LOCATION RESTRICTION DATE CONTRACTOR COST
PHILADELPHIA
*I-95 N & S Test Borings: LANE CLOSURE, SHOULDER
CLOSURE between Aramingo Ave. & Bridge St./
Harbison Ave Interchanges. 9 PM - 5 AM.
2/25/18-3/2/18 TRC Solutions
*US 1 N & S (Roosevelt Extension) Drain Cleaning/Debris Removal: INTERMITTENT
LANE RESTRICTIONS between I-76 & 9th St. 9:30
AM - 2 PM.
3/5/18-3/8/18 Maintenance
*I-676 E & W Drain Cleaning/Debris Removal: INTERMITTENT
LANE RESTRICTIONS between I-76 & I-95. 9:30 AM -
2 PM.
3/5/18-3/8/18 Maintenance
*I-95 N & S Drain Cleaning/Debris Removal: INTERMITTENT
LANE RESTRICTIONS between Phila. Int. Airport &
PA 63 (Woodhaven Rd.). 9:30 AM - 2 PM.
3/5/18-3/8/18 Maintenance
*I-76 E & W Drain Cleaning/Debris Removal: INTERMITTENT
LANE RESTRICTIONS between US 1 (City Ave.) &
26th St. 9:30 AM - 2 PM.
3/5/18-3/8/18 Maintenance
Passyunk Ave. Bridge Rehabilitation: RIGHT LANE CLOSED on Hon.
Robert C. Donatucci Memorial Bridge over Schuylkill
River 9 AM - 3 PM.
2/26/18-3/2/18 Buckley & Company,
Inc.
$33.5 million
Walnut Lane Debris Removal & Concrete Repair: LANE
CLOSURES between Magdelena St. & Park Lane
Drive. Weekdays. 9 AM - 3 PM.
2/26/18-3/2/18 Buckley & Company,
Inc.
$14 million
DATE: 03-01-2018
PENNSYLVANIA DEPARTMENT OF TRANSPORTATION
ENGINEERING DISTRICT 6-0
PHILADELPHIA REGION TRAFFIC BULLETIN
NOTE: SCHEDULES ARE SUBJECT TO CHANGE
PENNDOT ROADWAY MAINTENANCE HOTLINE 1-800-FIX-ROAD
TO CHECK REAL-TIME HIGHWAY CONDITIONS VISIT 511PA.COM; DOWNLOAD THE 511PA APP; OR CALL 5-1-1
3/1/2018 Page 1 of 22
LOCATION RESTRICTION DATE CONTRACTOR COST
Lewis St./Wheatsheaf Lane Shared Pathway: PARKING LANE CLOSED between
Aramingo Ave. & Delaware Ave. 7 AM - 4 PM.
2/26/18-3/2/18 James J. Anderson $869,700.00
JFK Blvd. East Bridge Rehabilitation: CLOSED & DETOURED
between 20th St. & Schuylkill Ave. 7 AM - 5 PM.
DETOUR POSTED.
2/26/18-3/2/18 Abbonizio
Contractors, Inc.
$15.8 million
*US 1 (Roosevelt Blvd.) ITS Fiber Cable & Duct Installation: LANE CLOSURE
between Comly Rd. & Old Trevose Rd. 9 AM - 3 PM.
2/26/18-3/2/18 Miller Bros. $15 million
Woodhaven Rd. (PA 63) ITS Fiber Cable Splicing: LANE CLOSURE between
Bristol Pike & Knights Rd. 9 AM- 3 PM.
2/26/18-3/2/18 Miller Bros. $15 million
*I-95 South Sign Structure Maintenance: LANE CLOSURES
between Columbus Blvd. & I-76. 9 PM - 5 AM.
2/26/18-3/2/18 J.D. Eckman, Inc. $2.7 million
*I-95 North Sign Structure Maintenance: LANE CLOSURES
between S. Broad St. & Packer Ave. 9 PM - 5 AM
2/26/18-3/2/18 J.D. Eckman, Inc. $2.7 million
Ridge Ave. Road Work: INTERMITTENT LANE CLOSURE
between Spring Garden St. & Jefferson St. 9 AM - 3
PM
2/26/18-3/2/18 Armour & Sons $1.7 million
Richmond St. Utility Installation: LANE RESTRICTIONS between
Ann St. & Allegheny Ave. 7 AM -3:30 PM.
2/26/18-3/2/18 Philadelphia Gas
Works
*I-95 S Bridge Inspection: RIGHT LANE CLSOURE between
Walt Whitman Bridge & Enterprise Ave 9 AM - 3 PM
3/1/18 Pickering, Corts &
Summerson
*I-95 N Bridge Inspection: LEFT LANE CLOSURE between
Broad St/Pattison Ave & Walt Whitman Bridge 9 AM -
12 PM
3/1/18 Pickering, Corts &
Summerson
PA 291 (Penrose Ave) Bridge Inspection: RIGHT LANE CLOSURE between
26th St. & I-95. 9 AM - 3 PM
3/4/18-3/7/18 Specialty
Engingeering, Inc
3/1/2018 Page 2 of 22
LOCATION RESTRICTION DATE CONTRACTOR COST
*I-95 N & S Test Borings: LANE CLOSURE, SHOULDER
CLOSURE between Aramingo Ave. & Bridge St./
Harbison Ave Interchanges. 9 PM - 5 AM.
3/4/18-3/10/18 TRC Solutions
*I-76 E & W Viaduct Construction: REDUCED TO ONE LANE
between I-676 & South St. interchanges. 9 PM - 5
AM.
3/5/18-3/8/18 Buckley & Company,
Inc.
$103.6 million
Richmond St. Utility Installation: LANE RESTRICTIONS between
Ann St. & Allegheny Ave. 7 AM -3:30 PM.
3/5/18-3/9/18 Philadelphia Gas
Works
*U.S.1 (Roosevelt Blvd) Roadway and Sidewalk Restoration: SINGLE TRAVEL
LANE & SHOULDER CLOSURE between Comly St. &
Old Trevose Rd. 9 AM - 3 PM
3/5/18-3/9/18 Wampole-Miller, Inc. $15.4 million
*I-95 South Road Work: SHOULDER CLOSURE between Market
St. & South St. 6:03 AM - 4:30 PM
3/5/18-3/9/18 PFK Mark III, Inc.
*I-95 South VMS Board Placement: SHOULDER CLOSURE
between Market St. & South St. 7 AM - 3:30 PM
2/19/18-3/05/18 PFK Mark III, Inc.
Holme Ave. Bridge Rehabilitation: RIGHT LANE CLOSED between
Longford St. & Arthur St. 24-HOUR RESTRICTIONS.
2/12/18-6/15/18 Road-Con, Inc. $1.3 million
Aramingo Ave. Road Work: NORTHBOUND LANE CLOSURES
between Wheatsheaf Lane & I-95 interchange. 24-
HOUR CLOSURES.
12/2/17-5/1/18 A.P. Construction,
Inc.
$87 million
JFK Blvd. East Bridge Rehabilitation: CLOSED & DETOURED
between 20th St. & Schuylkill Ave. 24-HOUR
DETOUR. DETOUR POSTED.
11/20/17-8/2018 Abbonizio
Contractors, Inc.
$15.8 million
Schuylkill Ave. Bridge Rehabilitation: TRAFFIC SWITCH WITH NO
RIGHT TURN at Walnut onto Schuylkill. 24-HOUR
RESTRICTIONS.
8/28/17-7/2018 Buckley & Company,
Inc.
$103 million
I-676 West Ramp to 22nd St. Bridge Construction: RAMP REDUCED TO ONE
LANE 24-HOUR
7/21/17-4/30/18 Buckley & Company,
Inc.
$64.8 million
3/1/2018 Page 3 of 22
LOCATION RESTRICTION DATE CONTRACTOR COST
Aramingo Ave. Utility Installation: LANE CLOSURES between
Wheatsheaf Lane & I-95 interchange. 9 AM - 3 PM.
7/20/17-4/1/18 A.P. Construction,
Inc.
$87 million
Palmer St. Overhead Bridge Construction: CLOSED &
DETOURED between Wildey St. & Delaware Ave. 24-
HOUR DETOUR. DETOUR POSTED.
6/15/16-5/1/18 James J. Anderson $211 million
Montgomery Ave. Bridge Demoliltion: CLOSED & DETOURED between
Wildy St. & Delaware Ave. 24-HOUR DETOUR.
DETOUR POSTED.
6/15/17-5/1/18 James J. Anderson $211 million
18th St. Roadwork: CLOSED & DETOURED between Vine St.
Local E/B & Vine St. Local W/B. 24-HOUR
CLOSURE. DETOUR POSTED.
5/15/17-4/2018 Buckley & Company,
Inc.
$64.8 million
22nd St. Bridge Construction: TRAFFIC PATTERN CHANGE
on bridge over I-676 between Ben Franklin Parkway &
Race St.
11/7/16-11/30/18 Buckley & Company,
Inc.
$64.8 million
21st St. Bridge Construction: TRAFFIC PATTERN CHANGE
on bridge over I-676 between Ben Franklin Parkway &
Race St.
11/7/16-11/30/18 Buckley & Company,
Inc.
$64.8 million
Sergeant St. Bridge Work: CLOSED & DETOUR between Salmon
St. & Richmond St. 24-HOUR DETOUR. DETOUR
POSTED.
12/28/15-12/2018 James J. Anderson $211 million
Huntingdon St. Bridge Work: CLOSED & DETOUR between Salmon
St. & Richmond St. 24-HOUR DETOUR. DETOUR
POSTED.
12/28/15-12/2018 James J. Anderson $211 million
Somerset St. Bridge Work: CLOSED & DETOUR between Salmon
St. & Richmond St. 24-HOUR DETOUR. DETOUR
POSTED.
12/28/15-12/2018 James J. Anderson $211 million
Delaware Ave. Reconstruction: NEW TRAFFIC PATTERN between
Columbia Ave. & Aramingo Ave. 24-HOUR
RESTRICTIONS.
4/1/15-10/2018 James J. Anderson $211.7 million
BUCKS COUNTY
PA 563 (North Ridge Rd.), East
Rockhill Twp.
Core Boring: LANE RESTRICTIONS between Tunnel
Rd. & Callow Hill Rd. 9 AM - 3 PM.
2/26/18-2/27/18 Penn Ridge
Development
Enterprises, Inc.
3/1/2018 Page 4 of 22
LOCATION RESTRICTION DATE CONTRACTOR COST
PA 611 South, Doylestown Twp. Line Painting: RIGHT LANE CLOSED between N.
Broad St. & W. State St. 9 AM - 3 PM.
2/26/18-3/2/18 Rohm & Haas
Chemicals LLC
PA 232 (Second Street Pike),
Wrightstown Twp.
Bridge Rehabilitation: CLOSED & DETOURED
between PA 413 (Durham Rd.) & Cherry Ln
Weekdays 7 AM - 4 PM. DETOUR POSTED
2/26/18-6/15/18 J.D. Eckman, Inc. $7.5 million
*I-95 North, Bensalem, Bristol Twps. Bridge Inspection: RIGHT LANE CLOSED between
PA 132 (Street Rd.) & PA 413 (Veterans Highway)
Interchanges. 9 AM - 3 PM.
2/28/18 AECOM
*I-95 South, Bensalem, Bristol Twps. Bridge Inspection: RIGHT LANE CLOSED between
PA 413 (Veterans Highway) & PA 132 (Street Rd.)
Interchanges. 9 AM - 3 PM.
3/1/18 AECOM
US 1 N & S (Lincoln Hwy.), Falls
Twp.
Barrier Replacement: LEFT LANE CLOSED between
US 13 (Bristol Pike) & Pennsylvania Ave. 9 PM - 12
AM.
3/1/18 Long Fence $2.7 million
Bordentown Rd., Falls Twp. Bridge Inspection: LANE CLOSURE between Main St.
& Dike Rd. 9 AM - 3 PM.
3/2/18 AECOM
New Rodgers Rd., Bensalem, Bristol
twps.
New Drainage Crossing: CLOSE AND DETOUR
between Bath Road and New Falls Road. 8 PM - 6
AM. DETOUR POSTED.
3/2/18-3/4/18 Pennsylvania
Turnpike Commission
$118.80
*U.S. 1 Falls, Lower Makefield, and
Middletown twps.
Beam Repair: ROAD CLOSURE at the Oxford Valley
Rd.interchange 9 PM - 6 AM
3/5/18
PA 413 (New Rodgers Rd.),
Bensalem, Bristol twps.
New Drainage Crossing: LANE SHIFTS between Bath
Road and New Falls Road. 7 AM - 5 PM.
3/5/18-3/9/18 Pennsylvania
Turnpike Commission
$142 million
PA 332 (Newtown Bypass) Newtown
Twp.
Guide Rail Repair: LEFT LANE CLOSED between
Woodbourne Rd. & Newtown Yardley Rd. 9 AM - 12
PM
3/6/18 Long Fence $2.2 million
Buck Rd., Northampton Twp. Utility Installation: LANE CLOSURE at Rolling Hills
Drive. Weekdays. 9 AM - 3 PM.
3/6/18-3/13/18 PECO Energy
3/1/2018 Page 5 of 22
LOCATION RESTRICTION DATE CONTRACTOR COST
Bristol Rd., Northampton, Upper
Southampton Twps.
Utility Installation: LANE RESTRICTIONS between
Churchville Rd. & Bustleton Pike 9 AM - 3 PM
3/7/18 PECO Energy
PA 413 (New Rodgers Rd.),
Bensalem, Bristol twps.
New Drainage Crossing: CLOSED & DETOURED
between Bath Road and New Falls Road. 8 PM - 6
AM. DETOUR POSTED
3/9/18-3/11/18 Pennsylvania
Turnpike Commission
$118 million
Bristol Rd., Northampton Twp. Utiltiy Installation: LANE CLOSURE between Whitney
Rd. & Cherry Blossom Dr. 9 AM - 3 PM
3/12/18-3/16/18 PECO Energy
Bid Oak Rd., Lower Makefield Twp. Utiltiy Installation: LANE CLOSURE between Sandy
Dr. & Daleview Dr. Weekdays 9 AM - 3 PM
3/13/18-3/20/18 PECO Energy
U.S 1 N, Middletown, Lower
Makefield Twp.
Barrier Setting: RIGHT LANE CLOSURE, SHOULDER
CLOSURE between I-95 & Oxford Valley Rd.
interchnages 9 AM - 3 PM
3/16/18 James D. Morrissey,
Inc.
$2.3 million
PA 113 (Souderton Rd.), Hilltown
Twp.
Arch Bridge Reconstruction: CLOSED & DETOURED
between Bethlehem Pike & Keystone Drive. 24-
HOUR DETOUR. DETOUR POSTED.
1/2/18-4/1/18 Loftus Construction $11.7 million
State Rd., Springfield Twp. Bridge Reconstruction: CLOSED & DETOURED
between Richlandtown Pike & Quarry Rd. 7 AM - 3
PM. DETOUR POSTED.
1/2/18-4/1/18 Loftus Construction $11.7 million
Main St., Sellersville Bor. Bridge Replacement: INTERMITTENT LANE
RESTRICTIONS WITH FLAGGING between Park
Ave. & Elm St. 9 AM - 3 PM.
1/8/18-3/2/18 J.D. Eckman, Inc. $4.6 million
Rocky Ridge Rd., Richland Twp. Bridge Replacement: CLOSED & DETOURED
between Rock Hill Rd. & Paletown Rd. 24-HOUR
DETOUR. DETOUR POSTED.
11/27/17-4/13/18 Loftus Construction,
Inc.
$11.7 million
Walnut St., Perkasie Bor. Bridge Replacement: CLOSED & DETOURED
between PA 152 & Constitution Ave. 24-HOUR
DETOUR. DETOUR POSTED.
9/25/17-11/25/18 H&K Group, Inc.
Sugan Rd., Solebury Twp. Bridge Rehabilitation: CLOSED & DETOURED
between Creamery Rd. & Paxson Rd. 24-HOUR
CLOSURE. DETOUR POSTED.
10/2/17-5/5/18 J.D. Eckman, Inc. $7,407,987.00
3/1/2018 Page 6 of 22
LOCATION RESTRICTION DATE CONTRACTOR COST
*I-95 North, Lower Makefield Twp. Roadwork: LANE CLOSURES between PA 332
(Yardley-Newtown Rd.) & NJ state line. 24-HOUR
RESTRICTIONS POSSIBLE.
9/16/17-Indef. Delaware River Joint
Toll Bridge
Commission
*I-95 South, Lower Makefield Twp. Roadwork: LANE CLOSURES between NJ state line &
PA 332 (Yardley-Newtown Rd.). 24-HOUR
RESTRICTIONS POSSIBLE.
9/16/17-Indef. Delaware River Joint
Toll Bridge
Commission
PA 32 (River Rd.), Lower Makefield
Twp.
Roadwork: LANE RESTRICTIONS between Woodside
Rd. & I-95. 24-HOUR RESTRICTIONS POSSIBLE.
9/16/17-Indef. Delaware River Joint
Toll Bridge
Commission
Woodside Rd., Lower Makefield
Twp.
Roadwork: ALTERNATING TRAFFIC between River
Rd. & Mt. Eyre Rd. 24-HOUR RESTRICTIONS
POSSIBLE.
9/16/17-Indef. Delaware River Joint
Toll Bridge
Commission
Taylorsville Rd., Lower Makefield
Twp.
Roadwork: LANE CLOSURES between Woodside Rd.
& Highland Drive. 24-HOUR RESTRICTIONS
POSSIBLE.
9/16/17-Indef. Delaware River Joint
Toll Bridge
Commission
PA 413 (New Rodgers Rd.), Bristol
Twp.
Bridge Rehabilitation: CLOSED & DETOURED
between Plumbridge Drive & Bath Rd./Durham Rd. 8
PM - 5 AM. DETOUR POSTED.
8/20/17-5/25/18 Pennsylvania
Turnpike Commission
$142 million
PA 413 (New Rodgers Rd.), Bristol
Twp.
Bridge Rehabilitation: LANE RESTRICTIONS & 15-
MINUTE STOPPAGES between Plumbridge Drive &
Bath Rd./Durham Rd. 7 AM - 3 PM & 8 PM - 5 AM.
8/20/17-5/25/18 Pennsylvania
Turnpike Commission
$142 million
Durham Rd., Bristol Twp. Roadwork: LANE RESTRICTIONS between PA 413 &
New Falls Rd. 7 AM - 3 PM.
8/20/17-5/25/18 Pennsylvania
Turnpike Commission
$142 million
Durham Rd., Bristol Twp. Roadwork: CLOSED & DETOURED between PA 413
& New Falls Rd. 8 PM - 5 AM. DETOUR POSTED.
8/20/17-5/25/18 Pennsylvania
Turnpike Commission
$142 million
Loux Covered Bridge over Cabin
Run, Bedminster Twp.
CLOSED & DETOURED INDEFINITELY: Due to
structural damage sustained from an oversized vehicle
DETOUR POSTED
8/1/17-Indef.
3/1/2018 Page 7 of 22
LOCATION RESTRICTION DATE CONTRACTOR COST
County Line Rd., Warrington,
Horsham, Montgomery twps.
Utility Installation: LANE RESTRICTIONS between
East Kulp Rd. & Stump Rd. 7 AM - 3 PM.
3/7/16-9/2018 James D. Morrissey,
Inc.
$14.8 million
Headquarters Rd., Tinicum Twp. Bridge Damage: CLOSED & DETOURED between
Red Hill Rd. & Tankhannen Rd. DETOUR POSTED.
3/2/11-Indef.
CHESTER COUNTY
Baltimore Pike, New Garden Twp. Guide Rail Repair: MOVING SHOULDER CLOSURE
between Newark Rd. & Chambers Rd. 9 AM - 3 PM
2/26/18-3/2/18 J. Fletcher Creamer &
Son, Inc
$1.8 million
Buck Run Rd., East Fallowfield Twp. Guide Rail Repair: MOVING SHOULDER CLOSURE
between Doe Run Station Rd. & Wilmington Rd. 9 AM -
3 PM
2/26/18-3/2/18 J. Fletcher Creamer &
Son, Inc
$1.8 million
PA 841 (Chatham Rd.) London
Grove Twp.
Guide Rail Repair: MOVING SHOULDER CLOSURE
between U.S 1 & Woodview Rd. 9 AM - 3 PM
2/26/18-3/2/18 J. Fletcher Creamer &
Son, Inc
$1.8 million
PA 926 (W.Street Rd.) East
Marlborough Twp.
Guide Rail Repair: MOVING SHOULDER CLOSURE
between Mill Rd. & Unionville Rd. 9 AM - 3 PM
2/26/18-3/2/18 J. Fletcher Creamer &
Son, Inc
$1.8 million
Ewing Rd. Penn Twp Guide Rail Repair: MOVING SHOULDER CLOSURE
between Jennersville Rd. & Woodcrest Rd. 9 AM - 3
PM
2/26/18-3/2/18 J. Fletcher Creamer &
Son, Inc
$1.8 million
PA 162 (Embreeville Rd.) Newlin
Twp.
Guide Rail Repair: MOVING SHOULDER CLOSURE
between Brandywine Creek Rd. & Stargazer Rd. 9 AM
- 3 PM
2/26/18-3/2/18 J. Fletcher Creamer &
Son, Inc
$1.8 million
East Baltimore Pike, London Grove
Twp
Guide Rail Repair: MOVING SHOULDER CLOSURE
between Chatham Rd. & PA 41 (Gap Newport Pike) 9
AM - 3 PM
2/26/18-3/2/18 J. Fletcher Creamer &
Son, Inc
$1.8 million
Surgartown Rd. Willistown Twp. Tree Removal: LANE RESTRICTIONS between
Firethorn Ln & Spring Road 9 AM - 3 PM
2/26/18- 3/2/18 Knight Brothers
US 202 South, Westtown Twp. Utility Installation: LANE CLOSURE between Robin's
Nest Lane & Old Wilmington Pike. Weeknights. 8 PM
- 6 AM.
2/26/18-3/8/18 Westtown Township
Authority
3/1/2018 Page 8 of 22
LOCATION RESTRICTION DATE CONTRACTOR COST
PA 100 N & S, S. Coventry, W.
Vincent, E. Nantmeal, Uwchlan twps.
Clearing: SINGLE LANE CLOSURE between
Blackhorse Rd. and PA 23. 9 AM - 3 PM.
2/26/18-3/30/18 Allan Myers $5.6 million
PA 372 (Valley Road), Sadsbury
Twp.
Utility Installation: LANE CLOSURE between
Belvedare Ave & Eastern Ave. Weekdays. 9 AM - 3
PM.
2/28/18-3/7/18 PECO Energy
*US 422, Lower Pottgrove Twp. Guide Rail Repair: LEFT LANE CLOSED between
Evergreen Rd & Armand Hammer Blvd. 9 AM to 3 PM
2/29/18 Maintenance
Newark Rd., New Garden Twp. Core Boring: LANE RESTRICTIONS at Airport Way.
9 AM - 3 PM.
3/1/18-3/2/18 New Garden
Township Authority
Newark Rd., New Garden Twp. Core Boring: LANE RESTRICTIONS at Church St. 9
AM - 3 PM.
3/1/18-3/2/18 New Garden
Township Authority
Baltimore Pike, New Garden Twp. Core Boring: LANE RESTRICTIONS between Newark
Rd. & Reese St. 9 AM - 3 PM.
3/1/18-3/2/18 New Garden
Township Authority
Baltimore Pike, New Garden Twp. Core Boring: LANE RESTRICTIONS between Newark
Rd. & Center St. 9 AM - 3 PM.
3/1/18-3/2/18 New Garden
Township Authority
PA 82 (Strode Rd.), Valley Twp. Utility Installation: LANE CLOSURE between Federal
St. & Newlinville Rd. Weekdays. 9 AM - 3 PM.
3/1/18-3/8/18 PECO Energy
PA 340 (West Kings Hwy) West Caln
Twp.
Utility Installation: LANE CLOSURE between Schraks
Creamery Rd. & Bonsall Rd. Weekdays. 9 AM - 3 PM.
3/1/18-3/8/18 PECO Energy
*U.S 202 (Wilmington Pike) N East
and West Whiteland Twps.
Lane Realignment: LANE CLOSURES between Boot
Rd. & US 30 interchanges 8 PM - 5 AM M-Th PM -10
AM Fri
3/5/18-3/9/18 Allan Myers
*U.S 30 (Coatesville-
Downington/Exton Bypass),
Sadsbury,West Cal,Caln,Valley,
West Whiteland Twps, Coatesville
City
Guide Rail Repair: MOVING SHOULDER CLOSURES
between PA 10 & Ship Road. 10 PM - 5 AM
3/5/18-3/9/18 J.Fletcher Creamer &
Son
$1.8 million
3/1/2018 Page 9 of 22
LOCATION RESTRICTION DATE CONTRACTOR COST
*U.S 30 E on ramp to US 202 N,
East and West Whiteland Twps.
Overhead Bridge Construction: RAMP CLOSURE US
30 E on ramp to US 202 N 8 PM - 5 AM M-Th, 8 PM -
10 PM Fri
3/5/18- 3/9/18 Allan Meyers
*U.S 202 N ramp to Business U.S.
30., East and West Whiteland Twps.
Lane Realignment: RAMP CLOSED & DETOURED 8
PM - 5 AM M-Th 8 PM -10 AM Fri DETOUR POSTED
3/5/18-3/9/18 Allan Myers
PA 724 (W.Schuykil Rd)., North
Coventry Twp.
Tree Removal: LANE RESTRICTIONS between Berks
County Line & Sheep Hill Road. 9 AM - 3 PM
3/5/18-3/9/18 Knight Brothers
*U.S. 1 (Township Line Rd.) Upper
Darby Twp.
Utility Installation: LANE RESTRICTIONS between
Rolling Rd & State Rd. Weekdays 9 AM - 3 PM
3/6/18-3/16/18 Aqua Pennsylvania
North Valley Rd., Tredyffrin Twp. Tree Removal: CLOSED & DETOURED between East
Central Ave. & Hawthorn Place. 9 AM - 3 PM.
DETOUR POSTED.
3/6/18 Davey Tree Expert
Company
*U.S. 202 N West Goshen Twp ITS Installation: LEFT LANE CLOSURE between
Route 3 & Route 100. 9 AM - 3 PM
3/7/18 Kuharchik $3.5 million
*U.S 30 (Lancaster Pike) West
Whiteland Twp.
Utility Installation: LANE RESTRICTIONS between
Pottstown Pike & Whitford Rd. 9 AM - 3 PM
3/8/18-3/9/18 PECO Energy
PA 401 (Conestoga Rd.), Tredyffrin
Twp.
Utility Installation: LANE RESTRICTIONS between W.
Lancaster Ave. & Upper Gulph Rd. Weekdays. 9 AM -
3 PM.
2/12/18-3/2/18 PECO Energy
Valley Rd., London Grove Twp. Bridge Replacement: CLOSED & DETOURED
between Guernsey Rd. & Kelton Rd. 24-HOUR
DETOUR. DETOUR POSTED.
2/12/18-12/1/18 Lobar Site
Development
$2.2 million
*US 202 North, West Whiteland
Twp.
Sign Structure Maintenance: LANE CLOSURES
between Boot Rd. & Business US 30. 9 PM - 5 AM
2/19/18- 2/22/18 J.D. Eckman, Inc. $2.7 million
PA 100 N & S, S. Coventry, W.
Vincent, E. Nantmeal, Uwchlan twps.
Clearing: SINGLE LANE CLOSURE between
Blackhorse Road and PA 23. 9 AM - 3 PM.
2/20/18-2/23/18 Allan Meyers
3/1/2018 Page 10 of 22
LOCATION RESTRICTION DATE CONTRACTOR COST
*US 202 N & S., Tredyffrin, East
Whiteland, West Goshen Twps.
Guide Rail Repair: MOVING SHOULDER CLOSURES
between Pennslyvania Turnpike & Street Road 9 AM -
3 PM
2/20/18-2/23/18 Maintenance
Street Rd., Upper Oxford Twp. Bridge Damage: CLOSED & DETOURED between
Newcomers Road and Bell Road. 24-HOUR
DETOUR. DETOUR POSTED.
2/2/18-Indef. PennDOT
White Horse Rd., Schuylkill Twp. Bridge Replacement: CLOSED & DETOURED
between Loramar Lane & Valley Park Rd. 24-HOUR
DETOUR. DETOUR POSTED.
1/29/18-4/30/18 Loftus Construction $11.7 million
PA 352 (Chester Rd.), East Goshen
Twp.
Pipe Installation: CLOSED & DETOURED at Boot Rd.
24-HOUR DETOUR. DETOUR POSTED.
1/19/18-12/31/18 Sunoco Pipeline L.P.
Creek Rd., East Brandywine Twp. Bridge Replacement: CLOSED & DETOURED
between Hopewell Rd. & Dowlin Forge Rd. 24-HOUR
DETOUR. DETOUR POSTED.
1/2/18-4/4/18 Loftus Construction $11.7 million
*US 422 E & W ramps from Stowe
(Grosstown Rd.), West Pottsgrove,
North Coventry, Douglass twps.
Road Work: RAMP CLOSED & DETOURED. 24-
HOUR DETOUR. DETOUR POSTED.
12/13/17-10/20/19 H&K Group, Inc. $35 million
US 422 West ramp to Stowe, West
Pottsgrove, North Coventry,
Douglass twps.
Road Work: RAMP CLOSED & DETOURED. 24-
HOUR DETOUR. DETOUR POSTED.
12/13/17-10/20/19 H&K Group, Inc. $35 million
Limestone Rd., Parkesburg Bor. Utility Installation: LANE RESTRICTIONS between
West First Ave. & West Sixth Ave. Weekdays. 9 AM -
3 PM.
11/16/17-2/23/18 Pennsylvania
American Water
Company
Brandywine Creek Rd., Newlin Twp. Barrier Installation: LANE CLOSURE between Green
Valley Rd. & Powell Rd. 24-HOUR RESTRICTIONS.
3/3/17-Indef. Maintenance
*US 422 E & W, North Coventry
Twp.
Road & Bridge Construction: PERIODIC LANE
CLOSURES between PA 724 (Schuylkill Rd.) &
Sanatoga interchanges.
12/23/16-12/29/18 J.D. Eckman, Inc. $73.3 million
3/1/2018 Page 11 of 22
LOCATION RESTRICTION DATE CONTRACTOR COST
Ross Fording Rd., West Fallowfield
Twp.
Bridge Rehabilitation: CLOSED & DETOURED
between Creek Rd. & Bryson Rd. 24-HOUR
DETOUR. DETOUR POSTED.
7/2/15-3/2018 Loftus Construction $7.2 million
PA 724 ramp to US 422 East, East
Coventry Twp.
Ramp/Bridge Construction: RAMP CLOSED &
DETOURED. DETOUR POSTED.
5/27/15-3/2018 J.D. Eckman, Inc. $73.3 million
*US 422 E & W, North Coventry
Twp.
Bridge Construction: REDUCED TO ONE LANE
between Stowe & PA 100 Interchange. 24-HOUR
RESTRICTION.
11/27/14-9/2018 J.D. Eckman, Inc. $36 million
*US 422 E & W, North Coventry
Twp.
Road Construction: TRAFFIC PATTERN SHIFT
between Sanatoga & PA 724 (Schuylkill Rd.)
interchanges. 24-HOUR PATTERN.
2/2/13-8/2018 J.D. Eckman, Inc. $73.3 million
DELAWARE COUNTY
Township Line Rd., Haverford Twp. Conduit Installation: LANE CLOSURE between Darby
Rd. & Hollywood Ave. 9 AM - 3 PM.
2/26/18 PECO Energy
*I-95 North, Upper Chichester Twp. Soil Excavation: LANE CLOSURE between PA 452
(Pennell Rd.) & Chincester Ave. 7 PM - 5 AM
2/26/18-2/27/18 Maintenance
*I-95 South, Tinicum, Ridley,
Chester, Upper Chichester, Lower
Chichester twps., Upland Bor.,
Chester City
Patching: INTERMITTENT LANE CLOSURES
between Philadelphia County Line & Delaware state
line. 9 AM - 3 PM.
2/26/18-2/27/18 Maintenance
*I-95 North, Tinicum, Ridley,
Chester, Upper Chichester, Lower
Chichester twps., Upland Bor.,
Chester City
Patching: INTERMITTENT LANE CLOSURES
between Delaware state line & Philadelphia County
line. 9 AM - 3 PM.
2/26/18-2/27/18 Maintenance
Thomson Ave., Springfield Twp. Utility Installation: LANE RESTRICTIONS at Prospect
Rd. 9 AM - 3 PM.
2/26/18-3/16/18 Aqua Pennsylvania
*I-476 N & S, Radnor, Haverford
twps.
ITS Fiber Installation & Splicing: SHOULDER
CLOSURE between I-76 & I-95. 9 AM - 3 PM.
2/26/18-3/2/18 Miller Bros. $15 million
3/1/2018 Page 12 of 22
LOCATION RESTRICTION DATE CONTRACTOR COST
*I-95 N & S, City of Chester Painting/Inspection & Repair: LANE RESTRICTIONS
between I-476 & PA 352/320. 10 PM - 5 AM.
2/26/18-3/2/18 South State, Inc. $16.6 million
*I-476 N & S, Radnor, Haverford,
Marple, Upper Providence, Nether
Providence, Springfield, Ridley twps.
Large Sign Maintenance: LANE CLOSURES between
PA 276/PA Turnpike & I-95. 8 PM - 5 AM.
2/26/18-3/3/18 Carr & Duff, Inc. $2.1 million
*I-476 North, Radnor, Haverford
twps.
ITS Fiber Installation & Splicing: SHOULDER
CLOSURE between Baltimore Pike & US 1. 7 PM - 5
AM.
2/26/18-3/3/18 Miller Bros. $15 million
*I-476 N & S, Radnor, Haverford
twps.
ITS Fiber Installation & Splicing: SHOULDER
CLOSURE between I-76 & I-95. 9 AM - 3 PM.
2/26/18-3/3/18 Miller Bros. $15 million
US 30 (Lancaster Ave.), Radnor
Twp.
Utility Installation: LANE RESTRICTIONS at S. Wayne
Ave. Monday thru Thursday. 7:30 PM - 5:30 AM.
2/26/18-3/8/18 Aqua Pennsylvania
State Rd., Upper Darby Twp. Utility Installation: LANE RESTRICTIONS at Alexander
Ave. Weekdays. 9 AM - 3 PM.
2/26/18-3/30/18 PECO Energy
PA 232 (Second Street Pike),
Wrightstown Twp.
Bridge Rehabilitation: CLOSED & DETOURED
between PA 413 (Durham Rd.) & Cherry Ln
Weekdays 7 AM - 4 PM. DETOUR POSTED
2/26/18- 6/15/18 J.D. Eckman, Inc. $7.4 million
Malin Rd. Marple, Newtown, Radnor
twps.
Water Main Installation: CLOSE & DETOUR between
PA 3 (West Chester Pike) and Bryn Mawr Ave. 9 AM -
3 PM.
2/26/18-6/29/18 Aqua Pennsylvania
US 322 E & W (Conchester Hwy.),
Concord, Bethel, Upper Chichester
twps.
Patching: LANE CLOSURES between Baltimore Pike
& I-95. 9 AM - 3 PM.
2/28/18-3/1/18 Maintenance
PA 320 N & S (Chester Rd.),
Swarthmore Bor.
Mast Arms/Pedestal Poles/Handicap Ramps: LANE
RESTRICTIONS between Fieldhouse Lane & Yale
Ave. Weekdays. 9 AM - 3 PM.
2/28/18-4/30/18 Marino Corporation $480,821.00
3/1/2018 Page 13 of 22
LOCATION RESTRICTION DATE CONTRACTOR COST
Yale Ave., Swarthmore Bor. Mast Arms/Pedestal Poles/Handicap Ramps: LANE
RESTRICTIONS between PA 320 (S. Chester Rd.) &
Avondale Rd. Weekdays. 9 AM - 3 PM.
2/28/18-4/30/18 Marino Corporation $480,821.00
*I-95 South, Ridley, Tinicum twps. Barrier Replacement: LEFT LANE CLOSED between
PA 420 (Wanamaker Ave.) & Ridley exits. 12 AM -5
AM.
3/2/18 Long Fence $2.7 million
Marple Rd., Marple Twp. Utility Installation: LANE CLOSURE between Ceton
Ct. & Foxcroft Rd. 9 AM - 3 PM.
3/2/18-3/9/18 PECO Energy
*US 30 E & W (Lancaster Ave.),
Radnor Twp.
Pedestrian Bridge Construction: LANE CLOSURES
between PA 320 (Spring Mill Rd.) & Ithan Ave. 24-
HOUR CLOSURE.
3/5/18-3/9/18 Neshaminy
Constructors, Inc.
$3.7 million
Darby Paoli Rd., Radnor Twp. Utiltity Installation: CLOSED AND DETOURED
between Godfrey Rd. & Newtown Rd. Weekdays 9 AM
- 3 PM Saturdays 7 AM - 5 PM. DETOUR POSTED
3/5/18-3/16/18 Radnor Township
Haverford Rd. Lower Merion Twp. Utility Installation: LANE RESTRICTIONS between
Miller St. & Railroad Ave 9 AM - 3 PM
3/5/18-3/16/18 PECO Energy
Larkin Rd., Upper Chichester Twp Utility Installation: LANE RESTRICTIONS between
Chichester Ave & Whitney Ave 9 AM - 3 PM
Weekdays
3/5/18-3/30/18 PECO Energy
W. 22nd St., Chester City Utility Installation: SHOULDER & PARKING
RESTRICTIONS between Howard St. & Upland Ave.
Weekdays. 9 AM - 3 PM.
3/5/18-3/30/18 PECO Energy
PA 29 (Morehall Rd.) East
Whiteland, Charlestown Twps
Line Striping & Placing Temp Barrier: LANE
CLOSURE between Falt Rd./Atwater Dr. & Yellow
Springs Rd. 6 PM - 5 AM
3/6/18-3/7/18 Allan, Myers, LP $2.5 million
State Rd. Upper Providence Twp. Utility Installation: LANE CLOSURE between Valley
View Rd. & Bobbin Mill Rd. 9 AM - 3 PM
3/8/18-3/15/18 PECO Energy
Fairview Rd., Ridley Twp. Utility Installation: CLOSED & DETOURED between
MacDade Blvd. & PA 13 (Chester Pike). Weekdays.
9 AM - 3 PM. DETOUR POSTED.
3/12/18-4/13/18 Aqua Pennsylvania
3/1/2018 Page 14 of 22
LOCATION RESTRICTION DATE CONTRACTOR COST
W. Rose Valley Rd., Nether
Providence Twp.
Utility Installation: CLOSED & DETOURED between
Brookhaven Rd. & PA 252 (S. Providence Rd.)
Weekdays. 9 AM - 3 PM. DETOUR POSTED.
3/12/18-6/15/18 Aqua Pennsylvania
Township Line Rd., Upper Darby
Twp.
Utility Installation: LANE RESTRICTIONS at Lindale
Ave. 9 AM - 3 PM. Weekdays
2/21/18-3/7/18 PECO Energy
Burmont Rd., Upper Darby Twp. Utility Installation: LANE RESTRICTIONS between
Alenander Ave & Cedar Ln. 9 AM to 3 PM. Weekdays
2/22/18-3/30/18 PECO Energy
MacDade Blvd., Glenolden Twp. Box Culvert Reconstruction: CLOSED AND
DETOURED between Dalmas Ave & Werner Ave.
6:30 AM - 3:30 PM. 24 HOUR DETOUR
2/23/18-8/31/18 Loftus Construction,
Inc.
$11.7 million
Lenni Rd., Middletown, Aston twps.,
Chester Heights Bor.
Utility Installation: CLOSED & DETOURED between
Pennell Rd. & Llewellyn Rd. Monday thru Saturday. 9
AM - 4 PM. DETOUR POSTED.
2/1/18-5/11/18 Aqua Pennsylvania
Earlington Rd., Haverford Twp. Utility Installation: CLOSED & DETOURED between
Manoa Rd. & US 1 (Township Line Rd.). Weekdays.
9 AM - 3 PM. DETOUR POSTED.
1/22/18-5/25/18 Aqua Pennsylvania
Pyle Rd., Concord Twp. Utility Installation: LANE RESTRICTIONS between
Wilmington West Chester Pike & Concord Crossing.
Weekdays. 9 AM - 3 PM.
1/16/18-2/23/18 PECO Energy
S. Wayne Ave., Radnor Twp. Utility Installation: CLOSED & DETOURED between
US 30 (Lancaster Ave.) & Audubon Ave. Weekdays.
9 AM - 3 PM. DETOUR POSTED.
1/16/18-3/30/18 Aqua Pennsylvania
Church Ln., Yeadon Bor. Utility Installation: CLOSED & DETOURED between
Baltimore Pike & MacDade Blvd. Weekdays. 9 AM -
3 PM. DETOUR POSTED.
1/22/18-5/11/18 Aqua Pennsylvania
Powell Rd., Springfield Twp. Utility Installation: CLOSED & DETOURED between
East Springfield Rd. & West Sproul Rd. Weekdays. 9
AM - 3 PM. DETOUR POSTED.
1/8/18-5/31/18 PECO Energy
3/1/2018 Page 15 of 22
LOCATION RESTRICTION DATE CONTRACTOR COST
PA 252 (South Newtown St.),
Newtown Twp.
Utility Installation: LANE RESTRICTIONS between
Mary Jane Lane & Reese Ave. Weeknights. 7 PM - 5
AM.
1/2/18-3/9/18 PECO Energy
*US 322 E & W (Conchester Hwy.),
Concord Twp.
Reconstruction & Road Widening: PERIODIC LANE
RESTRICTIONS between US 1 (Baltimore Pike) & PA
261 (Foulk Rd). 9 AM - 3 PM & Possible 7 AM - 7 PM
Saturdays.
12/18/17-10/20/18 J.D. Eckman, Inc. $62.7 million
*US 1 East (Baltimore Pike),
Middetown Twp.
Turn Lane Widening: LANE CLOSURE between
Oriole Ave. & PA 352 (South New Middletown Rd.).
Monday thru Friday. 9 AM - 3 PM. Saturday. 7 AM - 5
PM.
12/11/17-2/23/18 BT Granite Run LP
*US 30 E & W (Lancaster Ave.),
Radnor Twp.
Pedestrian Bridge Construction: SIDEWALK CLOSED
between PA 320 (Spring Mill Rd.) & Ithan Ave. 24-
HOUR CLOSURE.
10/2/17-3/4/18 Neshaminy
Constructors, Inc.
$3.7 million
Chestnut St., City of Chester Bridge Deck Reconstruction: CLOSED & DETOURED
between 12th St. & 13th. DETOURED POSTED.
9/25/17-5/18/18 South State, Inc. $16.8 million
Garrett Rd., Upper Darby Twp. Utility Installation: CLOSED & DETOURED between
Lansdowne Ave. & PA 3 (West Chester Pike).
Weekdays. 9 AM - 3 PM. DETOUR POSTED.
9/11/17-3/2/18 Aqua Pennsylvania
Potter St., City of Chester Deck Replacement: CLOSED & DETOURED between
13th St. & 12th St. 24-HOUR DETOUR. DETOUR
POSTED.
8/14/17-3/14/18 South State, Inc. $16.6 million
Station Rd., Concord Twp. Road Construction: CLOSED & DETOURED between
Concord Rd. & PA 322 (Conchester Hwy.). 24-HOUR
DETOUR. DETOUR POSTED.
8/7/17-10/20/18 Road-Con, Inc. $29.20 million
Morton Ave., City of Chester Road/Curb Reconstruction: CLOSED & DETOURED
between US 13 (E. 9th St.) & PA 291 (E. 4th St.). 24-
HOUR DETOUR. DETOUR POSTED.
6/20/17-6/30/18 South State, Inc. $16.6 million
College Ave., Haverford Twp. Bridge Construction: CLOSED & DETOURED
between Spring Mill Rd. & Haverford Rd. 24-HOUR
DETOUR. DETOUR POSTED.
11/29/16-5/2018 Road-Con, Inc. $5.2 million
MONTGOMERY COUNTY
3/1/2018 Page 16 of 22
LOCATION RESTRICTION DATE CONTRACTOR COST
*I-476 S, Upper Merion, Lower
Merion twps.
Dam Replacement: LANE CLOSURES at the I-76
interchange. 9 PM - 5 AM
2/25/18-3/1/18 J.D. Eckman, Inc. $21 million
*I-76 E & W, Upper Merion, Lower
Merion twps.
Ditch Cleaning and Drainage: LANE CLODURES
between PA 202 and City Avenue. 9 PM - 5 AM
2/25/18-3/1/18 J.D. Eckman, Inc. $21 million
*U.S. 202 North (DeKalb Pike),
Bridgeport Borough, Norristown
Bridge Inspection: RIGHT LANE CLOSED between
Dekalb St. & E. Main St. 9 AM - 3 PM.
2/26/18 AECOM
*US 422 West, Lower Pottsgrove
Twp.
Pavement Repairs: LEFT LANE CLOSED between
Sanatoga & Armand Hammer exits. 7 AM - 1 PM.
2/26/18 J.D. Eckman, Inc. $73.3 million
*US 422 West, Lower Pottsgrove
Twp.
Guide Rail Repair: LEFT LANE CLOSED between
Evergreen Rd & Armand Hammer Blvd. 9 AM to 3 PM
2/26/18 Long Fence
*US 422 East, Lower Pottsgrove
Twp.
Pavement Repairs: LEFT LANE CLOSED between
Keim St. & Armand Hammer exits. 9 AM - 2 PM.
2/26/18-2/27/18 J.D. Eckman, Inc. $73.3 million
Stump Hall Rd. Worchester,
Skippack twps
Tree Removal: LANE RESTRICTIONS between
Green Hill Rd. & PA 73 (Skippack Pike) 9 AM - 3 PM
2/26/18-2/28/18 Sidelines Tree
Service
PA 363 (Trooper Rd.), West Norriton
Twp.
Sign Structure Maintenance: LANE CLOSURES
between US 422 and Audubon Rd. 9 AM - 3 PM
2/26/18- 3/2/18 J.D. Eckman, Inc. $2.7 million
PA 363 (Trooper Rd.), West Norriton
Twp.
Sign Structure Maintenance: LANE CLOSURES
between I-476 & PA 320. 9 AM - 3 PM
2/26/18- 3/2/18 J.D. Eckman, Inc. $2.7 million
US 202 North, Upper Merion Twp. Sign Structure Maintenance: LANE CLOSURES
between Gulph Rd. & US 422 on-ramp. 9 AM - 3 PM
& 9 PM - 5 AM.
2/26/18-3/2/18 J.D. Eckman, Inc. $2.7 million
*I-76 West, Upper Merion Twp. Sign Structure Maintenance: LANE CLOSURES
between Pennsylvania Turnpike/I-276 & US 202. 9
AM - 3 PM & 9 PM - 5 AM.
2/26/18-3/2/18 J.D. Eckman, Inc. $2.7 million
3/1/2018 Page 17 of 22
LOCATION RESTRICTION DATE CONTRACTOR COST
*I-476 N & S, Plymouth Twp. Sign Structure Repairs: LANE CLOSURES between
Germantown Pike & County Line Rd. 9 AM - 3 PM.
2/26/18-3/2/18 J.D. Eckman, Inc. $2.7 million
PA 152 (Limekiln Pike) Upper Dublin
Twp.
Tree Removal: LANE RESTRICTIONS between
Shepard Dr. & Bell Ln 9 AM - 3 PM
2/26/18-3/2/18
*I-476 N & S, Lower Merion Twp.,
West Conshohocken Bor.
ITS Conduit & Fiber Installation: RIGHT SHOULDER
CLOSED between I-76 & I-95. 9 AM - 3 PM.
2/26/18-3/2/18 Wampole-Miller, Inc. $15 million
US 202 N & S (DeKalb St.),
Norristown
Utility Installation: LANE RESTRICTIONS between
Schuylkill Ave. & Main St. Weeknights. 8 PM - 6 AM.
2/26/18-3/2/18 PECO Energy
US 202 N & S (DeKalb St.),
Norristown
Test Holes: LANE CLOSURE between Carriage Lane
& Butchers Lane. 9 AM - 3 PM.
2/26/18-3/2/18 So-Deep, Inc.
High St., Pottstown Bor. ADA Ramp Construction: LANE CLOSURE at Adams
St.; Franklin St.; Charlotte St.; Hanover St.;
Pleasantview Rd.; College Drive; Manatawny St.; Penn
St.; Evans St.; York St.; Madison St.& Washington St.
9 AM - 3 PM.
2/26/18-3/2/18 Road-Con, Inc. $13.3 million
*I-476 N & S, Plymouth, Lower
Merion, Radnor twps., West
Conshohocken Bor.
Large Sign Maintenance: LANE CLOSURES between
PA 276/PA Turnpike & I-95. 8 PM - 5 AM.
2/26/18-3/3/18 Carr & Duff, Inc. $2.1 million
*U.S. 202 South (DeKalb Pike),
Bridgeport Bor., Norristown
Bridge Inspection: RIGHT LANE CLOSED between E.
Main St. & 4th St. Interchange. 9 AM - 3 PM.
2/27/18 AECOM
*I-76 West, Lower Merion Twp. ITS Camera Installation: RIGHT LANE CLOSED
between City Ave. & Green Lane exits. 10 PM - 4 AM.
3/1/18 Kuharchik $211.7 million
Church Rd., Cheltenham Twp. Utility Installation: CLOSED & DETOURED between
Hammond Rd. & New Second St. Weekdays. 9 AM -
3 PM. DETOUR POSTED.
3/1/18-5/31/18 PECO Energy
3/1/2018 Page 18 of 22
LOCATION RESTRICTION DATE CONTRACTOR COST
PA 23 W Ramp to U.S 422 W, Upper
Merion, West Norriton Twp
Ramp Construction: RAMP CLOSED & DETOURED 3
AM - 2 PM DETOURE POSTED
3/3/18 J.D. Eckman, Inc. $97.4 million
*U.S. 422 W, Upper Merion & West
Norriton twps.
Lane and Barrier Realignment: LEFT AND RIGHT
LANE CLOSURES, TEMPORARY STOPPAGES
between U.S 202 and Oaks interchange. 9 PM - 6 AM
3/3/18 J.D. Eckman, Inc. $97.4 million
*I-476 S, Upper Merion, Lower
Merion twps.
Dam Repleacement: LANE CLOSURES at the I-76
interchange. 9 PM - 5 AM
3/4/18-3/8/18 J.D. Eckman, Inc. $21 million
*I-76 East, Lower Merion Twp. ITS Installation: RIGHT CLOSURE between Gladwyne
& US 1 (City Ave) interchanges 9 PM - 5 AM
3/5/18 Kuharchik $3.5 million
Evergreen Rd., Lower Pottsgrove,
Limerick twps
Patching: CLOSED AND DETOURED between
Lightcap Rd. & Sanatoga Rd. 9 AM - 3 PM
3/5/18-3/6/18 Maintenance
*US 422 E & W, Lower Providence,
Upper Providence, Limerick, Lower
Pottsgrove, North Coventry twps.
Spray Patching & Litter & Debris Removal: MOVING
OPERATION WITH LANE CLOSURES between PA
100 (Pottstown Pike) & PA 363 (Trooper Rd.). 9 AM -
3 PM.
3/5/18-3/8/18 Maintenance
High St., Pottstown Bor. ADA Ramp Construction: LANE CLOSURE at Armand
Hammer Blvd.; Rosedale Rd.; Sunnybrook Rd.; Beech
St.; Pleaseantview & Moser Rd. 9 AM - 3 PM.
3/5/18-3/9/18 Road-Con, Inc. $13.3 million
US 202 N & S (DeKalb St.),
Norristown
Test Holes: LANE CLOSURE between Germantown
Piek & Butchers Lane. 9 AM - 3 PM.
3/5/18-3/9/18 So-Deep, Inc.
Flourtown Rd., Whitemarsh Twp. Utility Installation: CLOSED & DETOURED between
Joshua Rd. & Plymouth Rd. Weekdays. 9 AM - 3 PM.
DETOUR POSTED.
3/5/18-3/23/18 PECO Energy
Pine Road, Lower Moreland Twp. Utiltiy Installation: SINGLE LANE CLOSURE between
PA 63 (Red Lion Road) & Kirk Dr. Weekdays 9 AM - 3
PM
3/5/18-3/23/18 H&K Group, Inc.
3/1/2018 Page 19 of 22
LOCATION RESTRICTION DATE CONTRACTOR COST
Bethel Rd. Worcester Twp. Utility Installation: LANE CLOSURE between Deep
Medow Ln & Sibel Court 9 AM - 3 PM
3/6/18- 3/13/18 PECO Energy
*I-76 E & W, Upper Merion, Lower
Merion twps.
Ditch Cleaning and Drainage: LANE CLOSURES
between PA 202 and City Avenue. 9 PM - 5 AM
3/11/18-3/15/18 J.D. Eckman, Inc. $21 million
*I-76 E & W, Upper Merion, Lower
Merion twps.
Ditch Cleaning and Drainage: LANE CLODURES
between PA 202 and City Avenue. 9 PM - 5 AM
3/11/18-3/8/18 J.D. Eckman, Inc. $21 million
Edgehill Rd., Abington Twp. Utility Installation: CLOSED & DETOURED between
Jenkintown Rd. & Easton Rd. Weekdays 9 AM - 3 PM
DETOUR POSTED
3/15/18-7/31/18 Aqua Pennsylvania
US 422 East Ramp to PA 23 (Valley
Forge Rd.), Upper Merion Twp.
RAMP CONSTRUCTION: RAMP CLOSED &
DETOURED. 24-HOUR DETOUR. DETOUR
POSTED.
2/12/18-9/2018 J.D. Eckman, Inc. $97.4 million
*I-76 E & W, Upper Merion, Lower
Merion twps.
Ditch Cleaning and Drainage: LANE CLOSURES
between PA 202 and City Avenue. 9 PM - 5 AM
2/18/18-3/15/18 J.D. Eckman, Inc. $21 million
Township Line Rd., Whitpain,
Worcester, Plymouth, East Norriton
twps.
Intersection Widening & Upgrades: LANE
RESTRICTIONS between Sharon Ln. & Oakwood Dr.
Weekdays. 9 AM - 3 PM.
2/19/18-12/13/18 Scott Building Corp. $4.4 million
PA 263 (York Rd.) Upper Moreland
Twp.
Water Main Replacement: LANE RESTRICTION
between Easton Rd. and Sunset Ln. 9:00 AM - 3:00
PM.
2/19/18-7/31/18 Aqua Pennsylvania
High St., Lower Pottsgrove Twp. Ultilty Installation: LANE CLOSURE between Hause
Ave & Pleseantview Rd. 9 AM to 3 PM
2/21/18-2/28/18 PECO Energy
PA 29 (Main St.) Pennsburg Twp. Ultilty Installation: LANE CLOSURE between 5th St. &
6th St. 9 AM to 3 PM
2/21/18-2/28/18 PECO Energy
W. Welsh Rd., Lower Gwynedd Twp. Utility Installation: LANE CLOSURE between Marietta
Drive & Cedar Hill Rd. Weekdays. 9 AM - 3 PM.
2/21/18-2/28/18 PECO Energy
3/1/2018 Page 20 of 22
LOCATION RESTRICTION DATE CONTRACTOR COST
*US 422 East, West Pottsgrove,
North Coventry, Douglass twps.
Resurfacing: CLOSED & DETOURED at the split with
Benjamin Franklin Hwy. 9 PM - 5 AM. DETOUR
POSTED.
12/13/17-10/20/19 H&K Group, Inc. $35 million
Ramp from Stowe Interchange
(Grosstown Rd.) to Eastbound &
Westbound US 422, West
Pottsgrove, North Coventry,
Douglass twps.
Road Work: RAMP CLOSED & DETOURED. 24-
HOUR DETOUR. DETOUR POSTED.
12/13/17-10/20/19 H&K Group, Inc. $35 million
Ramp from US 422 West to Stowe,
West Pottsgrove, North Coventry,
Douglass twps.
Road Work: RAMP CLOSED & DETOURED. 24-
HOUR DETOUR. DETOUR POSTED.
12/13/17-10/20/19 H&K Group, Inc. $35 million
Bleim Rd., Lower Pottsgrove Twp. Utility Installation: CLOSED & DETOURED between
New Hanover Square Rd. & Pleasantview Rd. 9 AM -
3 PM. Saturdays. 7 AM - 7 PM. DETOUR POSTED.
10/25/17-2/16/18 Borough of Pottstown
Old Forty Foot Rd., Lower Salford
Twp.
Bridge Rehabilitation: CLOSED AND DETOURED
between Township Line Rd. & Kober Rd. 24-HOUR
CLOSURE.
10/30/17-6/2/18 J.D. Eckman, Inc. $7.4 million
Otts Rd., Perkiomen Twp. Excavation/Grading/Paving: CLOSED & DETOURED
between Miller Rd. & PA 29 (Gravel Pike). 24-HOUR
DETOUR. DETOUR POSTED.
5/2/17-5/2019 H&K Group, Inc. $11.3 million
County Line Rd., Warrington,
Horsham, Montgomery twps.
Utility Installation: LANE RESTRICTIONS between
Kulp Rd. & Stump Rd. 7 AM - 3 PM.
3/7/16-9/2018 James D. Morrissey,
Inc.
$14.8 million
Baligomingo Rd., West
Conshohocken Bor.
Slope Stabilization: CLOSED & DETOURED between
PA 23 (Front St.) & Portland Rd. 24-HOUR DETOUR.
DETOUR POSTED.
6/27/15-Indef.
PA 724 ramp to US 422 East, Lower
Pottsgrove Twp.
Roadwork: RAMP CLOSED & DETOURED. 24-
HOUR CLOSURE. DETOUR POSTED.
5/27/15-3/2018 J.D. Eckman, Inc. $73.3 million
*US 422 E & W, Lower Pottsgrove
Twp.
Road Construction: TRAFFIC PATTERN SHIFT
between Sanatoga & PA 724 (Schuylkill Rd.)
Interchanges. 24-HOUR PATTERN.
2/2/13-8/2018 J.D. Eckman, Inc. $73.3 million
3/1/2018 Page 21 of 22
LOCATION RESTRICTION DATE CONTRACTOR COST
*US 422 East, Lower Pottsgrove
Twp.
Road & Bridge Construction: LANE CLOSURES
between PA 724 (Schuylkill Rd.) & Sanatoga
Interchanges. 5 PM - 5 AM.
1/23/17-9/2018 J.D. Eckman, Inc. $73.3 million
*US 422 West, Lower Pottsgrove
Twp.
Road & Bridge Construction: WEEKEND LANE
CLOSURES between Sanatoga & PA 724 (Schuylkill
Rd.) Interchanges. 7 PM - 1 PM.
1/23/17-9/2018 J.D. Eckman, Inc. $73.3 million
*US 422 E & W, West Pottsgrove
Twp.
Bridge Construction: REDUCED TO ONE LANE
between Stowe & PA 100 Interchange. 24-HOUR
RESTRICTION.
11/27/14-9/2018 J.D. Eckman, Inc. $36 million
County Line Rd., Upper Merion Twp. Road Work: CLOSED & DETOURED WEEKDAYS
between PA 23 & Gulph Rd. 7 AM Mondays thru 5 PM
Fridays. 24-HOUR CLOSURE. DETOUR POSTED.
5/9/14-12/29/18 Valley Forge National
Historical Park
$29.29 million
3/1/2018 Page 22 of 22