pending projects summary (march 3, 2020) definitions … · 12/3/2019  · db – david brosky,...

9
CITY OF PETALUMA – PLANNING DIVISION City of Petaluma Planning Division T: (707) 778-4470 11 English Street, Petaluma, CA 94952 For faster response, please email us at: Hours: 8 am – 5 pm [email protected] Monday through Thursday. Closed Fridays. URL: cityofpetaluma.net/cdd/planning.html PENDING PROJECTS SUMMARY (March 3, 2020) This update provides a summary of all proposed major developments within the City of Petaluma. The development summary tables are separated by Commercial Projects, Mixed Use Projects, Residential Projects and Annexations. Please contact the developer directly for project details such as construction timing, cost and availability. DEFINITIONS OF STATUS CATEGORIES IN PLANNING PROCESS: Formal project application has been filed for one or more discretionary planning approvals. Residential projects of fewer than two units are not included unless Planning Commission approval is required, nor are non-residential projects that do not result in new development. ALL PLANNING APPROVALS: The project has received all discretionary approvals from the city, with no appeals pending. IN PLAN CHECK: The project has received all planning approvals; construction drawings have been submitted to the Building Division. UNDER CONSTRUCTION: The project has received all planning approvals; final plans approved; building and other permits have been issued; may be under construction. INACTIVE: Action by applicant needed; more than six months passed since request for action made by staff. NOTE: This list was prepared by the City of Petaluma Planning Division for informational purposes only. The City does not warrant the accuracy of the information provided. PLANNER CONTACT INFORMATION HH – Heather Hines, Planning Manager, 707-778-4316, [email protected] BB – Brittany Ann Bendix, Deputy Planning Manager, 707-778-4314, [email protected] EU – Emmanuel Ursu, Principal Planner, 707-778-4401, [email protected] AH – Aaron Hollister, Senior Planner, [email protected] TR – Tiffany Robbe, Senior Planner, 707-778-4318, [email protected] KR – Krystle Rizzi, Associate Planner, 707-778-4472, [email protected] DB – David Brosky, Associate Planner, 707-778-4340, [email protected] ER – Eric Roberts, Assistant Planner, 707-778-4317, [email protected]

Upload: others

Post on 28-Sep-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PENDING PROJECTS SUMMARY (March 3, 2020) DEFINITIONS … · 12/3/2019  · DB – David Brosky, Associate Planner, 707-7 78-4340, dbrosky@cityofpetaluma.org ER – Eric Roberts, Assistant

CITY OF PETALUMA – PLANNING DIVISION

City of Petaluma Planning Division T: (707) 778-4470 11 English Street, Petaluma, CA 94952 For faster response, please email us at: Hours: 8 am – 5 pm [email protected] Monday through Thursday. Closed Fridays. URL: cityofpetaluma.net/cdd/planning.html

PENDING PROJECTS SUMMARY (March 3, 2020) This update provides a summary of all proposed major developments within the City of Petaluma. The development summary tables are separated by Commercial Projects, Mixed Use Projects, Residential Projects and Annexations. Please contact the developer directly for project details such as construction timing, cost and availability.

DEFINITIONS OF STATUS CATEGORIES IN PLANNING PROCESS: Formal project application has been filed for one or more discretionary planning approvals. Residential projects of fewer than two units are not included unless Planning Commission approval is required, nor are non-residential projects that do not result in new development.

ALL PLANNING APPROVALS: The project has received all discretionary approvals from the city, with no appeals pending.

IN PLAN CHECK: The project has received all planning approvals; construction drawings have been submitted to the Building Division.

UNDER CONSTRUCTION: The project has received all planning approvals; final plans approved; building and other permits have been issued; may be under construction.

INACTIVE: Action by applicant needed; more than six months passed since request for action made by staff.

NOTE: This list was prepared by the City of Petaluma Planning Division for informational purposes only. The City does not warrant the accuracy of the information provided.

PLANNER CONTACT INFORMATION HH – Heather Hines, Planning Manager, 707-778-4316, [email protected]

BB – Brittany Ann Bendix, Deputy Planning Manager, 707-778-4314, [email protected] EU – Emmanuel Ursu, Principal Planner, 707-778-4401, [email protected]

AH – Aaron Hollister, Senior Planner, [email protected] TR – Tiffany Robbe, Senior Planner, 707-778-4318, [email protected]

KR – Krystle Rizzi, Associate Planner, 707-778-4472, [email protected] DB – David Brosky, Associate Planner, 707-778-4340, [email protected] ER – Eric Roberts, Assistant Planner, 707-778-4317, [email protected]

Page 2: PENDING PROJECTS SUMMARY (March 3, 2020) DEFINITIONS … · 12/3/2019  · DB – David Brosky, Associate Planner, 707-7 78-4340, dbrosky@cityofpetaluma.org ER – Eric Roberts, Assistant

Map # Applicant APN Project Location Status Date Filed Zoning Description Units/SQFT Planner

Commerical

1 Project: Brooks Note Winery - PLMA-19-0007

Daniel Welles

Summit Engineering, Inc., 463 Aviation

Blvd, Ste 209, Santa Rosa, CA 95403

006-163-015 426 Petaluma Blvd All Planning Approvals 10/2/2019 T-5

The project proposes a winery production facility with

ancillary tasting room and events. The project will

utilize the existing structure at 426 Petaluma

Boulevard North, with some exterior modifications to

the facades. The proposed production facility will be

approximately 4700 sq ft and tasting room will be

2300 square feet.

7,000 KR

2 Project: Wasatch Storage Facility SPAR - PLSR-19-0017

Scott Wyckoff

801-692-1417150-020-008 85 Corona Road In Planning Process 9/10/2019

PCD Rancho

Arroyo Business

Center

New construction of a two-story storage facility

containing 686 storage units, 900 square feet of office

and retail space, and retaining the 14,774 square foot

building location on eastern portion of the parcel

90,540 KR

3 Project: Adobe Road Winery - PLMA-18-0003

Kevin Buckler

707-939-7967008-069-002 1 C Street In Plan Check 3/26/2018 T-5

New construction of a two-story 15,848 square foot

building containing a winery, tasting room, private

event space and a motorsports gallery, collectively

operated as the Adobe Road Winery. The proposal

also includes improvements to the public frontages

along C Street and First Street.

15,848 sf BB

4 Project: 1395 N. McDowell Boulevard SPAR - PLSR-18-0002

Hank Malak

[email protected]

626-583-8348

007-411-0191395 N. McDowell

Blvd. In Plan Check 1/23/2018

PUD - Redwood

Technology Center

New 6,378 square foot 4-unit commercial building on

a vacant building pad established by the Redwood

Techonology Center PUD.

6,378 sf BB

5 Project: Valero Gas Station - PLMA-18-0001

Ed Hale

[email protected]

760-884-7011

007-061-043 &

042

532 E. Washington

StreetIn Plan Check 1/23/2018 MU1A

Demolition of existing gas station and consturction of

a new one in its place, including a convenience store

and smog station

3,036 sf BB

6 Project: McDonald's Remodel - PLSR-17-0030

Stantec Architecture, Inc.

[email protected]

916-669-5928

007-350-015259 N. McDowell

Blvd. Building Permit Issued 10/4/2017 C2

Demolish and reconstruct the existing McDonald's

Restaurant. Net increase of 14 sf. 4,456 sf AH

7 Project: Washington Square Façade Remodel - PLSR-17-0023

Nick Carter

[email protected]

916-383-3333

007-280-055373 S. McDowell

Blvd. All Planning Approvals 8/29/2017 C2

Façade remodel for a portion of the Washington

Square Shopping Center. 50,000 sf of the 200,000

sf shopping center BB

8 Project: Cagwin and Dorward - PLMA-16-0013

Greg LeDoux & Associates

[email protected]

707-795-8855

005-040-0550 Lakeville

HighwayUnder Construction 10/31/2016

PCD Park

Central/Park

Sqaure

New commercial building to accommodate Cagwin

and Dorward Landscaping. Project includes office and

landscape maintenance operations for approx. 100

employees

22,727 sq/ft TR

Page 1 3/2/2020

Page 3: PENDING PROJECTS SUMMARY (March 3, 2020) DEFINITIONS … · 12/3/2019  · DB – David Brosky, Associate Planner, 707-7 78-4340, dbrosky@cityofpetaluma.org ER – Eric Roberts, Assistant

Map # Applicant APN Project Location Status Date Filed Zoning Description Units/SQFT Planner

9 Project: Labcon Warehouse Addition - PLSR-16-0007

Greg LeDoux & Associates

[email protected]

707-795-8855

005-040-039 3200 Lakeville Under Construction 2/16/2016 BP

Addition and associated site improvements including

landscaping, parking facilities, frontage improvements

along Cader Lane and Lakeville Highway.

40,000 sq/ft TR

10 Project: 76 Gas Station Remodel - PLSR-15-0013

Muthana Ibraim

MI Architects, INC.

925-287-1174 x1

007-412-0154998 Petaluma

Blvd. N Under Construction 5/13/2015 C2

Demolition of gas station and construction of a

convenience store, self serve car wash and storage

area.

2,179 sq/ft fueling canopy HH

11 Project: Floathouse - PLSR-14-0013

Greg Sabourin

Petaluma Small Craft Center

[email protected]

007-142-018 150 Weller St. In Plan Check 5/8/2014

SMART Rail

Station Master

Plan

Floating rental office and dock in the turning basin &

restroom facility in Cavanagh Landing Park. 440 sf HH

12 Project: Hansel Toyota Expansion and Remodel - PLSR-14-0009

Henry Hansel

[email protected]

150-020-033 and

-034, -035

1125 Auto Center

Drive Under Construction 5/1/2014 PCD - Auto Center

Expansion to the north and west for showroom, sales

and offices from 14,786 sf to 25,404 sf 25,404 sf HH

13 Project: Petaluma Poultry Expansion - PLSR-14-0004

Petaluma Poultry, Steve Lafranchi,

[email protected]

2700 Lakeville

Hwy. Under Construction 2/3/2014 BP

Addition for office space, parking, and site design

modifications and addition of second shift 4,000 sq/ft HH

14 Project: Petaluman Hotel - PLSR-13-0019

Ross Jones

707-971-9400

[email protected]

007-582-009 2 Petaluma Blvd. S In Planning Process. Waiting on

revisions. 10/31/2013 MU2

Construction of a 54 room boutique hotel

48256 sf TR

15 Project: Safeway Fuel Center - PLSR-13-0012

Santec Architecture

Gary Semling, 707-765-1660,

gary.semling @stantec.com

007-280-046335 S McDowell

Blvd. In Plan Check 7/25/2013 C2

New gas station including 8 dispensers, 16 fuel

stations, canopy and convenience store. 697 sf HH

16 Project: Home 2 Suites - PLSR-18-0025

Matthew Sherrill

Basin Street Properties

707-283-0780

007-411-0341205 Redwood

WayIn Plan Check 8/9/2018

PUD - Redwood

Technology Center

New construction of a 85,802 sf hotel on a vacant pad

established by the Redwood Technology Center PUD.

The hotel will contain 140 guestrooms.

85,802 sf BB

17 Project: BioMarin PLSR-19-0010

Shar Zamanpour

BioMarin

415-382-5726

[email protected]

7770 Lindaro Street

San Rafael, CA 94901

005-280-0091700 S McDowell

BlvdAll Planning Approvals 5/15/2019 Lakeville PCD

Proposed commercial research and development

facility including two buildings, approx. 32,000 and

40,000 square feet on the vacant 5.89-acre project

site.

32,000 sf research and

office; 40,00 sf

warehouse

HH

Page 2 3/2/2020

Page 4: PENDING PROJECTS SUMMARY (March 3, 2020) DEFINITIONS … · 12/3/2019  · DB – David Brosky, Associate Planner, 707-7 78-4340, dbrosky@cityofpetaluma.org ER – Eric Roberts, Assistant

Map # Applicant APN Project Location Status Date Filed Zoning Description Units/SQFT Planner

Mixed Use

18 Project: Scannell Mixed Use Development - PLMA-20-0001

Matt Anderson

Scannell Properties

3468 Mt. Diablo Blvd, Suite B-1115

Lafayette, CA 94549

136-010-024 &

007-171-023

500 Lakeville

Street and 500

Hopper Street

In Planning Process 2/10/2020River Dependent

Industrial

The application is to develop the 39.22 acre site with a

mix of commercial office and residential uses. The

proposal also includes improvements to Hopper Street

and will create a new public riverfront greenway with

multi-use trail along the McNear Channel and

Petaluma River.

275 units; 190,000 gsf of

commercial office useBB

19 Project: East Washington Place SPAR and ZTA - PLMA-19-0009

Norman W. Sears

SGPA Architecture and Planning

200 Pine Street, Studio 500

San Francisco, CA 94104

007-241-002,

007-473-001,

007-251-001,

007-031-001

401 Kenilworth

Drive

In Planning Process. Waiting on

revisions.12/19/2019 MU1B

Site Plan and Architectural Review for two new single

story buildings on vacant pads, site landscaping and

hardscape improvements, updated exterior colors and

finishes, and changes to the Master Signage Program.

Project also includes a Zoning Text amendment to

pursue free standing freeway oriented signs.

BB

20 Project: 132 Petaluma Blvd. Historic SPAR - PLSR-18-0029

Richard Perlstein

Polsky Perlstein Architects

[email protected]

006-282-007132 Petaluma

Blvd. N

In Planning Process. Waiting on

revisions.10/4/2018 T-5

Site Plan and architectural Review for renovation of a

commercial building with a new residential

component. 2,1948 sf of commercial;

2 dwelling unitsBB

21 Project: Omahony Mixed Use Building - PLMA-17-0009

Paul Foley/Mike Omahony

131 Liberty St LLC

[email protected]

415-451-4841

006-361-030 131 Liberty Street In Plan Check 11/14/2017 MU2

Tentative Subdivision Map/Site Plan and Architectural

Review for Mixed Use Development 1,500 sf commerical and

10 residential unitsAH

22 Project: Riverfront 2010 - 11-TSM-0130-CR

Riverfront, LLC

Frank Marinello

[email protected]

136-010-027 500 Hopper Street Under Construction 2/10/2011 T4/T5/CS

Tentative Subdivision Map for Mixed Use

Development that includes 273 Residential units (134

single family, 39 town homes, 100 apartments) hotel

with 120 rooms, 60,000 sq.ft. office, 30,000 sq/ft on a

vacant 35.7 acre site.

273 Residential units (134

single family, 39 town

homes, 100 apartments)

hotel with 120 rooms,

60,000 sq.ft. office,

30,000 sq/ft

EU

23 Project: North River Apartments - PLSR-15-0015

AG Spanos Corp

Karen Garrett

[email protected]

209-955-2574

006-163 -040, -

041

368 and 402

Petaluma Blvd. N In Plan Check 6/1/2015 T5

184 new residential units on a 3.92-acre property

located at the intersection of Petaluma Blvd North and

Oak Street. The project includes the extension of Oak

Street and Water Street North, a new Class I multi-use

path along the Petaluma River, and an emergency

vehicle access roadway to the vicinity of Washington

Street

184 residential units BB

24 Project: Haystack Pacifica - PLMA-16-0001

Carey Algaze

Pacifica Companies

619-296-9000

007-143-003 and

004, 007, 014,

015

215 Weller Street All Planning Approvals 1/7/2013 T5/T6

178 new residential units with 14,516 sq/ft of

commercial at corners. 178 residential units and

14,516 sf of commercialTR

Page 3 3/2/2020

Page 5: PENDING PROJECTS SUMMARY (March 3, 2020) DEFINITIONS … · 12/3/2019  · DB – David Brosky, Associate Planner, 707-7 78-4340, dbrosky@cityofpetaluma.org ER – Eric Roberts, Assistant

Map # Applicant APN Project Location Status Date Filed Zoning Description Units/SQFT Planner

25 Project: Deer Creek Village - 09-SPC-0091

Merlone Geier Management

Mike Grehl

858-259-9909

[email protected]

007-380-005 and

-027

N. McDowell Blvd.

btwn Lynch Creek

and Rainier Ave.

Under Construction 3/29/2009 MU1B

345,000 sq/ft commercial center and associated site

improvements.

345,000 sq/ft HH

Page 4 3/2/2020

Page 6: PENDING PROJECTS SUMMARY (March 3, 2020) DEFINITIONS … · 12/3/2019  · DB – David Brosky, Associate Planner, 707-7 78-4340, dbrosky@cityofpetaluma.org ER – Eric Roberts, Assistant

Map # Applicant APN Project Location Status Date Filed Zoning Description Units/SQFT Planner

Residential

26 Project: DRG Casa Grande - PLMA-19-0006

Doyle Heaton

Falcon Point Assoc, 3496 Buskik Avenue,

#104, Pleasant Hill, CA 94532

017-040-020 &

059

240 & 250 Casa

GrandeIn Planning Process 10/15/2018 R4

The project proposes 35 single-family residential units;

30 market rate and 5 affordable on the 4.5 acre site.

The project also includes establishment of a PUD and

will require a subdivision map.

35 residential units AH

27 Project: Vartnaw Ranch - PLMA-19-0004

Geoff McComic

RBMC Advisors, 1500 3rd Street, Suite B1,

Napa, CA 94559

415-332-3868

019-210-032 149 McNear Ave In Planning Process 9/26/2019 R4

Demolish all existing on-site structures (including

three single-family dwellings) and the construction of

56 residential units on the 4.09-acre site. All five

parcels that comprise the project site would be

merged, and the property would be re-subdivided via

a one-lot parcel map that would establish the

proposed condominium ownership structure for each

of the 56 units in the project.

56 residential units AH

28 Project: 109 Ellis Street- PLSR-18-0030

Jerry Kler Architects

415-332-3868 007-361-003 109 Ellis Street All Planning Approvals 10/15/2018 PUD 13 unit apartment complex 13 residential units AH

29 Project: Deer Creek Residential - PLMA-18-0005

Merlone Geier Management

Mike Grehl

858-259-9909

[email protected]

007-380-034 0 N McDowell All Planning Approvals 10/1/2018 MU1B

New construction of a 129-unit residential

development within five three-story buildings on 4.71

acres. The project will provide up to 194 off-street

parking spaces.

129 residential units BB

30 Project: Olin Residence- PLSR-18-0027

Alan Olin

[email protected] 118 Kimberly Way

In Planning Process. Waiting on

applicant response.9/5/2018 MU2

New 2,461 square foot Single Family home within the

South Hills General Plan sub area, subject to hillside

ordinance.

2,461 square foot single

family dwellingBB

31 Project: Baywood Apartments - PLSR-18-0016

Matt Taylor

Farrell-Faber

[email protected]

707-579-3811

005-060-0422592 Casa Grande

Road In Planning Process 5/31/2018 R5

Proposal for 299 apartments in 27 different three-

story buildings. Project includes a recreation center

and indoor pool and all associated site improvements. 299 units BB

32 Project: PEP Housing Senior Housing - PLSR-18-0006

Robert W. Hayes

415-332-0999008-530-007

951 Petaluma Blvd

SIn Plan Check 2/26/2018 T5

Demolition of all existing buildings/site features and

construcion of affordable housing units in new two to

three story struncture with a manager's unit and one

two-story community building

53 dwelling units and 1

manager's unit.BB

33 Project: Sepaher Residential Building - PLMA-17-0008

Nick Lee

Nick Lee Architecture

[email protected]

415-378-4337

007-154-013315 Lakeville

Street In Plan Check 9/13/2017 MU1A

New building containing 4 residential units and

associated parking on site. Application includes a CUP

to allow for residential on the ground floor. 4 dwelling units BB

34 Project: Williams Residential Historic SPAR - PLSR-16-0039

Peter Williams

[email protected] 006-214-014

331 Kentucky

Street In Plan Check 12/27/2016 R3

Modifications to an existing single family residence

including a 1st floor rear addition and conversion of

exiting attic space into 2nd floor livingspace. single family dwelling BB

Page 5 3/2/2020

Page 7: PENDING PROJECTS SUMMARY (March 3, 2020) DEFINITIONS … · 12/3/2019  · DB – David Brosky, Associate Planner, 707-7 78-4340, dbrosky@cityofpetaluma.org ER – Eric Roberts, Assistant

Map # Applicant APN Project Location Status Date Filed Zoning Description Units/SQFT Planner

35 Project: Brody Ranch Subdivision - PLMA-15-0007

DeNova Homes

Trent Sanson

925-685-0110

trent@denovahomes .com

137-061-042 360 Corona Road Under Construction 11/30/2015 PUD - Brody Ranch

Development of 199 units consisting of 59 detached

single family residences, one duplex and 138

condominiums 199 dwelling units EU

36 Project: East Washington Commons - PLSR-15-0036

Jerry Kler

Jerry Kler Architects

415-332-3868

007-022-033,

055, 058

817, 822, 825 E.

Washington Street In Plan Check 12/21/2015 MU1A

SPAR and CUP for a new 3 story, 24-unit residential

project on 3 parcels, including 2 floors of residential

over ground floor parking and street level tenant

amenities. 24 dwelling units HH

37 Project: Riverbend Crossing PUD, SPAR and Subdivision - PLMA-19-0003

Steve Lafranchi

707-762-3122007-041-006 529 Madison In Planning Process 3/20/2019 R3

Tentative map, PUD Zoning Amendment (PUD and

SPAR for a 29 lot single family residential development

29 dwelling units AH

38 Project: Addison Ranch Apartments - 13-SPC-0122

GALA Construction

Gary Whitesides

[email protected]

916-719-5902

007-610-005

007-610-006

007-610-029

007-610-019

and

007-610-031

200 Greenbriar

Circle Under Construction 9/22/2014 R4

Add an additional 100 multi-family units in an existing

apartment complex.

100 dwelling units TR

39 Project: Davidon Homes - 03-TSM-0396-CR

Davidon Homes

Steve Abbs

019-120-040,

041

Windsor and D

Street

In Planning Process. Revised project

submitted and under review7/21/2014 R1

New construction of 28 single family detached units

and development of open space for future expansion

of Helen Putnam Park.

28 dwelling units HH

40 Project: Sid Commons 03-GPA-0379-CR

Mark Johnson

Acclaim Homes

[email protected]

650-324-9439

019-010-006

and 007, 008,

009

End of Graylawn In Planning Process 12/15/2014 R4 & PUD

New 278 unit apartment complex

278 dwelling units TR

41 Project: Sunnyslope II / the Oaks at Sunnyslope 03-TSM-0460-CR

Lafferty Communities 019-203-008674 Sunnyslope

Road In Plan Check and under construction 8/11/2014

PUD - Sunnyslope

II

The Oaks at Sunnyslope 18 single family pacrcels in

multiple phases. SPAR required for 17 lots and existing

historic house on lot 18. Lots 1-6 and 10-18 have

received SPAR approval as of October 2018. Site

Grading and Construction of lower homes is

underway.

18 dwelling units BB/TR

42 Project: Quarry Heights (Lomas) 09-GPA-0560-CR, 06-SPC-0615-CR

KB Homes

925-983-4522,

[email protected]

019-210-010

019-210-011

019-220-027

019-220-012

Petaluma Blvd. S

(Dutra Quarry)

142 townhome units and 40 SFD are

complete. Remaining 90 SFD not yet

under constrution

2/28/2006PUD- Quarry

Heights

272 new single family and townhomes. 91 single-

family dwellings to be constructed. 272 dwelling units TR

43 Project: Dailey Single Family Dwelling - PLSR-19-0003

Derek Dailey

530-570-9755

[email protected]

008-630-052 123 Kimberly Way All Planning Approvals 1/17/2019PUD - Country

Club Estates

Major SPAR for a new single family home in the

Country Club Estates PUD single family dwelling KR

Page 6 3/2/2020

Page 8: PENDING PROJECTS SUMMARY (March 3, 2020) DEFINITIONS … · 12/3/2019  · DB – David Brosky, Associate Planner, 707-7 78-4340, dbrosky@cityofpetaluma.org ER – Eric Roberts, Assistant

Map # Applicant APN Project Location Status Date Filed Zoning Description Units/SQFT Planner

44 Project: Sartori Historic SPAR - PLSR-19-0002

Steve Lafranchi

707-762-3122005-250-044

1416 Casa Grande

RoadIn Planning Process 1/2/2019 R2

Proposal to retain existing historic house, subdivide

property into seven parcels, rezone to a PUD, and

pursue SPAR for development of six new homes. 6 dwelling units EU

45 Project: Luchetti Residence Garage Replacement PLSR-19-0001

Brent Russell

[email protected] 245 Keokuk In Plan Check 1/8/2019

R3; Oakhill

Brewster Historic

District

Removal of addition at rear, new construction of

garage and ADU.single family dwelling and

ADUHH

46 Project: 107 6th Street - PLSR-18-0033

Charisse Rathle

415-238-8682

[email protected]

008-104-016 107 6th Street In Planning Process 12/26/2018R3; A Street

Historic District

New garage with approx. 480 sf ADU above. Includes

interior remodel and 2-story expansions at the side

and rear.

single family dwelling and

ADUBB

47 Project: Corona Station SPAR, TM, ZA, IS - PLMA-18-0006

Todd Kurtin (Lomas-Corona Station)

310-230-9278137-061-019

890 N. Mcdowell

Blvd. In Planning Process 12/4/2018 MU1B

Zoning Text Amendment, Major Subdivision, and Site

Plan and Architectural review of new 112 units single

family residential development adjacent to the future

SMART station.

112 dwelling units HH

48 Project: Pettigrew ADU and Porch, Historic SPAR - PLSR-19-0007

Chris Lynch

MAD Architecture

707-481-7410

[email protected]

006-201-009309/307 Walnut

StreetBuilding Permit Issued 4/29/2019

R3/Oakhill

Brewster

Project proposes to construct a new ADU at the

location of an existing ADU on the property. Proposal

also includes construction of a carport and a

restoration of the front porch on the primary dwelling.

ADU AH

Page 7 3/2/2020

Page 9: PENDING PROJECTS SUMMARY (March 3, 2020) DEFINITIONS … · 12/3/2019  · DB – David Brosky, Associate Planner, 707-7 78-4340, dbrosky@cityofpetaluma.org ER – Eric Roberts, Assistant

46

28

38

31

3547

4339

29

26

36

45

30

32

48

42

37

4433

40

41

27

34

4

10

3

17

1

8

11

12

16

9

6

13

14

15

5

2

7

20

25

19

2423

21

2218

City of Petaluma - Planning DivisionMap of Major Development Projects

March 3, 2020Commercial Projects Residential Projects

Mixed Use Projects AnnexationsNo new annexation projectsas of March 3, 2020

Data source: Sonoma County, City of Petaluma May 2019$ 0 0.65 1.30.325 Miles

1. Brooks Note Winery2. Wasatch Storage Facility3. Adobe Road Winery4. 1395 N. McDowell Boulevard SPAR5. Valero Gas Station6. McDonald's Remodel7. Washington Square Façade Remodel8. Cagwin and Dorward9. Labcon Warehouse Addition10. 76 Gas Station Remodel11. Floathouse12. Hansel Toyota Expansion and Remodel13. Petaluma Poultry Expansion14. Petaluman Hotel15. Safeway Fuel Center16. Home 2 Suites17. Biomarin

18. Scannell Mixed Use Development19. East Washington Place SPAR and ZTA20. 132 Petaluma Blvd Historic SPAR21. Omahony Mixed Use Building22. Riverfront 201023. North River Apartments24. Haystack Pacifica25. Deer Creek Village

26. DRG Casa Grande27. Vartnaw Ranch28. 109 Ellis Street29. Deer Creek Residential30. Olin Residence31. Baywood Apartments32. PEP Housing Senior Housing33. Sepaher Residential Building34. Williams Residential Historic SPAR35. Brody Ranch Subdivision36. East Washington Commons37. Riverbend Crossing PUD and Subdivision38. Addison Ranch Apartments39. Davidon Homes40. Sid Commons41. Sunnyslope II42. Quarry Heights43. Dailey Single Family Dwelling44. Sartori Historic SPAR45. Luchetti Residence Garage46. 107 6th Street47. Corona Station SPAR TM ZA IS48. Pettigrew ADU and Porch Historic SPAR