    OMV Petrom S.A. Regulation

    TABLE OF CONTENTS

    1 Introduction ................................................................................................................................ 3

    2 Range of Applicability ..................................................................... ........... ........... ..................... 4

    3 Objectives ................................................................................................................................... 5

    4 Content Procedure .......................................................... ........... ........... ..................................... 54.1 Step 1: Qualifications of Personnel ................................................. ........... ....................... 5

    4.2 Step 2: Identification of Flammable Substances .............................. ........... ..................... 5

    4.3 Step 3: Properties of Flammable Substances ................................................. ........... ....... 5

    4.4 Step 4: Source of Release and Ventilation .......................................................... .............. 6

    4.5 Step 5: Hazardous Areas Classification .................... ........... .............................................. 6

    4.6 Step 6: Hazardous Areas Drawing ........... ........... .............................................................. 7

    4.7 Step 7: Equipment Selection ............................................................................................ 7

    4.8 Step 8: Installation of Equipment .................................................................................... 10

    4.9 Step 9: Assessment of Equiment / Installation Initial Inspection ................... ........... ... 10

    4.10 Step 10: Documentation for Permitting .......................................................................... 11

    4.11 Step 11: Availability of Documents .......... ........... ............................................................ 12

    5 Definitions and Abbreviations ................................................................................................. 13

    6 References Documents ............................................................................................................ 15

    7 Obsolete Documents ................................................. .............................................................. 16

    8 Annexes .................................................................................................................................... 16

    8.1 Annex 1 Oil and Gas Characteristics in OMV Petrom EP ..................................................... 17

    8.2 Annex 2 Types of Protection for Electric Equipment ............................ ........... ................... 18

    8.3 Annex 3 Types of Protection NonElectrical Equipment ..................................................... 19

    8.4 Annex 4 Conformity Assessment Procedure ....................................................................... 20

    8.5 Annex 5 Conformity assessment procedure .................................................................... ... 21

    8.6 Annex 6 Deliverables List ..................................................................................................... 22

  • 7/25/2019 PE D HA PRO 001 01 E_ ATEX Procedure for Projects

    3/29

    OMV Petrom S.A. Regulation

    1 Introduction

    Hazardous area classification is an important part of processes safety and integrity.

    The term hazardous area, in the meaning of this document, refers to an area created by the

    presence of an explosive atmosphere.

    The term is also known as Electrical Area Classification, in the older references, or as "zoning".

    In Europe and beyond, ATEX (ATmospheres EXplosive) became an accepted standard for themanagement of the activity in the hazardous areas in order to protect staff and assets, and isbased on the same principles, regardless of the country where the facility is located.

    There are, however, differences between national laws governing these activities.

    This document outlines legislation, regulations and standards applicable in Romania in order to

    guide their own engineering staff or contractors due to differences from other countries.

    ATEX is governed by Directive 94/9/EC, Directive for equipment and by Directive 1999/92/EC,Directive for personnel. Both Directives have been transposed into the Romanian legislation.

    Consequently, ATEX regulations and reference standards, e.g. series of standards EN 60079, EN

    / ISO 80079, EN 1127 and EN 13463 are mandatory.List of reference standards are periodically updated and published in the Official Journal of the

    European Union, available on the website:

    http://ec.europa.eu/enterprise/policies/european-standards/harmonised-standards/equipment-explosive-atmosphere/index_en.htm

    ATEX regulations refer to all equipment, electrical and non-electrical.

    The latest edition of standard EN 60079-0, divides the explosive atmospheres into 3 groups:

    group I mines susceptible to firedamp

    group II gases, vapours or mist, other than those from the mines susceptible tofiredamp

    group III explosive dusts, other than those from the mines susceptible to firedamp

    Subdivision of group II

    IIA, typical gas: propane

    IIB, typical gas: ethylene

    IIC, typical gas: hydrogen

    Subgroup of group II are divided considering the maximum experimental safe gap MESG orminimum ignition current or MIC( minimum ignition current ) of explosive gaseousatmosphere in which the equipment may be installed (EN 60079-20-1).

    In oil and gas installations of OMV Petrom, EP Division, were identified explosive substances

    from group II (gases) and its subgroups, IIA (propane), respectively, IIB (ethylene).

    No substances from subgroup IIC (Hydrogen) or group III (dusts) were identified.

  • 7/25/2019 PE D HA PRO 001 01 E_ ATEX Procedure for Projects

    4/29

    OMV Petrom S.A. Regulation

    Relation with other standards

    Standard Status Applicable

    Projects, including extensions, modernizations or changes

    PE-D-HA-PRO-001-01-R_ ATEX Procedure for Projects In force Projects

    EP FA HA 01 ST PETROM Standard for Areas Classification In forceProjects

    Operation

    RO-EP-SR-GDL-001-01-E _Process Safety and IntegrityEngineering and Design 29112011

    In force Projects

    TO-HQ-02-019 Rev 00 Philosophy for Hazardous Area Classification

    and HVAC OnshoreIn force NO*

    Operation-Maintenance-Procurement-Inspection-Attestations (Permits)

    RO-EP-DMSS-STD-046-01-R _Standardization of types of explosionproof for low voltage electric motors ( in Romanian version)

    In forceMaintenanceProcurement

    PE-D-HA-GDL-001-01- R_ATEX_Attestation_of_Plants_06.03.2012 In force

    Operation

    Attestations

    EP HA 10 PR R1 Equipment Inspection in Hazardous AreasUnderreview

    Inspection

    EP -MNT-RO-06-POL-16-01.00R_ Maintenance And InspectionStrategy Of Ex Equipment( in Romanian version)

    In forceMaintenance

    Inspection

    Withdrawn

    RO-EP-SR-SOW-001-01-R _Scope of Work for ATEX certification of

    plants ( in Romanian version) Withdrawn NO

    RO-EP-SR-PRO-001-01-R_Ex Certification Procedure (in Romanianversion)

    Withdrawn NO

    RO-EP-SR-STD-001-01-E Company Standard for Selection of Ex

    EquipmentWithdrawn NO

    RI EX 9.2006 Procedure for Self-Certification for Three-Phase,

    Squirrel Cage Induction Motors in Normal Construction Used InZone 2

    Withdrawn NO

    Note * OMV philosophy contains conflicting standards with present procedure.

    2 Range of Applicability

    This procedure applies for the following:

    Projects, including extensions, modernization/upgrades or changes, starting fromconcept phase until commissioning and operation readiness, including permits system,

  • 7/25/2019 PE D HA PRO 001 01 E_ ATEX Procedure for Projects

    5/29

    OMV Petrom S.A. Regulation

    Project and engineering team members of OMV Petrom E&P

    Ex Responsible

    Maintenance personnel involved in extension, modernization or changes of existentplant.

    3 Objectives

    This document presents the applicable regulations and standards, the steps to be followed indifferent phases of a project, and the documents to be prepared in order to conform to national

    legal requirements.

    In order to achieve the same outcome for all installations, documentation must meet both therequirements of authorities and the requirements of OMV Petrom.

    4 Content Procedure

    The next chapters mentions briefly the minimum requirements and actions to be taken inengineering, design, construction and operation readiness of plants where explosive

    atmospheres are present or where they are expected to occur.Where, for those actions, there is an applicable standard it was preferred to refer to the

    appropriate standards, without going into details.

    4.1 Step 1: Qualifications of Personnel

    The area classification should be carried out by those who understand the relevance and

    significance of properties of flammable materials and by those who are familiar with theprocess and the equipment. Such personnel should consult with safety, electrical, mechanicaland other qualified engineering personnel as required.

    The design of the installation, the selection of equipment and the installation covered by this

    standard shall be carried out only by persons whose training has included instruction on thevarious types of protection and installation practices, relevant rules and regulations and on thegeneral principles of area classification. The competency of the person shall be relevant to the

    type of work to be undertaken.

    Note 1: Requirements for qualification of personnel are described in the 5th

    edition of standard EN 60079-14

    Nota 2: According to NEx 01-06 the companies that design, construct, maintain or repair equipment inexplosive atmospheres or prepare documentation for obtaining attestation of facilities shall have

    certified staff and specific procedures.

    4.2 Step 2: Identification of Flammable Substances

    The identification of flammable substances is made using analysis reports of crude oil, gases orwater injection. These documents are usually available to the Assets.If such reports are not available or dont contain enough data, the contractor shall order them,at his own expenses, from an authorized laboratory.

    4 3 Step 3: Properties of Flammable Substances

  • 7/25/2019 PE D HA PRO 001 01 E_ ATEX Procedure for Projects

    6/29

    OMV Petrom S.A. Regulation

    Hexane / Octane (IIA T3) Rich gas or crude oil, H2S not present

    Hydrogen Sulphide (IIB T3)

    Annex 1 lists the relevant properties, for this document, of crude oil, and gas. The Data hasbeen obtained from the examination of over than 40 analysis reports and Material Safety Data

    Sheets (MSDS) of flammable petroleum used in E&P.Consequently the subgroup IIB and temperature class T3cover the usual requirements for oiland gas installations from E&P.

    In case more hazardous substances are identified than those above mentioned they will belisted by CAS number (Chemical Abstract System).

    Unclassified liquids:

    Petroleum products having a Flash Point higher than 100 C will not be classified in theconditions specified in the Company Standard for Areas Classification.

    Water Injection circuits, e.g. pumps or manifolds, where fluids contain less than 200 ppm ofhydrocarbons, is not classified. Exceptions:

    o Tanks for untreated reservoir water or which may be occasionally used for oil storage

    o

    Pumps that may be used for conveying oil or because the location of those pumps fits inthe zone produced by neighbouring equipment.

    Deliverable: Hazardous area classification data sheet Part I: Flammable material list andcharacteristics according to EN 60079-10-1

    4.4 Step 4: Source of Release and Ventilation

    The basic elements for establishing the hazardous zones types are the identification of thesources of release and the determination of the grades of release.

    4.4.1 Identification of Source of Release

    The sources of release may be classified as continuous, primary or secondary grade.

    4.4.2 Characteristics of Ventilation

    Type of ventilation: natural or artificial ventilation (general or local)

    Degree of ventilation (dilution): high, medium, low

    Availability of ventilation: good, fair, poor

    Combining the concepts of degree of ventilation and level of availability depending on thegrade of release results in a quantitative method for the evaluation of zone type (see Annexes B

    and C of EN 60079-10-1).4.5 Step 5: Hazardous Areas Classification

    Area classification is a method of analysing and classifying the environment where explosivegas atmospheres may be present so as to facilitate the proper selection and installation ofequipment to be used in that environment. The classification also takes into account the

    ignition characteristics of the gas or vapour such as ignition energy (equipment group) and

  • 7/25/2019 PE D HA PRO 001 01 E_ ATEX Procedure for Projects

    7/29

    OMV Petrom S.A. Regulation

    Where necessary, the design, operation and location of process equipment should ensure that,even when it is operating abnormally, the amount of flammable material released into theatmosphere is minimised, so as to reduce the extent of the hazardous area.

    Hazardous areas are classified in zones based on the frequency and duration of explosiveatmospheres. Areas (0,1, 2 or unclassified) are defined in Art. 5, Definitions.

    Hazardous area classification is considered for normal operation.Hazardous area classification shall be in compliance with EN 60079-10-1 and Company

    Standards for Areas Classification.Deliverable: Hazardous area classification data sheet Part I: List of sources of releaseaccording to EN 60079-10-1.

    4.6 Step 6: Hazardous Areas Drawing

    After classifying areas, a risk assessment shall be performed in order to determine if the

    consequences of ignition of an explosive atmosphere requires the use of equipment with alevel of explosion protection (EPL) higher than what would normally be required, or if you canuse a device with a lower EPL than normally required.

    Requirements for EPL / ATEX category will be listed in the ATEX documents, includingHazardous plan to allow the correct choice of equipment.

    Hazardous area plan will include the following:

    Plans and elevations of three-dimensional model, if any, showing the type and extent of

    zones (quotas) and the requirements listed below

    Classification of gases or vapours in relation to equipment group or subgroup

    Temperature class or ignition temperature of the gas or vapours existing in thehazardous area

    External influences and ambient temperature

    Requirements for the protection level of equipment (EPL). This requirement applies even

    if the consequences were not subject to a risk assessment

    Calculus criteria, including the source and grade of release and the type, degree andavailability of ventilation (EN 60079-10-1).

    Hazardous area drawings will be delivered both in a signed form, on paper, and in nativeformat (e.g. AutoCAD), non-secured. Recommended format: A2/A3. Areas will be highlightedby patterns, according to EN 60079-10-1, so that black and white print does not createconfusion. Paper format will be presented and laminated for posting in site.

    Deliverable: Area classification drawings.

    4.7 Step 7: Equipment Selection

    For new installations the selected equipment must have been tested and certified inaccordance with directive 94/9/EC and current editions of the standards series EN 60079, EN

  • 7/25/2019 PE D HA PRO 001 01 E_ ATEX Procedure for Projects

    8/29

    OMV Petrom S.A. Regulation

    Table no. 1 - Relationship between Zones, EPLs and ATEX categories

    Zone Permitted explosion protection levels (EPLs) Permitted ATEX Category

    0 Ga 1G

    1 Gb 2G

    2 Gc 3G

    The use of equipment with a lower or higher EPL than was specified in the Table no. 1 shall bedemonstrated.

    To allow access to the bidding of different manufacturers and, taking into consideration theprogress of technology, references to Ex equipment will be made quoting the following:

    The area where the equipment will be used (zone 0,1 or 2) and,

    o The required EPL, or

    o The required ATEX equipment category and

    Equipment Group and Temperature Class (usually IIB T3)

    Justified: type of explosion protection.

    Note 1: Mentioning the type of protection may be necessary in Detailed Design Phase, case in which e.g.for Ex i equipment (safety intrinsically), it is necessary to design appropriate circuits.Note 2: The use of a higher EPL than requirement is allowed in procurement phases as a result of abetter offer. Example: the requirement is for an EPL Gc. 1

    stoffer: intrinsically ic (EPL Gc), price A. 2

    nd

    offer: intrinsically ia (EPL Ga) or ib (EPL GB), both of them at price B < A. 2nd

    offer is preferred and thereason is: it presents the best price with respect of technical criteria.

    Note 3: Since July 2012 mentioning EPL on the marking for each Ex equipment is mandatory.

    4.7.1 Conformity Assessment ProcedureDepending on the intended ATEX category, the manufacturer or his authorized representative

    established in the EU may choose one of the procedures described in Directive 94/9/EC thatensures and declares the compliance of product with the requirements of the directive.The conformity assessment procedures allowed by the Directive are presented in Annex 5.

    4.7.2 Preferred Types of Protection

    Table no. 2 presents the types of protection currently used in OMV Petrom EP and givesrecommendations on their use. This table serves as a guide only and is not intended to

    influence the choice of technology.The contractor must provide justification for the use of another type of protection than the ones

    mentioned below (e.g. a better price for another protection typemay be a reason buttraditionally manufacturers offer only this type of protectionis not acceptable).

    Types of protection unchecked in the table are not commonly used in OMV Petrom EP.

    Table no. 2 Types of protection currently used in OMV Petrom E&P

  • 7/25/2019 PE D HA PRO 001 01 E_ ATEX Procedure for Projects

    9/29

    OMV Petrom S.A. Regulation

    Recommended for:Type of protection Code According to:

    I1) A2) Boxes3) Motors4)

    Protection by oil immersion o EN 60079-6

    Protection by pressurizedenclosures

    p EN 60079-2

    Protection by powder filling q EN 60079-5

    Protection by using opticalradiation

    EN 60079-28

    Non-sparking equipment n EN 60079-15 Yes

    Fieldbus non-incendive concept

    (FNICO)EN 60079-27

    Note 1: Field instruments, e.g. sensors, transmitters, measuring equipment

    Note 2: Command or control devices, e.g. command buttons, solenoids

    Note 3: Connection or junction boxes

    Note 4: Three phases squirrel cage induction motor

    4.7.3 Motors Supplied by Converter

    It is normally expected that motors and converters will be evaluated as a system.

    Motors intended to be driven by converters will have the following additional markings (in

    accordance with standard EN 60079-0, edition 6):

    "For Converter Supply"

    Frequency / minimum speed / maximum speed allowed

    Type of converter acceptedNote 1: The term converter (used for driving of electric motors) is also known as a frequency converter,inverter or variable speed drive - VSD.

    Additionally, regardless of the zone (1 or 2), there are additional requirements that the

    following types of motors must meet:

    Exe with EPL Gb or Gc

    o thermal protection requirements

    o motor and a converter shall be tested as a complete unit

    Exd with EPL Gb or EPL Gc

    o thermal protection requirements

    o embedded temperature detectors, for direct controlling of temperature,

    o it is not mandatory for the motor and converter to be tested as a complete unit.

    Ex nA with EPL Gc

  • 7/25/2019 PE D HA PRO 001 01 E_ ATEX Procedure for Projects

    10/29

    OMV Petrom S.A. Regulation

    4.7.4 Gas Detectors

    Gas detectors, to be used as a protective measure (e.g. de-energise equipment if gas is

    detected), shall be used in accordance with relevant requirements of IEC 60079-29-1 and IEC60079-29-4.

    Gas detection may be used as a method of protection enabling the use of electrical equipmentin hazardous areas where that equipment might not have otherwise been allowed.

    Reference: IEC 60079-14, ed.5, Annex N.

    4.7.5 Light Metals as Construction Materials

    Installation materials (e.g. cable trays, mounting plates, weather protection) shall not containmore light metals than required by IEC 60079-0 for equipment.

    4.8 Step 8: Installation of Equipment

    The equipment shall be installed in accordance with its documentation.

    Reference standard: EN 60079-14.

    4.9 Step 9: Assessment of Equiment / Installation - Initial Inspection

    After the installation of the equipment is complete, an initial inspection must be carried out inaccordance with IEC 60079-14 Explosive atmospheres, Edition 5 - Part 14: Design, selection and

    construction of electrical installations.

    Note: Development of this standard is ongoing. Until the next edition is in force, the initial inspectionshall be performed in accordance with the current edition of standard EN 60079-17 Explosiveatmospheres - Part 17: Maintenance and inspection of electrical installations.

    The following aspects will be considered for initial inspection:

    That the initial checking of electrical installation was performed according to SR HD

    60364-6 and that the verification report has been prepared and is available. That equipment is properly marked with CE marking and Ex, in accordance with

    Directive 94/9/EC, with referenced standard and EC certificate / declaration ofconformity.

    That the classification of the installed equipment is appropriate for the installation area.

    That the Ex Certificate / declaration of conformity are available and contain the minimuminformation specified in Directive 94/9/EC and relevant standards. The content ofDeclaration of Conformity is described in Annex 4.

    Declaration of manufacturer for equipment without its own source of ignition and areconsidered out of scope of Directive 94/9/EC

    Declaration of manufacturer for equipment considered as "simple apparatus" accordingto Directive 94/9

    That documents for equipment with special conditions of operation (e.g. equipmenthaving certificate number with the suffix "_X") have been provided, and that the

  • 7/25/2019 PE D HA PRO 001 01 E_ ATEX Procedure for Projects

    11/29

    OMV Petrom S.A. Regulation

    Table no. 3 Equipment list

    Denumire echipamentsau instalaie

    ZonaFabricant /

    An fabricaie

    Datetehnice(Un, In,

    Nn)

    Tipprotecie

    (Ex)Grupa

    Clasa detemperatura

    CertificatEx

    Grad deprotecie(Codul IP)

    CategoriaATEX /

    EPL

    ConditiiSpeciale

    Name ofequipment/installation

    ZoneManufacturer

    / YearTechnical

    data

    Exprotection

    typeGroup

    TemperatureClass

    Excertificate

    Ingressprotection(IP code)

    ATEXcategory

    / EPL

    SpecialConditions

    4.10 Step 10: Documentation for Permitting

    This section presents the documentation to be produced/reviewed and attestations to be

    obtained, for installations in explosive atmospheres, namely:

    Explosion protection document as a requirement of the Directive 1999/92/EC, alsoknown as ATEX 137 or the directive for staff, transposed by HG 1058/2006

    Attestation of plant, based on documentation and an inspection on site, by NationalAuthority, as a provision of normative NEx 01-06.

    According to the normative and regulations mentioned above the responsibility for preparingdocumentation and obtaining the attestation is the responsibility of the user.

    Considering that, for new and modernized plants and for the various phases of the project, themajority of these documents are prepared by the Contractor the responsibility fordocumentation preparation and for obtaining of attestations will be transferred, by clearprovisions of contract, to the Contractor.

    4.10.1 Explosion Protection Documentation

    The documentation shall contain, as minimum:

    Presentation memo Area classification drawings

    Classification of Ex equipment and Ex certificates

    Guidelines for maintenance of equipment, as per SR EN 60079-17

    Qualification and training of personnel referring to protection against explosion

    Nomination of Ex responsible person

    Specifications for PPE

    Explosion risk assessment.4.10.2 Document for Attestation of Plants by INSEMEX

    The documentation shall contain, as minimum:

    General plant description

    Process flow diagrams

    Th li t f i t ( l t i l d h i l) l d i l ifi d ( t

  • 7/25/2019 PE D HA PRO 001 01 E_ ATEX Procedure for Projects

    12/29

    OMV Petrom S.A. Regulation

    4.10.3 Document Presentation

    The above mentioned documents will be approved by User before they are submitted to the

    Authority.

    After receipt of the attestation, the Contractor will send to user the documentation togetherwith the attestation.

    The Documentation will be delivered with respect of the following requirements:

    Both in hardcopy and in softcopy

    Original/native documents in editable format (MS Office, Adobe 6, AutoCAD 6)

    Romanian and English languages

    Separate file (from other technical documents)

    Contractor may combine both sets of documents in a single file

    Taxes and other expenses required for attestation will be Contractor's responsibility.

    Note: Some requirements e.g. "Nomination of Ex responsible person" will be fulfilled with user's support.

    4.10.4 Delivery Time

    The initial inspection shall be carried out after the mounting of equipment and before it is put infunction (energised). The attestation shall be obtained before the equipment is deemed to be

    ready for operation. It is the Contractor's responsibility for the timely submission of documentsand coordination with Authority.

    4.11 Step 11: Availability of Documents

    In order to ensure correct installation or extension of plants, the following information,additional to the requirements for non-hazardous areas, is required, where applicable.

    Reference: EN 60079-14 standard, ed. 5

    4.11.1 Site

    Area classification drawing, as indicated in [4.6]

    Optional assessment of consequences of ignition

    Material characteristics including electrical resistivity

    4.11.2 Equipment

    Instructions for installation and initial inspection

    Documents for electrical equipment with conditions of use, e.g. for equipment withcertificate numbers which have the suffix _X

    Descriptive system document for the intrinsically safe system

    Details of any relevant calculation, e.g. for purging rates, for instruments or analyserhouses

  • 7/25/2019 PE D HA PRO 001 01 E_ ATEX Procedure for Projects

    13/29

    OMV Petrom S.A. Regulation

    Documentation relating to the suitability of the equipment for the area and environmentto which it will be exposed, e.g. temperature ratings, type of protection, IP rating,corrosion resistance

    Details of the type of wiring system

    Record of selection criteria for cable entry system, for compliance with therequirements for particular types of protection

    Drawings and schedules relating to identification of circuits.

    4.11.4 Personnel

    Evidence of personnel competency (Annex A of EN 60079-14, ed.5).

    4.11.5 Approval of Documents

    Documents will be approved by competent persons and who own a valid attestation, accordingto [4.1], and who meet the required approval level given in the Discipline Authority Framework

    (DAF) and specified in Annex 6.

    4.11.6 Documents Keeping

    After commissioning of plant, the documents mentioned in this chapter, together with thosementioned in 4.9 and 4.10, including documentation for obtaining certificates, will be posted on

    SharePoint, by care of Responsible Ex, with support of Technical Compliance Office FacilityEngineering Department.

    4.11.7 Deliverable

    Deliverables by project phases, maturity and level of approval are presented in Annex 6

    5 Definitions and Abbreviations

    For the purpose of this procedure the following definitions are given:

    AssetOperating and Production Area (subunits) of Division OMV

    Petrom E&P

    E&P OMV Exploration & Production Division of Petrom

    Ex Responsible(ATEX expert)

    The person appointed by Asset Manager, part of the FacilityEngineering, included in PE Asset Department, in order tocomply with the requirements of the Explosion Protection

    Document. This person must be attested by INSEMEX.

    FE Facility Engineering PE Asset Project and Engineering Department from Asset

    ATEX ATmosfere EXplosive (Directive 94/9/CE)

    Attestation Document issued by the Authority

    AuthorityNational Authority for Explosion Protection, INCD INSEMEX

    Petroani

  • 7/25/2019 PE D HA PRO 001 01 E_ ATEX Procedure for Projects

    14/29

    OMV Petrom S.A. Regulation

    ATEX CategoryDefined by directive 94/9/EC. Similarly definitions withEPLATEX categories are, for Group II - gases and vapours: 1G, 2G

    and 3G

    Ex Certificate Certificate of conformity , as defined in Directive 94/9/EC

    CAS numberChemical Abstract System. Unique numerical identifier assigned

    to each substance described in scientific literature

    Temperature Class

    Classification of equipment for explosive atmospheres in terms

    of maximum surface temperature (IEV426).

    DocumentationSet of documents prepared in accordance with and in order toaccomplish legal requirements

    Declaration of

    Conformity

    Document prepared by manufacturer or his authorized

    representative in accordance with Directive 94/9/CE

    ExplosionProtectionDocument

    Documentation elaborated as a requirements and in conformitywhit Directive 1999/92/EC respectively GD 1058/2006

    Equipment

    protection level(EPL)

    The level of protection assigned to equipment based on its risk

    of becoming a source of ignition and distinguishing thedifferences between explosive gas atmospheres, explosive dustatmospheres and coal mines.

    EPL Ga

    ATEX II 1GCategory

    Equipment for explosive gas atmospheres, having a "very high"level of protection, which is not a source of ignition in normaloperation, expected malfunction or when subject to rare

    malfunction. Such equipment will have a form of protection,

    which will remain effective even in the presence of two potentialfaults (for example, intrinsic safety, level of protection ia), orwill have two independent means of protection (for example, Ex

    e and Ex d acting independently of each other).

    EPLGb

    ATEX II 2G

    Category

    Equipment for explosive gas atmospheres, having a "high" levelof protection, which is not a source of ignition in normal

    operation or when subject to faults that may be expected,though not necessarily on a regular basis. (The majority of the

    standard protection concepts bring equipment within thisequipment protection level).

    EPL Gc

    ATEX II 3G

    Equipment for explosive gas atmospheres, having a "normal"level of protection, which is not a source of ignition in normaloperation and which may have some additional protection toensure that it remains inactive as an ignition source in the case

    f l d (f l f il f l )

  • 7/25/2019 PE D HA PRO 001 01 E_ ATEX Procedure for Projects

    15/29

    OMV Petrom S.A. Regulation

    Normal operation

    Situation when the equipment is operating within its designedparametersNOTE 1: Minor releases of flammable material may be part of normaloperation. For example, releases from seals, which rely on wetting bythe fluid that is being pumped, are considered to be minor releases.

    NOTE 2: Failures (such as the breakdown of pump seals, flange gasketsor spillages caused by accidents), which involve urgent repairs orshutdown, are not considered to be part of normal operation nor are

    they considered to be catastrophic.NOTE 3: Normal operation includes start-up and shutdown conditions.

    (Equipment) Group

    Classification of electrical equipment related to the explosiveatmosphere for which it is to be used (IEV 426)

    NOTE: EN 60079-0 standard, ed. 5, defines 3 groups: group I(mines

    susceptible to firedamp) group II (vapours and gases) group III(dusts)

    LEL - lower

    explosive limit

    Concentration of flammable gas, vapour or mist in air below

    which an explosive gas atmosphere will not be formed ( IEV 426)

    Protection level

    Subdivision of the type of protection, correlated with theexplosion protection level (EPL) that differentiates the probabilityfor an equipment to become a source of ignition (EN 60079-0)

    Explanatory note: Type of intrinsically protection (i) is divided in levelsof protection "ia", "ib" and ic, and that they are correlated with EPL'sGa, Gb and Gc (for explosive gas atmospheres)

    Type of protectionSpecific measures for equipment applied to prevent ignition of

    explosive atmospheres surrounding ( IEV 426)

    Maximum surfacetemperature

    Highest temperature which is attained in service under the mostadverse conditions (but within the specified tolerances) by any

    part or surface of equipment

    NOTE: This temperature may occur on an internal component or on theexternal surface of the enclosure, depending upon the type ofprotection employed

    Flash point

    Lowest liquid temperature at which, under certain standardized

    conditions, a liquid gives off vapours in a quantity such as to becapable of forming an ignitable vapour/air mixture( IEV 426)

    UEL- upper

    explosive limit

    Concentration of flammable gas, vapour or mist in air, above

    which an explosive gas atmosphere will not be formed ( IEV 426)

    User

    For the purpose of Directive 99/99/EC and NEx 01-06: Companywho operate the plant. The user may not be the same with the

  • 7/25/2019 PE D HA PRO 001 01 E_ ATEX Procedure for Projects

    16/29

    OMV Petrom S.A. Regulation

    Non-hazardousarea (on account of

    explosive gasatmospheres)

    An area in which an explosive gas atmosphere is not expected to

    be present in such as quantities to require special precautionsfor the construction, installation and use of equipment

    6 References Documents

    Directive 94/9/EC transposed by HG 752/2004, modified

    Directive 99/92/EC, transposed by HG 1058/2006

    Normative NEx 01-06

    ATEX Guideline 3rdEdition July 2009

    EN 1127-1 Explosive atmospheres - Explosion prevention and protection - Part 1: Basicconcepts and methodology

    Series standards SR EN 60079 Explosive atmospheres

    Series standards SR EN 13463 Non-electrical equipment for use in potentially explosive

    atmospheres Series standards ISO/IEC 80079 Explosive atmospheres. Non-electrical equipment for

    use in potentially explosive atmospheres

    International Electrotechnical Vocabulary. Part 426 Electrical apparatus for explosiveatmospheres (IEV 426)

    SR HD 60364-6 Low voltage installations. Part 6: Verification

    EP FA HA 01 ST PETROM Standard for Areas Classification

    RO-EP-QA-MAN-002-01-R Quality manual of Facility Engineering Department ( in

    Romanian version)

    7 Obsolete Documents

    RO-EP-SR-PRO-001-01-R_Ex Certification Procedure (in Romanian version)

    RO-EP-SR-STD-001-01-E Company Standard for Selection of Ex Equipment

    RO-EP-SR-STD-001-01-R Company Standard for Selection of Ex Equipment

    RO-EP-SR-SOW-001-01-R _Scope of Work for ATEX certification of plants ( in Romanianversion)

    RI EX 9.2006 Procedure for Self-Certification for Three-Phase, Squirrel Cage InductionMotors in Normal Construction Used In Zone 2

    Note: EP HA 10 PR R1 Equipment Hazardous Areas 2007-10-10 procedure remains in force, it will bereviewed

    8 Annexes

    8.1 Annex 1 Oil and Gas Characteristics in OMV Petrom EP

  • 7/25/2019 PE D HA PRO 001 01 E_ ATEX Procedure for Projects

    17/29

    OMV Petrom S.A. Regulation

    PE-D-HA-PRO-001-01-E

    Valid from: 31.03.2012ATEX Procedure for Projects Page 17of 22

    Edition: 01

    8.1 Annex 1 Oil and Gas Characteristics in OMV Petrom EP

    CASNumber

    Material/ CompositionEquipment

    GroupTemperature

    Class(Auto) Ignition

    Temperature (C)Formula LEL (%) UEL(%)

    74-82-8 Methane* IIA T1 600 CH4 5,0 15,4

    74-84-0 Ethan IIA T1 515 CH3CH3 3,0 15,5

    74-98-6 Propane IIA T2 450 CH3CH2CH3 2,1 9,6

    106-97-8 n-Butane IIA T2 372 CH3(CH2)2CH2 1,5 8,5

    109-66-0 n Pentane IIA T3 243 CH3(CH2)3CH3 1,3 7,6

    110-54-3 Hexane (n-hexane) IIA T3 225 CH3(CH2)4CH3 1,1 7,5

    142-82-5 Heptane (n-heptane) IIA T3 204 C7H16 1,1 6,7

    111-65-9 n-Octane IIA T3 206 CH3(CH2)6CH3 1,0 6,5111-84-2 Nonane IIA T3 205 CH3(CH2)7CH2 0,74 5,6

    124-18-5 n-Decane IIA T3 235 C10H22 0,7 5,6

    7783-06-4 Hydrogen Sulphide IIB T3 260 H2S 4,0 45,5

    8008-20-6 Diesel fuel No. 2)) IIA T3 254 C15 C21 0,6 6,5

    8006-61-9 Gasoline (benzine) IIA T3 280 1,4 7,6

    Condensate - Asset II - INCERP T2 >300 0,6 6,0

    Rich gas- Asset VII INCPDM 537 5,0 15,0

    Gasoline - Asset VII >250 0,6 6,0

    Note*: Content< 25% (V/V) of Hydrogen (see EN 60079-20-1)

  • 7/25/2019 PE D HA PRO 001 01 E_ ATEX Procedure for Projects

    18/29

    OMV Petrom S.A. Regulation

    8.2 Annex 2 Types of Protection for Electric Equipment

    EPL ATEX Category Type of protection Code According to:

    Protection by Intrinsically safe ia EN 60079-11

    Protection by Encapsulation ma EN 60079-18

    Two independent types of protection, each

    satisfying the conditions imposed by theGb level

    EN 60079-26Ga 1G

    Protection of equipment and transmissionsystems using optical radiation

    EN 60079-28

    Protection by Flameproof enclosures d EN 60079-1

    Protection by Increased safety e EN 60079-7

    Protection by Intrinsically safe ib EN 60079-11

    Protection by Encapsulationm sau

    mb EN 60079-18

    Protection by Oil immersion o EN 60079-6

    Protection by Pressurized enclosuresp, px or

    pyEN 60079-2

    Protection by Powder filling q EN 60079-5

    Fieldbus intrinsically safe concept (FISCO) EN 60079-27

    Gb 2G

    Protection using optic radiation EN 60079-28

    Protection by Intrinsically safe ic EN 60079-11

    Protection by Encapsulation mc EN 60079-18

    Non-sparking equipment n or nA EN 60079-15

    Restricted breathing equipment nR EN 60079-15

    Energy limitation equipment nL EN 60079-15

    Sparking equipment nC EN 60079-15

    Protection by Pressurized enclosures pz EN 60079-2

    Fieldbus non-incendive concept (FNICO) EN 60079-27

    'Gc' 3G

    Protection by using optical radiation EN 60079-28

  • 7/25/2019 PE D HA PRO 001 01 E_ ATEX Procedure for Projects

    19/29

    OMV Petrom S.A. Regulation

    8.3 Annex 3 Types of Protection Non-Electrical Equipment

    EPL ATEX Category Type of protection Code According to:

    Constructional safety "c" EN 13463-5

    Control of ignition source "b" EN 13463-6Ga 1G

    Liquid immersion "k" EN 13463-8Flameproof "d" EN 13463-3

    Constructional safety "c" EN 13463-5

    Control of ignition source "b" EN 13463-6

    Pressurization "p" EN 13463-7

    Gb 2G

    Liquid immersion "k" EN 13463-8

    Flow restricting enclosure "fr" EN 13463-2

    Flameproof "d" EN 13463-3Constructional safety "c" EN 13463-5

    Control of ignition source "b" EN 13463-6

    Pressurization "p" EN 13463-7

    Gc 3G

    Liquid immersion "k" EN 13463-8

  • 7/25/2019 PE D HA PRO 001 01 E_ ATEX Procedure for Projects

    20/29

    OMV Petrom S.A. Regulation

    8.4 Annex 4 Content of EC declaration

    The EC declaration of conformity must contain the following elements [Directive 94/9/EC,Annex X, B]:

    the name or identification mark and the address of the manufacturer or his authorized

    representative established within the Community

    a description of the equipment, protective system, or device referred to in Article 1 .(2) ofdirective

    all relevant provisions fulfilled by the equipment, protective system, or device referred toin Article 1. (2) of directive

    where appropriate, the name, identification number and address of the notified body and

    the number of the EC-type-examination certificate

    where appropriate, reference to the harmonized standards

    where appropriate, the standards and technical specifications which have been used

    where appropriate, references to other Community Directives which have been applied identification of the signatory who has been empowered to enter into commitments on

    behalf of the manufacturer or his authorized representative established within the

    Community.

    The manufacturer or his authorized representative must keep a copy of the declaration of

    conformity for a period of at least 10 years from the date of manufacture the last equipment. If incase when neither the manufacturer nor his authorized representative not domiciled or have

    registered in Romania or in an EU Member State, obligation to keep available the technical

    documentation shall be the responsibility of the person who places the equipment or protectivesystem on the market.

  • 7/25/2019 PE D HA PRO 001 01 E_ ATEX Procedure for Projects

    21/29

    OMV Petrom S.A. Regulation

    8.5 Annex 5 Conformity Assessment Procedure

    Equipment of Groups I and II

    Categories M1 and 1* and

    Autonomous Protective

    Systems

    Equipment of group II

    Category 3*

    Equipment of Groups I and II

    Categories M2 and 2*

    Internal combustion

    engine or electrical

    equipment

    Internal control of

    production Annex VIII

    EC type Examination

    Annex III

    YES NO

    and

    Production

    QA

    Annex IVor

    Product

    verification

    Annex V

    EC type

    Examination

    Annex III

    Internal control

    of production

    Annex VIII

    and

    and

    Conformity to

    type

    Annex VI

    orProduct QA

    Annex VII

    Communicate atechnical

    documentation to

    a Notified Body

    Equipment of Groups I and II

    and Autonomous Protective

    Systems

    OR

  • 7/25/2019 PE D HA PRO 001 01 E_ ATEX Procedure for Projects

    22/29

    OMV Petrom S.A. Regulation

    8.6 Annex 6 Deliverables List

    ProjectPhase

    Document Maturity Approval

    Select Evidence of personnel competency Final DA2

    SelectSpecification for hazardous areas classification - Part I Listof flammable materials and their characteristics

    FinalDA2

    Define Explosion risk assessment Optionally DA2Define Hazardous Areas Drawing Baseline DA2

    Define Equipment Ex specifications Preliminary DA2

    Execute Evidence of personnel competency Final DA3

    ExecuteSpecification for hazardous areas classification - Part IIList of sources of release

    FinalDA3

    Execute Hazardous Areas Drawings Final DA2

    Execute Equipment Ex specifications Final* DA3

    Execute Materials characteristics, including electrical resistivity Final* DA3

    Execute Ex certificate of conformity Final DA3

    Execute Declaration of conformity EC Final DA3

    Execute

    Equipment manufacturer's Declaration which have not

    own source of ignition and are considered outside thescope of Directive 94/9/EC

    Final

    DA3

    ExecuteDocuments for electrical equipment with conditions ofuse, e.g. for equipment with certificate numbers whichhave the suffix _X

    FinalDA3

    Execute Descriptive Declaration of the intrinsically safety system Final* DA3

    ExecuteRisks assessment for assemblies, issued by the

    manufacturer, as defined in ATEX Guide Edition 3-a/2009.Final

    DA3

    ExecuteDetails of any relevant calculation, e.g. for purging rates,for instruments or analyser houses

    FinalDA3

    Execute Plans showing and details of type of wiring system Final DA3

    Execute

    Record of selection criteria for cables entry system, for

    compliance with the requirements for particular types ofprotection

    Final*

    DA3

    Execute Drawings and schedules relating to circuits identification Final DA3

  • 7/25/2019 PE D HA PRO 001 01 E_ ATEX Procedure for Projects

    23/29

    PE-D-HA-PRO-001-01-E

    ATEX Procedure for Projects

    IS 2014

    Aceasta Foaie de Interpretare a fost creat ca urmare si pentru a evita in viitor confuziile in

    utilizarea listei de livrabile din Anexa 6.

    In principiu doar documentele marcate cu verde ar trebui sa fie considerate livrabile.

    Celelalte documente sau informaii trebuie sa fie de asemenea disponibile, in faza de proiectmenionat, chiar daca sunt incluse in documente aparinnd diferitelor discipline sau sunt

    livrate de productorii de echipamente.

    In orice caz, toate documentele trebuie analizate si aprobate de autoritile pe disciplina, inconformitate cu DAF si faza de proiect

    This Interpretation Sheet (IS) has been developed as result of and in order to avoid in thefuture any confusion in use of Deliverable List from Annex 6.

    In principle only the documents in green should be considered as deliverable.

    The other documents shall be also available in the mentioned project phase, even if they are

    included in documents which belong to other disciplines or are delivered by manufacturers.

    In every case, all documents shall be reviewed and approved by discipline authority,

    according to DAF for Project Phase.

    AuthorJugravu Nicolae

  • 7/25/2019 PE D HA PRO 001 01 E_ ATEX Procedure for Projects

    24/29

  • 7/25/2019 PE D HA PRO 001 01 E_ ATEX Procedure for Projects

    25/29

  • 7/25/2019 PE D HA PRO 001 01 E_ ATEX Procedure for Projects

    26/29

  • 7/25/2019 PE D HA PRO 001 01 E_ ATEX Procedure for Projects

    27/29

    ATEX Procedure for Projects Interpretation Sheet 2014 Page 5of 7 Valid from: 2014

    Nr. Crt. Fazeleproiectului

    Document Observaii Livrabile Maturitate

    11. Execute

    Declaraia productorului pentruechipamente care nu dein surse deaprindere proprii i sunt considerate a fin afara scopului Directivei 94/9/EC.

    Equipment manufacturer's Declarationwhich have not own source of ignition

    and are considered outside the scope of

    Directive 94/9/EC

    Sunt livrate de ctre furnizor. Vor fi parte din EPD.

    Delivered by vendor. Will be part of EPDNu Final

    12. Execute

    Documente pentru echipamentele

    electrice nsoite de condiiile deutilizare, de ex. pentru echipamente cunumere de certificate care au sufixul_X .

    Documents for electrical equipment with

    conditions of use, e.g. for equipment

    with certificate numbers which have the

    suffix _X

    Sunt livrate de ctre furnizor. Vor fi parte din EPD.

    Delivered by vendor. Will be part of EPDNu Final

    13. Execute

    Descriptive Declaration of theintrinsically safety system

    Declaraie descriptiv a sistemelor de

    securitate intrinsec.

    Faza de construcie. A se vedea i EN 60079-25.Modelul Petrom este n curs de elaborare. Trebuie sa fie disponibilecaracteristicile aparatelor ex. U,L,C,I.Va fi parte din EPD.

    Construction phase. See also EN 60079-25.

    PETROM template under development.

    It requires the availability of apparatus characteristics e.g. U,L,C,I

    Will be part of EPD.

    Nu Final

    14. Execute

    Evaluarea de risc pentru ansamble, emisde productor, conform definirii dinGhidul ATEX ediia 3/2009.

    Risks assessment for assemblies, issuedby the manufacturer, as defined in ATEX

    Guide 3rd Edition /2009.

    Sunt livrate de ctre furnizor. Vor fi parte din EPD.

    Delivered by vendor. Will be part of EPDNu Final

  • 7/25/2019 PE D HA PRO 001 01 E_ ATEX Procedure for Projects

    28/29

    ATEX Procedure for Projects Interpretation Sheet 2014 Page 6of 7 Valid from: 2014

    Nr. Crt. Fazeleproiectului

    Document Observaii Livrabile Maturitate

    15. Execute

    Detalii ale oricrei calculaii relevante,ex. rata de purjare pentru instrumentesau lcaurile analizoarelor.

    Details of any relevant calculation, e.g.

    for purging rates, for instruments or

    analyser houses

    Dac este necesar, trebuie s faca parte din planul de zonare

    If case, it shall be part of hazardous areas drawing.

    Nu Final

    16. Execute

    Planuri care arat i detaliaz tipurile deconexiuni n sistem.

    Plans showing and details of type of

    wiring system

    Nu este solicitat ca document separat.

    Not required as separate document

    Nu Final

    17. Execute

    nregistrarea criteriilor de selecie asistemului de intrare a cablurilor, pentruconformarea cu cerinele pentru tipurileparticulare de protecie.

    Record of selection criteria for cables

    entry system, for compliance with the

    requirements for particular types of

    protection

    Nu este solicitat ca document separat. Va fi parte din EPD.

    Not required as separate document. Will be part of EPD

    Nu Final

    18. Execute

    Scheme i grafice pentru identificareacircuitelor.

    Drawings and schedules relating to

    circuits identification

    Nu este solicitat ca document separat.

    Not required as separate document

    Nu

    Final

    19.Execute

    Instruciuni pentru inspecia iniial iinstalare.Instructions for initial inspection and

    Installation

    Sunt livrate de ctre furnizor. Vor fi parte din EPD.Delivered by vendor. Will be part of EPD Nu

    Final

    20. ExecuteLista de echipamente i caracteristicilelorList of equipment and their

    characteristics

    Inclus n EPD ca parte din inspecia iniial.Included in EPD as part of initial inspection

    Nu

    Final

    21. Execute

    Report privind inspecia iniial (ATEX iElectric)Report regarding initial inspection (ATEXand Electric)

    Inclus n EPD, a se vedea EN 60079-14 i HD 60364-6

    Included in EPD, see EN 60079-14 and HD 60364-6

    Nu Final

    22. ExecuteInformaii pentru mentenan i revizie.

    Information for Maintenance and repairs

    Inclus n EPD

    Included in EPD

    Nu Final

  • 7/25/2019 PE D HA PRO 001 01 E_ ATEX Procedure for Projects

    29/29

    ATEX Procedure for Projects Interpretation Sheet 2014 Page 7of 7 Valid from: 2014

    Nr. Crt. Fazeleproiectului

    Document Observaii Livrabile Maturitate

    23. Execute

    Documentul de protecie la explozie(EPD)

    Explosion Protection Document (EPD)

    Ref: Directiva 1999/92, HG 1058/2006

    Se va furniza n format nativ, nu doar raportul, n cazul n care raportul afost obinut de la Autoritate (INSEMEX).

    Ref: Directive 1999/92, HG 1058/2006

    To be provided in native format, not only the report, in case a report have

    been obtained from Authority (INSEMEX)

    Da

    Final

    24. Execute

    Atestare(certificate, permis) de laINSEMEX, conform solicitriinormativului NEX 01/062

    Attestation (certificate, permit) from

    INSEMEX, as a requirement of normative

    NEX 01/063

    Documentaia depus pentru atestare trebuie furnizat n format nativnsoit de atestare

    Documentation submitted for attestation shall be provided in native

    format together with attestation itself

    Da

    Final

    2Atestarea de la INSEMEX poate s nu fie solicitat n cazul n care proiectul afecteaz doar parial instalaia care deja posed o atestare valabil, considernd c atestarea ar trebuiemis pentru ntreaga instalaie. Modificri/ mriri de capacitate/ modernizri,vor fi considerate, atunci cnd se solicit o nou atestare/ re-atestare.

    Attestation from INSEMEX may not be required in case if the project affects only partially the plant which already owns a valid attestation, considering that the attestation shall be

    issued for whole plant. Plant modification / upgrade/ revamp will be considered when it will apply for a new attestation/re-attestation.