO Energy

Valley Rd., London Grove Twp. Bridge Replacement: CLOSED & DETOURED

between Guernsey Rd. & Kelton Rd. 24-HOUR

DETOUR. DETOUR POSTED.

2/12/18-12/1/18 Lobar Site

Development

$2.2 million

*US 202 North, West Whiteland

Twp.

Sign Structure Maintenance: LANE CLOSURES

between Boot Rd. & Business US 30. 9 PM - 5 AM

2/19/18- 2/22/18 J.D. Eckman, Inc. $2.7 million

PA 100 N & S, S. Coventry, W.

Vincent, E. Nantmeal, Uwchlan twps.

Clearing: SINGLE LANE CLOSURE between

Blackhorse Road and PA 23. 9 AM - 3 PM.

2/20/18-2/23/18 Allan Meyers

3/1/2018 Page 10 of 22

Page 11: PENNSYLVANIA DEPARTMENT OF TRANSPORTATION …

LOCATION RESTRICTION DATE CONTRACTOR COST

*US 202 N & S., Tredyffrin, East

Whiteland, West Goshen Twps.

Guide Rail Repair: MOVING SHOULDER CLOSURES

between Pennslyvania Turnpike & Street Road 9 AM -

3 PM

2/20/18-2/23/18 Maintenance

Street Rd., Upper Oxford Twp. Bridge Damage: CLOSED & DETOURED between

Newcomers Road and Bell Road. 24-HOUR

DETOUR. DETOUR POSTED.

2/2/18-Indef. PennDOT

White Horse Rd., Schuylkill Twp. Bridge Replacement: CLOSED & DETOURED

between Loramar Lane & Valley Park Rd. 24-HOUR

DETOUR. DETOUR POSTED.

1/29/18-4/30/18 Loftus Construction $11.7 million

PA 352 (Chester Rd.), East Goshen

Twp.

Pipe Installation: CLOSED & DETOURED at Boot Rd.

24-HOUR DETOUR. DETOUR POSTED.

1/19/18-12/31/18 Sunoco Pipeline L.P.

Creek Rd., East Brandywine Twp. Bridge Replacement: CLOSED & DETOURED

between Hopewell Rd. & Dowlin Forge Rd. 24-HOUR

DETOUR. DETOUR POSTED.

1/2/18-4/4/18 Loftus Construction $11.7 million

*US 422 E & W ramps from Stowe

(Grosstown Rd.), West Pottsgrove,

North Coventry, Douglass twps.

Road Work: RAMP CLOSED & DETOURED. 24-

HOUR DETOUR. DETOUR POSTED.

12/13/17-10/20/19 H&K Group, Inc. $35 million

US 422 West ramp to Stowe, West

Pottsgrove, North Coventry,

Douglass twps.

Road Work: RAMP CLOSED & DETOURED. 24-

HOUR DETOUR. DETOUR POSTED.

12/13/17-10/20/19 H&K Group, Inc. $35 million

Limestone Rd., Parkesburg Bor. Utility Installation: LANE RESTRICTIONS between

West First Ave. & West Sixth Ave. Weekdays. 9 AM -

3 PM.

11/16/17-2/23/18 Pennsylvania

American Water

Company

Brandywine Creek Rd., Newlin Twp. Barrier Installation: LANE CLOSURE between Green

Valley Rd. & Powell Rd. 24-HOUR RESTRICTIONS.

3/3/17-Indef. Maintenance

*US 422 E & W, North Coventry

Twp.

Road & Bridge Construction: PERIODIC LANE

CLOSURES between PA 724 (Schuylkill Rd.) &

Sanatoga interchanges.

12/23/16-12/29/18 J.D. Eckman, Inc. $73.3 million

3/1/2018 Page 11 of 22

Page 12: PENNSYLVANIA DEPARTMENT OF TRANSPORTATION …

LOCATION RESTRICTION DATE CONTRACTOR COST

Ross Fording Rd., West Fallowfield

Twp.

Bridge Rehabilitation: CLOSED & DETOURED

between Creek Rd. & Bryson Rd. 24-HOUR

DETOUR. DETOUR POSTED.

7/2/15-3/2018 Loftus Construction $7.2 million

PA 724 ramp to US 422 East, East

Coventry Twp.

Ramp/Bridge Construction: RAMP CLOSED &

DETOURED. DETOUR POSTED.

5/27/15-3/2018 J.D. Eckman, Inc. $73.3 million

*US 422 E & W, North Coventry

Twp.

Bridge Construction: REDUCED TO ONE LANE

between Stowe & PA 100 Interchange. 24-HOUR

RESTRICTION.

11/27/14-9/2018 J.D. Eckman, Inc. $36 million

*US 422 E & W, North Coventry

Twp.

Road Construction: TRAFFIC PATTERN SHIFT

between Sanatoga & PA 724 (Schuylkill Rd.)

interchanges. 24-HOUR PATTERN.

2/2/13-8/2018 J.D. Eckman, Inc. $73.3 million

DELAWARE COUNTY

Township Line Rd., Haverford Twp. Conduit Installation: LANE CLOSURE between Darby

Rd. & Hollywood Ave. 9 AM - 3 PM.

2/26/18 PECO Energy

*I-95 North, Upper Chichester Twp. Soil Excavation: LANE CLOSURE between PA 452

(Pennell Rd.) & Chincester Ave. 7 PM - 5 AM

2/26/18-2/27/18 Maintenance

*I-95 South, Tinicum, Ridley,

Chester, Upper Chichester, Lower

Chichester twps., Upland Bor.,

Chester City

Patching: INTERMITTENT LANE CLOSURES

between Philadelphia County Line & Delaware state

line. 9 AM - 3 PM.

2/26/18-2/27/18 Maintenance

*I-95 North, Tinicum, Ridley,

Chester, Upper Chichester, Lower

Chichester twps., Upland Bor.,

Chester City

Patching: INTERMITTENT LANE CLOSURES

between Delaware state line & Philadelphia County

line. 9 AM - 3 PM.

2/26/18-2/27/18 Maintenance

Thomson Ave., Springfield Twp. Utility Installation: LANE RESTRICTIONS at Prospect

Rd. 9 AM - 3 PM.

2/26/18-3/16/18 Aqua Pennsylvania

*I-476 N & S, Radnor, Haverford

twps.

ITS Fiber Installation & Splicing: SHOULDER

CLOSURE between I-76 & I-95. 9 AM - 3 PM.

2/26/18-3/2/18 Miller Bros. $15 million

3/1/2018 Page 12 of 22

Page 13: PENNSYLVANIA DEPARTMENT OF TRANSPORTATION …

LOCATION RESTRICTION DATE CONTRACTOR COST

*I-95 N & S, City of Chester Painting/Inspection & Repair: LANE RESTRICTIONS

between I-476 & PA 352/320. 10 PM - 5 AM.

2/26/18-3/2/18 South State, Inc. $16.6 million

*I-476 N & S, Radnor, Haverford,

Marple, Upper Providence, Nether

Providence, Springfield, Ridley twps.

Large Sign Maintenance: LANE CLOSURES between

PA 276/PA Turnpike & I-95. 8 PM - 5 AM.

2/26/18-3/3/18 Carr & Duff, Inc. $2.1 million

*I-476 North, Radnor, Haverford

twps.

ITS Fiber Installation & Splicing: SHOULDER

CLOSURE between Baltimore Pike & US 1. 7 PM - 5

AM.

2/26/18-3/3/18 Miller Bros. $15 million

*I-476 N & S, Radnor, Haverford

twps.

ITS Fiber Installation & Splicing: SHOULDER

CLOSURE between I-76 & I-95. 9 AM - 3 PM.

2/26/18-3/3/18 Miller Bros. $15 million

US 30 (Lancaster Ave.), Radnor

Twp.

Utility Installation: LANE RESTRICTIONS at S. Wayne

Ave. Monday thru Thursday. 7:30 PM - 5:30 AM.

2/26/18-3/8/18 Aqua Pennsylvania

State Rd., Upper Darby Twp. Utility Installation: LANE RESTRICTIONS at Alexander

Ave. Weekdays. 9 AM - 3 PM.

2/26/18-3/30/18 PECO Energy

PA 232 (Second Street Pike),

Wrightstown Twp.

Bridge Rehabilitation: CLOSED & DETOURED

between PA 413 (Durham Rd.) & Cherry Ln

Weekdays 7 AM - 4 PM. DETOUR POSTED

2/26/18- 6/15/18 J.D. Eckman, Inc. $7.4 million

Malin Rd. Marple, Newtown, Radnor

twps.

Water Main Installation: CLOSE & DETOUR between

PA 3 (West Chester Pike) and Bryn Mawr Ave. 9 AM -

3 PM.

2/26/18-6/29/18 Aqua Pennsylvania

US 322 E & W (Conchester Hwy.),

Concord, Bethel, Upper Chichester

twps.

Patching: LANE CLOSURES between Baltimore Pike

& I-95. 9 AM - 3 PM.

2/28/18-3/1/18 Maintenance

PA 320 N & S (Chester Rd.),

Swarthmore Bor.

Mast Arms/Pedestal Poles/Handicap Ramps: LANE

RESTRICTIONS between Fieldhouse Lane & Yale

Ave. Weekdays. 9 AM - 3 PM.

2/28/18-4/30/18 Marino Corporation $480,821.00

3/1/2018 Page 13 of 22

Page 14: PENNSYLVANIA DEPARTMENT OF TRANSPORTATION …

LOCATION RESTRICTION DATE CONTRACTOR COST

Yale Ave., Swarthmore Bor. Mast Arms/Pedestal Poles/Handicap Ramps: LANE

RESTRICTIONS between PA 320 (S. Chester Rd.) &

Avondale Rd. Weekdays. 9 AM - 3 PM.

2/28/18-4/30/18 Marino Corporation $480,821.00

*I-95 South, Ridley, Tinicum twps. Barrier Replacement: LEFT LANE CLOSED between

PA 420 (Wanamaker Ave.) & Ridley exits. 12 AM -5

AM.

3/2/18 Long Fence $2.7 million

Marple Rd., Marple Twp. Utility Installation: LANE CLOSURE between Ceton

Ct. & Foxcroft Rd. 9 AM - 3 PM.

3/2/18-3/9/18 PECO Energy

*US 30 E & W (Lancaster Ave.),

Radnor Twp.

Pedestrian Bridge Construction: LANE CLOSURES

between PA 320 (Spring Mill Rd.) & Ithan Ave. 24-

HOUR CLOSURE.

3/5/18-3/9/18 Neshaminy

Constructors, Inc.

$3.7 million

Darby Paoli Rd., Radnor Twp. Utiltity Installation: CLOSED AND DETOURED

between Godfrey Rd. & Newtown Rd. Weekdays 9 AM

- 3 PM Saturdays 7 AM - 5 PM. DETOUR POSTED

3/5/18-3/16/18 Radnor Township

Haverford Rd. Lower Merion Twp. Utility Installation: LANE RESTRICTIONS between

Miller St. & Railroad Ave 9 AM - 3 PM

3/5/18-3/16/18 PECO Energy

Larkin Rd., Upper Chichester Twp Utility Installation: LANE RESTRICTIONS between

Chichester Ave & Whitney Ave 9 AM - 3 PM

Weekdays

3/5/18-3/30/18 PECO Energy

W. 22nd St., Chester City Utility Installation: SHOULDER & PARKING

RESTRICTIONS between Howard St. & Upland Ave.

Weekdays. 9 AM - 3 PM.

3/5/18-3/30/18 PECO Energy

PA 29 (Morehall Rd.) East

Whiteland, Charlestown Twps

Line Striping & Placing Temp Barrier: LANE

CLOSURE between Falt Rd./Atwater Dr. & Yellow

Springs Rd. 6 PM - 5 AM

3/6/18-3/7/18 Allan, Myers, LP $2.5 million

State Rd. Upper Providence Twp. Utility Installation: LANE CLOSURE between Valley

View Rd. & Bobbin Mill Rd. 9 AM - 3 PM

3/8/18-3/15/18 PECO Energy

Fairview Rd., Ridley Twp. Utility Installation: CLOSED & DETOURED between

MacDade Blvd. & PA 13 (Chester Pike). Weekdays.

9 AM - 3 PM. DETOUR POSTED.

3/12/18-4/13/18 Aqua Pennsylvania

3/1/2018 Page 14 of 22

Page 15: PENNSYLVANIA DEPARTMENT OF TRANSPORTATION …

LOCATION RESTRICTION DATE CONTRACTOR COST

W. Rose Valley Rd., Nether

Providence Twp.

Utility Installation: CLOSED & DETOURED between

Brookhaven Rd. & PA 252 (S. Providence Rd.)

Weekdays. 9 AM - 3 PM. DETOUR POSTED.

3/12/18-6/15/18 Aqua Pennsylvania

Township Line Rd., Upper Darby

Twp.

Utility Installation: LANE RESTRICTIONS at Lindale

Ave. 9 AM - 3 PM. Weekdays

2/21/18-3/7/18 PECO Energy

Burmont Rd., Upper Darby Twp. Utility Installation: LANE RESTRICTIONS between

Alenander Ave & Cedar Ln. 9 AM to 3 PM. Weekdays

2/22/18-3/30/18 PECO Energy

MacDade Blvd., Glenolden Twp. Box Culvert Reconstruction: CLOSED AND

DETOURED between Dalmas Ave & Werner Ave.

6:30 AM - 3:30 PM. 24 HOUR DETOUR

2/23/18-8/31/18 Loftus Construction,

Inc.

$11.7 million

Lenni Rd., Middletown, Aston twps.,

Chester Heights Bor.

Utility Installation: CLOSED & DETOURED between

Pennell Rd. & Llewellyn Rd. Monday thru Saturday. 9

AM - 4 PM. DETOUR POSTED.

2/1/18-5/11/18 Aqua Pennsylvania

Earlington Rd., Haverford Twp. Utility Installation: CLOSED & DETOURED between

Manoa Rd. & US 1 (Township Line Rd.). Weekdays.

9 AM - 3 PM. DETOUR POSTED.

1/22/18-5/25/18 Aqua Pennsylvania

Pyle Rd., Concord Twp. Utility Installation: LANE RESTRICTIONS between

Wilmington West Chester Pike & Concord Crossing.

Weekdays. 9 AM - 3 PM.

1/16/18-2/23/18 PECO Energy

S. Wayne Ave., Radnor Twp. Utility Installation: CLOSED & DETOURED between

US 30 (Lancaster Ave.) & Audubon Ave. Weekdays.

9 AM - 3 PM. DETOUR POSTED.

1/16/18-3/30/18 Aqua Pennsylvania

Church Ln., Yeadon Bor. Utility Installation: CLOSED & DETOURED between

Baltimore Pike & MacDade Blvd. Weekdays. 9 AM -

3 PM. DETOUR POSTED.

1/22/18-5/11/18 Aqua Pennsylvania

Powell Rd., Springfield Twp. Utility Installation: CLOSED & DETOURED between

East Springfield Rd. & West Sproul Rd. Weekdays. 9

AM - 3 PM. DETOUR POSTED.

1/8/18-5/31/18 PECO Energy

3/1/2018 Page 15 of 22

Page 16: PENNSYLVANIA DEPARTMENT OF TRANSPORTATION …

LOCATION RESTRICTION DATE CONTRACTOR COST

PA 252 (South Newtown St.),

Newtown Twp.

Utility Installation: LANE RESTRICTIONS between

Mary Jane Lane & Reese Ave. Weeknights. 7 PM - 5

AM.

1/2/18-3/9/18 PECO Energy

*US 322 E & W (Conchester Hwy.),

Concord Twp.

Reconstruction & Road Widening: PERIODIC LANE

RESTRICTIONS between US 1 (Baltimore Pike) & PA

261 (Foulk Rd). 9 AM - 3 PM & Possible 7 AM - 7 PM

Saturdays.

12/18/17-10/20/18 J.D. Eckman, Inc. $62.7 million

*US 1 East (Baltimore Pike),

Middetown Twp.

Turn Lane Widening: LANE CLOSURE between

Oriole Ave. & PA 352 (South New Middletown Rd.).

Monday thru Friday. 9 AM - 3 PM. Saturday. 7 AM - 5

PM.

12/11/17-2/23/18 BT Granite Run LP

*US 30 E & W (Lancaster Ave.),

Radnor Twp.

Pedestrian Bridge Construction: SIDEWALK CLOSED

between PA 320 (Spring Mill Rd.) & Ithan Ave. 24-

HOUR CLOSURE.

10/2/17-3/4/18 Neshaminy

Constructors, Inc.

$3.7 million

Chestnut St., City of Chester Bridge Deck Reconstruction: CLOSED & DETOURED

between 12th St. & 13th. DETOURED POSTED.

9/25/17-5/18/18 South State, Inc. $16.8 million

Garrett Rd., Upper Darby Twp. Utility Installation: CLOSED & DETOURED between

Lansdowne Ave. & PA 3 (West Chester Pike).

Weekdays. 9 AM - 3 PM. DETOUR POSTED.

9/11/17-3/2/18 Aqua Pennsylvania

Potter St., City of Chester Deck Replacement: CLOSED & DETOURED between

13th St. & 12th St. 24-HOUR DETOUR. DETOUR

POSTED.

8/14/17-3/14/18 South State, Inc. $16.6 million

Station Rd., Concord Twp. Road Construction: CLOSED & DETOURED between

Concord Rd. & PA 322 (Conchester Hwy.). 24-HOUR

DETOUR. DETOUR POSTED.

8/7/17-10/20/18 Road-Con, Inc. $29.20 million

Morton Ave., City of Chester Road/Curb Reconstruction: CLOSED & DETOURED

between US 13 (E. 9th St.) & PA 291 (E. 4th St.). 24-

HOUR DETOUR. DETOUR POSTED.

6/20/17-6/30/18 South State, Inc. $16.6 million

College Ave., Haverford Twp. Bridge Construction: CLOSED & DETOURED

between Spring Mill Rd. & Haverford Rd. 24-HOUR

DETOUR. DETOUR POSTED.

11/29/16-5/2018 Road-Con, Inc. $5.2 million

MONTGOMERY COUNTY

3/1/2018 Page 16 of 22

Page 17: PENNSYLVANIA DEPARTMENT OF TRANSPORTATION …

LOCATION RESTRICTION DATE CONTRACTOR COST

*I-476 S, Upper Merion, Lower

Merion twps.

Dam Replacement: LANE CLOSURES at the I-76

interchange. 9 PM - 5 AM

2/25/18-3/1/18 J.D. Eckman, Inc. $21 million

*I-76 E & W, Upper Merion, Lower

Merion twps.

Ditch Cleaning and Drainage: LANE CLODURES

between PA 202 and City Avenue. 9 PM - 5 AM

2/25/18-3/1/18 J.D. Eckman, Inc. $21 million

*U.S. 202 North (DeKalb Pike),

Bridgeport Borough, Norristown

Bridge Inspection: RIGHT LANE CLOSED between

Dekalb St. & E. Main St. 9 AM - 3 PM.

2/26/18 AECOM

*US 422 West, Lower Pottsgrove

Twp.

Pavement Repairs: LEFT LANE CLOSED between

Sanatoga & Armand Hammer exits. 7 AM - 1 PM.

2/26/18 J.D. Eckman, Inc. $73.3 million

*US 422 West, Lower Pottsgrove

Twp.

Guide Rail Repair: LEFT LANE CLOSED between

Evergreen Rd & Armand Hammer Blvd. 9 AM to 3 PM

2/26/18 Long Fence

*US 422 East, Lower Pottsgrove

Twp.

Pavement Repairs: LEFT LANE CLOSED between

Keim St. & Armand Hammer exits. 9 AM - 2 PM.

2/26/18-2/27/18 J.D. Eckman, Inc. $73.3 million

Stump Hall Rd. Worchester,

Skippack twps

Tree Removal: LANE RESTRICTIONS between

Green Hill Rd. & PA 73 (Skippack Pike) 9 AM - 3 PM

2/26/18-2/28/18 Sidelines Tree

Service

PA 363 (Trooper Rd.), West Norriton

Twp.

Sign Structure Maintenance: LANE CLOSURES

between US 422 and Audubon Rd. 9 AM - 3 PM

2/26/18- 3/2/18 J.D. Eckman, Inc. $2.7 million

PA 363 (Trooper Rd.), West Norriton

Twp.

Sign Structure Maintenance: LANE CLOSURES

between I-476 & PA 320. 9 AM - 3 PM

2/26/18- 3/2/18 J.D. Eckman, Inc. $2.7 million

US 202 North, Upper Merion Twp. Sign Structure Maintenance: LANE CLOSURES

between Gulph Rd. & US 422 on-ramp. 9 AM - 3 PM

& 9 PM - 5 AM.

2/26/18-3/2/18 J.D. Eckman, Inc. $2.7 million

*I-76 West, Upper Merion Twp. Sign Structure Maintenance: LANE CLOSURES

between Pennsylvania Turnpike/I-276 & US 202. 9

AM - 3 PM & 9 PM - 5 AM.

2/26/18-3/2/18 J.D. Eckman, Inc. $2.7 million

3/1/2018 Page 17 of 22

Page 18: PENNSYLVANIA DEPARTMENT OF TRANSPORTATION …

LOCATION RESTRICTION DATE CONTRACTOR COST

*I-476 N & S, Plymouth Twp. Sign Structure Repairs: LANE CLOSURES between

Germantown Pike & County Line Rd. 9 AM - 3 PM.

2/26/18-3/2/18 J.D. Eckman, Inc. $2.7 million

PA 152 (Limekiln Pike) Upper Dublin

Twp.

Tree Removal: LANE RESTRICTIONS between

Shepard Dr. & Bell Ln 9 AM - 3 PM

2/26/18-3/2/18

*I-476 N & S, Lower Merion Twp.,

West Conshohocken Bor.

ITS Conduit & Fiber Installation: RIGHT SHOULDER

CLOSED between I-76 & I-95. 9 AM - 3 PM.

2/26/18-3/2/18 Wampole-Miller, Inc. $15 million

US 202 N & S (DeKalb St.),

Norristown

Utility Installation: LANE RESTRICTIONS between

Schuylkill Ave. & Main St. Weeknights. 8 PM - 6 AM.

2/26/18-3/2/18 PECO Energy

US 202 N & S (DeKalb St.),

Norristown

Test Holes: LANE CLOSURE between Carriage Lane

& Butchers Lane. 9 AM - 3 PM.

2/26/18-3/2/18 So-Deep, Inc.

High St., Pottstown Bor. ADA Ramp Construction: LANE CLOSURE at Adams

St.; Franklin St.; Charlotte St.; Hanover St.;

Pleasantview Rd.; College Drive; Manatawny St.; Penn

St.; Evans St.; York St.; Madison St.& Washington St.

9 AM - 3 PM.

2/26/18-3/2/18 Road-Con, Inc. $13.3 million

*I-476 N & S, Plymouth, Lower

Merion, Radnor twps., West

Conshohocken Bor.

Large Sign Maintenance: LANE CLOSURES between

PA 276/PA Turnpike & I-95. 8 PM - 5 AM.

2/26/18-3/3/18 Carr & Duff, Inc. $2.1 million

*U.S. 202 South (DeKalb Pike),

Bridgeport Bor., Norristown

Bridge Inspection: RIGHT LANE CLOSED between E.

Main St. & 4th St. Interchange. 9 AM - 3 PM.

2/27/18 AECOM

*I-76 West, Lower Merion Twp. ITS Camera Installation: RIGHT LANE CLOSED

between City Ave. & Green Lane exits. 10 PM - 4 AM.

3/1/18 Kuharchik $211.7 million

Church Rd., Cheltenham Twp. Utility Installation: CLOSED & DETOURED between

Hammond Rd. & New Second St. Weekdays. 9 AM -

3 PM. DETOUR POSTED.

3/1/18-5/31/18 PECO Energy

3/1/2018 Page 18 of 22

Page 19: PENNSYLVANIA DEPARTMENT OF TRANSPORTATION …

LOCATION RESTRICTION DATE CONTRACTOR COST

PA 23 W Ramp to U.S 422 W, Upper

Merion, West Norriton Twp

Ramp Construction: RAMP CLOSED & DETOURED 3

AM - 2 PM DETOURE POSTED

3/3/18 J.D. Eckman, Inc. $97.4 million

*U.S. 422 W, Upper Merion & West

Norriton twps.

Lane and Barrier Realignment: LEFT AND RIGHT

LANE CLOSURES, TEMPORARY STOPPAGES

between U.S 202 and Oaks interchange. 9 PM - 6 AM

3/3/18 J.D. Eckman, Inc. $97.4 million

*I-476 S, Upper Merion, Lower

Merion twps.

Dam Repleacement: LANE CLOSURES at the I-76

interchange. 9 PM - 5 AM

3/4/18-3/8/18 J.D. Eckman, Inc. $21 million

*I-76 East, Lower Merion Twp. ITS Installation: RIGHT CLOSURE between Gladwyne

& US 1 (City Ave) interchanges 9 PM - 5 AM

3/5/18 Kuharchik $3.5 million

Evergreen Rd., Lower Pottsgrove,

Limerick twps

Patching: CLOSED AND DETOURED between

Lightcap Rd. & Sanatoga Rd. 9 AM - 3 PM

3/5/18-3/6/18 Maintenance

*US 422 E & W, Lower Providence,

Upper Providence, Limerick, Lower

Pottsgrove, North Coventry twps.

Spray Patching & Litter & Debris Removal: MOVING

OPERATION WITH LANE CLOSURES between PA

100 (Pottstown Pike) & PA 363 (Trooper Rd.). 9 AM -

3 PM.

3/5/18-3/8/18 Maintenance

High St., Pottstown Bor. ADA Ramp Construction: LANE CLOSURE at Armand

Hammer Blvd.; Rosedale Rd.; Sunnybrook Rd.; Beech

St.; Pleaseantview & Moser Rd. 9 AM - 3 PM.

3/5/18-3/9/18 Road-Con, Inc. $13.3 million

US 202 N & S (DeKalb St.),

Norristown

Test Holes: LANE CLOSURE between Germantown

Piek & Butchers Lane. 9 AM - 3 PM.

3/5/18-3/9/18 So-Deep, Inc.

Flourtown Rd., Whitemarsh Twp. Utility Installation: CLOSED & DETOURED between

Joshua Rd. & Plymouth Rd. Weekdays. 9 AM - 3 PM.

DETOUR POSTED.

3/5/18-3/23/18 PECO Energy

Pine Road, Lower Moreland Twp. Utiltiy Installation: SINGLE LANE CLOSURE between

PA 63 (Red Lion Road) & Kirk Dr. Weekdays 9 AM - 3

PM

3/5/18-3/23/18 H&K Group, Inc.

3/1/2018 Page 19 of 22

Page 20: PENNSYLVANIA DEPARTMENT OF TRANSPORTATION …

LOCATION RESTRICTION DATE CONTRACTOR COST

Bethel Rd. Worcester Twp. Utility Installation: LANE CLOSURE between Deep

Medow Ln & Sibel Court 9 AM - 3 PM

3/6/18- 3/13/18 PECO Energy

*I-76 E & W, Upper Merion, Lower

Merion twps.

Ditch Cleaning and Drainage: LANE CLOSURES

between PA 202 and City Avenue. 9 PM - 5 AM

3/11/18-3/15/18 J.D. Eckman, Inc. $21 million

*I-76 E & W, Upper Merion, Lower

Merion twps.

Ditch Cleaning and Drainage: LANE CLODURES

between PA 202 and City Avenue. 9 PM - 5 AM

3/11/18-3/8/18 J.D. Eckman, Inc. $21 million

Edgehill Rd., Abington Twp. Utility Installation: CLOSED & DETOURED between

Jenkintown Rd. & Easton Rd. Weekdays 9 AM - 3 PM

DETOUR POSTED

3/15/18-7/31/18 Aqua Pennsylvania

US 422 East Ramp to PA 23 (Valley

Forge Rd.), Upper Merion Twp.

RAMP CONSTRUCTION: RAMP CLOSED &

DETOURED. 24-HOUR DETOUR. DETOUR

POSTED.

2/12/18-9/2018 J.D. Eckman, Inc. $97.4 million

*I-76 E & W, Upper Merion, Lower

Merion twps.

Ditch Cleaning and Drainage: LANE CLOSURES

between PA 202 and City Avenue. 9 PM - 5 AM

2/18/18-3/15/18 J.D. Eckman, Inc. $21 million

Township Line Rd., Whitpain,

Worcester, Plymouth, East Norriton

twps.

Intersection Widening & Upgrades: LANE

RESTRICTIONS between Sharon Ln. & Oakwood Dr.

Weekdays. 9 AM - 3 PM.

2/19/18-12/13/18 Scott Building Corp. $4.4 million

PA 263 (York Rd.) Upper Moreland

Twp.

Water Main Replacement: LANE RESTRICTION

between Easton Rd. and Sunset Ln. 9:00 AM - 3:00

PM.

2/19/18-7/31/18 Aqua Pennsylvania

High St., Lower Pottsgrove Twp. Ultilty Installation: LANE CLOSURE between Hause

Ave & Pleseantview Rd. 9 AM to 3 PM

2/21/18-2/28/18 PECO Energy

PA 29 (Main St.) Pennsburg Twp. Ultilty Installation: LANE CLOSURE between 5th St. &

6th St. 9 AM to 3 PM

2/21/18-2/28/18 PECO Energy

W. Welsh Rd., Lower Gwynedd Twp. Utility Installation: LANE CLOSURE between Marietta

Drive & Cedar Hill Rd. Weekdays. 9 AM - 3 PM.

2/21/18-2/28/18 PECO Energy

3/1/2018 Page 20 of 22

Page 21: PENNSYLVANIA DEPARTMENT OF TRANSPORTATION …

LOCATION RESTRICTION DATE CONTRACTOR COST

*US 422 East, West Pottsgrove,

North Coventry, Douglass twps.

Resurfacing: CLOSED & DETOURED at the split with

Benjamin Franklin Hwy. 9 PM - 5 AM. DETOUR

POSTED.

12/13/17-10/20/19 H&K Group, Inc. $35 million

Ramp from Stowe Interchange

(Grosstown Rd.) to Eastbound &

Westbound US 422, West

Pottsgrove, North Coventry,

Douglass twps.

Road Work: RAMP CLOSED & DETOURED. 24-

HOUR DETOUR. DETOUR POSTED.

12/13/17-10/20/19 H&K Group, Inc. $35 million

Ramp from US 422 West to Stowe,

West Pottsgrove, North Coventry,

Douglass twps.

Road Work: RAMP CLOSED & DETOURED. 24-

HOUR DETOUR. DETOUR POSTED.

12/13/17-10/20/19 H&K Group, Inc. $35 million

Bleim Rd., Lower Pottsgrove Twp. Utility Installation: CLOSED & DETOURED between

New Hanover Square Rd. & Pleasantview Rd. 9 AM -

3 PM. Saturdays. 7 AM - 7 PM. DETOUR POSTED.

10/25/17-2/16/18 Borough of Pottstown

Old Forty Foot Rd., Lower Salford

Twp.

Bridge Rehabilitation: CLOSED AND DETOURED

between Township Line Rd. & Kober Rd. 24-HOUR

CLOSURE.

10/30/17-6/2/18 J.D. Eckman, Inc. $7.4 million

Otts Rd., Perkiomen Twp. Excavation/Grading/Paving: CLOSED & DETOURED

between Miller Rd. & PA 29 (Gravel Pike). 24-HOUR

DETOUR. DETOUR POSTED.

5/2/17-5/2019 H&K Group, Inc. $11.3 million

County Line Rd., Warrington,

Horsham, Montgomery twps.

Utility Installation: LANE RESTRICTIONS between

Kulp Rd. & Stump Rd. 7 AM - 3 PM.

3/7/16-9/2018 James D. Morrissey,

Inc.

$14.8 million

Baligomingo Rd., West

Conshohocken Bor.

Slope Stabilization: CLOSED & DETOURED between

PA 23 (Front St.) & Portland Rd. 24-HOUR DETOUR.

DETOUR POSTED.

6/27/15-Indef.

PA 724 ramp to US 422 East, Lower

Pottsgrove Twp.

Roadwork: RAMP CLOSED & DETOURED. 24-

HOUR CLOSURE. DETOUR POSTED.

5/27/15-3/2018 J.D. Eckman, Inc. $73.3 million

*US 422 E & W, Lower Pottsgrove

Twp.

Road Construction: TRAFFIC PATTERN SHIFT

between Sanatoga & PA 724 (Schuylkill Rd.)

Interchanges. 24-HOUR PATTERN.

2/2/13-8/2018 J.D. Eckman, Inc. $73.3 million

3/1/2018 Page 21 of 22

Page 22: PENNSYLVANIA DEPARTMENT OF TRANSPORTATION …

LOCATION RESTRICTION DATE CONTRACTOR COST

*US 422 East, Lower Pottsgrove

Twp.

Road & Bridge Construction: LANE CLOSURES

between PA 724 (Schuylkill Rd.) & Sanatoga

Interchanges. 5 PM - 5 AM.

1/23/17-9/2018 J.D. Eckman, Inc. $73.3 million

*US 422 West, Lower Pottsgrove

Twp.

Road & Bridge Construction: WEEKEND LANE

CLOSURES between Sanatoga & PA 724 (Schuylkill

Rd.) Interchanges. 7 PM - 1 PM.

1/23/17-9/2018 J.D. Eckman, Inc. $73.3 million

*US 422 E & W, West Pottsgrove

Twp.

Bridge Construction: REDUCED TO ONE LANE

between Stowe & PA 100 Interchange. 24-HOUR

RESTRICTION.

11/27/14-9/2018 J.D. Eckman, Inc. $36 million

County Line Rd., Upper Merion Twp. Road Work: CLOSED & DETOURED WEEKDAYS

between PA 23 & Gulph Rd. 7 AM Mondays thru 5 PM

Fridays. 24-HOUR CLOSURE. DETOUR POSTED.

5/9/14-12/29/18 Valley Forge National

Historical Park

$29.29 million

3/1/2018 Page 22 of 22