Page 1: Peak's Experience on online Linear State Estimators Experience on online... · Alex Ning, Peak Reliability Lin Zhang, Electric Power Group Marianna Vaiman, V&R Energy Peak's Experience

Alex Ning, Peak Reliability

Lin Zhang, Electric Power Group

Marianna Vaiman, V&R Energy

Peak's Experience on online Linear State Estimator

Implementation and Vendor’s Update

JSIS

May 16 2018

Page 2: Peak's Experience on online Linear State Estimators Experience on online... · Alex Ning, Peak Reliability Lin Zhang, Electric Power Group Marianna Vaiman, V&R Energy Peak's Experience

2

• Peak needs a tool to process “raw PMU signals” with bad data detection and data

conditioning capability

• Peak has integrated “validated” PMU voltage phasor data (DS) into SCADA and

SE as supplemental to ICCP data

o EMS engineers manually watch DS-PMU phasor data quality closely

• RC needs PMU based wide area visualization & situational awareness tools as

backup in event of SCADA/SE failure

• LSE results in the observable areas can be used as pseudo PMU data to expand

data coverage

Peak’s Business Drivers of LSE

Page 3: Peak's Experience on online Linear State Estimators Experience on online... · Alex Ning, Peak Reliability Lin Zhang, Electric Power Group Marianna Vaiman, V&R Energy Peak's Experience

3

• Peak has deployed EPG LSE at DEMS since 2016

o Reads breaker and switch status through a SCADA exported file

• Peak is working with EPG installing LSE at TEMS; plan to install in

Production by end of 2018

o Receives breaker (and switch) status through ICCP link in real-time

• Many enhancements has been made between Peak and EPG since

then

• Peak has installed V&R energy LSE in April 2018 as part of the DOE

PRSP project.

o Plan to test and validate with vendor

Peak’s Efforts on Implementing Online LSE

Page 4: Peak's Experience on online Linear State Estimators Experience on online... · Alex Ning, Peak Reliability Lin Zhang, Electric Power Group Marianna Vaiman, V&R Energy Peak's Experience

4

• Accurate topology is very important

o Peak uses a script to generate both breaker and switch

status to feed EPG LSE

o LSE could get wrong topology if only uses breaker status

as it assumes all switches are closed

o EPG has added capability of reading switches status

• Capability of modeling transformer and reading

transformer tap is crucial

o Missing transformer in the model is like replacing

transformer by a wall in the system

o Creates manmade system islands, decreases observable

branches and areas

o EPG is working on modeling transformer

Lessons Learned on LSE

Page 5: Peak's Experience on online Linear State Estimators Experience on online... · Alex Ning, Peak Reliability Lin Zhang, Electric Power Group Marianna Vaiman, V&R Energy Peak's Experience

5

• Comparing LSE results to raw PMU data

• Ideally, the difference should not be greater than 5% if

o PMU Data Quality (availability and accuracy) is good

o System model parameter is accurate

o Breaker and switch status are accurate

o PMU-WSM mapping is accurate

• In reality, still see some significant mismatches, working with vendors on

improving LSE results

• More significant mismatches in currents than voltages

o Transformer branches are unobservable

o Voltages are states, currents are calculated by using voltage and line parameters

Peak’s Validation Efforts

Page 6: Peak's Experience on online Linear State Estimators Experience on online... · Alex Ning, Peak Reliability Lin Zhang, Electric Power Group Marianna Vaiman, V&R Energy Peak's Experience

6

Visual Observation

Peak’s Validation Efforts - Methods

Statistical Results over Time

Page 7: Peak's Experience on online Linear State Estimators Experience on online... · Alex Ning, Peak Reliability Lin Zhang, Electric Power Group Marianna Vaiman, V&R Energy Peak's Experience

About EPG’s enhanced Linear State Estimator

– eLSE

7

• Operates at different observable islands

• Provision for Series Capacitors• Shunt capacitor/reactor• Split bus• Naming convention• Bypass breaker modeled in line• Build-in bad data detection and

identification module

Validated by field implementations at: BPA, SCE, Duke, ERCOT, Peak

Operationally tailored by EPG for large systems addressing key practical

issues:

Page 8: Peak's Experience on online Linear State Estimators Experience on online... · Alex Ning, Peak Reliability Lin Zhang, Electric Power Group Marianna Vaiman, V&R Energy Peak's Experience

eLSE Solving at Individual Observable Island

8

Internal system

External system 1

Observable Island

Observable Island

Observable Island

Unobservable Island

Page 9: Peak's Experience on online Linear State Estimators Experience on online... · Alex Ning, Peak Reliability Lin Zhang, Electric Power Group Marianna Vaiman, V&R Energy Peak's Experience

New Enhancements on eLSE

9

Incorporate real-time switch status for topology processor

Enhance else to retrieve breaker/switch status through flat file

Log observable island information

Log breaker/switch status change

Log observable bus and its observability by PMU or eLSE

Add real-time display for time consumption of eLSE solving one frame

Page 10: Peak's Experience on online Linear State Estimators Experience on online... · Alex Ning, Peak Reliability Lin Zhang, Electric Power Group Marianna Vaiman, V&R Energy Peak's Experience

Future Enhancements on eLSE

10

Integrate transformer tap configuration model

Enhance ICCP to transfer integer transformer tap position for eLSE

Page 11: Peak's Experience on online Linear State Estimators Experience on online... · Alex Ning, Peak Reliability Lin Zhang, Electric Power Group Marianna Vaiman, V&R Energy Peak's Experience

11

eLSE Deployment Map

• 1

Source: http://www.ferc.gov/industries/electric/indus-act/rto.asp

In progress

Page 12: Peak's Experience on online Linear State Estimators Experience on online... · Alex Ning, Peak Reliability Lin Zhang, Electric Power Group Marianna Vaiman, V&R Energy Peak's Experience

12

eLSE Use Experience from Deployments at ISOs &

Utilities

• 12BPA Duke SCE ERCOT PEAK

Deployment 2015/16 2015/16 2016 2016/17 2016/17Months of

Operation34 19 14 11 12

Rate samples/sec 60 30 30 30 30

Number of

Substations

with PMU

37 54 13 30 171

Observable

Substations65 56 52 54 491

U

s

e

C

a

s

e

s

Data Conditioning Data Conditioning Data Conditioning Data Conditioning Data Conditioning

Increased

Observability

Increased

Observability

Increased

Observability

Increased

Observability

Synchrophasor

System for Grid

Resiliency with

PhasorNXT

Synchrophasor

System for Grid

Resiliency with

PhasorNXT

Page 13: Peak's Experience on online Linear State Estimators Experience on online... · Alex Ning, Peak Reliability Lin Zhang, Electric Power Group Marianna Vaiman, V&R Energy Peak's Experience

PMU ROSE: LSE Demonstration under PRSP

• Real-Time analysis:

– Identifying observable parts of the system o Includes PMU buses/branches; buses where we can compute voltages based on

PMU data, branches where we can compute current based on PMU data

– Kalman filtering combined with LSEo Bad data detection and conditioning

– Creation of PMU-based WECC-wide state estimator case (e.g., PMU Case)

– Performing full VSA using PMU Case

• Off-Line analysis:

– Optimal PMU placement, which identifies minimum number of PMUs to achieve full system observability

13Copyright © 1996-2018 V&R Energy Systems Research, Inc. All rights reserved.

Page 14: Peak's Experience on online Linear State Estimators Experience on online... · Alex Ning, Peak Reliability Lin Zhang, Electric Power Group Marianna Vaiman, V&R Energy Peak's Experience

14Copyright © 1996-2018 V&R Energy Systems Research, Inc. All rights reserved.14

PMU ROSE/LSE Components

Output of the process:– Conditioned PMU data;

– Bad data reporting and statistics;

– A list of observable islands and their details;

– PMU-based WECC-wide state estimator case (e.g., PMU Case).

Page 15: Peak's Experience on online Linear State Estimators Experience on online... · Alex Ning, Peak Reliability Lin Zhang, Electric Power Group Marianna Vaiman, V&R Energy Peak's Experience

15Copyright © 1996-2018 V&R Energy Systems Research, Inc. All rights reserved.15

Components of LSE Framework

• Multi-step process:1. Several pre-screening

techniques 2. Data range checks3. Combination of filtering

and smoothing techniques based on Kalman filter

4. Linear state estimation5. End-to-end machine

learning

Page 16: Peak's Experience on online Linear State Estimators Experience on online... · Alex Ning, Peak Reliability Lin Zhang, Electric Power Group Marianna Vaiman, V&R Energy Peak's Experience

• Provides the mechanism for selecting, viewing, and analyzing input data and LSE results

PMU-ROSE Visualization

16Copyright © 1996-2018 V&R Energy Systems Research, Inc. All rights reserved.

Page 17: Peak's Experience on online Linear State Estimators Experience on online... · Alex Ning, Peak Reliability Lin Zhang, Electric Power Group Marianna Vaiman, V&R Energy Peak's Experience

• Displays PMU values and values computed by LSE, compares PMU and LSE values with State Estimator values

• Red graph – real-time PMU measurements; Pink plot – the same PMU measurements processed by the LSE (conditioned values); Orange line – State Estimator value.

Chart Widget

17Copyright © 1996-2018 V&R Energy Systems Research, Inc. All rights reserved.

Page 18: Peak's Experience on online Linear State Estimators Experience on online... · Alex Ning, Peak Reliability Lin Zhang, Electric Power Group Marianna Vaiman, V&R Energy Peak's Experience

• A new concept and a different definition of a “model”

• Creates PMU-based WECC-wide state estimator case (e.g., PMU Case)

– Node-breaker model

– Dimensions: Example using one of the past cases –10,300 nodes/800 collapsed buses

• Performs voltage stability analysis using PMU Case:

– Based on scenarios like conventional VSA (stressing, contingencies)

PMU Case!

18Copyright © 1996-2018 V&R Energy Systems Research, Inc. All rights reserved.

Page 19: Peak's Experience on online Linear State Estimators Experience on online... · Alex Ning, Peak Reliability Lin Zhang, Electric Power Group Marianna Vaiman, V&R Energy Peak's Experience

Future Work• PMU-ROSE installation:

– Was installed at Peak in April, 2018

– Working with IPC to install it there

– After it’s installed at IPC, will be installed at SDGE

• Currently, V&R is testing SCADA-based (nonlinear SE) which is fast and has small pseudo-injections:

– Will be made available for Peak to be potentially used as a back-up SE

• Tool to access the quality of SE cases, “SE Quality Index”:

– If the Quality Index is low – the SE case has issues, and RTCA, VSA etc. results are suspicious

– These cases are subject to processing by back-up SE