PARADIP REFINERY PROJECT PROJECT SPECIFICATION A

GENERAL SPECIFICATION FOR PILING

PDRP-8310-SP-0006 PAGE : 2 OF 61

REV : F3

PDRP-8310-SP-0006 DSN 2009

CONTENTS

SECTION SUBJECT

1.0 SCOPE......................................................................................................... 5 2.0 REFERENCES .............................................................................................. 5 2.1 Project Specific Standards ........................................................................ 5 2.2 Indian Codes and Standards ..................................................................... 5 2.3 Other Standards and Codes ...................................................................... 6 3.0 CONFLICT OF STANDARDS ..................................................................... 8 4.0 GENERAL REQUIREMENTS FOR ALL TYPES OF PILING......................... 9 4.1 Safety Precautions..................................................................................... 9 4.2 Soil and Site Conditions ............................................................................ 9 4.3 Tolerances .................................................................................................. 9 4.4 Piling Method ............................................................................................. 9 4.5 Performance Specification ...................................................................... 10 4.6 Piling Programme and Records ............................................................... 10 4.7 Prevention of Nuisance/Damage............................................................. 10 5.0 GENERAL REQUIREMENTS FOR ALL TYPES OF CONCRETE PILING .. 10 5.1 General ..................................................................................................... 10 5.2 Aggregates ............................................................................................... 10 5.3 Cement ..................................................................................................... 11 5.4 Admixtures ............................................................................................... 11 5.5 Water ........................................................................................................ 11 5.6 Concrete Mixes ........................................................................................ 12 5.7 Trial Mixes................................................................................................ 12 5.8 Testing Works Concrete.......................................................................... 13 5.9 Batching Concrete ................................................................................... 14 5.10 Mixing Concrete....................................................................................... 14 5.11 Transporting Concrete............................................................................. 15 5.12 Ready-Mixed Concrete ............................................................................ 15 5.13 Steel Reinforcement ................................................................................ 15 6.0 REQUIREMENTS FOR PRECAST NORMAL REINFORCED AND

PRESTRESSED PILES .............................................................................. 16 6.1 General ..................................................................................................... 16 6.2 Grout......................................................................................................... 16 6.3 Pile Shoes................................................................................................. 16 6.4 Tolerances in Pile Dimensions................................................................. 16

Page 3: PDRP-8310-SP-0006+REV+F3.pdf

PARADIP REFINERY PROJECT PROJECT SPECIFICATION A

GENERAL SPECIFICATION FOR PILING

PDRP-8310-SP-0006 PAGE : 3 OF 61

REV : F3

PDRP-8310-SP-0006 DSN 2009

6.5 Fixing Reinforcement............................................................................... 16 6.6 Fixing Formwork ...................................................................................... 17 6.7 Concreting ................................................................................................ 17 6.8 Prestressing.............................................................................................. 18 6.9 Marking Handling and Storage of Piles .................................................. 19 6.10 Segmental Concrete Piles ....................................................................... 20 6.11 Driving Piles ............................................................................................. 20 6.12 Repair and Lengthening of Piles.............................................................. 21 6.13 Cutting off Pile Heads ............................................................................. 22 7.0 REQUIREMENTS FOR BORED CAST-IN-PLACE PILES........................... 22 7.1 General ..................................................................................................... 23 7.2 Bentonite .................................................................................................. 23 7.3 Mixing Drilling Fluid ................................................................................. 23 7.4 Testing Drilling Fluid ................................................................................ 23 7.5 Setting out Piles....................................................................................... 24 7.6 Boring ....................................................................................................... 24 7.7 Concreting ................................................................................................ 26 7.8 Extracting Casing..................................................................................... 28 7.9 Temporary Backfilling above Pile Casting Level .................................... 28 8.0 REQUIREMENTS FOR DRIVEN CAST-IN-PLACE PILES ......................... 29 8.1 General ..................................................................................................... 29 8.2 Permanent Casing.................................................................................... 29 8.3 Pile Shoes................................................................................................. 29 8.4 Temporary Casings .................................................................................. 29 8.5 Enlarged Pile Bases .................................................................................. 29 8.6 Driving Piles ............................................................................................. 29 8.7 Repairing Damaged Pile Heads ............................................................... 31 8.8 Lengthening of Piles ................................................................................ 31 8.9 Inspecting Pile Casing ............................................................................. 32 8.10 Fixing Reinforcement............................................................................... 32 8.11 Concreting ................................................................................................ 32 8.12 Extracting Casing..................................................................................... 34 8.13 Temporary Backfilling Above Pile Casting Level.................................... 34 9.0 STEEL PILES ............................................................................................. 34 9.1 General ..................................................................................................... 34 9.2 Strengthening of Piles ............................................................................. 35 9.3 Steel Piles Workmanship ......................................................................... 36

Page 4: PDRP-8310-SP-0006+REV+F3.pdf

PARADIP REFINERY PROJECT PROJECT SPECIFICATION A

GENERAL SPECIFICATION FOR PILING

PDRP-8310-SP-0006 PAGE : 4 OF 61

REV : F3

PDRP-8310-SP-0006 DSN 2009

9.4 Site Fabrication/Testing/Marking of Piles............................................... 36 9.5 Longitudinal Welded Piles ....................................................................... 37 9.6 Coating of Piles........................................................................................ 38 9.7 Handling/Storing Piles.............................................................................. 40 9.8 Driving Piles ............................................................................................. 40 9.9 Preparing Pile Heads ................................................................................ 42 10.0 PILE TESTING ........................................................................................... 42 10.1 General ..................................................................................................... 42 10.2 Definitions ................................................................................................ 42 10.3 Supervision............................................................................................... 44 10.4 Safety Precautions................................................................................... 44 10.5 Construction of Preliminary Pile to be Tested ....................................... 45 10.6 Preparation of Working Pile to be Tested .............................................. 46 10.7 Concrete Test Cubes ............................................................................... 46 10.8 Time of Test Loading............................................................................... 47 10.9 Loading ..................................................................................................... 48 10.10 Measuring Movement of Pile Heads ....................................................... 49 10.11 Protection of Testing Equipment ............................................................ 50 10.12 Test Procedure ......................................................................................... 51 10.13 Presentation of Results ........................................................................... 52 10.14 Pile Acceptance Criteria .......................................................................... 55 10.15 Completion of a Test ............................................................................... 56

Page 5: PDRP-8310-SP-0006+REV+F3.pdf

PARADIP REFINERY PROJECT PROJECT SPECIFICATION A

GENERAL SPECIFICATION FOR PILING

PDRP-8310-SP-0006 PAGE : 5 OF 61

REV : F3

PDRP-8310-SP-0006 DSN 2009

1.0 SCOPE

This Standard covers the general requirements for the structural design, construction, installation and testing of piling.

2.0 REFERENCES

Design, materials and workmanship for piling shall be in accordance with the latest revisions and amendments of the following Standards and Codes of Practice current at time of Contract Placement.

2.1 Project Specific Standards

PDRP-8310-SP-0005 General Specification for Concrete Works

PDRP-8310-SP-0007 Design of Concrete Foundations, Structures and Paving

PDRP-8310-SP-0014 Earthworks

2.2 Indian Codes and Standards

IS 456 Plain and Reinforced Concrete - Code of Practice

IS 1261 Code of practice for seam welding in mild steel

IS 1323 Code of practice for oxy-acetylene welding for structural work in mild steels

IS 1477 Code of Practice for Painting of Ferrous Metals in Buildings

IS 1489 Specification for Portland pozzolana cement

IS 1791 General Requirements for Batch Type Concrete Mixers

IS 2062 Steel for General Structural Purposes - Specification

IS 2751 Code of Practice for Welding of Mild Steel Plain and Deformed Bars for Reinforced Concrete Construction

IS 2911 Part 1 Sec 1

Code of practice for design and construction of pile foundations: Part 1 Concrete piles, Section 1 Driven cast in-situ concrete piles

Part 1 Sec 2

Code of practice for design and construction of pile foundations: Part 1 Concrete piles, Section 2 Bored cast-in-situ piles

Part 1 Sec 3

Code of practice for design and construction of pile foundations: Part 1 Concrete piles, Section 3 Driven precast concrete piles

Part 1 Code of practice for design and construction of pile

Page 6: PDRP-8310-SP-0006+REV+F3.pdf

PARADIP REFINERY PROJECT PROJECT SPECIFICATION A

GENERAL SPECIFICATION FOR PILING

PDRP-8310-SP-0006 PAGE : 6 OF 61

REV : F3

PDRP-8310-SP-0006 DSN 2009

Sec 4 foundations: Part 1 concrete piles, Section 4 Bored precast concrete piles

IS 3025 Methods of Sampling and Test (Physical and Chemical) for Water Used in Industry

IS 9595 Metal arc welding of carbon and carbon manganese steels – Recommendations

2.3 Other Standards and Codes In situation where sufficient information/guidance is not found available in Indian Codes and Standards, the following Standards and Codes of Practice shall apply. The revision current at the time of Contract Placement shall be used.

2.3.1 British Standards and Codes

BS 812 Testing Aggregates

Part 2 Methods of Determination of Physical Properties

BS 1452 Specification for Flake Graphite Cast Iron

BS 1881 Testing Concrete

Part 101 Method of Sampling Fresh Concrete on Site

Part 102 Method of Determination of Slump

Part 103 Method of Determination of Compacting Factor

Part 111 Method of Normal Curing of Test Specimens

Part 112 Method of Accelerated Curing of Test Cubes

BS 4027 Specification for Sulphate Reisting Portland Cement

BS 4449 Specification for Carbon Steel Bars for the reinforcement of Concrete

BS 4486 Specification for Hot Rolled and Hot Rolled and Processed High Tensile Alloy Steel Bars for the Prestressing of Concrete

BS 5135 Metal Arc-Welding of Carbon and Carbon Manganese Steels

BS 5228 Noise Control on Construction and open Sites

Part 4 Code of Practice for Noise and Vibration Control Applicable to Piling Operations

BS 5493 Code of Practice for Protective Coating of Iron and Steel Structures against Corrosion

BS 5896 Specification for High Tensile Steel Wire Strand of

Page 7: PDRP-8310-SP-0006+REV+F3.pdf

PARADIP REFINERY PROJECT PROJECT SPECIFICATION A

GENERAL SPECIFICATION FOR PILING

PDRP-8310-SP-0006 PAGE : 7 OF 61

REV : F3

PDRP-8310-SP-0006 DSN 2009

Prestressing of Concrete

BS 6031 Code of Practice for Earthworks

BS 6265 Specification for Resistancy Seam Welding of Uncoated and Coated Low Carbon Steel

BS 7668 Specification for Weldable Structural Steels. Hot Finished Structural Hollow Sections in Weather Resistant Steels

BS 8004 Code of Practice for Foundations

BS 8008 Guide to Safety Precautions and Procedures for the Construction and Descent of Machine Bored Shafts for Piling and other Purposes

BS 8500-2 Concrete – Complementary British Standard to BS EN 206-1. Specification for constituent materials and concrete

BS 8666 Scheduling, dimensioning, bending and cutting of steel reinforcement for concrete – Specification

2.3.2 International Standards

BS EN 197-1 Cement. Composition, specifications and conformity criteria for common cements

BS EN 933-3 Test for geometrical properties of aggregates. Determination of particle shape – Flakiness index

BS EN 1008 Methods of test for water for making concrete (including notes on the suitability of the water)

BS EN 1097-3 Test for mechanical and physical properties of aggregates. Determination of loose bulk density and voids

BS EN 10025 Hot Rolled Products of Non-alloy Steels and their Technical Delivery Conditions

BS EN 10027 Designation Systems for Steel

Part 1 Steel Names, Principal Symbols

Part 2 Steel Numbers

BS EN 10216-1 Seamless Steel Tubes for Pressure Purposes – Technical Delivery Conditions

Part 1 Non-Alloy Steel Tubes with Specified Room Temperature Properties

BS EN 10217-1 Welded Steel Tubes for Pressure Purposes –

Page 8: PDRP-8310-SP-0006+REV+F3.pdf

PARADIP REFINERY PROJECT PROJECT SPECIFICATION A

GENERAL SPECIFICATION FOR PILING

PDRP-8310-SP-0006 PAGE : 8 OF 61

REV : F3

PDRP-8310-SP-0006 DSN 2009

Technical Delivery Conditions - Non-Alloy Steel Tubes with Specified Room Temperature Properties

BS EN 10210 Hot Finished Structural Hollow Sections of NON-Alloy and Fine Grain Structural Steels

Part 1 Technical Delivery Requirements

Part 2 Tolerances, Dimensions and Sectional Properties

BS EN 10293 Steel Castings for general engineering uses

BS EN 12390-1 Testing Hardened Concrete – Part 1: Shape, Dimensions and other Requirements for Specimens and Moulds

BS EN 12390-2 Testing Hardened Concrete – Part 2: Making and Curing Specimens for Strength Test

BS EN 12390-3 Testing Hardened Concrete – Part 3: Compressive Strength of Test Specimens

BS EN 12620 Aggregates for Concrete

BS EN ISO 8503 Preparation of steel substrate before application of paints and related products – Surface roughness characteristics of blast-cleaned steel substrates

3.0 CONFLICT OF STANDARDS

In the instances where Other Standards and Codes listed in Section 2.3 are to be used, Contractor shall identify which Standards it proposes to use and present a list to IOCL for review and approval. Contractor shall prepare a tabulated list of discrepancies between this Specification and the Other Standards and Codes in Section 2.3 for review by IOCL. Resolution of any such conflicts shall be obtained from IOCL in writing before proceeding.

Where conflict exists between IOCL Arrangement drawings and Standards, the Drawings shall govern.

Where conflict exists within Project Specific Standards, IOCL shall be notified. The affected Standards will be revised by IOCL as necessary to clarify requirements and resolve the conflict.

Page 9: PDRP-8310-SP-0006+REV+F3.pdf

PARADIP REFINERY PROJECT PROJECT SPECIFICATION A

GENERAL SPECIFICATION FOR PILING

PDRP-8310-SP-0006 PAGE : 9 OF 61

REV : F3

PDRP-8310-SP-0006 DSN 2009

4.0 GENERAL REQUIREMENTS FOR ALL TYPES OF PILING

4.1 Safety Precautions 4.1.1 Standards

Safety precautions throughout the piling operations shall be in accordance with all relevant Indian Standards and local regulations.

4.2 Soil and Site Conditions 4.2.1 Unexpected Ground Conditions

Any circumstances which indicate that the ground conditions differ from those expected from the interpretation of the Site Investigation Reports shall be reported immediately.

4.3 Tolerances 4.3.1 Setting Out

Piles shall be set out from the main grid lines or centre lines of the proposed structure. The pile positions shall be marked immediately before installation of the pile with suitable identifiable pins or markers.

4.3.2 Position

For a pile cut off at or above ground level the maximum permitted deviation of the pile centre point shown on the setting out drawing shall be 75 mm in any direction. An additional tolerance for a pile head cut off below ground level will be permitted in accordance with Section 4.3.3 and 4.3.4.

4.3.3 Verticality

The maximum permitted deviation of the finished pile from the vertical is 1 in 75.

4.3.4 Rake

The piling rig shall be set and maintained to attain the required rake. The maximum permitted deviation of the finished pile from the specified rake is 1 in 25.

4.3.5 Cut-Off Levels

The allowable deviation in cut-off level shall be plus or minus 25 mm except for steel piling, refer to Section 9.9.1.

4.3.6 Forcible Corrections

Forcible correction of any nature shall not be made to concrete piles. Forcible corrections may be made to other pile types only if approved in writing by IOCL.

4.4 Piling Method Any alternative piling methods proposed to that specified shall be in accordance with this Standard.

Page 10: PDRP-8310-SP-0006+REV+F3.pdf

PARADIP REFINERY PROJECT PROJECT SPECIFICATION A

GENERAL SPECIFICATION FOR PILING

PDRP-8310-SP-0006 PAGE : 10 OF 61

REV : F3

PDRP-8310-SP-0006 DSN 2009

4.5 Performance Specification 4.5.1 Supply Details

Contractor shall supply full details and calculations of:

- The type of pile offered and the proposed method of working. - The standards of control intended to be used. - The method by which the calculation and checking of the local

bearing capacity and settlement of the piles will be carried out. - The tests proposed to be undertaken on the site. - A complete description of the basis of acceptance of working piles

with associated calculations to illustrate the validity of this basis.

4.6 Piling Programme and Records 4.6.1 Record Keeping

Contractor shall keep records as indicated by an asterisk in Table 2. Any unexpected driving or boring conditions shall be briefly noted in the records.

4.7 Prevention of Nuisance/Damage 4.7.1 Noise and Disturbance

The work shall be carried out in such a manner and at such times as to minimise noise and disturbance.

4.7.2 Damage to Piles

Completed piles shall not be damaged.

The sequence and timing for driving or boring piles shall have regard to the avoidance of damage to adjacent piles.

4.7.3 Temporary Support

Piles shall be temporarily braced or stayed immediately after driving to prevent loosening of the piles in the ground and to ensure that no damage resulting from oscillation, vibration or movement of any free-standing pile length can occur.

5.0 GENERAL REQUIREMENTS FOR ALL TYPES OF CONCRETE PILING

5.1 General Clauses in Section 4 "General Requirements for All Types of Piling" are to be read as part of this subsection in so far as they are appropriate to, and not in conflict with, the particular requirements of this subsection.

5.2 Aggregates 5.2.1 Provide Details

- Before commencement of work information on the source of supply of all the aggregates to be used in the works shall be provided.

Page 11: PDRP-8310-SP-0006+REV+F3.pdf

PARADIP REFINERY PROJECT PROJECT SPECIFICATION A

GENERAL SPECIFICATION FOR PILING

PDRP-8310-SP-0006 PAGE : 11 OF 61

REV : F3

PDRP-8310-SP-0006 DSN 2009

- Evidence shall be provided regarding the properties and consistency of the aggregates.

5.2.2 Type of Aggregate

All types of aggregate shall be naturally occurring material free from deleterious matter. Marine aggregates shall not be used.

5.2.3 Salt Content

The content of chloride salt in the aggregate, expressed as the equivalent anhydrous calcium chloride percentage by weight of the cement to be used in the concrete, shall be within the following limits:

- In steel reinforced concrete work, less than 0.4%. - In pre-tensioned prestressed concrete work, less than 0.1%. - In the main concrete of post-tensioned prestressed concrete work

unless there is an impermeable and durable barrier, in addition to any grout, between the main concrete and the tendons, less than 0.1%.

5.2.4 Storage

Aggregates shall be stored so that they are kept free from deleterious matter and shall segregate aggregates of different types and sizes in different hoppers or different stockpiles.

5.3 Cement 5.3.1 Type of Cement

Either Portland Pozzolana conforming to IS 1489, Rapid-hardening Portland, Sulphate Resisting Portland, Super-sulphated or Portland Blast-furnace Cement shall be used. High alumina cement will not be approved under any circumstance.

5.3.2 Storage

Cement shall be stored in separate containers according to type in substantially built waterproof stores or silos.

5.4 Admixtures When required admixtures may be used if full details are supplied to IOCL and approval granted.

5.5 Water 5.5.1 Source

Potable water shall be used.

5.5.2 Tests

Water shall be tested in accordance with IS 3025 Parts 22 and 23 and during the progress of the work. When necessary water temperature shall be reduced by mechanical refrigeration and kept cold by insulating pipes, tanks and trucks used for storage and transportation.

Page 12: PDRP-8310-SP-0006+REV+F3.pdf

PARADIP REFINERY PROJECT PROJECT SPECIFICATION A

GENERAL SPECIFICATION FOR PILING

PDRP-8310-SP-0006 PAGE : 12 OF 61

REV : F3

PDRP-8310-SP-0006 DSN 2009

5.6 Concrete Mixes 5.6.1 Grade Designation

Grades of concrete shall be denoted by characteristic 28 day test cube strength in Newton per square millimetre.

5.6.2 Mix

Concrete mixes shall be in accordance with Section 5.6.3 (designed mix) or Section 5.6.4 (prescribed mix).

The concrete shall have sufficient workability to enable it to be placed and compacted by the methods used in forming the piles.

5.6.3 Designed Mix

Designed mixes shall be in accordance with PDRP-8310-SP-0005 General Specification for Concrete Works or other Grades approved by IOCL as appropriate to the work. Complete information on the mix and sources of aggregate for each Grade of concrete and the water/cement ratio and the proposed degree of workability shall be approved by IOCL before work commences.

5.6.4 Prescribed Mix

When a prescribed mix is specified IOCL will specify the mix proportions.

Prescribed mixes shall be in accordance with the Tables 3 and 4.

5.6.5 Sulphate Attack

For concrete in piles exposed to sulphate attack the requirements of IS 456 Table 4 shall be observed.

5.6.6 Minimum Cement Content

The cement content in any mix shall be not less than 300 kg/m3. Where concrete is to be placed under water or drilling mud by tremie, or where the pile will be exposed to sea water, the cement content shall be not less than 400 kg/m3.

5.6.7 Maximum Cement Content

The cement content in any mix shall not exceed 550 kg/m3.

5.7 Trial Mixes 5.7.1 General

When designed mixes are specified trial mixes for each grade of concrete shall be prepared for testing, unless there are existing data showing that the proposed mix proportions and manufacture will produce a concrete of the strength and quality required having adequate workability for compaction by the method to be used in placing.

Page 13: PDRP-8310-SP-0006+REV+F3.pdf

PARADIP REFINERY PROJECT PROJECT SPECIFICATION A

GENERAL SPECIFICATION FOR PILING

PDRP-8310-SP-0006 PAGE : 13 OF 61

REV : F3

PDRP-8310-SP-0006 DSN 2009

5.7.2 Preliminary Trial Mixes

Preliminary trial mixes shall be prepared before the commencement of concreting, preferably under full scale production conditions, or, if this is not possible, in an approved laboratory using a sufficient number of samples to be representative of the aggregates and cement to be used.

Unless otherwise approved for each grade of concrete a set of six cubes shall be made from each of three batches. From each set of six cubes, three shall be tested at an age of 7 days and three at 28 days. This procedure will be followed when accelerated testing is proposed for works cubes, but an additional three cubes from each batch shall be made, cured and tested in accordance with the accelerated regime.

5.7.3 Trial Mixes During the Work

Where a trial mix is required after commencement of the work the procedure in Section 5.7.2 shall be adopted for full scale production conditions as approved. The strength requirement shall be as in Section 5.7.5.

5.7.4 Workability

The workability of each batch of the trial mixes shall be determined by the slump test as per applicable Indian Standards or by an alternative approved method.

5.7.5 Standard of Acceptance

Unless otherwise approved, the trial mix proportions will be approved if the criteria is in accordance with IS 516.

5.7.6 Variations in Approved Mix

When a mix has been approved, variations shall not be made in the proportions, the original source of the cement and aggregates or their type, size or grading zone without consent. Further tests may be required.

5.8 Testing Works Concrete 5.8.1 Sampling

Concrete for the piles shall be sampled in accordance with IS 1199 and applicable Indian Standards.

5.8.2 Workability

The workability of concrete shall be determined by the slump test as described in PDRP-8310-SP-0005 General Specification for Concrete Works or by an alternative approved method.

5.8.3 Works Cube Tests

For each grade of concrete four cubes shall be made from a single batch when required for each 50m3 of concrete or part thereof for each day's work.

The cubes shall be made, cured and tested in accordance with PDRP-8310-SP-0005 General Specification for Concrete Works or as otherwise approved.

Page 14: PDRP-8310-SP-0006+REV+F3.pdf

PARADIP REFINERY PROJECT PROJECT SPECIFICATION A

GENERAL SPECIFICATION FOR PILING

PDRP-8310-SP-0006 PAGE : 14 OF 61

REV : F3

PDRP-8310-SP-0006 DSN 2009

One cube shall be tested at an age of seven days and the other three at 28 days. Alternatively test cubes in accordance with an approved accelerated testing regime.

Certified copies of the results of all tests shall be submitted.

5.8.4 Standard of Acceptance

The standard of acceptance of the works cubes shall be in accordance with PDRP-8310-SP-0005 General Specification for Concrete Works or as otherwise approved.

5.8.5 Record of Tests

A detailed record shall be kept of the results of all tests on concrete and concrete materials. Each test shall be clearly identified with the pile or piles to which it relates.

5.9 Batching Concrete 5.9.1 Accuracy of Weighing and Measuring Equipment

The weighing and water-dispensing mechanisms shall be maintained at all times to within the limits of accuracy described in IS 1791.

5.9.2 Tolerance in Weights

The weights of the quantities of each size of aggregate and of cement shall be within a tolerance of 2% of the respective weights per batch after due allowance has been made for the presence of free water in the aggregates which shall be determined by an approved method.

5.9.3 Moisture Content of Aggregate

The moisture content of aggregates shall be measured immediately before mixing and as frequently thereafter as is necessary to maintain consistency of mix.

5.10 Mixing Concrete 5.10.1 Type of Mixer

The mixer shall be of the batch type, unless otherwise approved.

5.10.2 Tolerance of Mixer Blades

The mixing blades of pan mixers shall be maintained within the tolerances specified by the manufacturers of the mixers, and the blades replaced when it is no longer possible to maintain the tolerances by adjustment.

5.10.3 Cleaning of Mixers

Mixers which have been out of use for more than 30 minutes shall be thoroughly cleaned before another batch of concrete is mixed. Unless otherwise required, the first batch of concrete through a mixer after cleaning shall contain the normal batch quantity of cement and sand, but only two thirds of the normal quantity of coarse aggregate. Mixing plant shall be thoroughly cleaned between the mixing of different types of cement.

Page 15: PDRP-8310-SP-0006+REV+F3.pdf

PARADIP REFINERY PROJECT PROJECT SPECIFICATION A

GENERAL SPECIFICATION FOR PILING

PDRP-8310-SP-0006 PAGE : 15 OF 61

REV : F3

PDRP-8310-SP-0006 DSN 2009

5.11 Transporting Concrete 5.11.1 Method of Transporting

Concrete shall be transported in uncontaminated watertight containers in such a manner that loss of material and segregation are prevented.

5.11.2 Pumping Concrete

The use of pumped concrete and the methods employed in its use shall be subject to approval by IOCL.

5.12 Ready-Mixed Concrete All concrete shall be compacted with mechanical vibrators unless otherwise approved. The method employed must have been approved by IOCL and must ensure that no segregation or arching of the concrete will be caused.

5.12.1 Conditions for Use

Ready-mixed concrete shall be in accordance with PDRP-8310-SP-0005 General Specification for Concrete Works.

5.13 Steel Reinforcement 5.13.1 Condition

Steel reinforcement shall be stored in clean conditions. It shall be clean and free from loose rust and loose mill scale at the time of fixing in position and subsequent concreting.

5.13.2 Placing of Reinforcement

All intersecting bars shall be tied together with approved wire unless otherwise permitted.

Reinforcement shall be assembled in the form of a cage, with additional support, such as spreader forks and lacings, necessary to form a rigid cage. Hoops, links or helical reinforcement shall fit closely around the main longitudinal bars to be bound to them by approved wire, the ends of which shall be turned into the interior of the pile or pour. Place and maintain reinforcement in position.

The cover to all reinforcement shall be at least 40mm or as specified.

Spacer blocks shall be approved and shall be as small as possible consistent with their purpose. They shall be made with 10mm maximum aggregate size and shall have a strength not less than that of the concrete in the pile.

5.13.3 Welding of Reinforcement

Welded joints and welding procedures shall be carried out in accordance with IS 2751.

Page 16: PDRP-8310-SP-0006+REV+F3.pdf

PARADIP REFINERY PROJECT PROJECT SPECIFICATION A

GENERAL SPECIFICATION FOR PILING

PDRP-8310-SP-0006 PAGE : 16 OF 61

REV : F3

PDRP-8310-SP-0006 DSN 2009

6.0 REQUIREMENTS FOR PRECAST NORMAL REINFORCED AND PRESTRESSED PILES

6.1 General Clauses in Sections 4 "General Requirements for all Types of Piling" and 5 "General Requirements for all Types of Concrete Piling" to be read as part of this subsection insofar as they are appropriate to, and not in conflict with, the particular requirements of this subsection.

6.2 Grout Grout used shall be Ordinary Portland Cement, water and approved additives.

6.3 Pile Shoes 6.3.1 Steel Pile Shoes

Manufactured from steel to IS 2062.

6.3.2 Straps and Other Fastenings to Cast Pile Shoes

Manufactured from steel to IS 2062. They shall be cast into the point to form an integral part of the shoe.

6.4 Tolerances in Pile Dimensions 6.4.1 Cross-Sectional Dimensions

The cross-sectional dimensions of the pile shall be not less than those specified and do not exceed them by more than 6mm.

Any face of a pile shall not deviate by more than 6mm from a straight edge 3m long laid on the face and the centroid of any cross section of the pile shall not deviate by more than 12mm from the straight line connecting the centroids of the end faces of the pile.

6.5 Fixing Reinforcement 6.5.1 Longitudinal Reinforcement

The main longitudinal reinforcing bars in piles not exceeding 12m in length shall be in one continuous length unless otherwise specified. In piles exceeding 12m long, joints will be permitted in main longitudinal bars. Maximum lengths of bars shall be used.

Joints in adjacent bars shall be staggered at least 1m apart along the length of the pile.

Joints in reinforcement shall be such that the full strength of the bar is effective across the joint.

Lap or splice joints shall be provided with sufficient link bars to resist eccentric forces.

Welded joints shall be made in accordance with IS 2751.

Page 17: PDRP-8310-SP-0006+REV+F3.pdf

PARADIP REFINERY PROJECT PROJECT SPECIFICATION A

GENERAL SPECIFICATION FOR PILING

PDRP-8310-SP-0006 PAGE : 17 OF 61

REV : F3

PDRP-8310-SP-0006 DSN 2009

6.6 Fixing Formwork 6.6.1 Adjacent Piles as Forms

When the sides of adjacent piles are used as formwork an approved method to prevent adhesion between concrete surfaces shall be used.

The head of each pile shall be positioned square to the longitudinal axis, the head and the corners of the pile shaft shall be chamfered 25mm x 25mm for a distance of 300mm from the head, and the point of the pile or shoe shall lie on the longitudinal axis of the pile.

Holes for toggle bolts shall be positioned at right angles to the faces of the piles, shall be lined with steel tubes or other approved material and shall provide holes for handling and pitching lined with steel tubes. Alternatively, approved inserts may be cast in.

6.6.2 Construction

Formwork shall be:

- Sufficiently robust in construction to withstand the disturbances due to placing and compacting of concrete, and that there is no loss of material from wet concrete.

- So constructed when forming hollow cores that a continuous core is formed.

- Cleaned immediately before concrete is placed. - Struck not less than 12 hours after the completion of the

compaction of the concrete. - Removed without damage to the concrete.

6.7 Concreting Concrete shall be compacted with vibrators unless otherwise approved. Internal vibrators shall be capable of producing not less than 150 Hz and external vibrators not less than 50 Hz. Internal vibrators shall not operate closer than 75mm to shuttering.

Segregation of the concrete constituents, and displacement of reinforcement during compaction of the concrete, shall be prevented.

6.7.1 Protecting and Curing Concrete

Immediately after compaction the concrete shall be adequately protected from the harmful effects of the weather, including wind, rain, rapid temperature changes, and frost and from drying out, by an approved method of curing.

The period of curing at an ambient temperature of 10oC shall not be less than that shown in the Table 1, increased or decreased to achieve the necessary maturity if the temperature is respectively less than or greater than 10oC.

When accelerated curing is used ensure that the curing procedure is approved. Four hours must elapse from the completion of placing concrete before the temperature is raised. The rise in temperature attained shall not

Page 18: PDRP-8310-SP-0006+REV+F3.pdf

PARADIP REFINERY PROJECT PROJECT SPECIFICATION A

GENERAL SPECIFICATION FOR PILING

PDRP-8310-SP-0006 PAGE : 18 OF 61

REV : F3

PDRP-8310-SP-0006 DSN 2009

exceed 70oC. The rate of subsequent cooling shall not exceed the rate of heating.

6.8 Prestressing Tensioning shall be carried out only when the IOCL Representative is present, unless otherwise approved.

In cases where piles are manufactured off the site IOCL shall be given adequate notice and every facility for inspecting the manufacturing process. The prestressing operations shall be carried out only under the direction of an experienced and competent supervisor and all personnel operating the stressing equipment and shall have been trained in its use.

6.8.1 Concrete Strength

Sufficient cubes shall be cast to be able to demonstrate by testing two cubes at a time, at approved intervals between pairs of cubes, that the specified transfer strength of the concrete has been reached. Unless otherwise permitted in the specification concrete shall not be stressed until two test cubes attain the specified transfer strength.

The calculated extensions and total forces, including allowance for losses shall be agreed with the Engineer in charge before stressing is commenced.

Stressing of tendons and transfer of prestress shall be carried out at a gradual and steady rate. The force in the tendons shall be obtained from readings on a load cell or pressure gauge incorporated in the equipment. The extension of the tendons under the agreed total forces shall be within 5% of the agreed calculated extension.

6.8.2 Tensioning Records

Detailed records shall be kept of time of tensioning, measured extensions, pressure gauge readings or load cell readings and the amount of pull-in at each anchorage. Copies of these records shall be supplied to IOCL within such reasonable time of completion of each tensioning operation as may be required, and in any case not later than noon on the following working day.

6.8.3 Grout unless otherwise directed or agreed shall:

- Consist only of Cement, water and approved additives (refer to section 5.3.1 for cement type)

- Have a water/cement ratio as low as possible consistent with the necessary workability, but the water/cement ratio shall not exceed 0.45 unless an approved mix containing an expanding agent is used.

- Not be subject to bleeding in excess of 2% after 3 hours or 4% maximum when measured 18oC in a covered glass cylinder approximately 100mm in diameter with a height of grout of approximately 100mm, and the water shall be reabsorbed after 24 hours.

- Not have admixtures containing chlorides or nitrates.

Page 19: PDRP-8310-SP-0006+REV+F3.pdf

PARADIP REFINERY PROJECT PROJECT SPECIFICATION A

GENERAL SPECIFICATION FOR PILING

PDRP-8310-SP-0006 PAGE : 19 OF 61

REV : F3

PDRP-8310-SP-0006 DSN 2009

6.8.4 Grouting Procedure

Grout shall be mixed for a minimum of 2 minutes and until a uniform consistency is obtained.

Before grouting is started thoroughly clean by means of compressed air. In the case of vertical piles this shall be done from the bottom upwards.

Grout shall be injected near the lowest point in the duct in one continuous operation and allowed to flow from the outlet until the consistency is equivalent to that of the grout being injected. Vents shall be provided in ducts.

Ducts and vents in post-tensioned piles shall be grouted after the transfer of prestress.

6.8.5 Grouting Records

Records shall be kept of grouting including the date, the proportions of the grout and any admixtures used, the pressure, details of interruption and topping required. Copies of these records shall be supplied within such reasonable time after completion of each grouting operation as may be required and in any case not later than noon on the following working day.

6.9 Marking Handling and Storage of Piles 6.9.1 Marking

The following information shall be marked clearly and indelibly on the head of the pile and inscribed on the top surface of the pile after the pile has been cast:-

- Date of casting - Reference number - Length - Prestressing force (where appropriate).

6.9.2 Handling and Storage

The method and sequence of lifting, handling, transporting and storing piles is to be such that the piles are not damaged. Only the designed lifting and support points shall be used for transport and piles shall be stored on adequate supports located under the lifting points of the piles.

Concrete shall at no time be subjected to loading, including its own weight, which will induce a compressive stress in it exceeding 0.33 of its strength at the time of loading or of the specified strength, whichever is the lesser. For this purpose the assessment of the strength of the concrete and of the stresses produced by the loads shall be subject to the agreement of IOCL.

Piles shall be stacked in groups of the same length and provide packing of uniform thickness between piles at the lifting points.

Page 20: PDRP-8310-SP-0006+REV+F3.pdf

PARADIP REFINERY PROJECT PROJECT SPECIFICATION A

GENERAL SPECIFICATION FOR PILING

PDRP-8310-SP-0006 PAGE : 20 OF 61

REV : F3

PDRP-8310-SP-0006 DSN 2009

6.10 Segmental Concrete Piles 6.10.1 Segmental Piles

For segmental concrete piles, the following details of the system intended to be used shall be provided:

- Section shape - Joint type - Width of segment - Length of segment - Reinforcement - Concrete mix - Minimum 28 day cube strength

6.11 Driving Piles 6.11.1 Strength of Piles

Piles shall not be driven until concrete has achieved the specified characteristic strength.

6.11.2 Leaders and Trestles

At all stages during driving and until incorporation in the superstructure the piles shall be adequately supported and restrained by means of leaders, trestles, temporary supports and other guide arrangements to maintain position and alignment and to prevent buckling. These arrangements shall be such that damage to the pile does not occur.

6.11.3 Performance of Driving Equipment

The weight or power of the hammer shall be sufficient to produce a final penetration of 2.5mm per blow unless rock is reached. In the case of drop hammer and single acting steam or compressed air hammers the height of the drop shall not exceed 1.20m. The weight of the hammer should normally be approximately equal to that of the pile being driven but on no account should it be less than half the weight. Where double acting or diesel hammers are concerned no more than the maker's average energy output shall be assumed for computational purposes.

Unless otherwise approved drop hammers shall not be used from floating craft.

6.11.4 Not used

6.11.5 Driving Procedure and Redrive Checks

Each pile shall be driven continuously until the required set and/or depth has been reached, except that IOCL may permit the suspension of driving if satisfied that the rate of penetration prior to the cessation of driving will be substantially re-established on its resumption or if satisfied that the suspension of driving is beyond the control of Contractor. A follower (long dolly) shall not be used unless approved in which case the set will require to be revised to take into account the reduction in the effectiveness of the hammer blow.

Page 21: PDRP-8310-SP-0006+REV+F3.pdf

PARADIP REFINERY PROJECT PROJECT SPECIFICATION A

GENERAL SPECIFICATION FOR PILING

PDRP-8310-SP-0006 PAGE : 21 OF 61

REV : F3

PDRP-8310-SP-0006 DSN 2009

IOCL shall be informed without delay if an unexpected change in driving characteristics is noted. A detailed record shall be taken of the driving resistance over the full length of the nearest available pile if required.

Sets shall be taken at the start of new work or in a new area or section at intervals during the last 3m of the driving to establish the behaviour of the piles.

Adequate notice shall be given and all facilities provided to enable IOCL to check driving resistances. A set shall be taken only in the presence of the IOCL Representative unless otherwise approved.

Redrive checks shall be carried out if required to an approved procedure.

6.11.6 Final Set

The final set of each pile shall be recorded either as the penetration in millimetres per 10 blows or as the number of blows required to produce a penetration of 25mm. When a final set is being measured:

- The exposed part of the pile shall be in good condition without damage or distortion.

- The dolly and packing, if any, shall be in sound condition. - The hammer blow shall be in line with the pile axis and the impact

surfaces shall be flat and at right angles to the pile and hammer axis. - The hammer shall be in good condition and operating correctly. - The temporary compression of the pile and ground shall be recorded.

6.11.7 Driving Sequence and Risen Piles

Piles shall be driven in an approved sequence to minimise the detrimental effects of heave and lateral displacement of the ground.

Levels and measurements shall be taken when required to determine the movement of the ground or any pile resulting from the driving process.

When a pile has risen as a result of adjacent piles being driven, proposals shall be submitted for correcting this and the avoidance of it in subsequent work.

6.11.8 Preboring

If preboring is specified the pile shall be pitched into a hole prebored to the depth shown on the drawings.

6.11.9 Jetting

Jetting shall be carried out only when detailed proposals have been approved and not over the last 3m of penetration.

6.12 Repair and Lengthening of Piles 6.12.1 Repair of Damaged Pile Heads

When repairing the head of a pile, the head shall be cut off square at sound concrete. Loose particles shall be removed by wire brushing followed by

Page 22: PDRP-8310-SP-0006+REV+F3.pdf

PARADIP REFINERY PROJECT PROJECT SPECIFICATION A

GENERAL SPECIFICATION FOR PILING

PDRP-8310-SP-0006 PAGE : 22 OF 61

REV : F3

PDRP-8310-SP-0006 DSN 2009

washing with water. If the pile is to be subjected to further driving, the head shall be replaced with concrete of an approved grade.

If the driving of a pile has been accepted but sound concrete of the pile is below cut-off level, Contractor shall make good the pile to the cut-off level with concrete of a grade not inferior to that of the concrete of the pile.

6.12.2 Lengthening of Normal Reinforced Piles

The head shall be cut off square to sound concrete. All loose particles shall be removed by wire brushing, followed by washing with water.

Joints in reinforcement shall be such that the full strength of the bar is effective across the joint.

Welded joints shall be made in accordance with IS 2751 and the main longitudinal reinforcing bars in the head of the pile exposed for at least 300mm below the weld.

Sufficient link bars shall be provided in lap or splice joints to resist eccentric forces.

If the pile is to be subjected to further driving, the additional length shall be of a grade approved by IOCL.

Other methods of lengthening shall be subject to the approval of IOCL.

6.12.3 Lengthening of Prestressed Piles

If mild steel bars have been designed and incorporated in the head of a prestressed pile during manufacture for use as bonding bars, the pile shall be lengthened if required, in the manner described in Section 6.12.2

Any provision for lengthening prestressed piles incorporated at the time of manufacture shall be as designed or approved.

If no provision for lengthening prestressed piles was incorporated at the time of manufacture, any method for lengthening shall be such that joints are capable of taking safely the stresses during driving and under load.

6.12.4 Driving Repaired or Lengthened Piles

Repaired or lengthened piles shall not be driven until the added concrete has reached the specified characteristic strength of the concrete of the pile.

6.13 Cutting off Pile Heads The pile head shall be cut off to the level specified or shown on the drawings when the driving of a pile has been approved and if not otherwise specified. The length of splice reinforcing bars projecting above this level is to be as shown on the drawings.

Care shall be taken to avoid shattering or otherwise damaging the rest of the pile. Any cracked or defective concrete shall be cut away and made good with new concrete properly bonded to the old.

7.0 REQUIREMENTS FOR BORED CAST-IN-PLACE PILES

Page 23: PDRP-8310-SP-0006+REV+F3.pdf

PARADIP REFINERY PROJECT PROJECT SPECIFICATION A

GENERAL SPECIFICATION FOR PILING

PDRP-8310-SP-0006 PAGE : 23 OF 61

REV : F3

PDRP-8310-SP-0006 DSN 2009

7.1 General Clauses in Sections 4 "General Requirements for all Types of Piling" and 5 "General Requirements for all Types of Concrete Piling" to be read as part of this subsection insofar as they are appropriate to, and not in conflict with, the particular requirements of this subsection.

7.2 Bentonite Bentonite shall be in accordance with IS 2911 Part 2 Appendix A.

A certificate shall be obtained from the manufacturer of the bentonite powder showing the properties of each consignment delivered to the site.

This certificate shall be made available on request to IOCL.

The properties to be given by the manufacturer are the apparent viscosity range (in centipoises) and the gel strength range (in Newton per square metre) for solids in water.

7.3 Mixing Drilling Fluid 7.3.1 Mix Bentonite

Bentonite shall be thoroughly mixed with clean fresh water to make a suspension which will maintain the stability of the pile excavation for the period necessary to place concrete and complete construction.

Special precautions shall be taken, where saline or chemically contaminated ground water occurs, to modify the bentonite suspension or prehydrate the bentonite in fresh water so as to render it suitable in all respects for the construction of piles.

7.4 Testing Drilling Fluid 7.4.1 Frequency of Testing

Proposals for frequency of testing may subsequently be varied as required, depending on the consistency of the results obtained.

7.4.2 Method and Procedure for Sampling

Proposals for the method and procedure for sampling shall be stated prior to commencement of work.

7.4.3 Control Tests

Control tests shall be carried out on the bentonite suspension using suitable apparatus.

The density of freshly mixed bentonite suspension shall be tested each day as a check on the quality of the suspension being formed and use a measuring device calibrated to read within + 0.005 g/mm3.

Density, viscosity, shear strength and pH value of the bentonite supplied to the pile boring shall be tested until an acceptable consistent working pattern has been established, including consideration of the following:

a) The mixing process.

Page 24: PDRP-8310-SP-0006+REV+F3.pdf

PARADIP REFINERY PROJECT PROJECT SPECIFICATION A

GENERAL SPECIFICATION FOR PILING

PDRP-8310-SP-0006 PAGE : 24 OF 61

REV : F3

PDRP-8310-SP-0006 DSN 2009

b) The blending of freshly mixed and previously used bentonite suspension.

c) Any process employed to remove impurities from previously used bentonite suspension.

In average soil conditions the results generally shall be within the ranges shown in Table 5.

When the results show consistent behaviour the tests for shear strength and pH value may be discontinued, and tests for density and viscosity shall be carried out as agreed. More regular tests for shear strength and pH value shall be reintroduced in the event of a change in the established working pattern or if required.

7.5 Setting out Piles 7.5.1 Position

The casing position for each pile shall be checked during and immediately after placing the casing.

7.5.2 Pile Diameter

The diameter of each pile shall not be less than the specified diameter on the drawings.

7.6 Boring 7.6.1 Near Recently Cast Piles

Piles shall not be bored close to other piles which have recently been cast, and which contain workable or unset concrete, such that a flow of concrete could be induced from or damage caused to any of the piles.

7.6.2 Temporary Casings

Temporary casings of an approved quality shall be used or an alternative method approved by IOCL to maintain the stability of pile excavation which might otherwise collapse. During the installation of temporary casings in unstable strata, the leading edge shall be maintained ahead of the bottom of the soil bore. Where this is considered to be impracticable other precautions shall be adopted appropriate to the conditions such as mud mixing ahead of the casing, drilling under bentonite or providing a permanent liner. In such cases temporary casings shall be:

- Free from significant distortion. - Of uniform cross section throughout each continuous length. - Free from internal projections and encrusted concrete during

concreting, which might prevent the proper formation of piles.

7.6.3 Stability of Pile Excavation Using Drilling Fluid

Where the use of drilling fluid is approved for maintaining the stability of a boring :

Page 25: PDRP-8310-SP-0006+REV+F3.pdf

PARADIP REFINERY PROJECT PROJECT SPECIFICATION A

GENERAL SPECIFICATION FOR PILING

PDRP-8310-SP-0006 PAGE : 25 OF 61

REV : F3

PDRP-8310-SP-0006 DSN 2009

- The level of the fluid in the excavation shall be maintained so that the fluid pressure always exceeds the pressures exerted by the soils and external groundwater.

- An adequate temporary casing shall be used with the method to ensure stability of the strata near ground level until concrete has been placed.

- The fluid level shall be maintained at a level not less than 1m above the level of the external groundwater.

In the event of a rapid loss of bentonite suspension from the pile excavation, the excavation shall be backfilled without delay and IOCL’s instructions obtained before resuming excavation at that location.

7.6.4 Spillage and Disposal

All reasonable steps shall be taken to prevent the spillage of bentonite suspension on the site in areas outside the immediate vicinity of boring.

Discarded bentonite shall be removed from the site without delay.

The regulations of the local controlling authority shall be complied with in any disposal of bentonite.

7.6.5 Pumping From Boreholes

Pumping from a borehole shall not be permitted unless a casing has been placed into a stable stratum which prevents the flow of water from other strata in significant quantities into the boring, or unless it can be shown that pumping will not have a detrimental effect on the surrounding soil or property.

7.6.6 Continuity of Construction

A pile constructed in a stable cohesive soil without the use of temporary casing or other form of support shall be bored and concreted without prolonged delay and in any case soon enough to ensure that the soil characteristics are not significantly impaired.

7.6.7 Enlarged Pile Bases Mechanically Formed

When mechanically forming an enlarged pile base:

- The base shall be formed not smaller than the required dimensions. - The base shall be formed concentric with the pile shaft to within a

tolerance of 10% of the shaft diameter. - The sloping surface of the frustum forming the enlargement shall

make an angle to the horizontal of not less than 55o.

7.6.8 Cleanliness of Pile Bases

On completion of boring loose, disturbed or remoulded soil shall be removed from the base of the pile.

Page 26: PDRP-8310-SP-0006+REV+F3.pdf

PARADIP REFINERY PROJECT PROJECT SPECIFICATION A

GENERAL SPECIFICATION FOR PILING

PDRP-8310-SP-0006 PAGE : 26 OF 61

REV : F3

PDRP-8310-SP-0006 DSN 2009

7.6.9 Inspection

Each pile boring shall be inspected prior to the placing of concrete in it. The inspection shall be carried out thus:

- In the case of dry bores of diameter of less than 750mm from ground level.

- In the case of dry bores with diameter of 750mm or greater, from within the bore, provide equipment to enable a person, to descend into the boring, and shall ensure that any method of descent and the equipment used complies with the relevant Indian Standards and local regulations.

7.6.10 Longitudinal Reinforcement

Joints in longitudinal reinforcement will be permitted unless otherwise specified. Joints in reinforcement shall be made so that:

- The full strength of the bar is effective across the joint. - There is no relative displacement of the reinforcement during the

construction of the pile.

7.7 Concreting 7.7.1 Placing Generally

The method of placing and the workability of the concrete shall be such that a continuous monolithic concrete shaft of the full cross-section is formed.

Approval shall be obtained to the method of placing.

The concrete shall be placed without such interruption as would allow the previously placed batch to have hardened.

All precautions shall be taken in the design of the mix and placing of the concrete to avoid arching of the concrete in a casing. No spoil, liquid or other foreign matter shall be allowed to contaminate the concrete.

In the event of the groundwater level being higher than the required pile head casting level shown on the drawings, proposals shall be submitted for approval prior to placing concrete. Pile head shall not be left below the groundwater unless precautions are approved.

7.7.2 Workability

The proposed slump factor shall be submitted for approval before commencement of work.

The concrete shall have sufficient workability to enable it to be placed by the method of placing approved and compacted when its final position and after all constructional procedures in forming the pile have been completed.

Slump measured at the time of discharge into the pile boring shall be in accordance with Table 6.

7.7.3 Compaction by Internal Vibrators

Page 27: PDRP-8310-SP-0006+REV+F3.pdf

PARADIP REFINERY PROJECT PROJECT SPECIFICATION A

GENERAL SPECIFICATION FOR PILING

PDRP-8310-SP-0006 PAGE : 27 OF 61

REV : F3

PDRP-8310-SP-0006 DSN 2009

Internal vibrators shall not be used unless:

- The method of using has been approved by IOCL. - It can be shown that no segregation or arching of the concrete will

be caused.

7.7.4 Placing Concrete in Dry Borings

When placing concrete in dry borings :

- Measures shall be taken to avoid segregation and bleeding, and to ensure that the concrete at the bottom of the pile is not deficient in grout.

- Approval of such measures shall be obtained from IOCL.

7.7.5 Placing Concrete Under Water or Drilling Fluid

When placing concrete under water or drilling fluid :

- There shall be no accumulation of silt or other material at the base of the boring.

- Heavily contaminated bentonite suspension, which could impair the free flow of concrete from the pipe of the tremie, shall not accumulate in the bottom of the hole.

- A sample of the bentonite suspension from the base of the boring shall be taken using an approved sampling device. Placing of concrete shall not proceed if the specific gravity of the suspension exceeds 1.25. In this event modify or replace the bentonite to meet the specification as approved.

- The concrete shall be placed in such a manner that segregation does not occur using a tremie, unless otherwise approved. Concrete shall not discharge freely into the water or drilling fluid. The use of bottom opening skips will not be permitted.

- A rich coherent concrete mix of high workability shall be used as Mix C in Table 6 and in accordance with Section 5.6.6.

- Care shall be taken during and after concreting to avoid damage to the concrete from pumping and dewatering operations.

- The hopper and pipe of the tremie shall be clean and watertight throughout.

- The pipe shall be extended to the base of the boring and place in the pipe a sliding plug or barrier to prevent direct contact between the first charge of concrete in the pipe of the tremie and the water or drilling fluids.

- The pipe shall at all times penetrate the concrete which has been previously placed and do not withdraw from the concrete until completion of concreting.

- At all times a sufficient quantity of concrete within the pipe shall be maintained so that the pressure from it exceeds that from the water or drilling fluid.

Page 28: PDRP-8310-SP-0006+REV+F3.pdf

PARADIP REFINERY PROJECT PROJECT SPECIFICATION A

GENERAL SPECIFICATION FOR PILING

PDRP-8310-SP-0006 PAGE : 28 OF 61

REV : F3

PDRP-8310-SP-0006 DSN 2009

A tremie shall be used with a pipe of internal diameter not less than 150mm for concrete made with 20mm aggregate and not less than 200mm for concrete made with 40mm aggregate. The design shall be such that external projections are minimised, allowing the tremie to pass through reinforcing cages without causing damage, and that the internal face of the pipe of the tremie is free from projections.

The placing of concrete by tremie shall be continued up to a point of 0.5m above cut-off level to allow for removal of contaminated or otherwise defective concrete. The technique by which the placing of concrete by tremie is terminated below this level, the water or drilling mud pumped out and the remainder of the pile placed in the dry whilst removing the casing, will be permitted only where the piles are of sufficient diameter to allow operatives to enter the uncompleted part of the pile in order to remove defective or contaminated concrete and to cut off the casing if necessary. IOCL shall be satisfied that adoption of this technique will in no way impair the continuity of the pile at the junction point.

7.8 Extracting Casing 7.8.1 Workability

Temporary casings shall be extracted while the concrete within them remains sufficiently workable to ensure that the concrete is not lifted.

7.8.2 Concrete Level

Concrete shall be placed continuously as the casing is extracted until the desired head of concrete is obtained.

A sufficient quantity of concrete shall be maintained within the casings as it is being extracted to ensure that pressure from external water, drilling fluid or soil is exceeded and that the pile is neither reduced in section nor contaminated.

No concrete shall be placed in the boring once the bottom of the casing has been lifted above the top of the concrete.

Adequate precautions shall be taken in all cases where excess heads of water or drilling fluid could occur as the casing is withdrawn because of the displacement of water or fluid by the concrete as it flows into its final position against the walls of the shaft. Approval shall be obtained for the proposed method of working where two or more discontinuous lengths or casing (double casing) are used in the construction.

Vibrating extractors will be permitted to be used subject to Sections 4.7.1 and 4.7.2.

7.9 Temporary Backfilling above Pile Casting Level 7.9.1 Remaining Empty Bore

After each pile has been cast any empty bore remaining shall be protected and carefully backfill as soon as possible with approved materials.

Page 29: PDRP-8310-SP-0006+REV+F3.pdf

PARADIP REFINERY PROJECT PROJECT SPECIFICATION A

GENERAL SPECIFICATION FOR PILING

PDRP-8310-SP-0006 PAGE : 29 OF 61

REV : F3

PDRP-8310-SP-0006 DSN 2009

8.0 REQUIREMENTS FOR DRIVEN CAST-IN-PLACE PILES

8.1 General This subsection applies to piles for which a permanent casing of steel or concrete is driven and which may be reinforced prior to being filled with concrete, or for which a temporary casing is driven, reinforcement placed in the temporary casing and the hole formed by the temporary casing filled with concrete during extraction of the casing.

Clauses in Sections 4 "General Requirements for all Types of Piling" and 5 "General Requirements for all Types of Concrete Piling" to be read as part of this subsection insofar as they are appropriate to, and not in conflict with, the particular requirements of this subsection.

8.2 Permanent Casing Where a permanent casing is to be made from a series of short sections it shall be designed and placed so as to produce a continuous water-free shaft.

The dimensions and quality of the casing shall be adequate to withstand the stresses caused by handling and driving without damage or distortion.

8.3 Pile Shoes Pile shoes shall be manufactured from durable material capable of withstanding the stresses caused by driving without damage, designed to give a watertight joint when used with any permanent casing.

8.4 Temporary Casings Temporary casings shall be:

- Free from significant distortion. - Of uniform cross-section throughout each continuous length. - Free from internal projections and encrusted concrete during

concreting, which might prevent the proper formation of piles.

8.5 Enlarged Pile Bases Where it is desired to form a pile with an enlarged base, details shall be given of the proposed method of forming the base and the materials to be used.

8.6 Driving Piles 8.6.1 Piling Near Recently Cast Piles

Casings shall not be driven or piles formed so close to other piles which have recently been cast and which contain workable or unset concrete that a flow of concrete could be induced from or damage caused to any of the piles.

8.6.2 Performance of Driving Equipment

The weight or power of the hammer shall be sufficient to produce a final penetration of 2.5mm per blow unless rock is reached. In the case of drop hammer and single acting steam or compressed air hammers, the height of the drop shall not exceed 1.20m. The weight of the hammer should normally

Page 30: PDRP-8310-SP-0006+REV+F3.pdf

PARADIP REFINERY PROJECT PROJECT SPECIFICATION A

GENERAL SPECIFICATION FOR PILING

PDRP-8310-SP-0006 PAGE : 30 OF 61

REV : F3

PDRP-8310-SP-0006 DSN 2009

be approximately equal to that of the pile being driven but on no account should it be less than half the weight. Where double acting or diesel hammers are concerned no more than the maker's average energy output shall be assumed for computational purposes.

Unless otherwise approved drop hammers shall not be used from a floating craft.

8.6.3 Length of Piles

The length of pile to be driven in any position shall be sufficient to develop load capacity as shown on the drawings.

8.6.4 Driving Procedure and Redrive Checks

Each pile shall be driven continuously until the required set and/or depth has been reached, except that IOCL may permit the suspension of driving if satisfied that the rate of penetration prior to the cessation of driving will be substantially re-established on its resumption or if satisfied that the suspension of driving is beyond the control of Contractor. A follower (long dolly) shall not be used unless approved in which case the set will require to be revised to take into account the reduction in the effectiveness of the hammer blow.

IOCL shall be informed without delay if an unexpected change in driving characteristics is noted. A detailed record shall be taken of the driving resistance over the full length of the nearest available pile if required.

Sets shall be taken at the start of new work or in a new area or section at intervals during the last 3m of the driving to establish the behaviour of the piles.

Adequate notice shall be given and all facilities provided to enable IOCL to check driving resistances. A set shall be taken only in the presence of the IOCL Representative unless otherwise approved.

Redrive checks shall be carried out if required to an approved procedure.

8.6.5 Final Set

The final set of each pile shall be recorded either as the penetration in millimetres per 10 blows or as the number of blows required to produce a penetration of 25mm. When a final set is being measured:

- The exposed part of the pile shall be in good condition without damage or distortion.

- The dolly and packing, if any, shall be in sound condition. - The hammer blow shall be in line with the pile axis and the impact

surfaces shall be flat and at right angles to the pile and hammer axis.

- The hammer shall be in good condition and operating correctly. - The temporary compression of the pile and ground shall be

recorded.

Page 31: PDRP-8310-SP-0006+REV+F3.pdf

PARADIP REFINERY PROJECT PROJECT SPECIFICATION A

GENERAL SPECIFICATION FOR PILING

PDRP-8310-SP-0006 PAGE : 31 OF 61

REV : F3

PDRP-8310-SP-0006 DSN 2009

8.6.6 Driving Sequence and Risen Piles

Piles shall be driven in an approved sequence to minimise the detrimental effects of heave and lateral displacement of the ground.

Levels and measurements shall be taken when required to determine the movement of the ground or any pile resulting from the driving process.

When a pile has risen as a result of adjacent piles being driven, proposals shall be submitted for correcting this and the avoidance of it in subsequent work.

8.6.7 Preboring

If preboring is specified the pile shall be pitched into a hole prebored to the depth shown on the drawings.

8.6.8 Jetting

Jetting shall be carried out only when detailed proposals have been approved and not over the last 3m of penetration.

8.6.9 Internal Drop Hammer

Where a casing for a pile without an enlarged base is to be driven by an internal drop hammer a plug consisting of concrete Grade M20 with a water/cement ratio not exceeding 0.25 shall be placed in the pile. This plug shall have a compacted height of not less than 2½ times the diameter of the pile. Add fresh concrete to ensure that this height of driving plug is maintained in the casing throughout the period of driving and in any event add a plug of fresh concrete after 1½ hours of normal driving, after ¾ hour of hard driving or, should the pile driving be interrupted, add fresh concrete after ½ hour of the cessation of driving.

8.7 Repairing Damaged Pile Heads The head shall be cut off square at sound concrete. Loose particles shall be removed by wire brushing, followed by washing with water. If the driving of a pile has been accepted but sound concrete of the pile is below cut-off level, the pile shall be made good to the cut-off level with concrete of a grade not inferior to that of the concrete of the pile.

8.8 Lengthening of Piles The head shall be cut off square to sound concrete. All loose particles shall be removed by wire brushing, followed by washing with water.

Joints in reinforcement shall be such that the full strength of the bar is effective across the joint.

Welded joints shall be made in accordance with IS 2751 and the main longitudinal reinforcing bars in the head of the pile exposed for at least 300mm below the weld.

Sufficient link bars shall be provided in lap or splice joints to resist eccentric forces.

Page 32: PDRP-8310-SP-0006+REV+F3.pdf

PARADIP REFINERY PROJECT PROJECT SPECIFICATION A

GENERAL SPECIFICATION FOR PILING

PDRP-8310-SP-0006 PAGE : 32 OF 61

REV : F3

PDRP-8310-SP-0006 DSN 2009

If the pile is to be subjected to further driving, the additional length shall be of a grade approved by IOCL.

Other methods of lengthening shall be subject to the approval of IOCL.

8.9 Inspecting Pile Casing Prior to placing concrete in a pile casing it shall be checked that any permanent casing is undamaged, and that the casing is free from water or other foreign matter. In the event of water or foreign matter having entered the pile casing either withdraw the casing, repair if necessary and redrive or take other action as may be approved by IOCL to continue the construction of the pile.

8.10 Fixing Reinforcement 8.10.1 Longitudinal Reinforcement

Joints in longitudinal reinforcement will be permitted unless otherwise specified. Joints in reinforcement shall be made so that:

- The full strength of the bar is effective across the joint. - There is no relative displacement of the reinforcement during the

construction of the pile.

8.11 Concreting 8.11.1 Placing Generally

The method of placing and the workability of the concrete shall be such that a continuous monolithic concrete shaft of the full cross-section is formed.

Approval shall be obtained to the method of placing.

The concrete shall be placed without such interruption as would allow the previously placed batch to have hardened.

All precautions shall be taken in the design of the mix and placing of the concrete to avoid arching of the concrete in a casing. No spoil, liquid or other foreign matter shall be allowed to contaminate the concrete.

In the event of the groundwater level being higher than the required pile head casting level shown on the drawings, proposals shall be submitted for approval prior to placing concrete. Pile head shall not be left below the groundwater unless precautions are approved.

8.11.2 Workability

The proposed slump factor shall be submitted for approval before commencement of work.

The concrete shall have sufficient workability to enable it to be placed by the method of placing approved and compacted when its final position and after all constructional procedures in forming the pile have been completed.

Slump measured at the time of discharge into the pile boring shall be in accordance with Table 6 except that those mixes shall not apply to piling

Page 33: PDRP-8310-SP-0006+REV+F3.pdf

PARADIP REFINERY PROJECT PROJECT SPECIFICATION A

GENERAL SPECIFICATION FOR PILING

PDRP-8310-SP-0006 PAGE : 33 OF 61

REV : F3

PDRP-8310-SP-0006 DSN 2009

systems which use semi-dry concrete and employ special means for its compaction.

8.11.3 Compaction by Internal Vibrators

Compaction by internal vibrators shall not be used unless:

- The method of using has been approved by IOCL. - It can be ensured that no segregation or arching of the concrete will

be caused.

8.11.4 Placing Concrete in Dry Borings

When placing concrete in dry borings :

- Measures shall be taken to avoid segregation and bleeding, and to ensure that the concrete at the bottom of the pile is not deficient in grout.

- Approval of such measures shall be obtained from IOCL.

8.11.5 Placing Concrete Under Water

When placing concrete under water :

- There shall be no accumulation of silt or other material at the base of the boring.

- Concrete shall be placed in such a manner that segregation does not occur using a tremie, unless otherwise approved. Concrete shall not discharge freely into water. The use of bottom opening skips will not be permitted.

- A rich coherent concrete mix of high workability shall be used as Mix C in Table 6 and in accordance with Section 5.6.6.

- Care shall be taken during and after concreting to avoid damage to the concrete from pumping and dewatering operations.

- The hopper and pipe of the tremie shall be clean and watertight throughout.

- The pipe shall be extended to the base of the boring and place in the pipe a sliding plug or barrier to prevent direct contact between the first charge of concrete in the pipe of the tremie and the water.

- The pipe shall at all times penetrate the concrete which has been previously placed and do not withdraw from the concrete until completion of concreting.

- At all times a sufficient quantity of concrete within the pipe shall be maintained so that the pressure from it exceeds that from the water.

A tremie shall be used with a pipe of internal diameter not less than 150mm for concrete made with 20mm aggregate and not less than 200mm for concrete made with 40mm aggregate. The design shall be such that external projections are minimised, allowing the tremie to pass through reinforcing cages without causing damage, and that the internal face of the pipe of the tremie is free from projections.

Page 34: PDRP-8310-SP-0006+REV+F3.pdf

PARADIP REFINERY PROJECT PROJECT SPECIFICATION A

GENERAL SPECIFICATION FOR PILING

PDRP-8310-SP-0006 PAGE : 34 OF 61

REV : F3

PDRP-8310-SP-0006 DSN 2009

The placing of concrete by tremie shall be continued up to a point of 0.5m above cut-off level to allow for removal of contaminated or otherwise defective concrete. The technique by which the placing of concrete by tremie is terminated below this level, the water pumped out and the remainder of the pile placed in the dry whilst removing the casing, will be permitted only where the piles are of sufficient diameter to allow operatives to enter the uncompleted part of the pile in order to remove defective or contaminated concrete and to cut off the casing if necessary. IOCL shall be satisfied that adoption of this technique will in no way impair the continuity of the pile at the junction point.

8.12 Extracting Casing 8.12.1 Workability

Temporary casings shall be extracted while the concrete remains sufficiently workable to ensure that the concrete is not lifted. Should a semi-dry mix have been approved the means of ensuring that the semi-dry concrete does not lift during extraction of the casing shall be subject to approval by IOCL.

8.12.2 Concrete Level

A sufficient quantity of concrete shall be maintained within the casing as it is being extracted to ensure that pressure from external water or soil is exceeded and that the pile is neither reduced in section nor contaminated.

No concrete shall be placed in the boring once the bottom of the casing has been lifted above the top of the concrete. Concrete shall be placed continuously as the casing is extracted until the desired head of concrete is obtained.

Adequate precautions shall be taken in all cases where excess hydraulic heads could be caused as the casing is withdrawn because of the displacement of water by the concrete as it flows into its final position against the walls of the shaft.

Vibrating extractors will be permitted to be used subject to Sections 4.7.1 and 4.7.2

8.13 Temporary Backfilling Above Pile Casting Level 8.13.1 Remaining Empty Bore

After each pile has been cast any empty bore remaining shall be protected and carefully backfill as soon as possible with approved materials.

9.0 STEEL PILES

9.1 General This subsection does not include steel sheet piling.

Clauses in Sections 4 "General Requirements for all Types of Piling" are to be read as part of this subsection insofar as they are appropriate to, and not in conflict with, the particular requirements of this subsection.

Page 35: PDRP-8310-SP-0006+REV+F3.pdf

PARADIP REFINERY PROJECT PROJECT SPECIFICATION A

GENERAL SPECIFICATION FOR PILING

PDRP-8310-SP-0006 PAGE : 35 OF 61

REV : F3

PDRP-8310-SP-0006 DSN 2009

9.2 Strengthening of Piles The strengthening to the toe of a pile in lieu of a shoe or the strengthening of the head of a pile shall be made from material of the same grade as the pile unless otherwise approved.

9.2.1 Pile Sections and Pile Dimensions

For standard rolled sections the dimensional tolerances and weight shall comply with the relevant standard. For proprietary sections the dimensional tolerances shall comply with the manufacturer's standards. The rolling or manufacturing tolerances shall be such that the actual weight of sections does not differ from the theoretical weight by more than -2.5% to +5% unless otherwise agreed.

For a tubular pile where the loads will be carried by the wall of the pile, and if the pile will be subjected to loads that induce reversal of stress during or after construction, the external dimensions at any section as measured by using a tape on the circumference shall not differ from the theoretical dimensions by more than -1% to +1%. The rolling or manufacturing tolerances shall be such that the actual weight of any section does not differ from the theoretical weight by more than -2.5% to +5%.

For a tubular pile where the load will be static and will be carried by the wall of the pile or by a concrete core, the dimensions shall comply with the applicable Indian standards. The rolling or manufacturing tolerances shall be such that the actual weight of any section does not differ from the theoretical weight by more than -3.5% to +10%.

9.2.2 Straightness of Piles

For standard rolled sections the deviation from straightness shall not exceed 1.04 (L-4.5) where L is in metres and the deviation in millimetres. For proprietary sections made up from rolled sections the deviation from straightness shall not exceed 1/1000 of the length of the pile.

For tubular piles the deviation from straightness shall exceed 1/600 of a length not exceeding 10m. When two or more such lengths are joined the deviation from straightness shall not exceed 1/960 of the completed length unless otherwise agreed by IOCL.

9.2.3 Fabrication of Piles

The root edges or root faces of lengths of piles that are to be butt welded shall not differ by more than 25% of the thickness of piles not exceeding 12mm thick or by more than 3mm for piles thicker than 12mm. When piles of unequal thickness are to be butt welded the thickness of the thinner material shall be the criterion.

Pile lengths shall be set up so that the differences in dimensions are matched as evenly as possible.

Page 36: PDRP-8310-SP-0006+REV+F3.pdf

PARADIP REFINERY PROJECT PROJECT SPECIFICATION A

GENERAL SPECIFICATION FOR PILING

PDRP-8310-SP-0006 PAGE : 36 OF 61

REV : F3

PDRP-8310-SP-0006 DSN 2009

9.2.4 Matching of Pile Lengths

Longitudinal seam welds and spiral seam welds of lengths of tubular piles forming a completed pile shall whenever possible be evenly staggered but if, in order to obtain a satisfactory match of the ends of piles or the specified straightness, the longitudinal seams or spiral seams are brought closely to one alignment at the joint then they shall be staggered by at least 100mm.

9.2.5 Welding

For a pile where the load will be carried by the wall or section of the pile, and if the pile will be subjected to loads that induce reversal of stresses during or after construction, the welding shall be to IS 1261, IS 1323 and IS 9595.

For a tubular pile where the load will be static and will be carried by the wall of the pile or by a concrete core, the welding shall be to IS 1261, IS 1323 and IS 9595.

9.2.6 Inspection and Test Certificates

Test certificates, analyses and mill sheets shall be provided. Adequate notice shall be given when the processes can be inspected or tests can be witnessed. IOCL has the right to inspect the test at any stage of the manufacturing processes provided that, once notified of when the materials will be ready for inspection, any delay in attendance does not cause delay to or disrupt the production processes.

9.2.7 Pile Shoes

Welded fabricated pile shoes shall be manufactured from steel to IS 2062.

9.3 Steel Piles Workmanship 9.3.1 Instructions for Ordering Piles

When preliminary test piles are specified the instructions for the piles for the main work will not necessarily be given until the results of the driving and tests on the preliminary piles have been received and evaluated.

9.3.2 Welding

For details of welding requirements and procedures refer to IS 1261,IS 1323 and IS 9595.

9.4 Site Fabrication/Testing/Marking of Piles 9.4.1 Fabrication of Piles on Site

When the pile lengths are to be made up on site all test procedures and dimensional tolerances shall conform to the specification for the supply of pile material. Adequate facilities for supporting and aligning the lengths of pile shall be provided.

9.4.2 Marking of Piles

Each pile shall be clearly marked at the top in white paint with its number and its overall length. In addition mark each pile at intervals of 250mm along the top 3m of its length before being driven.

Page 37: PDRP-8310-SP-0006+REV+F3.pdf

PARADIP REFINERY PROJECT PROJECT SPECIFICATION A

GENERAL SPECIFICATION FOR PILING

PDRP-8310-SP-0006 PAGE : 37 OF 61

REV : F3

PDRP-8310-SP-0006 DSN 2009

9.5 Longitudinal Welded Piles 9.5.1 Welded Tube Piles

Approval shall be obtained if different edge preparation from that shown on the drawings is required for use with automatic welding machines or because of the method of rolling. All welds shall be of full penetration butt welds and, with the exception of continuous tube making processes, longitudinal welds shall be made with extension plates at the starting and finishing points of each seam.

9.5.2 Welded Box Piles and Proprietary Sections

Welded box piles or proprietary sections made up from two or more hot rolled sections shall be welded in accordance with the manufacturer's standards.

9.5.3 Radiographs

During production of welded tube piles at least one radiograph approximately 300mm long shall be required on each completed length as a spot check on weld quality. This shall be taken on a circumferential or longitudinal weld in a position as directed.

The position and number of radiographs of welded box piles shall be as specified.

9.5.4 Spirally Welded Piles

Prior to forming a spirally welded pile ensure the edges of the strip are straight. The forming and welded process shall be approved. Before fabrication commences tests shall be made as required in accordance with the standards for forming and welding to ensure that the welding procedure is satisfactory. IOCL shall be satisfied that all production welding is of sound quality. One of the following tests shall be carried out:

- For tubes of wall thickness 12mm or less three spot check radiographs, one at each end of each length of the tube as manufactured and one at a position to be chosen at the time of testing and spot check radiographs as required on the weld joints between strip lengths.

- For tubes of any wall thickness continuous ultrasonic examination over the whole weld, supplemented where necessary by radiographs to investigate defects revealed by the ultrasonic examination.

If the results of any weld test do not conform to the specified requirements, test two additional specimens from the same length of pile. In the case of failure of one or both of these additional tests the length of pile covered by the tests shall be rejected.

Page 38: PDRP-8310-SP-0006+REV+F3.pdf

PARADIP REFINERY PROJECT PROJECT SPECIFICATION A

GENERAL SPECIFICATION FOR PILING

PDRP-8310-SP-0006 PAGE : 38 OF 61

REV : F3

PDRP-8310-SP-0006 DSN 2009

9.6 Coating of Piles 9.6.1 Definition

The term 'coating' shall include the primer and the number of other coats specified.

9.6.2 Specialist Labour

The preparation of surfaces and the application of the coats to form the coating shall be carried out by approved labour and, where appropriate, by specialist labour having experience in the preparation of the surface and the application of the coating specified.

9.6.3 Protection During Coating

All work associated with surface preparation and coating shall be undertaken inside a substantially built waterproof structure unless such work is the lengthening of a partly driven pile.

9.6.4 Surface Preparation by Grit Blasting

All surfaces to be coated shall be clean and dry. All surfaces shall be cleaned and shall be grit blasted with an approved abrasive to remove rust, mill scale and other adhering materials to provide a finish to IS 1477 quality.

Grit manufactured from copper slag shall not be used. Blast cleaning shall only be carried out after fabrication unless otherwise approved. Unless an instantaneous recovery blasting machine is used, air blast the cleaned steel surface with clean dry air, vacuum cleaned or otherwise freed from abrasive residues and dust immediately after cleaning. Fittings which cannot be blast cleaned satisfactorily may be cleaned as otherwise approved.

9.6.5 Surface Preparation by Pickling

All surfaces to be coated shall be clean and dry. Pickling of piles shall be carried out by an approved process. Before being placed in the pickling solution thoroughly degrease all surfaces to be treated and remove all paint marks. On completion give the surfaces a neutralising wash and ensure that any by-product chemicals are compatible with the coating to be applied.

9.6.6 Surface Preparation by Flame Cleaning

All surfaces to be coated shall be clean and dry. Flame cleaning shall be carried out by an approved method, the number of passes and the speed of pass being determined by the apparatus used and the condition of the surface of the pile. On completion brush the surface to provide a finish to IS 1477. Apply the priming or coating while the surface is still warm.

9.6.7 Surface Preparation by Wire Brushing

All surfaces to be coated shall be clean and dry. Brush all surfaces to be wire brushed to provide a finish to IS 1477.

Page 39: PDRP-8310-SP-0006+REV+F3.pdf

PARADIP REFINERY PROJECT PROJECT SPECIFICATION A

GENERAL SPECIFICATION FOR PILING

PDRP-8310-SP-0006 PAGE : 39 OF 61

REV : F3

PDRP-8310-SP-0006 DSN 2009

9.6.8 Surface Preparation by Degreasing

All surfaces to be coated shall be clean and dry. Carry out where necessary degreasing with approved solvents compatible with the coating.

9.6.9 Application and Type of Primer

Immediately after surface preparation coat the surface with an approved primer or the specified coating to avoid recontamination. Do not apply any coat to a metal surface which is not thoroughly dry. Ensure the primer is compatible with the specified coating and is such that if subsequent welding or cutting is to be carried out it shall not emit noxious fumes or be detrimental to the welding.

9.6.10 Control of Humidity During Coating

Apply no coat either to a cold surface or when the humidity in the vicinity of the surface is such that condensation would occur on the surface before or during the application or when the humidity could have an adverse effect on the coat. When heating or ventilation is used to secure suitable conditions to allow coating to proceed, take care to ensure that heating or ventilation of a local surface does not have an adverse effect on adjacent surfaces of work already done.

9.6.11 Parts to be Welded

The coating within 200 mm of a weld shall be applied after welding.

9.6.12 Thickness Number and Colour of Coats

The minimum thickness of the finished coating shall be as specified but in addition, where appropriate, the minimum thickness of each coat and the minimum number of coats that are to be applied shall also be as specified or as shown on the drawings. Apply each coat at an interval that ensures the proper hardening or curing of the previous coat and provides the specified dry film thickness without detriment to the surface finish. Where applying more than one coat to a surface each coat shall, if possible, be of a different colour from the previous coat. The colour of the final coat shall be approved.

9.6.13 Acceptability and Inspection of Coatings

The finished coating shall be generally smooth, of a dense and uniform texture and free from sharp protuberances or pin holes. Sags, dimpling or curtaining on up to 3% of the surface area of each member will be acceptable although sharp protuberances shall be removed by using a carpenter's chisel laid flat on the surface; lightly wire brush areas from which material is removed and recoat in accordance with the painting specification.

Reclean to the original standard and recoat with the specified sequence of coats any coat damaged by subsequent processes or which has deteriorated to an extent such that proper adhesion of the coating may not be obtained or maintained.

Check the completed coating for thickness and continuity by an approved magnetic thickness gauge and Holiday detector. Areas where the thickness is

Page 40: PDRP-8310-SP-0006+REV+F3.pdf

PARADIP REFINERY PROJECT PROJECT SPECIFICATION A

GENERAL SPECIFICATION FOR PILING

PDRP-8310-SP-0006 PAGE : 40 OF 61

REV : F3

PDRP-8310-SP-0006 DSN 2009

less than that specified shall receive approved additional treatment. Check also the completed coating for adhesion by driving a sharp carpenter's chisel laid almost flat through the coating and along the surface of the steel. A coating will be considered to be acceptably bonded if no separation is apparent between coats and if it can be seen to be adhering in the depressions on the exposed metal surface. Alternatively the coatings may be checked by the cross-hatched method with each line spaced at ten times the thickness of the coating. Tests shall be made for each 20m2 or part thereof or surface treated. Areas where the adhesion is not approved shall receive approved additional treatment. The coating shall be approved before pitching and driving of the piles.

9.7 Handling/Storing Piles Piles shall be stacked in groups of the same length and on approved supports and shall carry out all operations such as handling, transporting and pitching of piles in a manner such that damage to piles and their coatings is minimised.

9.8 Driving Piles 9.8.1 Leaders and Trestles

At all stages during driving and until incorporation in the super-structure the pile shall be adequately supported and restrained by means of leaders, trestles, temporary supports or other guide arrangements to maintain position and alignment and prevent buckling. These arrangements shall be such that damage to the piles or their coatings is minimised.

9.8.2 Performance of Driving Equipment

The weight or power of the hammer shall be sufficient to produce a final penetration of 2.5mm per blow unless rock is reached. In the case of drop hammer and single acting steam or compressed air hammers the height of the drop shall not exceed 1.20m. The weight of the hammer should normally be approximately equal to that of the pile being driven but on no account should it be less than half the weight. Where double acting or diesel hammers are concerned no more than the maker's average energy output shall be assumed for computational purposes.

Unless otherwise approved drop hammers shall not be used from floating craft.

9.8.3 Length of Piles

The length of piles to be driven in any position shall be approved by IOCL. If approved each pile may be provided in more than one length, the first length or subsequent lengths being extended during an interval in the pile driving operation. Clean and prepare the extra lengths to the tolerances in Section 9.2.1. During and after welding securely hold the lengths of pile to line and level.

9.8.4 Driving Procedure and Redrive Checks

Page 41: PDRP-8310-SP-0006+REV+F3.pdf

PARADIP REFINERY PROJECT PROJECT SPECIFICATION A

GENERAL SPECIFICATION FOR PILING

PDRP-8310-SP-0006 PAGE : 41 OF 61

REV : F3

PDRP-8310-SP-0006 DSN 2009

Each pile shall be driven continuously until the required set and/or depth has been reached, except that IOCL may permit the suspension of driving if satisfied that the rate of penetration prior to the cessation of driving will be substantially re-established on its resumption or if satisfied that the suspension of driving is beyond the control of Contractor. A follower (long dolly) shall not be used unless approved in which case the set will require to be revised to take into account the reduction in the effectiveness of the hammer blow.

IOCL shall be informed without delay if an unexpected change in driving characteristics is noted. A detailed record shall be taken of the driving resistance over the full length of the nearest available pile if required.

Sets shall be taken at the start of new work or in a new area or section at intervals during the last 3m of the driving to establish the behaviour of the piles.

Adequate notice shall be given and all facilities provided to enable IOCL to check driving resistances. A set shall be taken only in the presence of the Engineer Representative unless otherwise approved.

Redrive checks shall be carried out if required to an approved procedure.

9.8.5 Final Set

The final set of each pile shall be recorded either as the penetration in millimetres per 10 blows or as the number of blows required to produce a penetration of 25mm. When a final set is being measured:

- The exposed part of the pile shall be in good condition without damage or distortion.

- The dolly and packing, if any, shall be in sound condition. - The hammer blow shall be in line with the pile axis and the impact

surfaces shall be flat and at right angles to the pile and hammer axis.

- The hammer shall be in good condition and operating correctly. - The temporary compression of the pile and ground shall be

recorded.

9.8.6 Driving Sequence and Risen Piles

Piles shall be driven in an approved sequence to minimise the detrimental effects of heave and lateral displacement of the ground.

Levels and measurements shall be taken when required to determine the movement of the ground or any pile resulting from the driving process.

When a pile has risen as a result of adjacent piles being driven, proposals shall be submitted for correcting this and the avoidance of it in subsequent work.

Page 42: PDRP-8310-SP-0006+REV+F3.pdf

PARADIP REFINERY PROJECT PROJECT SPECIFICATION A

GENERAL SPECIFICATION FOR PILING

PDRP-8310-SP-0006 PAGE : 42 OF 61

REV : F3

PDRP-8310-SP-0006 DSN 2009

9.8.7 Preboring

If preboring is specified the pile shall be pitched into a hole prebored to the depth shown on the drawings.

9.8.8 Jetting

Jetting shall be carried out only when detailed proposals have been approved and not over the last 3m of penetration.

9.9 Preparing Pile Heads 9.9.1 Cut-off Level Tolerance

Heads shall be cut down:

- To within 10mm of the levels shown on the drawings if a steel superstructure is to be welded to the piles.

- To within 20mm of the levels shown on the drawings if piles are to be encased in concrete. Remove protective coatings from the surfaces of the pile heads down to a level 100mm above the soffit of the concrete.

10.0 PILE TESTING

10.1 General Tests covered in this subsection deal with the application of an axial load to a pile as follows:

- Compressive force to vertical and raking piles (i.e. force in a direction such as would cause the piles to penetrate further into the ground).

- Tensile force in vertical or raking piles (i.e. forces in a direction such as would cause the piles to be extracted from the ground).

Clauses in Section 4 are to be read as part of this subsection insofar as they are appropriate to, and not in conflict with, the particular requirements of this subsection.

Clauses in Sections 4 to 9 inclusive relating to the manufacture and installation of the type of pile to be tested, are to be read as part of this subsection insofar as they are appropriate to, and not in conflict with, the particular requirements of this subsection.

10.2 Definitions 10.2.1 Working Load

The load which may be safely applied to a pile after taking into account its ultimate bearing capacity, negative friction, pile spacing, overall bearing capacity of the ground below and allowable settlement.

10.2.2 Compression Pile

A pile which is designed to resist an axial compressive force.

Page 43: PDRP-8310-SP-0006+REV+F3.pdf

PARADIP REFINERY PROJECT PROJECT SPECIFICATION A

GENERAL SPECIFICATION FOR PILING

PDRP-8310-SP-0006 PAGE : 43 OF 61

REV : F3

PDRP-8310-SP-0006 DSN 2009

10.2.3 Tension Pile

A pile which is designed to resist an axial tensile force.

10.2.4 Preliminary Pile

A pile installed before the commencement of the main piling works or a specific part of the works for the purpose of establishing the suitability of the chosen type of pile and for confirming its design, dimensions and bearing capacity.

10.2.5 Working Pile

A pile forming part of the permanent works.

10.2.6 Raking Pile

A pile installed at an inclination to the vertical.

10.2.7 Test Pile

Any pile to which a test is, or is to be, applied.

10.2.8 Constant Rate of Penetration (CRP) Test

A test in which the pile is made to penetrate the soil from its position as installed at a constant speed while the force applied at the top of the pile to maintain the rate of penetration is continuously measured. The force / penetration relationship obtained does not represent an equilibrium condition between load and settlement.

10.2.9 Constant Rate of Uplift (CRU) Test

A test in which the pile is extracted from its position as installed in the soil at a constant speed while the force applied at the top of the pile to maintain the rate of uplift is continuously measured. The force/uplift relationship obtained does not represent an equilibrium condition between the extractive force and the uplift.

10.2.10 Maintained Load Test

A loading test in which each increment of load is held constant either for a defined period of time or until the rate of movement (settlement or uplift) falls to a specified value.

10.2.11 Kentledge

The dead weight used in the loading test.

10.2.12 Proof Load

A load applied to a selected working pile to confirm that it is suitable for the load at the settlement specified. A proof load should not normally exceed 150% of the working load on a pile.

10.2.13 Working Load

The load which the pile is designed to carry with an appropriate factor of safety. Refer to Specification PDRP-8310-SP-0007.

Page 44: PDRP-8310-SP-0006+REV+F3.pdf

PARADIP REFINERY PROJECT PROJECT SPECIFICATION A

GENERAL SPECIFICATION FOR PILING

PDRP-8310-SP-0006 PAGE : 44 OF 61

REV : F3

PDRP-8310-SP-0006 DSN 2009

10.2.14 Reaction System

The arrangement of kentledge, piles, anchors or rafts that provides a resistance against which the pile is tested.

10.2.15 Ultimate Bearing Capacity

The load at which the resistance of the soil becomes fully mobilised as per load test.

10.3 Supervision 10.3.1 Competent Supervisor

All tests shall be carried out only under the direction of an experienced and competent supervisor conversant with the test equipment and test procedure. All personnel operating the test equipment shall have been trained in its use. All such personnel are subject to the approval of IOCL.

10.3.2 Notice of Test

IOCL shall be given at least 24 hours notice of the commencement of the test.

10.3.3 Records

The testing equipment and all records of the tests as required in Sections 10.13.1 to 10.13.11 shall be made available for inspection during the progress of a test.

10.4 Safety Precautions 10.4.1 General

When preparing for, conducting and dismantling a pile test the requirements of the various acts, orders, regulations, and other statutory instruments that are applicable to the work for the provision and maintenance of safe working conditions shall be carried out, and in addition such other provisions shall be made as may be necessary to safeguard against any hazards that are involved in the testing or preparations for testing.

10.4.2 Kentledge

Where kentledge is used:

- The foundations for the kentledge and any cribwork, beams or other supporting structure shall be constructed in such a manner that there will not be differential settlement, bending or deflection of an amount that constitutes a hazard to safety or impairs the efficiency of the operation.

- The kentledge shall be adequately bonded, tied or otherwise held together to prevent it falling apart, or becoming unstable because of deflection of the supports.

- The weight of kentledge shall be greater than the maximum test load and if the weight is estimated from the density and volume of the constituent materials allow an adequate factor of safety against error.

Page 45: PDRP-8310-SP-0006+REV+F3.pdf

PARADIP REFINERY PROJECT PROJECT SPECIFICATION A

GENERAL SPECIFICATION FOR PILING

PDRP-8310-SP-0006 PAGE : 45 OF 61

REV : F3

PDRP-8310-SP-0006 DSN 2009

10.4.3 Tension Piles and Ground Anchors

When tension piles or ground anchors are used ensure that the load is correctly transmitted to all the tie rods or bolts. It is not permitted to extend the rods by welding unless it is known that the steel will not be reduced in strength by welding. The bond stresses of the rods in tension shall not exceed normal permissible bond stresses for the type of steel and grade of concrete used.

10.4.4 Testing Equipment

In all cases ensure that when the hydraulic jack and load measuring device are mounted on the pile head the whole system will be stable up to the maximum load to be applied. Means shall be provided to enable dial gauges to be read from a position clear of the kentledge stack or test frame in conditions where failure in any part of the system due to overloading, buckling, loss of hydraulic pressure and so on might constitute a hazard to personnel.

The hydraulic jack, pump, hoses, pipes, coupling and other apparatus to be operated under hydraulic pressure shall be capable of withstanding a test pressure of 3.0 times the maximum working pressure without leaking.

Display the maximum test load or test pressure expressed as a reading on the gauge in use and make all operators aware of this limit.

10.5 Construction of Preliminary Pile to be Tested 10.5.1 Notice of Construction

At least 48 hours notice shall be given of the commencement of construction of any preliminary pile which is to be test loaded.

10.5.2 Method of Construction

Each preliminary test pile shall be constructed in a manner similar to that to be used for the construction of the working piles, and by the use of similar equipment and materials. Any variation will only be permitted with prior approval. Extra reinforcement and concrete of increased strength will be permitted in the shafts of preliminary piles at the discretion of IOCL.

10.5.3 Boring or Driving Record

A detailed record shall be made of the soils encountered during boring, or of the progress during driving, for each preliminary pile which is to be tested and submitted daily not later than noon on the next working day.

Where required soil samples shall be taken or in situ tests to be made in bored piles, and the results of such tests given to IOCL without delay.

10.5.4 Cut-off Level

The pile shaft shall terminate at the normal cut-off level or at a level specified.

The pile shaft shall be extended where necessary above the cut-off level of working piles so that gauges and other apparatus to be used in the testing process will not be damaged by water or falling debris.

Page 46: PDRP-8310-SP-0006+REV+F3.pdf

PARADIP REFINERY PROJECT PROJECT SPECIFICATION A

GENERAL SPECIFICATION FOR PILING

PDRP-8310-SP-0006 PAGE : 46 OF 61

REV : F3

PDRP-8310-SP-0006 DSN 2009

Where the pile shaft is extended above the cut-off level of a working pile in a soil which would influence the load bearing capacity of the pile, a sleeve shall be installed and kept in place during testing to eliminate friction which would not arise in the working pile. Alternatively, if the friction above the designed cut-off level can be calculated with reasonable accuracy, with approval a sleeve need not be used, but the calculated friction must be taken into account in assessing the load being applied to the pile.

If the cut-off level is below ground level, the shaft is not extended and there is a risk of the borehole collapsing, a sleeve in place or insert above the pile shaft, or take other approved action. Give adequate clearance between the top of the pile shaft and the bottom of the sleeve to permit unrestricted movement of the pile.

10.5.5 Pile Head for Compression Test

For a pile that is tested in compression, the pile head or cap shall be formed to give a plane surface which is normal to the axis of the pile, sufficiently large to accommodate the loading and settlement measuring equipment and adequately reinforced or protected to prevent damage from the concentrated application of load from the loading equipment.

The pile cap shall be concentric with the test pile; the joint between the cap and the pile shall have a strength equivalent to that of the pile.

Sufficient clear space shall be made under any part of the cap projecting beyond the section of the pile so that, at the maximum expected settlement, load is not transmitted to the ground except through the pile.

10.5.6 Pile Connection for Tension Test

For a pile that is tested in tension means of transmitting the test load axially to the pile shall be provided. The connection between the pile and the loading equipment shall be constructed in such a manner as to provide a strength equal to the maximum load which is to be applied to the pile during the test with an appropriate factor of safety on the structural design.

10.6 Preparation of Working Pile to be Tested The pile shall be cut down or otherwise prepared for testing as required by IOCL in accordance with Sections 10.5.4 to 10.5.6 inclusive if a test is required on a working pile.

10.7 Concrete Test Cubes Three test cubes shall be made from the concrete used in the preliminary test pile and from the concrete used for building up a working pile. If a concrete cap is cast separately from a preliminary pile or a working pile a further three cubes shall be made from this concrete. Make and test the cubes in accordance with PDRP-8310-SP-0005 General Specification for Concrete Works. The pile test shall not be started until the strength of the cubes taken from the pile exceeds twice the average direct stress in any pile section under the maximum required test load and the strength of the cubes taken from the

Page 47: PDRP-8310-SP-0006+REV+F3.pdf

PARADIP REFINERY PROJECT PROJECT SPECIFICATION A

GENERAL SPECIFICATION FOR PILING

PDRP-8310-SP-0006 PAGE : 47 OF 61

REV : F3

PDRP-8310-SP-0006 DSN 2009

cap exceeds twice the average stress at any point in the cap under the same load. Variation of procedure will be permitted only if approved by IOCL.

10.8 Time of Test Loading 10.8.1 Driven Piles

Driven piles which derive their bearing capacity mainly from granular soils shall not be tested until at least three days after driving.

Driven piles which derive their bearing capacity mainly from clays and silts shall not be tested until at least four weeks after driving. Where the four week period is impracticable it may, with the written consent of IOCL, be reduced but under no circumstances will the pile be tested until at least two weeks have elapsed since it was driven.

Driven piles which incorporate some element of in situ concrete shall not be tested in general at the times specified above, except that no pile shall be tested until at least seven days after the concrete was placed. Bored cast in place concrete piles shall not be tested until they are at least seven days old.

10.8.2 Reaction Systems

a) Compression Tests

Tests shall be carried out using kentledge, tension piles or specially constructed anchorages. Kentledge shall not be used for tests on raking piles. Where kentledge is to be used, support it on cribwork positioned around the pile head so that its centre of gravity is on the axis of the pile. The bearing pressure under supporting cribs shall be such as to ensure stability of the kentledge stack. Kentledge shall not be carried directly on the pile head, except when directed.

b) Tension Tests

Tests shall be carried out using compression piles or rafts constructed on the ground. The use of inclined reaction piles or anchors is not precluded, but is subject to approval. In all cases the resultant force of the reaction system shall be co-axial with the test pile.

c) Working Piles

Working piles shall not be used as reaction piles without approval. Where working piles are used as reaction piles their movement shall be measured to an accuracy of 0.5mm.

d) Spacing

Where kentledge is used for loading vertical piles in compression, the distance from the edge of the test pile to the nearest part of the crib supporting the kentledge stack in contact with the ground shall not be less than 1.3m.

The centre to centre spacing of vertical reaction piles, including working piles used as reaction piles, from a test pile shall not be less than three times the diameter of the test pile or the reaction piles or 2m, whichever

Page 48: PDRP-8310-SP-0006+REV+F3.pdf

PARADIP REFINERY PROJECT PROJECT SPECIFICATION A

GENERAL SPECIFICATION FOR PILING

PDRP-8310-SP-0006 PAGE : 48 OF 61

REV : F3

PDRP-8310-SP-0006 DSN 2009

is the greatest. Where a pile to be tested has an enlarged base, the same criterion shall apply with regard to the pile shaft, with the additional requirement that the surface of no reaction pile shall be closer to the base of the test pile than one half of enlarged base diameter.

Where ground anchors are used to provide a test reaction for loading in compression, no part of the section of the anchor transferring load to the ground shall be closer to the test pile than three times the diameter of the test pile. Where the pile to be tested has an enlarged base, the same criterion shall apply with regard to the pile shaft, with the additional requirement that no section of the anchor transferring load to the ground shall be closer to the pile base than a distance equal to the base diameter.

e) Adequate Reaction

The size, length and number of the piles or anchors, or the area of the rafts, shall be adequate to transmit the maximum test load to the ground in a safe manner without excessive movement or influence on the test pile. In the case of the proof-load test, the reaction system shall be capable of applying a load of at least 1.5 times the working load of pile. Where the test is intended to determine the ultimate load bearing capacity of the pile, the reaction system shall be able to apply a load of not less than 1.25 times the calculated ultimate bearing capacity.

f) Care of Piles

The method employed in the installation of any reaction piles, anchors, or rafts shall be such as to prevent damage to any test pile or working pile.

g) Loading Arrangement

The loading arrangement used shall be designed to transfer safely to the test pile the maximum load required in testing. Full details shall be submitted prior to any work related to the testing process being carried out on the site.

10.9 Loading 10.9.1 Equipment for Applying Load

- The equipment used shall consist of one or more hydraulic rams or jack.

- The total capacity of the jacks shall be at least equal to the required maximum load.

- The jack or jacks shall be arranged in conjunction with the reaction system to deliver an axial load to the test pile.

- The complete system shall be capable of transferring the maximum load required for the test.

10.9.2 Measurement of Load

Page 49: PDRP-8310-SP-0006+REV+F3.pdf

PARADIP REFINERY PROJECT PROJECT SPECIFICATION A

GENERAL SPECIFICATION FOR PILING

PDRP-8310-SP-0006 PAGE : 49 OF 61

REV : F3

PDRP-8310-SP-0006 DSN 2009

Measure the load by a load measuring device and by a calibrated pressure gauge included in the hydraulic system. Record readings of both the load measuring device and the pressure gauge. In interpreting the test data the values given by the load measuring device shall normally be used, the pressure gauge readings being required as a check for gross error.

The load measuring device may consist of a proving ring, load measuring column, pressure cell or other appropriate system. Use a spherical seating in conjunction with any devices that are sensitive to eccentric loading, taking care to avoid any risk of buckling. Load measuring devices and jacks shall be short in axial length in order to achieve the best possible stability, and attention shall be paid to details in order to ensure that axial loading is maintained.

Calibrate the load measuring device before and after each series of tests, whenever adjustments are made to the device or at intervals appropriate to the type of equipment. The pressure gauge and hydraulic jack shall be calibrated together. Certificates of calibration shall be supplied to IOCL.

Obtain agreement in writing before any modification of this procedure is adopted.

10.9.3 Adjusting Loading Equipment

The loading equipment shall be capable of adjustment throughout the test to obtain a smooth increase of load or to maintain each load constant at the required stages of a maintained loading test.

10.10 Measuring Movement of Pile Heads 10.10.1 Maintained Load Test

In a maintained load test measure movement of the pile head by one of the methods in Sections 10.10.3, 10.10.4, 10.10.5 and 10.10.6, in the case of vertical piles, or by one of the methods in Sections 10.10.4, 10.10.5 and 10.10.6 in the case of raking piles, as required.

10.10.2 CRP and CRU Tests

In a CRP or a CRU test use the method of Section 10.12.4. Check levelling of the reference frame or on the pile head shall not be required. The dial gauge shall be graduated in divisions of 0.02mm or less.

10.10.3 Levelling Method

An optical or any other levelling method by reference to an external datum may be used.

Where a level and staff are used, choose the level and scale of the staff to enable readings to be made to within an accuracy of 0.5mm. A scale attached to the pile or pile cap may be used instead of a levelling staff. Establish at least two datum points on permanent objects or other well-founded structures, or install deep datum points. Each datum point shall be situated so that only one setting up of the level is needed.

Page 50: PDRP-8310-SP-0006+REV+F3.pdf

PARADIP REFINERY PROJECT PROJECT SPECIFICATION A

GENERAL SPECIFICATION FOR PILING

PDRP-8310-SP-0006 PAGE : 50 OF 61

REV : F3

PDRP-8310-SP-0006 DSN 2009

No datum point shall be affected by the test loading or other operations on the Site.

Where another method of levelling is proposed this shall be approved in writing by IOCL.

10.10.4 Independent Reference Frame

An independent reference frame may be set up to permit measurement of the movement of the pile. The supports for the frame shall be founded in such a manner and at such a distance from the test pile, kentledge support cribs, reaction piles, anchorages and rafts that movements of the ground in the vicinity of the equipment do not cause movement of the reference frame during the test which will affect the required accuracy of the test. Make check observations of any movements of the reference frame and check the movement of the pile head relative to an external datum, during the progress of the test. In no case shall the supports be less than three test pile diameters or 2m, whichever is the greater, from the centre of test pile.

Take the measurement of pile movement by two dial gauges rigidly mounted on the reference frame that bear on surfaces normal to the pile axis fixed to the pile cap or head. Alternatively the gauges may be fixed to the pile and bear on surfaces on the reference frame. Place the dial gauges in diametrically opposed positions and equidistant from the pile axis. The dial gauges shall enable readings to be made to within an accuracy of 0.1mm.

Protect the reference frame from sun and wind.

10.10.5 Reference Wire

Hold a reference wire under constant tension between two foundations formed as in the method of Section 10.10.4. Position the wire against a scale fixed to the pile and determine the movement of the scale relative to the wire.

Make check observations of any movements of the supports of the wire or make a check of the movement of the pile head as in the method of Section 10.10.3. Take readings to within an accuracy of 0.5mm.

Protect the reference wire from sun and wind.

10.10.6 Other Methods

Other methods for measuring the movement of pile heads may be submitted for approval.

10.11 Protection of Testing Equipment 10.11.1 Protection from Weather

All equipment for measuring load and movement shall be protected from the weather throughout the test period.

10.11.2 Prevention of Disturbance

Construction equipment and persons who are not involved in the testing process shall be kept at a sufficient distance from the test to avoid disturbance to the measurement apparatus.

Page 51: PDRP-8310-SP-0006+REV+F3.pdf

PARADIP REFINERY PROJECT PROJECT SPECIFICATION A

GENERAL SPECIFICATION FOR PILING

PDRP-8310-SP-0006 PAGE : 51 OF 61

REV : F3

PDRP-8310-SP-0006 DSN 2009

10.12 Test Procedure 10.12.1 Maintained Load Test

The maximum load which shall be applied in a proof test on a working pile is 1.5 times the working load. The loading and unloading shall be carried out in stages as shown in Table 7.

The maximum load which shall be applied on a preliminary pile is 3.0 times the working load. The loading and unloading shall be carried out in stages as shown in Table 7.

Following each application of an increment of load hold the load for not less than the period shown in Table 7 or until the rate of settlement is less than 0.25mm/h and slowing down. Calculate the rate of settlement from the slope of the curve obtained by plotting values of settlement versus time and drawing a smooth curve through the points.

Each stage of unloading shall proceed after the expiry of the period shown in Table 7.

For any period when the load is constant, record time and settlement immediately on reaching the load and at approximately 15 min. intervals for 1h, at 30 min. intervals between 1h and 4 h, and at 1 h intervals between 4 h and 12 h after the application of the increment of load.

10.12.2 Use of CRP Test

To determine the ultimate bearing capacity of preliminary piles and piles which are not to be used subsequently as working piles by the CRP test, unless otherwise required.

10.12.3 Use of CRU Test

To determine the ultimate capacity in tension of preliminary piles which are not to be used subsequently as working piles by the CRU test, unless otherwise required.

10.12.4 Procedure for a CRP or CRU Test

Unless otherwise agreed prior to commencement the test shall be carried out in the following manner:

- Steadily increase the load on the pile in such a way that the settlement of the pile head proceeds at a constant rate and continue this process without any pause until a penetration equal to 3 times that corresponding to the failure load, as defined below, has been reached. Control the rate of penetration of the pile either by manually checking the time taken for small increments of load and adjusting the pumping rate accordingly or preferably by means of a pacing device attached to one of the dial gauges recording the settlement.

- Take readings of time, penetration and load at convenient and constant intervals of penetration. Where the control of the rate of penetration is manual these readings shall be sufficiently closely

Page 52: PDRP-8310-SP-0006+REV+F3.pdf

PARADIP REFINERY PROJECT PROJECT SPECIFICATION A

GENERAL SPECIFICATION FOR PILING

PDRP-8310-SP-0006 PAGE : 52 OF 61

REV : F3

PDRP-8310-SP-0006 DSN 2009

spaced so as to give an adequate control of the rate of penetration. As the test proceeds one of the operators shall make a plot of load versus penetration or load versus time in order to determine when the ultimate bearing capacity has been achieved, so that the test may be terminated at 3 times the penetration at failure. If the control of rate of penetration is manual, make an additional plot of penetration versus time during the test as a check on the rate of penetration achieved.

- After completion of the test, run off the load and repeat the whole test so that two complete cycles of loading are obtained. The rate of penetration is not critical and may be chosen to suit the apparatus available but it should generally lie within the range 0.4mm/min. and 3.5mm/min.

- Make available for the test a sufficient number of skilled operators to carry out all of the functions required. The actual number will depend upon the arrangements for the test but in no event shall less than three operators be employed.

- Present the results of each test in the form of three graphs:

• Load (Y axis) versus Penetration.

• Penetration (Y axis) versus Time.

• Load (Y axis) versus Time.

Determine the failure load of the pile from the load penetration graph as follows. Draw a line which is tangential to the final and flatter portions of the two curves resulting from the two cycles of loading. The point where this line intersects the load axis shall be taken as the failure load.

10.12.5 Combined Proof Test and CRP or CRU Test

A proof test by maintained loading shall be carried out where required prior to a CRP or CRU test.

10.13 Presentation of Results 10.13.1 Results to be Submitted

Results shall be submitted as a summary in writing unless otherwise directed within 24 hours of the completion of the test, which shall give:

- For a proof test by maintained load for each stage of loading, the period for which the load was held, the load and the maximum settlement or uplift recorded.

- For a CRP or CRU test the maximum load reached and a graph of load against penetration or load against uplift.

- The completed schedule of recorded data as in Sections 10.13.2 to 10.13.11 within seven days of the completion of the test.

Page 53: PDRP-8310-SP-0006+REV+F3.pdf

PARADIP REFINERY PROJECT PROJECT SPECIFICATION A

GENERAL SPECIFICATION FOR PILING

PDRP-8310-SP-0006 PAGE : 53 OF 61

REV : F3

PDRP-8310-SP-0006 DSN 2009

10.13.2 Recorded Data Generally

Information shall be provided about the tested pile in accordance with the following where applicable:

− Site location − Contract identification − Proposed structure − Main Contractor − Piling Contractor − Engineer − Client − Date of test

10.13.3 Recorded Pile Data All Types

Information shall be provided about the tested pile in accordance with the following where applicable:

− Identification (number and location) − Position relative to adjacent piles − Brief description of location (e.g. in cofferdam, in cutting, over

water) − Ground level at pile position − Head level at which test load is applied − Type of pile (e.g. precast reinforced concrete, steel H, bored in

place, driven in place, composite type) − Vertical or raking, compression or tension − Shape and size of cross-section of pile, position of change in cross-

section − Shoe or base details − Head details − Length in ground − Level of toe − Any permanent casing or core

10.13.4 Recorded Concrete Pile Data

Information shall be provided about the tested pile in accordance with the following where applicable:

− Concrete mix − Aggregate type and source − Cement type − Slump − Cube test results of pile and cap − Date of casting of precast pile − Reinforcement

Page 54: PDRP-8310-SP-0006+REV+F3.pdf

PARADIP REFINERY PROJECT PROJECT SPECIFICATION A

GENERAL SPECIFICATION FOR PILING

PDRP-8310-SP-0006 PAGE : 54 OF 61

REV : F3

PDRP-8310-SP-0006 DSN 2009

10.13.5 Recorded Steel Pile Data

Information shall be provided about the tested pile in accordance with the following where applicable:

− Steel quality − Coating − Filling

10.13.6 Recorded Pile Installation Data all Types

Information shall be provided about the tested pile in accordance with the following where applicable:

− Dates and times of boring, driving and concreting of test pile and adjacent piles

− Unexpected circumstances and difficulties − Date and time of casting concrete pile cap − Start and finish of each operation during driving or installation of a

pile and subsequent testing − Difficulties in handling, pitching and driving pile − Delays due to environmental conditions

10.13.7 Recorded Bored Pile Installation Data

Information shall be provided about the tested pile in accordance with the following where applicable:

− Type of equipment used and method of boring − Temporary casing, method of installation and extraction − Strata encountered during boring − Water encountered during boring − Method of placing concrete and conditions pertaining − Volume of concrete placed − Concrete level before and after extraction of casing

10.13.8 Recorded Driven Preformed and Driven in Place Pile Installation Data

Information shall be provided about the tested pile in accordance with the following where applicable:

− Method of support of pile and hammer (frame, hanging leaders, suspended hammer or other method)

− Driven length of pile or temporary casing at final set − Hammer type, size or weight − Dolly and packing, type and condition before and after driving. − Driving log (depth, blows per 25mm, interruptions or breaks in

driving) − Final set in number of blows to produce penetration of 25mm − Redrive check, time interval and set in number of blows to produce

penetration of 25mm − At final set and at redrive set, for drop or single acting hammer the

length of the drop or stroke, for diesel hammer the length of the

Page 55: PDRP-8310-SP-0006+REV+F3.pdf

PARADIP REFINERY PROJECT PROJECT SPECIFICATION A

GENERAL SPECIFICATION FOR PILING

PDRP-8310-SP-0006 PAGE : 55 OF 61

REV : F3

PDRP-8310-SP-0006 DSN 2009

stroke and the blows per minute, for double acting hammer the number of blows per minute

− Condition of pile head or temporary casing after driving − Use of a follower − Use of preboring − Use of jetting − Lengthening − Details of temporary casing − Concrete level before and after extraction of casing − Method of placing concrete and conditions pertaining

10.13.9 Recorded Test Procedure Data

Information shall be provided about the tested pile in accordance with the following where applicable:

− Weight of kentledge − Tension pile, ground anchor or compression pile details − Plan of test arrangement showing position and distances of

kentledge supports, rafts, tension or compression piles and reference frame to test pile

− Jack capacity − Method of load measurement − Method(s) of penetration or uplift measurement − Proof test by maintained loading and CRP or CRU − Relevant dates and times

10.13.10 Recorded Test Results Data

Information shall be provided about the tested pile in accordance with the following where applicable:

− In tabular form − In graphical form, load plotted against settlement, load plotted

against uplift, with times − Ground heave − Effect on adjacent structure

10.13.11 Recorded Site Investigation Data

Site investigation report number

Borehole references

10.14 Pile Acceptance Criteria 10.14.1 Maintained Load Test

In the case of a maintained load test, a pile will be considered to have failed if, at any time during the test, a state of progressive settlement occurs. Unless otherwise informed by the requirements of a particular project specification failure will also be considered to have occurred if one or more of the following limits is exceeded:

Page 56: PDRP-8310-SP-0006+REV+F3.pdf

PARADIP REFINERY PROJECT PROJECT SPECIFICATION A

GENERAL SPECIFICATION FOR PILING

PDRP-8310-SP-0006 PAGE : 56 OF 61

REV : F3

PDRP-8310-SP-0006 DSN 2009

− A settlement of 10mm under working load − A settlement of 20mm under 1.5 times working load − A residual settlement after removal of proof load of 8mm

10.14.2 CRP or CRU Test

In the case of a CRP or CRU test, the failure load shall be as defined in Section 10.13.4.

10.14.3 Unsatisfactory Tests

If the tests indicate that the piles are unsatisfactory, works shall be carried out as are necessary to enable a sufficient support to be given to the structure. If the type of pile is suitable, piles may be lengthened and driven deeper into the soil. Where this is not possible, one or more additional piles shall be provided and the pile cap modified to suit. As soon as possible after the piles are known to be unsatisfactory, proposals shall be submitted for adequately supporting the structure but shall not implement such proposals until approval is given by IOCL.

One further test shall be carried out either on the original pile lengthened or on a substitute pile. IOCL shall be satisfied also that any piles constructed prior and subsequent to the results of the test being known are capable of carrying the specified working load. Further tests shall be carried out if directed and any piles which are unsatisfactory shall be dealt with as previously described.

Acceptance criteria shall demonstrate that the capacity of pile has been achieved. The integrity test shall assure that the pile is sound and no cracks have been induced during driving.

10.15 Completion of a Test 10.15.1 Measuring Equipment

On completion of a test all equipment and measuring devices shall be dismantled, checked and either stored so that they are available for use in further tests or removed from the site as required.

10.15.2 Kentledge

Kentledge and its supporting structure shall be removed from the test pile and store so that it is available for use in further tests, or remove from the site, as required.

10.15.3 Ground Anchors and Temporary Piles

On completion of a preliminary test, tension piles and ground anchors shall be cut off below ground level, removed from the site and the ground made good with approved material as specified.

10.15.4 Preliminary Test Pile Cap

The pile cap shall be broken off, if formed in concrete, and the resulting material disposed of off the site. If the cap is made of steel, cut off and store so that it is available for use in further tests or remove from the site as

Page 57: PDRP-8310-SP-0006+REV+F3.pdf

PARADIP REFINERY PROJECT PROJECT SPECIFICATION A

GENERAL SPECIFICATION FOR PILING

PDRP-8310-SP-0006 PAGE : 57 OF 61

REV : F3

PDRP-8310-SP-0006 DSN 2009

required. Make good or extend the pile head to the cut off level in Section 6.12.1.

10.15.5 Proof Test Pile Cap

On completion of a test of a proof pile, the test pile cap shall be stripped if in concrete and left in a state ready for incorporation in the permanent works. The resulting material shall be disposed of off the site. Cut off the pile cap if made of steel and store so that it is available for use in further tests or remove from the site as required.

10.15.6 Ground Anchors and Temporary Piles

On completion of a proof test, temporary piles and ground anchors shall be removed, cut off as specified or, if approved, incorporated in the permanent works.

TABLE 1: CURING TIMES

Type of Cement

Wet curing time after completion of placing concrete

Ordinary Portland Sulphate-resisting Portland Portland Pozzolona(fly ash based) Super-sulphated Rapid-hardening Portland

4 days 4 days 4 days 4 days 3 days

Page 58: PDRP-8310-SP-0006+REV+F3.pdf

PARADIP REFINERY PROJECT PROJECT SPECIFICATION A

GENERAL SPECIFICATION FOR PILING

PDRP-8310-SP-0006 PAGE : 58 OF 61

REV : F3

PDRP-8310-SP-0006 DSN 2009

TABLE 2: RECORD KEEPING

DATA

DRIVEN PRE CAST AND STEEL PILES

BORED CAST IN PLACE PILES

DRIVEN CAST IN PLACE PILES

Contract

*

*

*

Pile reference number (location) *

*

*

Pile type *

*

*

Nominal cross-sectional dimensions or diameter *

*

*

Nominal diameter of underream -

*

-

Length of preformed pile *

-

-

Standing ground water level -

*

-

Date and time of driving, redriving or boring *

*

*

Date of concreting -

*

*

Ground level at commencement of installation of pile *

*

*

Working level *

*

*

Depth from working level to pile toe *

*

*

Toe level *

*

*

Depth from working level to pile head level -

*

*

Length of temporary casing -

*

*

Length of permanent casing -

*

*

Type, weight, drop and mechanical condition of hammer and equivalent information for other equipment

*

-

*

Number and type of packing used and type and condition of dolly used during driving the pile

*

-

*

Set of pile tube in mm per 10 blows or number of blows per 25mm of penetration

*

-

*

If required, the sets taken at intervals during the last 3m of the driving

*

-

*

If required, temporary compression of ground and pile from time of a market increase in driving resistance until pile reaches its final level

*

-

*

Soil samples taken and in situ tests carried out

-

*

-

Length and details of reinforcement -

*

*

Concrete mix -

*

*

Volume of concrete supplied to pile where this can be measured in practice

-

*

*

All information regarding obstructions delays and other interruptions to the sequence of work

*

*

*

Page 59: PDRP-8310-SP-0006+REV+F3.pdf

PARADIP REFINERY PROJECT PROJECT SPECIFICATION A

GENERAL SPECIFICATION FOR PILING

PDRP-8310-SP-0006 PAGE : 59 OF 61

REV : F3

PDRP-8310-SP-0006 DSN 2009

TABLE 3: PRESCRIBED MIX (USING INTERNAL VIBRATORS)

Prescribed mixes for piling where the concrete can be compacted in position by the use of internal vibrators or other approved methods.

Concrete Grade

Nominal Maximum Size of

Aggregate Mm

40

20

Workability

Medium

High

Medium

High

Slump limits, mm

50- 100

100- 150

25- 75

75- 125

M20 Cement, kg/m3 Total aggregate, kg/m3 Sand/total aggregate: zone 1

zone 2zone 3

300

1850 35% 30% 30%

320

1750 40% 35% 30%

320

1800 40% 35% 30%

350

1750 45% 40% 35%

M25 Cement, kg/m3 Total aggregate, kg/m3 Sand/Total aggregate: zone 1

zone 2zone 3

340

1800 35% 30% 30%

360

1750 40% 35% 30%

360

1750 40% 35% 30%

390

1700 45% 40% 35%

M30 Cement. kg/m3 Total aggregate, kg/m3 Sand/Total aggregate: zone 1

zone 2zone 3

370

1750 35% 30% 30%

390

1700 40% 35% 30%

400

1700 40% 35% 30%

430

1650 45% 40% 35%

Notes

1. If the specific gravity of either the coarse or the fine aggregate differs significantly from 2.6 the weight of each type of aggregate shall be adjusted in proportion to the specific gravity of the materials.

2. If crushed stone sand or crushed gravel sand is used instead of natural sand the weight of the coarse aggregate shall be reduced by at least 90 kg without alteration to the weight of sand or cement.

3. The cement shall be Portland pozzolona cement or Sulphate Resisting Portland. Where other cements are used, special consideration shall be given to the design of the mix.

4. The weights of cement and dry aggregates are those which will produce approximately one cubic metre of compacted concrete.

Page 60: PDRP-8310-SP-0006+REV+F3.pdf

PARADIP REFINERY PROJECT PROJECT SPECIFICATION A

GENERAL SPECIFICATION FOR PILING

PDRP-8310-SP-0006 PAGE : 60 OF 61

REV : F3

PDRP-8310-SP-0006 DSN 2009

TABLE 4: DELETED

TABLE 5: BENTONITE TESTING

Property to be measured

Range of results at 20�

Test Method

Density Viscosity Shear Strength (10 minute gel strength) pH

Less than 1.10 g/ml. 30-90 second or less than 20 cP 1.4-10 N/m2 or 4-40 N/m2 9.5-12

Mud density balance Marsh Cone Method Fann Viscometer* Shearometer Fann Viscometer pH indicator paper strips or electrical pH meter

*Where the Fann viscometer is specified, the fluid sample should be screened by a number 52 sieve (300 micro m) prior to testing.

TABLE 6: WORKABILITY

Piling Mix Workability

Slump

Typical conditions of use

Minimum

mm

Maximum

mm

A

75

125

Placed into water-free unlined bore. Widely spaced reinforcement leaving ample room for free movement between bars.

B

100

175 Where reinforcement is not spaced widely enough to give free movement between bars. Where casting level of concrete is within the casing. Where pile diameter is less than 600mm.

C

150 -

Where concrete is to be placed by tremie under water or drilling fluid.

Page 61: PDRP-8310-SP-0006+REV+F3.pdf

PARADIP REFINERY PROJECT PROJECT SPECIFICATION A

GENERAL SPECIFICATION FOR PILING

PDRP-8310-SP-0006 PAGE : 61 OF 61

REV : F3

PDRP-8310-SP-0006 DSN 2009

TABLE 7: LOAD INCREMENTS

Load, percentage of working load

Minimum Time of Holding Load

25

1 h 50

1 h

75

1 h 100

1 h

75

10 min 50

10 min

25

10 min 0

1 h

100

6 h 125

1 h

150

6 h 125

10 min

100

10 min 75

10 min

50

10 min 25

10 min

0

1 h