Peel Valley Works and Drought Update 5 th and 6 th August 2019 Dungowan and Tamworth \ Adrian Langdon Executive Manager, System Operations Ronan Magaharan Executive Manager - Assets

Upload: others

Post on 10-Nov-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Peel Valley Works and Drought Update 5th and 6th August 2019

Peel Valley Works and Drought Update

5th and 6th August 2019

Dungowan and Tamworth

\

Adrian LangdonExecutive Manager, System Operations

Ronan MagaharanExecutive Manager - Assets

Page 2: Peel Valley Works and Drought Update 5th and 6th August 2019

2

Discussion Agenda• Introduction from Tamworth Regional Council • Overview• Worst Drought Ever• Drought Outlook

Impact on the Peel• Groundwater• Tributary Inflows

Customer Impacts• Peel System Users • BLR• Environment

• What is WaterNSW doing now?• How to keep updated• Next steps• Questions and Answers

Page 3: Peel Valley Works and Drought Update 5th and 6th August 2019

3

The Peel System

Page 4: Peel Valley Works and Drought Update 5th and 6th August 2019

4

Worst Drought Ever

Page 5: Peel Valley Works and Drought Update 5th and 6th August 2019

5

NSW rainfall1 May 2017 – 30 April 2019

Page 6: Peel Valley Works and Drought Update 5th and 6th August 2019

6

NSW rainfall

Page 7: Peel Valley Works and Drought Update 5th and 6th August 2019

7

NSW rainfall

Page 8: Peel Valley Works and Drought Update 5th and 6th August 2019

8

NSW rainfall

Page 9: Peel Valley Works and Drought Update 5th and 6th August 2019

9

Temperature

Water NSW

Page 10: Peel Valley Works and Drought Update 5th and 6th August 2019

10

Maximum temperature1 May 2018 – 30 April 2019

Water NSW

Page 11: Peel Valley Works and Drought Update 5th and 6th August 2019

11

Drought Stages

Page 12: Peel Valley Works and Drought Update 5th and 6th August 2019

12

State Policy

Page 13: Peel Valley Works and Drought Update 5th and 6th August 2019

13

Peel River Operations

Page 14: Peel Valley Works and Drought Update 5th and 6th August 2019

Peel System Inflows

14

Page 15: Peel Valley Works and Drought Update 5th and 6th August 2019

15

Page 16: Peel Valley Works and Drought Update 5th and 6th August 2019

16

Peel Tributary Inflows

Page 17: Peel Valley Works and Drought Update 5th and 6th August 2019

Chaffey Dam Levels

17WaterNSW

May 2019

Page 18: Peel Valley Works and Drought Update 5th and 6th August 2019

Chaffey Dam releases 16-17

19

INSERT GRAPH

Page 19: Peel Valley Works and Drought Update 5th and 6th August 2019

Chaffey Dam releases 17-18

20

INSERT GRAPH

Page 20: Peel Valley Works and Drought Update 5th and 6th August 2019

Chaffey 18-19 Releases

WaterNSW 21

Gap between black and red line highlights high losses in the system = 2 years Tamworth Supply demand

Page 21: Peel Valley Works and Drought Update 5th and 6th August 2019

Groundwater Table

22

-11.5

-11

-10.5

-10

-9.5

-9

-8.5

-81/

07/2

010

1/10

/201

0

1/01

/201

1

1/04

/201

1

1/07

/201

1

1/10

/201

1

1/01

/201

2

1/04

/201

2

1/07

/201

2

1/10

/201

2

1/01

/201

3

1/04

/201

3

1/07

/201

3

1/10

/201

3

1/01

/201

4

1/04

/201

4

1/07

/201

4

1/10

/201

4

1/01

/201

5

1/04

/201

5

1/07

/201

5

1/10

/201

5

1/01

/201

6

1/04

/201

6

1/07

/201

6

1/10

/201

6

1/01

/201

7

1/04

/201

7

1/07

/201

7

1/10

/201

7

1/01

/201

8

1/04

/201

8

1/07

/201

8

1/10

/201

8

1/01

/201

9

1/04

/201

9

Gro

undw

ater

Dep

th (m

)

Depth to groundwater table below the measuring point.

Page 22: Peel Valley Works and Drought Update 5th and 6th August 2019

23

Drought Outlook

Page 23: Peel Valley Works and Drought Update 5th and 6th August 2019

24

Temperate Outlook

Page 24: Peel Valley Works and Drought Update 5th and 6th August 2019

25

Rainfall Outlook

Page 25: Peel Valley Works and Drought Update 5th and 6th August 2019

26

So…What does all this mean for the Peel Valley ?

Page 26: Peel Valley Works and Drought Update 5th and 6th August 2019

Storage Forecast

27

0

20

40

60

80

100

May-18 Aug-18 Nov-18 Feb-19 May-19 Aug-19 Nov-19 Feb-20 May-20 Aug-20 Nov-20 Feb-21

Stor

age

capa

city

(GL)

Chaffey Dam - forecast storage volume (chance of exceedance)

Minimum 99% COE DRY 80% COE Median 50% COE WET 20% COE actual No Inflow

Page 27: Peel Valley Works and Drought Update 5th and 6th August 2019

Block banks will extend water supply (Zero Inflow Model)

28

Page 28: Peel Valley Works and Drought Update 5th and 6th August 2019

Block banks - Drought of Record Model

29

Page 29: Peel Valley Works and Drought Update 5th and 6th August 2019

Peel River: Current State of Play

Drought stage Stage 3 severe water shortage.

Storage Level •Chaffey Dam at 23% of active storage and currently releasing 20ML/d.

Allocations

•No allocation for general security in 2019/20.•Last general security allocation made in October 2018.•Reduced allocations for high priority (town and domestic and stock) and for high security users, although supply below Dungowan will be restricted later in 2019 if dry conditions continue.

Action

•Work is underway for a series of temporary weirs in the Peel River to extend supply for Tamworth and reduce around 17,000 ML in transmission losses below Chaffey Dam. The Government has committed $3.4 million for these works and $2 million for further supply investigations.

Issues

•Inflows into the dam and transmission losses below Chaffey Dam are at record high levels.•Supply below Dungowan will be restricted and alternative supply may need to sought for downstream commercial users.

Outlook •All efforts are being made to secure and extend Tamworth’s supply.

30

Page 30: Peel Valley Works and Drought Update 5th and 6th August 2019

Now

Med

ium

Long

er

Operational Savings Secure Alternative Supply Future Water Supply1. AssessLate May 2019InvestigationsBathymetry and water quality for peel.Benefits: Optimises water supply and quality for towns and high security

2. Block BanksJune: Development of block bank requirements with councilBenefits: Supply Town water for a longer period from Chaffey Dam.

3. Block BanksJune: Water quality for fauna assessment to be done for Northern ValleysBenefits: Help protect and maintain ecosystem.

1. Accessing deep water storage for Chaffey (Peel)

Trigger: Last responsible moment necessary before water ceases to flow.Benefits: Possibility of supplying town water for longer period when ground water source is used as an alternative

Industry2. Develop carting and distribution

optionsTrigger: Stopping flow at TamworthBenefits: Extend high security water to critical industries.

3. Sinking BoresTrigger: Stopping flow at TamworthBenefits: Water supply for towns and industries.

4. Aeration for deep/dead storageBenefits: Extend town water supply

1. Pipeline Chaffey to Tamworth

Develop proposal to secure supplies to Tamworth if inflows continue to stay below the drought of record

2. Groundwater storage and usage Options

PEEL Mitigation Measures

Page 31: Peel Valley Works and Drought Update 5th and 6th August 2019

32

What are we doing Now?

Page 32: Peel Valley Works and Drought Update 5th and 6th August 2019

Infrastructure Solutions

Ronan Magaharan

Page 33: Peel Valley Works and Drought Update 5th and 6th August 2019

Approach to extending Water Supply

Context

• Chaffey Dam supplies most of Tamworth Regional Council’s water• High transmission losses incurred through delivering water along the Peel River• Prolonging supply in Chaffey is the most effective way of servicing Tamworth’s water needs.• The sooner the rate of depletion level in the dam can be reduced and river transmission

losses can be minimised, the longer we will be able to supply water to Tamworth.• Doing nothing is simply not an option.

Proposed Solution

WaterNSW has proposed a two-staged infrastructure solution supported by NSW Government

• Stage 1: Installation of temporary weirs and pump station, extending supply for approximately four months

• Stage 2: Construction of permanent infrastructure, pipeline for Chaffey Dam to existing Dungowan pipeline that would ensure Tamworth does not run out of town water supply (under drought-of-record conditions) if constructed early enough.

Page 34: Peel Valley Works and Drought Update 5th and 6th August 2019

Stage 1 – Temporary Weirs

Stage 1 – Install Temporary Weirs on the Peel River

To reduce heavy transmission losses and extend water supply. WaterNSW is proposing to install temporary weirs on the Peel river at two locations:

– Dungowan Village• Allows for pooling of water to be pumped into the existing TRC owned Dungowan pipeline for

delivery to Tamworth• Water pumped via a temporary pump station with a temporary pipeline of approximately 700M in

length from temporary weir to existing Dungowan Pipeline.– Jewry Street

• to control flow downstream of Tamworth and provide further backup of town supply

• Construction options being analysed (soil, gabion, sump), and will be removed when supply is secured (pipeline operation or significant inflows)

• Weirs are expected to be 1.5 to 2m high, and store 22ML (capacity of Dungowan pipeline)

• Tributary flows downstream of the dam will continue• Installation required by November 2019 to maximise available water supply• Funding commitment of $3.4M by Minister Pavey to complete the works

35

Page 35: Peel Valley Works and Drought Update 5th and 6th August 2019

Stage 1 – Location of Infrastructure

Proposed temporary weir location

Option for temporary pipeline route

Option for temporary pipeline route

Page 36: Peel Valley Works and Drought Update 5th and 6th August 2019

37

Page 37: Peel Valley Works and Drought Update 5th and 6th August 2019

Stage 1 – Key Dates

• Commencement of construction works at Dungowan is likely to be early October 2019

• Completion of construction works at Dungowan is early November 2019.

• Pump Station Operational at Dungowan same time

• Completion of Construction works a Jewry St to be confirmed after Dungowan project is completed.

38

Page 38: Peel Valley Works and Drought Update 5th and 6th August 2019

39

Local Tributary inflows only below weir.

Page 39: Peel Valley Works and Drought Update 5th and 6th August 2019

What about impacts on Fish and Wildlife?There is very likely to be if drought continues and inflows remain low… Critical human needs is now the top priority.

Here is what we are doing

• Working with DPI Fisheries around priority refuge water holes.

• Monitor water quality and quantity

• Tributary inflows will flow through the system

• Community can report issues with fish / wildlife to DPI Fisheries on 1800 043 536

41

Page 40: Peel Valley Works and Drought Update 5th and 6th August 2019

Stage 2 – Permanent Pipeline

Stage 2 – Construction of a Permanent Pipeline

• Pipeline (approx. 17-20km in length) from Chaffey Dam to Dungowan Town (and connecting to the existing pipeline owned by TRC), which would conserve Chaffey’s remaining storage by reducing transmission losses on the Peel River.

• Critically, this project would provide long-term drought security for Tamworth, and would ensure the town does not run out of water supply (under drought-of-record conditions) provided it is installed early in 2020.

• Funding of $1.9M announced my Minister Pavey to complete planning works. Funding for construction (~$38M) subject to further Govt approval.

• Where possible construction to be within existing road easements or land within the Chaffey Dam property boundary.

42

Page 41: Peel Valley Works and Drought Update 5th and 6th August 2019

Where could the pipeline run?Stage 2Two routes are to be considered: Currently preferred route (~18.5 km) via Back-Woolomin Road (Red Line). Alternate route (~16.5 km) via Tamworth-Nundle Road (Yellow Line). A third “Yellow, Pink & Red Lines” connecting pipeline of about 490 m length along Westbank Road at

Woolomin is also to be considered.

Page 42: Peel Valley Works and Drought Update 5th and 6th August 2019

Stage 2 – Permanent Pipeline

Pipeline route

• Pipeline route has not been selected:– Review of Environmental Factors to be completed. This will confirm the required

approval pathways, which are expected to be numerous.– Engagement with impacted landholders to be completed

Key Dates• Extremely challenging timeframes with multiple parallel paths• Targeting award of D&C Contract in September 2019• Construction commencement pending

– Environmental approvals– Pipe availability– Selected route– Contractors installation methodology

Page 43: Peel Valley Works and Drought Update 5th and 6th August 2019

Stakeholder Coordination, Design and Scope Development – 3 Months

Initiation – 1 months

Tender – 3 Months

Resource allocation – 1 months

Planning and Environmental Approvals – 3 Months

Funding and Approvals –2 Months

Procurement – 3 Months

Detailed Design – 3 Months Construction – 3 Months

Commission –1-2 Months

Project Close –1-2 Months

Total Project Delivery Time = 9 Months

Route Selection, Land Identification and Acquisition – 3-4 Months

Key Challenge - TimeWhat have we done to reduce timeframe:

Engaged additional resources

Working closely with Tamworth Council to coordinate project

Early briefings to Government Approval agencies

Financial approval process commenced

Land / Route selection – primarily council land

Early Contractor Involvement process

Pipe capacity / size review to being prioritised

Pipe Suppliers engaged to minimise lead time

Lessons learnt from delivering the Broken Hill Pipeline

Page 44: Peel Valley Works and Drought Update 5th and 6th August 2019

When do the temporary weirs get removed ?

Two triggers for removal

1) Dungowan Pipeline project is installed and operational.

2) Chaffey Dam has more than two years supply in storage.

Which ever occurs first !

Page 45: Peel Valley Works and Drought Update 5th and 6th August 2019

Such is the severity of the drought and forecasts showing no improvement…..

Doing nothing is simply not an option.

A collaborative response between NSW Government, WaterNSW, Tamworth Regional Council is needed to secure Critical Human Water supply needs.

Page 46: Peel Valley Works and Drought Update 5th and 6th August 2019

Next Steps

• If you are a riverfront landholder with BLR rights with no alternate water supply (town water supply connected or existing bore etc) option, please let us know.

• Will be back to talk to the community in Mid October,

• WaterNSW to update Tamworth Water Taskforce in 2 weeks.

• Continue planning and feasibility on Stage 2 Pipeline project.

• Updates also via our website, social media and local media.

Page 47: Peel Valley Works and Drought Update 5th and 6th August 2019

49

Questions?

Page 48: Peel Valley Works and Drought Update 5th and 6th August 2019

Fact Sheets available today

DPI site www.industry.nsw.gov.au for facts

Visit the website at: waternsw.com.au/drought

For information including water availability reports and drought reports go to: https://www.waternsw.com.au/supply/drought-information/regional-nsw

Call us on: 1300 662 077

Subscribe at: waternsw.com.au/subscribeFor weekly customer drought updates and more information

50

More information

Page 49: Peel Valley Works and Drought Update 5th and 6th August 2019

More Information

BoresFor specific inquiries about stock and domestic bores (Basic landholder rights bores) email [email protected] Gleeson-Lendon’s (02) 9849 9960

The WNSW general inquiry number – 1300 662 077 [email protected]

Early Warning network Registration (EWN)- Via registration forms available here tonight.

Page 50: Peel Valley Works and Drought Update 5th and 6th August 2019

Dedicated Peel Valley information

Facebook Group

https://www.facebook.com/groups/WaterNSWPeelRiver/

Dedicated web pages

Page 51: Peel Valley Works and Drought Update 5th and 6th August 2019

53

Thankyou for your attendance