pdoc-53-2013-ra-04
TRANSCRIPT
-
8/13/2019 PDOC-53-2013-RA-04
1/11
ClientTHYNA PETROLEUM
SERVICES7 Avenue Abdelrahmen El GhafikiBP 069 / 3069
Sfax-HachedSfax (Tunisia)Phone: 216 74 229 999 - Fax: 216 74 299 916
TENDER REFERENCE
PUR/TEN/02/2013
ConstructorHALWANI COMPANY Ltd
INDUSTRIAL AND METALCONSTRUCTION
Zone Industrielle Madagascar Prs SomatraCP 3000Sfax (Tunisia)
Phone: 216 74 497 166/010 - Fax: 216 74 497 795
DOCUMENT No.
PDOC-53/2013-RA-04
Project Title:
LOADING / OFFLOADING STATIONSAND METERING SKIDS INSTALLATION
AT TANK BATTERY / GUEBIBA BASE & TRAPSA
RISK ASSEMEMENT Rev. 00
-
8/13/2019 PDOC-53-2013-RA-04
2/11
HALWANI COMPANY Ltd
AUTHOR: AKRAM FERCHICHI
DOC.: RISK ASSESSMENT
PROJECT: LOADING / OFFLOADING STATIONS
Job No : 53-2013
PDOC-53/2013-RA-04
Rev. : 00
Sheet : 2 of 11
Job Number : OF 053/2013
Task or Work activities : Supply and Erection of Trucks loading and
offloading steel stations at Tank Battery / Guebiba
base & Trapsa, including procurement and
pre-construction will all Civil & Steel Works
needs.
Site(s) : TANK BATTERY StationGUEBIBA BaseTRAPSA Terminal
Equipment to be used : Civil Works:
Concrete Mixer Truck, Concrete Pump, Hoses /Concrete shoots, Concrete buckets, AirCompressor, Survey Equipment, Level, TotalStation ( Surveying instrument for checking thelevels & distances ), Masonry Accessories,Wheel Barrows, Concrete Vibrators
Erection Steel Works:
L dd M bil S ff ld H d t l F klift
-
8/13/2019 PDOC-53-2013-RA-04
3/11
HALWANI COMPANY Ltd
AUTHOR: AKRAM FERCHICHI
DOC.: RISK ASSESSMENT
PROJECT: LOADING / OFFLOADING STATIONS
Job No : 53-2013
PDOC-53/2013-RA-04
Rev. : 00
Sheet : 3 of 11
F = Frequency S = Severity R = Rating (FxS) = High (6 & 9), Medium (3 & 4), and Low (1 & 2)
Rev. : 00 Sheet : 3 of 11
# ACTIVITYSequence ofworking
activities
HAZARDSThe potential to causeharm (heath, Injury,
Property damage,environment etc.)
CONSEQUANCES(The harm whichcould possibly
occur)
RISK RATINGCONTROL MEASURESDescribe controls that are required to be taken RESIDUAL RISK
F S R F S R
1 Vehicle/Equipmentmovementinside therestricted area
Vehicle movement Driver
Labors
Forman
2 3 HIGH Close supervision
Identify vehicle routes
Vehicle to leave the area once job is complete
Journey Management system to be implemented
1 2 LOW
2 ManualExcavation
Employees working
near the pits
Environmental hazard
H2S
Labors
Forman
2 3 HIGH All heavy machinery / vehicles should not be
allowed working without assessing banks man
Carry out a physical survey to whole surrounding
area
Limited workers allow to work at one location
Close supervision
1 1 LOW
3 Mechanicalexcavation
Employees working
near the moving
equipment/trench
Environmental hazard
Equipment moving
Driver
Labors
Forman
2 3 HIGH Emergency procedure and contingency plan to be
in place and cascaded to all crew members and
really available at sit locations
Primary and secondary assembly point to be
assigned by considering the prevailing
Close supervision
1 1 LOW
-
8/13/2019 PDOC-53-2013-RA-04
4/11
HALWANI COMPANY Ltd
AUTHOR: AKRAM FERCHICHI
DOC.: RISK ASSESSMENT
PROJECT: LOADING / OFFLOADING STATIONS
Job No : 53-2013
PDOC-53/2013-RA-04
Rev. : 00
Sheet : 4 of 11
F = Frequency S = Severity R = Rating (FxS) = High (6 & 9), Medium (3 & 4), and Low (1 & 2)
Rev. : 00 Sheet : 4 of 11
4 Lifting operationand installationof pre-cast
foundations andslabsfoundations andslabs into thetrench
Lifting
Wind speed
Labors
Forman
3 3 HIGH Close supervision
Identify rigging location
Lifting machine placement shall be at safe
distance from live lines/equipment
Lifting machine leave the plant once complete the
job
1 1 LOW
5 Mixing &Pouring ofconcrete
Cement
Moving parts of the
rotating mixer
Labors
Forman
2 3 HIGH Close supervision 1 1 LOW
6 Back filling andCompacting ofsand & Gatch
Moving Equipment
operation
Dust
Vibration
Impact/Hitting from
compacting machine
Labors
Forman
Operator
2 3 HIGH All rotating parts of the machine should be in
place
Avoid long time exposure to dust/vibration:
frequent rests
Employ a minimum hand grip to observe less
vibration
1 2 LOW
-
8/13/2019 PDOC-53-2013-RA-04
5/11
HALWANI COMPANY Ltd
AUTHOR: AKRAM FERCHICHI
DOC.: RISK ASSESSMENT
PROJECT: LOADING / OFFLOADING STATIONS
Job No : 53-2013
PDOC-53/2013-RA-04
Rev. : 00
Sheet : 5 of 11
F = Frequency S = Severity R = Rating (FxS) = High (6 & 9), Medium (3 & 4), and Low (1 & 2)
Rev. : 00 Sheet : 5 of 11
7 Erection ofprecastelements with
mobile/crane
fall of person from
height
Failure of slings or
other lifting gears
Electrocution from
portable hand tools
Cut and bruise
injuries to erectors
Unsafe lifting and
fixing by erectors
Untrained erectors
Miss communication
between rigger, tirfor
lifters and crane
operator.
Structural failure
Collapse of edge
protection
Erector
Forman
2 3 HIGH All works to be carried out as per approved
method statement document
All crane lifts to be controlled by a competent and
authorize signaler/Banks man.
The crane will be tested and certified as per
manufacturers recommendations and statuary
regulations.
All lifting gear (Slings, chain, etc.) to be tested.
Daily before the start of work Forman should
visually examine all lifting gears for any defects:
Responsibility Site Forman
Only competent erectors to be used for the
structure erection
Mutually understandable signals to be used
between crane operator and rigger. If necessary use
the walky talkie
All erectors to use full body harness and latch
them to the standard lifeline
Forman should inspect the precast structure on
arrive for any crack or defects than can lead to thecollapse of it during erection
All the workers and staff should have specifics
site safety induction by safety officer and records to
be kept.
1 2 LOW
-
8/13/2019 PDOC-53-2013-RA-04
6/11
HALWANI COMPANY Ltd
AUTHOR: AKRAM FERCHICHI
DOC.: RISK ASSESSMENT
PROJECT: LOADING / OFFLOADING STATIONS
Job No : 53-2013
PDOC-53/2013-RA-04
Rev. : 00
Sheet : 6 of 11
F = Frequency S = Severity R = Rating (FxS) = High (6 & 9), Medium (3 & 4), and Low (1 & 2)
Rev. : 00 Sheet : 6 of 11
8 Unloading ofstructure parts
Failure of Crane,
Slings, clutch
Fall of persons from
height
Crushing injuries to
workers caused by
coming between
structure parts and truck
Overloading the crane
Structural failure
Impact or collision
Labor
Operator
2 3 HIGH Respective supervisor/ operator should examine
the slings
Clutches, before starting the work.
Cranes should have valid third party inspection
certificate
Clearly marking safe working load
Labors should use ladders to go up release the
clutch
Labors always wear full body harness and latch
them at Top
Labors should be very careful during the work and
not to put body parts under the structure part(s)
Competent and trained operator to do the lift
Every lift has to be pre-planned.
2 1 LOW
9 Scaffolding &Ladders
Collapse of scaffold
Fall from height
Falling from ladders
Falling objects
Crane associated
hazards
Splinters, protruding
nails, sharp edges
Unsafe positioning of
Rigger
Operator
Labor
2 3 HIGH Scaffold must be erected by competent person/
under competent supervision.
All crane lifts to be controlled by a competent and
authorize signaler /Banks man.
This risk assessment must be communicated to
the workers on site.
An effective access/egress design is to be
followed
All platforms are to be fully boarded and hand
2 2 MED
-
8/13/2019 PDOC-53-2013-RA-04
7/11
HALWANI COMPANY Ltd
AUTHOR: AKRAM FERCHICHI
DOC.: RISK ASSESSMENT
PROJECT: LOADING / OFFLOADING STATIONS
Job No : 53-2013
PDOC-53/2013-RA-04
Rev. : 00
Sheet : 7 of 11
F = Frequency S = Severity R = Rating (FxS) = High (6 & 9), Medium (3 & 4), and Low (1 & 2)
Rev. : 00 Sheet : 7 of 11
ladders railed
No board is to be unrestrained at its ends.
Toe boards are to be installed on all used platform
levels.
Tool-retainers (boxes and buckets) to be used to
reduce the risk of tools falling form scaffold.
All workers in elevated positions are to wear a
safety harness.
Secure the ladders/ stairs properly.
Minimize number of people in the area.
A suitable qualified supervisor or deputy should
be present during the erection of the scaffolds.
Stairs should have regular landings where
workers can rest effectively.
Regular cleaning will be done to minimize trip
hazards and the buildup of surplus materials on
platforms
10 Hot WorkOperation
Fire and explosion
Metal spatter
Prolonged exposureto heat
Gases & fumes
Improper welding
equipments
Welder
Helper
2 3 HIGH A competent fire watch with suitable fire
extinguishers must be Improper welding equipments
present at hot work areaWhere possible all flammable material should be
removed from the welding operations area.
Only competent and authorized personnel to use
equipment (i.e. welders, cutter/burners).
1 1 LOW
-
8/13/2019 PDOC-53-2013-RA-04
8/11
HALWANI COMPANY Ltd
AUTHOR: AKRAM FERCHICHI
DOC.: RISK ASSESSMENT
PROJECT: LOADING / OFFLOADING STATIONS
Job No : 53-2013
PDOC-53/2013-RA-04
Rev. : 00
Sheet : 8 of 11
F = Frequency S = Severity R = Rating (FxS) = High (6 & 9), Medium (3 & 4), and Low (1 & 2)
Rev. : 00 Sheet : 8 of 11
Free standing/without
protection cap for Gas
Bottles
Incorrect PPE
Appropriate PPE to be used when carrying out hot
works operations
Equipment to be well maintained and inspected
as per Manufacturers recommendations.
All oxy/Acetylene cutting sets must be provided
with flash back arresters.
Cylinders must be stored, handled and
transported in a safe manner.
Effective fume control equipment should be
provided when working in confined area. (in need)
Extra ventilation should be introduced to reduce
the likelihood of heat stress occurrence. (in need)
The placing of a second person on stand-by in
case of emergency should be considered.
Prolonged welding operations to be shielded from
the sightline of adjacent operatives to reduce the risk
of 'arc-eve'.
11 Work at height Fall person
Absence edge
protectionTrips
Falling object from up
Improper Accesses
Labor
Staff
2 3 HIGH Provide guardrail all the un-protected edges
Close the open wholes property
Arrange barricading and warning signs whereverneeded.
Must wear full body harness and latch the
lanyard.
Work area very clear
1 2 MED
-
8/13/2019 PDOC-53-2013-RA-04
9/11
HALWANI COMPANY Ltd
AUTHOR: AKRAM FERCHICHI
DOC.: RISK ASSESSMENT
PROJECT: LOADING / OFFLOADING STATIONS
Job No : 53-2013
PDOC-53/2013-RA-04
Rev. : 00
Sheet : 9 of 11
F = Frequency S = Severity R = Rating (FxS) = High (6 & 9), Medium (3 & 4), and Low (1 & 2)
Rev. : 00 Sheet : 9 of 11
Make sure nobody can have work in the up
Before using any access make inspection it is
safe Secured your tools by wire rope
12 Office Activities(Temp Cabins)
Fire
Poor House keeping
Slip, trip and falls
Poor posture
Improper use of work
station
Over loading of
electric sockets
Trailing cables on
walk ways
Office Staffs 2 3 HIGH Good housekeeping habit must be enforced
Control smoking in temporary cabins
Ensure firefighting procedure
Provide emergency access and keep them clear
always.
Train employees on manual handling and
ergonomics where applicable.
Use conduits for electrical cords.
Use right kitchen wares and equipments
Prepare emergency evacuation plan and taught
to office staffs
Assign trained fire warden for all areas.
1 1 LOW
-
8/13/2019 PDOC-53-2013-RA-04
10/11
HALWANI COMPANY Ltd
AUTHOR: AKRAM FERCHICHI
DOC.: RISK ASSESSMENT
PROJECT: LOADING / OFFLOADING STATIONS
Job No : 53-2013
PDOC-53/2013-RA-04
Rev. : 00
Sheet : 10 of 11
F = Frequency S = Severity R = Rating (FxS) = High (6 & 9), Medium (3 & 4), and Low (1 & 2)
Rev. : 00 Sheet : 10 of 11
1. Risk assessment to be made available and approved by the Owner of the project2. Method Statement to be made available and approved by the Owner of the project3. Ensure that all manpower safety inducted and know the Emergency numbers (Fire = 198 | Medical 190)
-
8/13/2019 PDOC-53-2013-RA-04
11/11
HALWANI COMPANY Ltd
AUTHOR: AKRAM FERCHICHI
DOC.: RISK ASSESSMENT
PROJECT: LOADING / OFFLOADING STATIONS
Job No : 53-2013
PDOC-53/2013-RA-04
Rev. : 00
Sheet : 11 of 11
F = Frequency S = Severity R = Rating (FxS) = High (6 & 9), Medium (3 & 4), and Low (1 & 2)
Rev. : 00 Sheet : 11 of 11