pelon final final

18
INTENSIDAD MAXIMA EN 24 HORAS año pmax.24 hr (mm) I24 (mm/hr) INTENSIDAD HISTÓRICA DURACIÓN DE LLUVIA EN MINUTOS 5 10 15 20 25 30 60 1998 157.76 6.57 111.55 78.88 64.40 55.78 49.89 45.54 32.20 1999 211.72 8.82 149.71 105.86 86.43 74.85 66.95 61.12 43.22 2000 242.94 10.12 171.78 121.47 99.18 85.89 76.82 70.13 49.59 2001 220.84 9.20 156.15 110.42 90.16 78.08 69.83 63.75 45.08 2002 92.70 3.86 65.55 46.35 37.85 32.78 29.32 26.76 18.92 2003 159.54 6.65 112.81 79.77 65.13 56.41 50.45 46.06 32.57 2004 90.67 3.78 64.11 45.33 37.01 32.06 28.67 26.17 18.51 2005 51.04 2.13 36.09 25.52 20.84 18.04 16.14 14.73 10.42 2006 79.52 3.31 56.23 39.76 32.46 28.11 25.15 22.96 16.23 2007 191.13 7.96 135.15 95.57 78.03 67.57 60.44 55.17 39.01 2008 115.61 4.82 81.75 57.81 47.20 40.87 36.56 33.37 23.60 2009 204.56 8.52 144.64 102.28 83.51 72.32 64.69 59.05 41.76 promedio 107.13 75.75 61.85 53.56 47.91 43.73 30.93 desviaci on 139.50 102.12 80.54 69.75 62.39 56.95 40.27 u 44.35 29.79 25.60 22.17 19.83 18.10 12.80 a 108.77 79.62 62.80 54.38 48.64 44.40 31.40 y 0.58 0.58 0.58 0.58 0.58 0.58 0.58 d 0.009 0.013 0.016 0.018 0.021 0.023 0.032

Upload: danniel

Post on 11-Nov-2015

232 views

Category:

Documents


3 download

DESCRIPTION

estaciones

TRANSCRIPT

INTENSIDAD MAXIMA EN 24 HORAS

aopmax.24hr (mm)I24 (mm/hr)INTENSIDAD HISTRICA

DURACIN DE LLUVIA EN MINUTOS

5101520253060

1998157.766.57111.5578.8864.4055.7849.8945.5432.20

1999211.728.82149.71105.8686.4374.8566.9561.1243.22

2000242.9410.12171.78121.4799.1885.8976.8270.1349.59

2001220.849.20156.15110.4290.1678.0869.8363.7545.08

200292.703.8665.5546.3537.8532.7829.3226.7618.92

2003159.546.65112.8179.7765.1356.4150.4546.0632.57

200490.673.7864.1145.3337.0132.0628.6726.1718.51

200551.042.1336.0925.5220.8418.0416.1414.7310.42

200679.523.3156.2339.7632.4628.1125.1522.9616.23

2007191.137.96135.1595.5778.0367.5760.4455.1739.01

2008115.614.8281.7557.8147.2040.8736.5633.3723.60

2009204.568.52144.64102.2883.5172.3264.6959.0541.76

promedio107.1375.7561.8553.5647.9143.7330.93

desviacion139.50102.1280.5469.7562.3956.9540.27

u44.3529.7925.6022.1719.8318.1012.80

a108.7779.6262.8054.3848.6444.4031.40

y0.580.580.580.580.580.580.58

d0.0090.0130.0160.0180.0210.0230.032

FORMULAS A USAR

TrF(X) =1-1/TDuracion de lluvias en minutos

5101520253060

100.90289.110208.972166.917144.555129.295118.02783.458

250.96392.238284.468226.457196.119175.416160.129113.229

500.98468.745340.475270.628234.372209.631191.362135.314

750.99544.686396.069314.472272.343243.594222.364157.236

1000.99544.686396.069314.472272.343243.594222.364157.236

CON ESTOS DATOS SE PROCEDER A GRAFICAR LA CURVA IDF

CAUDAL DE DISEO

Donde:Q= CaudalC= Coeficiente de escorrentaA= reaI= Intensidad de precipitacin en (mm/h)TC=148.60C=0.1 para bosques

TrCAi DISEOQ

AOSKm2mm/hm3/s

500.10152.14132.00558.29

APLICANDO METODO DE THIESEN

MESESN DATOSPOMAHUACASALLIQUECHONTALIPOMAHUACA (Km2)SALLIQUEL (Km2)CHONTALI (Km2)AREA CUENCAPmed. (mm)

ENERO131.6438.06157.393.6642.1816.3152.14157.756

FEBRERO263.8552.42180.093.6642.1816.3152.14211.717

MARZO355.4619.92345.093.6642.1816.3152.14242.937

ABRIL444.4609.84228.093.6642.1816.3152.14220.836

MAYO552.6187.0579.093.6642.1816.3152.1492.705

JUNIO636.3394.37260.093.6642.1816.3152.14159.540

JULIO741.7227.9016.993.6642.1816.3152.1490.670

AGOSTO825.1119.5022.993.6642.1816.3152.1451.034

SEPTIEMBRE917.3229.3249.493.6642.1816.3152.1479.519

OCTUBRE1029.6573.04131.093.6642.1816.3152.14191.130

NOVIEMBRE1130.6297.00134.793.6642.1816.3152.14115.611

DICIEMBREVOLUMEN POTENCIALMENTE APROVECHABLEV= CPADonde:P= precipitacin pluvial del mesA= reaC= Coeficiente de escorrenta

1222.5623.33167.093.6642.1816.3152.14204.558

ANALICIS DE CONSISTENCIA EN LAS ESTACIONES 24 HORAS

AnualAcumulado

AoPOMAHUACACHONTALISALLIQUEPPPOMAHUACACHONTALISALLIQUEPPA

1998231.312532622.81369.031665.307156.8722142.2510321.47

1999181.51078.53023.071427.691434.005903.8719519.458952.44

2000198.7619.522426.161081.461252.504825.3716496.387524.75

2001177.9581.241650.645803.261053.804205.8514070.226443.29

2002172.8369.052158.435900.10875.903624.6112419.575640.03

2003118.5586.521841.595848.87703.103255.5610261.144739.93

2004118.1668.251942.13909.49584.602669.048419.543891.06

2005123.7669.791959.126917.54466.502000.796477.412981.57

2006203656.261931.277930.18342.801331.004518.292064.03

2007139.8674.742587.0081133.85139.80674.742587.011133.85

2008177461.122766.2831134.80177.00461.122766.281134.80

2009136.3341.992619.0761032.46136.30341.992619.081032.46

Si 0.99 entonces PPA no oes consistenteCONCLUSION : Las tres estaciones son consistentes

DETERMINACION DE LA PRECIPITACION EFECTIVA (METODO FAQ)Pe=0.6P-10P70mm

MESPP mediaPP EFECTIVA

Ene.157.75684.65

Feb.211.717117.03

Mar242.937135.76

Abr220.836122.50

May92.70545.62

Jun159.54085.72

Jul90.67044.40

Ago51.03420.62

Sep79.51937.71

Oct191.130104.68

Nov115.61159.37

Dic204.558112.73

Para determinar: TMF, CH, CE, MF, ETP, se calcula mediante la formula.

Para TMF:

TMF = 9/5 * C + 32

Para enero: TMF = 9/5 * 32.18 + 32 =89.924

Para CH:

CH = 0.166 * (100 HR)^0.5

Para enero: CH = 0.166 * (100 77)^0.5 = 0.80

Para CE:

CE = 1.0 + 0.4* (altitud/2000)

CE = 1.0 + 0.4* (1255/2000) = 1.25

Para MF:

Para el clculo de MF, se determino mediante los valores establecidos

En la tabla de Factor de ETP potencial.

Para enero, a 05 55' S de latitud es de 1.53

Para ETP:

ETP = TMF*CH*CE*MF

Para enero: ETP = 89.924 * 0.8 * 1.25* 1.52 = 136.13mm/mes

BALANCE HDRICO

CURVA MASA OFERTA VS OFERTA DEMANDA

BIBLIOGRAFA

HIDROLOGA Ing. Maximo Villon HIDROLOGIA PARA INGENIEROS- Linsley Kohler Paulus HIDROLOGIA PARA ESTUDIANTES DE INGENIERIA CIVIL- Wendor Chereque Moran ESTUDIO HIDROLGICO DE HABILITACION URBANA HUABAL ALTO-SAN FELIPE-JAEN.