2.1.1
EASTERN RAILWAY
ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15
(Figures in thousand of Rupees)
Item
No.
RE 2014-15
1 Lakshmikantapur-Namkhana-Chandanagar with new material modification for
Kakadwip-Budakhali (5 km) & Chandanagar-Bakhali (17.2 km)
Cap. 2,19,15
2 Deogarh-Dumka (72.25 km) Cap. 5,53,80
EBR ..
3 Deoghar-Sultanganj incl. Banka to Barhat & Banka to Bithia Road (147 km) Cap. 40,00,00
4 Tarakeswar-Bishnupur with extension upto Dhaniakhali, Arambagh-Irphala and new
material modification for Irphala-Ghatal (11.2 km), Arambagh-Champadanga (23.3
km) & Bishnupur-Uparsol (31.8 km)
Cap. 33,69,00
5 Rampurhat-Mandarhill via Dumka (130 km) with new material modification for
Rampurhat-Murarai (29.48 km) - 3rd line
Cap. 55,36,05
EBR 14,98,00
6 Azimganj-Murshidabad (Jiaganj), incl. railway bridge over river Bhagirathi Cap. 4,10,00
7 Bariarpur-Mananpur via Kharagpur, Lachimpur-Barhat (67.78 km) Cap. 50,00
8 Sultanganj-Katuria via Asarganj, Tarapur & Belhar (74.8 km) Cap. 51,00
9 Tarkeshwar-Magra (51.95 km); incl material modification for Tarkeshwar-Furfura
Sharif (21.75 km) - New Line
Cap. 20,00
10 Hasnabad-Hingalganj (17.37 km) Cap. 1,19,00
11# Hansdiha-Godda (30 km) Cap. 8,03,00
EBR 2,00,00
12 Pirpainti - Jasidih (97 km) Cap. 25,00
TOTAL-WORKS IN PROGRESS Cap. 151,56,00
EBR 16,98,00
TOTAL-New Lines (Construction) Cap. 151,56,00
EBR 16,98,00
13 Bardhaman-Katwa (51.52 km) with new material modification for Katwa-Bazarsau
(30.59 km) - doubling, Katwa (Dainhat)-Mateswar (34.4 km), Negun - Mangalkot
(8.60 km) & Mateswar - Memari (35.6 km) - NL
Cap. ..
EBR 62,49,98
TOTAL-WORKS IN PROGRESS EBR 62,49,98
TOTAL-Gauge Conversion EBR 62,49,98
14 Sainthia-Tarapith - 3rd line Cap. 60,00,00
15 Plassey-Jiaganj (54.29 km) Cap. 39,00,00
16 Boinchi-Shaktigarh - 3rd line (25.83 km) Cap. 10,62,34
17 Bandel-Boinchi - 3rd line (30.53 km) Cap. 12,00,00
18 Princepghat-Majherhat - Doubling of Circular Railway (4.98 km) Cap. 50,50
19 Pirpainti-Bhagalpur (59.06 km) Cap. 25,00,00
A - Works in Progress
GAUGE CONVERSION
A - Works in Progress
DOUBLING
AllocationParticulars
NEW LINES (CONSTRUCTION)
A - Works in Progress
2.1.2
EASTERN RAILWAY
ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15
(Figures in thousand of Rupees)
Item
No.
RE 2014-15AllocationParticulars
20 Bazar Sau-Azimganj Jn (42.15 km) Cap. 50,00
21 Monigram-Nimtita (34.30 km) Cap. 10,00
22 New Alipore-Akra & Budge Budge-Pujali with new material modification for Pujali-
Uluberia (Birshivpur)(10.25 km) & Pujali-Bahrahat(9.75 km)- new lines
Cap. 61,60
EBR ..
23 Habra-Bongaon Phase-I (Habra-Chandpara) & Machlandapur-Swarupnagar Cap. 55,00
EBR ..
24 Sonarpur-Canning (14.96 km) with new material modification for Kalikapur-Minakhan
via Ghatakpur (38 km) - new line
Cap. 1,10,00
EBR ..
25 Kalinarayanpur-Krishnanagar with Krishnanagar-Shantipur-Nabadwipghat - GC,
Krishnanagar-Chartala, MM for Krishnanagar-Chapra-NL, Naihati-Ranaghat-3rd line,
Nabadwipghat-Nabadwipdham upto BB loop (9.58 km), Ranaghat-Lalgola-
strengthening (bridge No.2)
Cap. 25,00,00
EBR ..
26 Barasat-Hasnabad (12.12 km) Cap. 1,35,91
EBR ..
27 Bandel-Jirat of Bandel-Katwa section Cap. 1,50,25
EBR ..
28 Baruipur-Magrahat (15 km) Cap. 1,75,00
EBR ..
29 Kajra-Kiul (15.85 km) Cap. 27,80
EBR ..
30 Chandpara-Bongaon with extension to Chandabazar and new material modification
for Bongaon-Poramaheshtala (20 km) & Chandabazar-Bagdah (13.86 km) - new
lines
Cap. 2,00,00
EBR ..
31 Barharwa-Tinpahar (16.49 km) Cap. 2,57,00
32 Pandabeswar-Chinpai (21.41 km) with new material modification between Barbani-
Churulia (9 km) - new line
Cap. 1,55,00
EBR ..
33 Chinpai-Sainthia & New Lines - Prantik-Siuri and new material modification for
Chowrigachha - Sainthia via Kandi
Cap. 3,37,50
C.Fund ..
EBR ..
34 Tinpahar-Sahibganj (37.81 km) - As phase-I of doubling of Tinpahar-Bhagalpur Cap. 67,20,00
EBR ..
35 Ghutiari Sharif-Canning with extension upto Bangankhali & new material modification
for Bangankhali-Basanti (14.3 km) & Basanti-Jharkhali (23 km) - new line
Cap. 7,23,00
EBR ..
36 Dakshin Barasat-Lakshmikantapur (19.68 km), new line from Joynagar to Raidighi
(20 km) and new material modification for Joynagar-Durgapur (32 km)
Cap. 14,50,00
DOUBLING
2.1.3
EASTERN RAILWAY
ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15
(Figures in thousand of Rupees)
Item
No.
RE 2014-15AllocationParticulars
37 Magrahat-Diamond Harbour (19.67 km) with material modification for Sangrampur -
Krishanchandpur (25 km), Diamond Harbour (Gurudasnagar) - Bahrahat (21 km) -
new line & Daiamond Harbour (Gurudasnagar) - Kulpi (17.25 km) - new line
Cap. 7,85,00
EBR ..
38 Jirat-Ambika Kalna (20.23 km) Cap. 4,00,00
39 Nallikul-Tarakeshwar (17.18 km) Cap. 1,61,50
EBR ..
40 Krishnanagar-Bethuadahari (27.92 km) Cap. 13,50,00
EBR ..
41 Liluah-Dankuni - 3rd line (10.13 km) with extension to Furfura Sharif Cap. 6,90,00
EBR ..
42 Kalinarayanpur-Shantipur (15.85 km) with new material modification for Ranaghat
(Aranghata)-Duttapulia (8.17 km) - new line
Cap. 12,50,00
EBR ..
43 Katwa-Patuli (17.7 km) with new material modification for Ahmedpur-Katwa (51.92
km) - gauge conversion
Cap. 97,94,06
EBR ..
44 Nalhati-Sagardighi (26.30 km) Cap. 22,20,25
45 Sondalia-Champapukur (23.64 km) with new material modification for Bira-Chakla
(11.5 km)
Cap. 20,97,00
EBR ..
46 Azimganj-Manigram (20.49 km) Cap. 18,00,00
EBR ..
47 Lalgola-Jiaganj (22.95 km) Cap. 7,00,25
EBR ..
48 Sealdah Division - 2nd passenger line between Mile 5-B and New Alipore (1.67 km) Cap. 50,00
49 Bethudahari-Palassey (22.51 km) Cap. 13,71,32
EBR ..
50 Sahibganj-Pirpanti (10.45 km) Cap. 21,46,89
EBR ..
51 Nabadwip Dham-Patuli (22 km) Cap. 16,65,00
EBR ..
52 Ambika Kalna-Nabadwipdham (23.29 km) Cap. 41,02,50
EBR ..
53 Barharwa-Bonidanga (4.73 km) Cap. 10,05,00
EBR ..
54 Dankuni-Chandanpur- 4th line(25.41 km) as 1st phase of Dankuni-Saktigarh 4th line
with new material modification for Baruipara-Furfura - new line
Cap. 1,30,33
55 Dankuni-Bhattanagar via CC line (west) - Doubling with one additional loop at
Bhattanagar
Cap. 3,31,00
56 Tarapith-Rampurhat - 3rd line Cap. 14,00,00
DOUBLING
2.1.4
EASTERN RAILWAY
ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15
(Figures in thousand of Rupees)
Item
No.
RE 2014-15AllocationParticulars
57 Sagardighi-Azimganj Cabin (16.30 km) Cap. 6,00,00
TOTAL-WORKS IN PROGRESS Cap. 618,81,00
58 Works costing below Rs.2.5 crore each Cap. ..
DRF ..
TOTAL-NEW WORKS Cap. ..
DRF ..
TOTAL-Doubling Cap. 618,81,00
DRF ..
59 Sitarampur - Remodelling of Yard DF(3) 1,00
60 Dum Dum Jn. - Flyover to improve passage of goods & mail/express trains Cap. 1,00
EBR ..
61 Barachak - Direct delivery line & goods shed Cap. 3,00,00
62 Tikiapara-Howrah - Removal of operational constraints by laying addl track below
Chandmari bridge
DF(3) 1
63 Durgapur - Extension of up & down loops DF(3) 50,00
64 Sheoraphuli, Uttarpara & Liluah - Dismantling of diamond crossing, provision of new
crossings and wiring of Bhadreswar Ghat siding
DF(3) 50
65 Howrah - Extension of platform No.10-11 & 12-13 for accommodating longer length
train
DF(3) 10,00
66 Asansol Division - Electrification of 1st down colliery siding with down avoiding line DF(3) 1,00
67 Barddhaman - Remodelling of yard (Phase-I) (Stage-II) Cap. 1,00
68 Chitpur - Addl. terminal Cap. 4,00,00
69 Sealdah-Bongaon-Ranaghat - Running of 12-coach electrical multiple unit trains DF(3) 1,00,00
70 Belgharia-Naihati - Automatic signalling system of quadruple line (C-route) DF(3) 25,00
71 Talit - Addl. movement facility DF(3) 1
72 Aranghata - Full rake capacity goods loop Cap. 9,00
73 Sonarpur-Canning, Ballygunj-Budge Budge & Baruipur-Namkhana - Extension of
platform for running of 12-coach electrical multiple unit trains
DF(3) 40,00
74 Sealdah-Kalinarayanpur-Santipur, Kalyani-Kalyani Simanta - Extension of platforms
for running 12-coach electrical multiple unit trains
DF(3) 50,00
75 Belur-Dankuni-Bardhaman, Bandel-Naihati & Bandel-Katwa - Running of 12-coach
electrical multiple unit trains
DF(3) 1,00
76 Kajoragram-Andal Jn. Cabin - Bypass line to Sendha Road with electrification Cap. 30,00
77 Bandel-Katwa-Azimganj - Extension of loops DF(3) 5,00,00
78 Murahara - Conversion of halt station to B-class DF(3) 1,00,00
TRAFFIC FACILITIES-YARD REMODELLING & OTHERS
A - Works in Progress
DOUBLING
B - New Works
2.1.5
EASTERN RAILWAY
ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15
(Figures in thousand of Rupees)
Item
No.
RE 2014-15AllocationParticulars
79 Pakur, Tilvita & Kotalpukur - Development of freight & passenger train handling
facilities
DF(3) 15,00
80 Topsi & Sonachara - Panel interlocking building DRF 1,00,00
81 Asansol - Stabling line for main line electrical multiple unit rakes DF(3) 5,00
82 Durgapur - Development of 3rd direct delivery line with world class freight terminal DF(3) 70,00
83 Dankuni - Development of freight terminal DF(3) 1,50,00
84 Madhupur - Development of direct despatch line for goods traffic DF(3) 10
85 Katwa-Azimganj - Tokenless block instrument DRF 2,22,00
86 Kankinara-Naihati - 4th passenger line by conversion of 1 up goods line with platform
facilities at Kakinara
DF(3) 85,00
87 Jamalpur - Remodelling of yard and extension of platform No.2 & 3 for 24 coaches DRF 40,00
88 Malda Division - 1st foot over bridge (5 stations) DF(4) 7,00
89 Dum Dum-Barasat - Automatic signalling system DF(3) 68,00
90 Sealdah Division - Running of 12-coach electrical multiple unit trains on circular
railway
DF(3) 12,00
91 Ranaghat-Gede - Running of 12-coach electrical multiple unit trains DF(3) 20,00
92 Tilbihta, Kotalpukur, Gumani & Tarapith Road - Addl loops DF(3) 1,00
93 Howrah Division - Through renewal of turnouts on main line & loop line (12 stations) DF(3) 20,00
94 Mankar - Addl. loop Cap. 1
EBR ..
95 Bypass line avoiding Naihati-Bandel DF(3) 2,00,00
96 Sealdah - Addl platform No.9-C with ancillary works DF(1) 35,00
97 Belur - Bybass connection for direct movement of electrical multiple unit trains from
Bardhman / Bandel to Belur Math
DF(3) 20,00
98 Chittaranjan - Conversion of down loop into common loop DF(3) 1,00,00
99 New Garia - New rail terminal station between Sealdah & Sonarpur DF(3) 50,00
100 Tikani - Goods shed DF(3) 1,00
101 Andal-Sainthia - Broad gauge bypass line with direct connection from quadruple line
to branch line (2.565 km)
Cap. 10
102 Barrakpore - Development of terminal station (Phase-II) and Kakinara Yard -
development of coach maintenance facilities with ancillary works
DF(3) 1,00
103 Kalipahari - Rearrangement of up loops to accommodate full-length trains DF(3) 8,50
104 Nathnagar - Addl shunting & holding capacity and Akbarnagar, Bariarpur - Shunt
signals
DF(3) 7,00
105 Andal - Conversion of down line No.2 into common loop DF(3) 25,00
106 Topsi - Full length direct delivery line at south side of existing line DF(3) 2,50,00
107 Works costing below Rs.2.5 crore each Cap. 3,16,89
DRF 1,27,05
DF(1) 30,00
DF(2) ..
DF(3) 5,15,70
DF(4) 34,00
TRAFFIC FACILITIES-YARD REMODELLING & OTHERS
2.1.6
EASTERN RAILWAY
ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15
(Figures in thousand of Rupees)
Item
No.
RE 2014-15AllocationParticulars
TOTAL-WORKS IN PROGRESS Cap. 10,58,00
DRF 4,89,05
DF(1) 65,00
DF(2) ..
DF(3) 25,02,82
DF(4) 41,00
108 Works costing below Rs.2.5 crore each Cap. 50,00
DRF 42,50
DF(1) ..
DF(2) 5,00
DF(3) 20,00
TOTAL-NEW WORKS Cap. 50,00
DRF 42,50
DF(1) ..
DF(2) 5,00
DF(3) 20,00
TOTAL-Traffic Facilities-Yard Remodelling & Others Cap. 11,08,00
DRF 5,31,55
DF(1) 65,00
DF(2) 5,00
DF(3) 25,22,82
DF(4) 41,00
109 Eastern Railway - Unreserved ticketing system (under Railway Board) DF(1) ..
110 Eastern Railway - Extension of RDBMS DF(3) 31,80
111 Eastern Railway - Extension of unreserved ticketing system to balance A, B, C & D
category stations
DF(1) 16,18
112 Provision of automatic ticket vending machines for Eastern & South Eastern
Railways
Cap. 5,82
113 Eastern Railway - Extension of unreserved ticketing system to E-category stations DF(1) 23,81
114 Eastern Railway - Extension of automatic ticket vending machines Cap. 8,98,18
115 Works costing below Rs.2.5 crore each Cap. ..
DRF ..
DF(1) ..
DF(3) ..
TOTAL-WORKS IN PROGRESS Cap. 9,04,00
DRF ..
DF(1) 39,99
DF(3) 31,80
116 Works costing below Rs.2.5 crore each DRF 4,47,00
DF(1) 1,19,51
DF(3) 36,70
TOTAL-NEW WORKS DRF 4,47,00
DF(1) 1,19,51
DF(3) 36,70
TOTAL-Computerisation Cap. 9,04,00
DRF 4,47,00
DF(1) 1,59,50
DF(3) 68,50
A - Works in Progress
B - New Works
B - New Works
COMPUTERISATION
2.1.7
EASTERN RAILWAY
ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15
(Figures in thousand of Rupees)
Item
No.
RE 2014-15AllocationParticulars
117 Leased Assets - Payment of Capital component of lease charges to Indian Railway
Finance Corporation
C.Fund 403,83,00
TOTAL-WORKS IN PROGRESS C.Fund 403,83,00
TOTAL-Leased Assets - Payment of Capital Component C.Fund 403,83,00
118 Sealdah Division - Interlocking of level crossing gates (58 Nos) (suburban section) S.Fund 7,00,00
119 Howrah Division - Elimination of unmanned level crossing gates by merging with
adjacent ones (16 Nos)
S.Fund 50,00
120 Howrah Division - Upgradation with interlocking to Spl-class (4 level crossing gates)
(multi aspect colour light signalling section)
S.Fund 1,00
121 Sealdah Division - Repl. of swing gates by lifting barriers (73 level crossings) S.Fund 4,43
122 Sealdah Division - Upgradation of level crossing gates into special class in suburban
section (20 Nos)
Cap. ..
S.Fund 19,04
123 Malda Division - Hexagonal block at all level crossing gates Cap. ..
S.Fund 1
124 Howrah Division - Improvement of level crossing gates, road surfaces, removal of
infrastructural deficiencies, repl of swing gates etc
S.Fund 78,61
125 Sealdah Division - Upgradation of level crossing gates (10 Nos) S.Fund 42,38
126 Asansol Division - Shifting of level crossing gate lodges for minimum clearance from
road (25 Nos), height gauges in electrified section (main line)
S.Fund 39,35
127 Eastern Railway - Manning of unmanned level crossings (80 Nos) S.Fund 1,57,00
128 Howrah Division - Upgradation of level crossing gates (Nos 4, 10, 12, 16-A, 19, 23-A
& 24)
S.Fund 10,00
129 Eastern Railway - Manning of unmanned level crossing gates (23 Nos) S.Fund 1,57,00
130 Howrah Division - Interlocking of level crossing gates on suburban & automatic
section (36 Nos)
S.Fund 2,75,00
131 Works costing below Rs.2.5 crore each S.Fund 6,08,69
TOTAL-WORKS IN PROGRESS S.Fund 21,42,51
132 Works costing below Rs.2.5 crore each S.Fund 1,41,65
TOTAL-NEW WORKS S.Fund 1,41,65
TOTAL-Road Safety Works-Level Crossings. S.Fund 22,84,16
133 Ambika Kalna-Dhatrigram - Road over bridge in lieu of level crossing No.12 S.Fund 5,00
EBR ..
134 Andal-Sainthia - Road over bridge in lieu of level crossing No.22-B/T on Seuri west
end
S.Fund 10,00
EBR ..
ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES.
A - Works in Progress
A - Works in Progress
B - New Works
LEASED ASSETS - PAYMENT OF CAPITAL COMPONENT
A - Works in Progress
ROAD SAFETY WORKS-LEVEL CROSSINGS.
2.1.8
EASTERN RAILWAY
ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15
(Figures in thousand of Rupees)
Item
No.
RE 2014-15AllocationParticulars
135 Bansberia-Bandel - Road over bridge in lieu of level crossing No.1 S.Fund 2,00
EBR ..
136 Adisaptagram-Magra - Road over bridge in lieu of level crossing No.13 S.Fund 2,00
EBR ..
137 Bandel-Adisaptagram - Road over bridge in lieu of level crossing No.12 S.Fund 2,00
EBR ..
138 Guskara-Pichkurirdhal - Road over bridge in lieu of level crossing No.4 S.Fund 10
EBR ..
139 Murarai-Nalhati - Road over bridge in lieu of level crossing No.32 S.Fund 10,00
EBR ..
140 Nalhatil-Rampurhat - Road over bridge in lieu of level crossing No.26/AE and foot
over bridge with ramp at level crossing No.27/Spl
S.Fund 10,00
EBR ..
141 Sheoraphuli-Diara - Road over bridge in lieu of level crossing No.4 on Grand Trunk
Road
S.Fund 10,00
EBR ..
142 Bahirkhand-Tarakeswar - Road over bridge in lieu of level crossing No.23-A S.Fund 10,00
EBR ..
143 Bolpur - 2-lane road over bridge in lieu of road over bridge No.71 (Lalpul) S.Fund 4,41,00
EBR ..
144 Kumardhubi-Mugma - 2-lane road over bridge in lieu of existing 2-lane road under
bridge No.20
S.Fund 50,00
EBR ..
145 Habra - Road over bridge and limited use road under bridge in lieu of level crossing
gate No.28-A/T
S.Fund 1
EBR ..
146 Belanagar-Dankuni - Limited height subway on Howrah-Bardhman chord S.Fund 20,00
147 Rishra - Limited use subway in lieu of level crossing No.3 S.Fund 1,00
148 Sonarpur - Limited use road under bridge in lieu of level crossing No.13 S.Fund 1
EBR ..
149 Baruipur - Limited use road under bridge in lieu of level crossing No.21/S/T S.Fund 20,01
EBR ..
150 Madhupur-Joramow - Road over bridge in lieu of road under bridge No.618 S.Fund 1,00
EBR ..
151 Madhupur-Nawapatra - Road over bridge in lieu level crossing gate No.20 S.Fund 1,00
EBR ..
152 Berhampur Court - Road over bridge & limited use subway in lieu of level crossing
gate No.131/T
S.Fund 1,00
EBR ..
153 Sealdah Division - 2-lane road over bridge in lieu of road over bridge No.66-A
(Baroda Bridge)
S.Fund 50,00
EBR ..
ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES.
2.1.9
EASTERN RAILWAY
ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15
(Figures in thousand of Rupees)
Item
No.
RE 2014-15AllocationParticulars
154 Habra - Road over bridge & limited use subway in lieu of level crossing gate
No.27/A/T
S.Fund 1
EBR ..
155 Jamtara-Bodma - Road over bridge in lieu of level crossing gate No.9-B S.Fund 50
EBR ..
156 Chittaranjan-Bodma - Road over bridge in lieu of level crossing gate No.7-A/T S.Fund 50
EBR ..
157 Rupnarayanpur-Chittaranjan - Road over bridge in lieu of level crossing gate
No.5/Spl
S.Fund 50
EBR ..
158 Katwa-Azimganj - Elimination of level crossing by limited height subways (6 Nos) S.Fund 2,48,90
159 Malda Division - Normal height subway in lieu of level crossing gate No.82-B/T near
Sahibganj
S.Fund ..
160 Malda Division - Elimination of level crossings by limited height subways (32 Nos) S.Fund 6,25,00
161 Road under bridge near level crossing gate No.26/B (BB Loop), Howrah Division S.Fund 50
162 Dankuni-Khana - Elimination of level crossings on dedicated freight corridor route (40
Nos)
S.Fund 5,00
EBR ..
163 Berhampur Court - Road over bridge in lieu of level crossing gate No.132/T at
Lalgola end
S.Fund 10,00
EBR ..
164 Satsang Nagar-Baidyanath Dham - Road over bridge in lieu of level crossing No.4-
B/T
S.Fund 5,00
EBR ..
165 Road under bridge in lieu of level crossing No. 111/T, Beldanga S.Fund 5,00
166 Khana-Pradhankanta - Elimination of level crossings on dedicated freight corridor
route (48 Nos)
S.Fund 5,00
EBR ..
167 Sankarpur-Jasidih - Road over bridge in lieu of level crossing No.27/C S.Fund 1,00
EBR ..
168 Park Circus-Sir Gurudas Banerjee Halt - Regirdering of road under bridge No.X/25 S.Fund 1,00
169 Jamalpur Yard - Repl. of road over bridge No.215 with approach road S.Fund 50
170 Ichhapur-Shyamnagar - Regirdering of road under bridge No.56 S.Fund 1,00
171 Baghajatin - Road over bridge in lieu of level crossing No.9/A/E S.Fund 1,00,00
EBR ..
172 Barrackpore - Road over bridge in lieu of level crossing No.15/A/3T S.Fund 13,15
EBR ..
173 Barddhaman-Kalna Road - Road over bridge in lieu of level crossing No.50 S.Fund 50
EBR ..
ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES.
2.1.10
EASTERN RAILWAY
ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15
(Figures in thousand of Rupees)
Item
No.
RE 2014-15AllocationParticulars
174 Baruipur - Road over bridge in lieu of level crossing No.21 B/T S.Fund 1,00,00
EBR ..
175 Durgapur - Road over bridge in lieu of level crossing No.113 B/T S.Fund 1
EBR ..
176 Memari - Road over bridge in lieu of level crossing No.33 S.Fund 5,00
EBR ..
177 Nalikul - Road over bridge in lieu of level crossing No.14 S.Fund 2,00
178 Rishra-Srirampur - Road over bridge in lieu of level crossing No.4 S.Fund 1
EBR ..
179 Baruipara-Kamarkundu - Road over bridge in lieu of level crossing No.27 S.Fund 1,16,77
EBR ..
180 Dankuni - Road over bridge in lieu of level crossing No.8 S.Fund 20,10
EBR ..
181 Jaugram-Masagram - Road over bridge in lieu of level crossing No.59 S.Fund 1,10,00
EBR ..
182 Samudragarh-Nabadwipdham - Road over bridge in lieu of level crossing No.14 S.Fund 5,00
EBR ..
183 Bariyarpur - Road over bridge in lieu of level crossing No 15/BT S.Fund 1,00
EBR 3,30,00
184 Mianpur Railway Crossing - Road over bridge in lieu of level crossing No.23/B/T
near Jangipur Road
S.Fund ..
EBR 3,30,00
185 Howrah Division - Limited use subways in lieu of level crossings (20 Nos) S.Fund 2,15,78
EBR ..
186 Barddhaman Yard - 4-lane road over bridge in lieu of 2-lane road over bridge No.213 S.Fund 32,00,00
EBR ..
187 Howrah - Repl.of Chandmari road over bridge S.Fund 10,00
188 Howrah Division - Limited use subways for manned level crossing gates (Nos. 36 &
44)
S.Fund 1,00
189 Katwa-Azimganj - Limited height subways in lieu of level crossing (Nos.24/2, 24/7,
24/8, 24/9, 24/10, 24/A/13, 26/A/3 & 26/A/4)
S.Fund 1,24,28
190 Howrah Division - Repl. of Benaras road over bridge by cable-stayed bridge S.Fund 10
191 Chandmari, Mahuadanga, Asansol - Road under bridge adjacent to bridge No.529 S.Fund 10
192 Pakur - Limited use subway in lieu of manned level crossing No.38 S.Fund 10,00
193 Works costing below Rs.2.5 crore each S.Fund 9,91,11
TOTAL-WORKS IN PROGRESS S.Fund 65,81,45
EBR 6,60,00
194 Works costing below Rs.2.5 crore each S.Fund 4,00,00
TOTAL-NEW WORKS S.Fund 4,00,00
TOTAL-Road Safety Works-Road Over/Under Bridges. S.Fund 69,81,45
EBR 6,60,00
B - New Works
ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES.
2.1.11
EASTERN RAILWAY
ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15
(Figures in thousand of Rupees)
Item
No.
RE 2014-15AllocationParticulars
195 Barharwa-Sahibgang & New Farakka-Malda - CTR (P) - 10 km DRF 1,23,66
R.
196 Andal-Sainthia - TRR(P) - 4.26 km DRF 60,48
197 Sealdah Division - TFR - 71.60 km DRF 80,48
198 Howrah-Bandel - CTR(P) - 7 km DRF 1,00,00
R.
199 Sealdah Division - Through Rail Renewal (Primary) on various sections - 33.5 km DRF 3,44,65
200 Kiul - Barharwa - Complete Track Renewal (Primary) on up & down lines on Malda
Division -15.73 km
DRF 5,20,00
201 New Farakka - Malda Town - Complete Track Renewal (Primary) on Up and Down
lines on Malda Division - 15.03 km
DRF 1,38,00
Complete Track Renewal
202 Sitarampur-Chhota Ambana - CTR(P) - 11.71 km DRF 3,00,00
R.
203 Khana-Durgapur - CTR(P) - 16.3 km DRF 7,25,71
R.
204 Lilluah Workshop - CTR(S) - 8 km DRF 30,00
R.
205 Bandel-Shaktigarh - CTR(P) - 7.15 km DRF 2,50,00
R.
206 Belur-Bandel - CTR(P) - 6 km DRF 3,50,00
R.
207 Kanchrapara Workshop - CTR(S) - 5 km & TTR - 10 sets DRF 70,00
R.
208 Kahlgaon-Bhagalpur - CTR(P) - 16.4 km DRF 1,41,48
R.
209 Barharwa-Kahlgaon - CTR(P) - 12 km DRF 90,07
R.
210 Belur-Bandel - CTR(P) - 5 km DRF 4,50,00
211 Kiul-Barharwa - CTR(P) - 7.69 km DRF 2,09,50
212 Sealdah Division - CTR(S) - 11.25 km (loop/yard lines) DRF 2,09,41
213 Khana-Sitarampur-Jhajha - CTR(P) - 1.29 km & TRR(P) - 10 km DRF 2,01,76
214 Dum Dum-Bongaon & Sealdah-Gede - CTR(P) - 4.70 km DRF 2,40,00
215 Sealdah-Gede - CTR(P) - 3.40 km DRF 1,83,22
216 Sainthia-Pakur - CTR(P) - 10 km DRF 3,80,66
217 Sitarampur-Jhajha - CTR(P) - 6.95 km DRF 1,75,38
218 Sealdah-Baruipur - CTR(P) - 2 km DRF 95,38
219 Sealdah-Baruipur - CTR(P) - 2.65 km DRF 91,36
220 Sainthia-Pakur - CTR(P) - 27 km DRF 6,00,00
TRACK RENEWALS
A - Works in Progress
2.1.12
EASTERN RAILWAY
ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15
(Figures in thousand of Rupees)
Item
No.
RE 2014-15AllocationParticulars
221 Andal & Asasol Yards - CTR(S) - 16.30 km DRF 1,20,95
222 Sitarampur-Jhajha - CTR(P) - 4 km DRF 1,20,95
223 Dum Dum-Dankuni, Ranaghat-Lalgola, Sealdah-Gede & Ballygunge-Budge Budge -
CTR(P) - 3.04 km & TRR(P) - 1.36 km
DRF 2,18,18
224 Rampurhat - Gumani - CTR(P) - 13.4 km with TTR - 17 Nos DRF 4,50,00
R.
225 Rampurhat - Pakur - CTR(P) - 22.5 km with TTR - 8 Nos DRF 6,00,00
R.
226 Sainthia-Rampurhat - CTR(P) - 26.2 km with TTR - 27 Nos DRF 8,00,00
R.
227 New Farakka-Malda Town - CTR(P) - 2 km DRF 1,00,00
R.
228 Barrackpore-Naihati-Ranaghat - CTR(P) - 19.5 km DRF 1,50,66
R.
229 Howrah Yard - CTR(S) - 4.7 km DRF 3,00,00
R.
230 Ballygunge-Sonarpur - CTR(P) - 5 km DRF 1,11,75
R.
231 Ballygunge Jn - Mile5b, Dumdum Jn-Bangaon Jn & Sealdah - Barrakpore - CTR(P) -
5.52 km
DRF 1,33,31
R.
232 Andal-Sainthia - CTR(S) - 23.95 km DRF 2,00,00
R.
233 Khana-Jhajha - CTR(S) - 8 km DRF 1,00,00
R.
234 Sitarampur-Jhajha - CTR(P) - 3.7 km DRF 1,00,00
R.
235 Tapasi - Barabani - CTR - 7.24 km (S) DRF 30,24
R.
236 Rajgram Quarry - CTR - 5.5 km (S) DRF 8,50
R.
237 Howrah - Khana - CTR - 9 km (S) DRF 7,74
R.
238 Andal - Sainthia - CTR - 9.94 km (S) DRF 9,92
R.
239 Andal Yard - CTR - 8.2 km (S) DRF 36,29
R.
240 Bamangachhi Yard - CTR - 7.5 km (S) DRF 1,00,00
R.
241 Khana - Durgapur - CTR- 17 km (P) (down) DRF 1,20,95
R.
242 Howrah - Bandel - Khana - CTR - 3.62 km & TRR - 13.06 km (P) DRF 2,00,00
R.
TRACK RENEWALS
2.1.13
EASTERN RAILWAY
ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15
(Figures in thousand of Rupees)
Item
No.
RE 2014-15AllocationParticulars
243 Rajla-Barachak - CTR - 3.06 km & TRR - 1 km (P) DRF 30,24
R.
244 Andal-Sainthia - CTR - 2.38 km & TRR - 2.53 km (P) DRF 6,05
R.
245 Howrah - Khana - CTR - 2.3 km (P) DRF 30,00
R.
246 Gumani - Khana - CTR - 12.52 km (P) DRF 2,50,00
R.
247 Bandel Yard - CTR - 8.7 km (S) DRF 2,00,00
R.
248 Andal -Tapsi - Barabani - CTR - 6.5 km (S) DRF 1,27,50
R.
249 Azimganj Yard - CTR - 6 km (S) DRF 5,87
R.
250 Kiul - Barharwa - Malda - CTR - 17.8 km & TRR - 4 km (P) DRF 5,55,00
R.
251 Kiul-Barharwa-Malda - CTR - 9 km & TRR - 5.95 km (P) DRF 63,75
R.
252 Ballygunge Jn-Bidhannagar Road (Kankurgachi Chord) - CTR (P) - 5.2 km DRF 1,27,16
R.
253 Sahibganj Loop - CTR (P) - 9.05 km DRF 3,97,96
R.
254 Khana-Asansol - CTR (P) - 16.9 km DRF 1,78,40
Through Rail Renewal
255 Khana-Durgapur - TRR(P) - 13.2 km DRF 2,41,90
256 Durgapur-Andal - TRR(P) - 3.49 km DRF 90,71
257 Asansol, Sitarampur, Kalubathan & Suri (Yard Lines) - CTR(S) - 17.77 km DRF 3,02,38
R.
258 Andal (Yard Lines) - CTR(S) - 29.2 km DRF 3,02,38
R.
259 Barasat-Bangaon - TRR(P) - 3.7 km DRF 46,91
260 Naihati-Gede (Loop Lines) - TRR(S) - 12.73 km DRF 1,27,43
261 Bandel-Saktigarh - TRR(P) - 18 km DRF 3,00,00
262 Azimgang-Nalhati - TRR(P) - 11.05 km DRF 3,00,00
263 New Farakka-Malda - TRR(P)- 13.25 km & TRR(S) - 3.5 km DRF 7,65
264 Barharwa-Kahlgaon (Passenger Loops) - TRR(S) & TSR(P) - 8 km each DRF 1,70,00
R.
265 Sheoraphuli-Tarkeswar - TRR(P) - 29.41 km DRF 4,00,00
R.
266 Bandel-Saktigarh - TRR(P) - 5.20 km DRF 2,00,00
267 Kiul-Barharwa - TRR(P) - 6.02 km DRF 2,55,00
TRACK RENEWALS
2.1.14
EASTERN RAILWAY
ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15
(Figures in thousand of Rupees)
Item
No.
RE 2014-15AllocationParticulars
268 Sealdah Division - TRR(S) - 10.80 km (loop/yard lines) DRF 2,09,96
269 Dum Dum-Bongaon - TRR(P) - 5 km DRF 1,92,03
270 Khana-Asansol - TRR(S) - 7.44 km DRF 1,20,95
271 Bandel-Saktigarh - TRR(P) - 11.38 km DRF 3,00,00
272 Khana-Sitarampur - TRR(P) - 10.36 km DRF 1,75,21
273 Khana-Asansol - TRR(P) - 10.55 km DRF 50,00
274 Sitarampur-Pradhankanta - TRR(P) - 4 km DRF 50,00
275 Dankuni-Shaktigarh - TRR(P) - 3 km DRF 1,00,00
276 Dankuni-Shaktigarh - TRR(P) - 4 km DRF 85,00
277 Bandel-Shaktigarh - TRR(P) - 6 km DRF 42,50
278 New Farakka - Azimganj Jn. & Sahibganj - Bhagalpur - TRR(S) - 6 km (passenger
loops)
DRF 73,00
279 Tinpahar-Rajmahal - TRR(S) - 5 km DRF 85,00
280 Bhagalpur-Mandarhill - TRR(P) - 8 km DRF 1,70,51
281 Bandel-Shaktigarh - TRR(P) - 13.3 km DRF 3,00,00
282 Chhota Ambana - Khana - TRR - 4 km (P) DRF 24,19
283 Jasidih - Jhajha - TRR - 3.75 km (P) DRF 24,19
284 Dum Dum - Dankuni -TRR - 5.66 km (P) DRF 62,45
285 Gumani-Khana - TRR - 5.55 km (P) DRF 3,50,00
286 Chhota Ambona-Khana - TRR - 40.65 km (P) DRF 1,69,33
287 Sitarampur-Khana - TRR - 10.5 km (P) DRF 1,20,95
288 Howrah-Khana - TRR - 11.1 km (P) DRF 21,25
289 Howrah-Khana - TRR - 7.47 km (P) DRF 17,00
290 Howrah Division - TRR - 6.5 km (S) DRF 59,50
291 Azimganj-Nalhati - TRR - 9.46 km (P) DRF 59,50
292 Bhagalpur-Mandar Hill - TRR - 22 km (P) DRF 2,55,00
293 Ballyganj-Budge Budge - TRR - 3.15 km (P) & 2.8 km (S) DRF 56,88
294 Ranaghat-Lalgola - TRR - 18.8 km (P) DRF 1,53,64
295 Sitarampur-Jhajha - TRR (P) - 9 km DRF 1,10,95
296 Circular Railway - TRR (P) - 4.7 km DRF 31,52
297 Sahibganj Loop - TRR (P) - 16.6 km DRF 2,55,00
Through Sleeper Renewal
298 Sealdah Division - TBTR (4640 Nos) DRF 1,73,77
299 Tinpahar - Rajmahal -TSR(P) with TRR(S) - 6.34 km DRF 5,00
R.
300 Chitpur Yard - TSR(P) with TRR(S) - 4.68 km DRF 16,69
R.
301 Budge Budge Yard - TSR - 3.52 km (P) &TRR - 4.07 km (S) DRF 45,93
R.
TRACK RENEWALS
2.1.15
EASTERN RAILWAY
ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15
(Figures in thousand of Rupees)
Item
No.
RE 2014-15AllocationParticulars
302 Andal-Tapasi-Barabani - TSR (P) & TRR (S) - 6.5 km each DRF 1,81,86
R.
303 Kolkata Yard - TSR (P) & TRR (S) - 5.4 km each DRF 93,50
R.
304 Andal Yard - TSR(P) with TRR(S) - 9.7 km DRF 1,70,00
R.
305 Kiul - Barharwa - Malda - TSR(P) with TRR(S) - 6.35 km DRF 73,58
R.
306 Kiul-Barharwa-Malda - TSR(P) with TRR(S) - 3 km DRF 1,00
R.
307 Chitpur Yard - TSR(P) with TRR(S) - 10 km DRF 1,61,60
R.
308 Sealdah Yard - TSR(P) with TRR(S) - 5.18 km DRF 84,37
R.
309 Kalyani & Naihati Yards - TSR(P) with TRR(S) - 7.12 km DRF 70,62
R.
Ballast
310 Khana-Pradhankhunta & Srirampur-Jhajha - TBR - 52.24 km DRF 1,81,43
R.
311 Pandabeswar-Sainthia - TBR - 48.52 km DRF 1,70,00
R.
312 Sealdah Division - TBR - 59.8 km DRF 1,77,43
R.
313 Howrah Division - TBR - 32.48 km DRF 91,70
R.
314 Howrah Division - TTR - 97 sets DRF 3,00,00
R.
315 Bandel-Khana - TBR - 49.71 km DRF 85,00
316 Khana-Pradhankhunta - TBR - 102.70 km DRF 2,46,50
317 Sealdah Division - TBR - 50.68 km DRF 2,51,03
318 Khana-Jhajha - TBR - 67.54 km DRF 1,00,00
R.
319 Asansol Division - Through ballast renewal - 67.12 km DRF 6,05
R.
320 Chhota Ambana - Rajla -Through ballast renewal - 79 km DRF 30,24
R.
321 Howrah Division - TBR - 146.56 km (main line, Sahibganj loop, BB loop &
Tarakeshwar branch)
DRF 2,00,00
R.
322 Sealdah Division - Through ballast renewal - 44.2 km DRF 11,97
R.
323 Gumani - Khana - TBR - 42 km DRF 49,01
R.
TRACK RENEWALS
2.1.16
EASTERN RAILWAY
ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15
(Figures in thousand of Rupees)
Item
No.
RE 2014-15AllocationParticulars
324 Asansol Division - Through ballast renewal - 66.3 km DRF 1,20,95
R.
325 Howrah Division - Through ballast renewal - 149 km DRF 5,50,00
R.
326 Malda Division - Through ballast renewal - 42.3 km DRF 24,19
R.
327 Sealdah Division - Through ballast renewal - 118.24 km DRF 2,21,90
R.
Points & Crossings
328 Khana-Pradhankhunta (Yard Lines) - TTR - 70 sets DRF 60,48
R.
329 Undal-Tapsi-Barabani - TTR - 23 sets DRF 60,48
R.
330 Sealdah Division - TTR - 70 sets DRF 1,78,11
R.
331 Malda Division - TTR - 66 Nos DRF 70,00
R.
332 Sealdah Division - Switches, crossings, rails & fittings of points & crossings - 50 sets DRF 1,19,56
333 Barddhaman-Khana - Renewal of points & crossings - 23 sets DRF 1,70,00
334 Sealdah Division - Renewal of points & crossings - 50 sets DRF 1,00,00
335 Howrah-Khana - Renewal of switches, crossings, rails & fittings - 50 sets DRF 85,00
336 Asansol Division - Renewal of switches, crossings, rails & fittings - 50 sets DRF 20,00
337 Andal Yard - Renewal of points & crossings - 40 sets DRF 1,81,43
338 Andal Down Yard - TTR (50 Nos) DRF 1,50,00
R.
339 Sealdah Division - TTR 180 sets DRF 3,00,00
R.
340 Bandel - Katwa & Bandel - Barddhaman -TTR (25 sets &39 sets) diamond crossing
(12 sets)
DRF 4,00,00
R.
341 Howrah Yard Complex - TTR (67 sets) DRF 2,13,03
R.
342 Andal - Sainthia - TTR (74 sets) DRF 36,29
R.
343 Sealdah Yard - TTR (40 sets) DRF 34,40
R.
344 Chitpur Yard - TTR (23 sets) DRF 24,76
R.
345 Howrah, Asansol & Sealdah Divisions - Complete renewal of points & crossings with
thick web switches & weldable CMS (16, 16 & 20 sets)
DRF 1,00
R.
TRACK RENEWALS
2.1.17
EASTERN RAILWAY
ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15
(Figures in thousand of Rupees)
Item
No.
RE 2014-15AllocationParticulars
346 Howrah, Asansol, Sealdah & Malda Divisions - Complete renewal of points &
crossings with thick web switches (74, 40, 40 & 30 sets)
DRF 1,53,10
R.
347 Andal Yard - TTR (83 sets) DRF 84,67
R.
348 Howrah Division - Thick web switches & weldable CMS crossings (17 sets) DRF 85,00
R.
349 Tikiapara & Jheel Siding - TTR (60 sets) DRF 1,78,50
R.
350 Malda Yard - Thick web switches & weldable CMS crossings (16 sets) DRF 5,00
R.
351 Sahibganj, Bhagalpur & Jamalpur Yards - TTR (60 sets) DRF 28,01
R.
352 Chitpur Yard - TTR (30 sets) DRF 78,22
R.
353 Pradhankhanta - Khana - TTR (75 sets) DRF 1,36,74
R.
354 Sitarampur - Khana - TTR (60 sets) DRF 1,20,95
R.
355 Tikiapara Yard - TTR (57 sets) DRF 72,25
R.
356 Howrah Division - TTR (54 sets) DRF 2,55,00
R.
357 Howrah - Khana - TTR (33 sets) DRF 28,62
R.
358 Kiul - Barharwa-Malda - TTR (35 sets) DRF 22,17
R.
359 Kiul - Barharwa - Malda - TTR (31 sets) DRF 5,13
R.
360 Sealdah South - TTR (28 sets) DRF 29,60
R.
361 Sealdah Yard - TTR (30 sets) DRF 41,90
R.
362 Chitpur Yard - TTR (21 sets) DRF 5,51
R.
Others
363 Sealdah Division - TWR - 47 km (1274 joints) DRF 70,00
364 Howrah Division - TFR - 183.88 km DRF 2,55,00
365 Sainthia-Barharwa - TWR - 44.5 km DRF 1,70,00
366 Khana-Sainthia - TFTR - 16.2 km DRF 1,70,00
367 Malda Town-New Farakka-Azimganj - TFTR - 11.53 km DRF 85,00
TRACK RENEWALS
2.1.18
EASTERN RAILWAY
ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15
(Figures in thousand of Rupees)
Item
No.
RE 2014-15AllocationParticulars
368 Malda Division - Strengthening of embankment at vulnerable locations - 16.17 km DRF 1,00
369 Khana - Gumani - TFTR - 6.4 km (up & down) (Sahibganj loop) DRF 1,10,50
370 Baltikuri - Dankuni - Addl berm & blanketing - 6.61 km DRF 1,78,50
371 Ballyghat-Dankuni - Strengthening of embankment by provision of sub-bank &
blanketing - 4.67 km
DRF 42,50
372 Sahibganj Loop - Widening of cess & provision of sub-bank with boulder drains &
filling up of borrow pits - 15.66 km
DRF 3,00,00
373 Howrah Division - TWR - 67.4 km DRF 1,00,00
374 Howrah Division - TFR - 59.82 km DRF 80,00
375 Malda Division - TWR - 37 km DRF 85,00
376 Works costing below Rs.2.5 crore each DRF 55,75,99
TOTAL-WORKS IN PROGRESS DRF 332,76,16
Complete Track Renewal
377 Sahibganj Loop (SL) - CTR(P) - 2.5 km DRF 1,84,60
R.
378 Barrackpore-Ranaghat Jn - CTR(P) - 7.78 km DRF 1,50,00
R.
379 Sitarampur-Jhajha (up) - CTR (P) - 2 km DRF 1,25,75
R.
380 Khana-Sitarampur - CTR(P) - 4 km DRF 2,51,50
R.
381 Sitarampur-Jhajha (dn) - CTR (P) - 3.8 km DRF 2,61,97
R.
382 Sitarampur-Jhajha (dn) -CTR (P) - 4.02 km DRF 2,52,76
R.
383 Sitarampur-Jhajha (dn) - CTR (P) - 2.01 km DRF 1,26,38
R.
Through Rail Renewal
384 Dankuni-Burdwan - TRR(P) - 16.43 km DRF 5,48,19
385 Barharwa-Sahibganj (up) - CTR(P) -15 km DRF 9,41,44
R.
Through Sleeper Renewal
386 Burdwan-Khana (up) - TSR(P) - 10.46 km DRF 2,81,25
R.
TOTAL-NEW WORKS DRF 31,23,84
TOTAL-Track Renewals DRF 364,00,00
387 Barakar-Kumardhubi - Repl. of deck plates & inspection pathway (bridge
No.18/down)
DRF 50,00
BRIDGE WORKS
A - Works in Progress
TRACK RENEWALS
B - New Works
2.1.19
EASTERN RAILWAY
ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15
(Figures in thousand of Rupees)
Item
No.
RE 2014-15AllocationParticulars
388 Dhatrigram-Samudragarh - Repl. of girders (bridge No.83) DRF 20,00
389 Howrah Division - Modification of MBG welded girders by replacing cross frame &
stifners etc of different bridges
DRF 60,00
390 Tildanga-Barharwa - Reinforced concrete cement jacketting & repl. of early steel
girders (bridge No.398) and New Farakka-Azimganj Jn - Protection works (bridge
No.368)
DRF 5,50
391 Bhagalpur-Jamalpur - Reinforced concrete cement jacketting of piers & abutments
(bridge No.184, 186, 195, 204 & 162)
DRF 1,50
392 Bhagalpur-Mandar Hill - Repl. of bridges by PSC/FC slabs with RCC jacketting of
piers & abutments (bridge No.1, 24, 72-A, 88 & 74)
DRF 75,00
393 Gangpur-Barddhaman - Repl. & strengthening of bridge members (bridge No.209/up
main & up HBC line)
DRF 60,00
394 Kuntighat-Dumurdaha - Repl. of girders (bridge No.20) DRF 50,00
395 Howrah Division - Strengthening of arches, piers & abutments by reinforced concrete
cement jacketting (bridge Nos.19 & 20)
DRF 8,50
396 Bandel-Naihati - New rail bridge in repl.of Jubilee Bridge No.8 across Hooghly river DRF 54,05,63
397 Sealdah Division (ML Section) - Repl of girders (bridge No.1) DRF 70,50
SRSF ..
398 Asansol Division (GC Section) - Repl of girders (bridge No.18) DRF 3,00,00
399 Ranaghat-Lalgola - Repl of girders (bridge No.17/A) DRF 1,00
400 Asansol Division - Rebuilding of hume pipes / arches on Rajdhani route (26 Nos) DRF 50,00
401 Howrah Division - Strengthening of arches, piers & abutments by reinforced concrete
cement jacketing (32 bridges)
DRF 1
402 Kajra-Kiul - Conversion of minor masonry arch, shallow girder & FC slab bridges into
reinforced concrete cement box (44 bridges)
DRF 8,00
403 Andal-Durgapur - Strengthening of sub-structure & foundation (bridge No.436) incl.
flooring, dropwall, curtain wall for 25 ton axle load
DRF 20,00
404 Howrah Division - Rebuilding by pre-stressed concrete box girder with reinforced
concrete cement substructure etc (bridge No.172)
DRF 12,00,00
405 Sainthia-Pakur - Repl. of girders of down line by reinforced concrete cement box (5
bridges)
DRF 1,00,00
406 Howrah Division - Strengthening of sub-structure & foundation incl. flooring, dropwall
& curtain wall for 25 ton axle load (bridge No.171 & 212)
DRF 17,58
407 Lailakhmamalkha-Sabour - Rebuilding of bridge No.144 with steel plate girders DRF 1,37,00
408 Howrah Division - Rebuilding / rehabilitation with reinforced concrete cement box
(bridge Nos.240, 258 & 261 down and 262 & 263 up / down)
DRF 30,00
409 Howrah Division - Strengthening of piers & abutments by reinforced concrete cement
jacketing and protection of floor (bridge No.77 & 89 up)
DRF ..
410 Katwa-Gangatikuri & Katwa-Ambalgram - Addl. openings DRF 1
411 Asansol Division - Strengthening of piers & abutments (bridge No.509) DRF 25,50
412 Bhagalpur-Mandarhill - Repl. of small span steel girder bridges (bridge No.2, 3, 6, 15,
26, 27, 30, 33 & 100)
DRF 60,19
BRIDGE WORKS
2.1.20
EASTERN RAILWAY
ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15
(Figures in thousand of Rupees)
Item
No.
RE 2014-15AllocationParticulars
413 Malda Division - Reinforced concrete cement jacketing (bridge No.186 & 195), RCC
box (bridge No.120, 102, 132 & 140), rebuilding (bridge No.279 & 304)
DRF 80,00
414 Ekchari-Ghoga - River training works (bridge No.133) DRF 10,61
415 Burnpur-Gede - Repl.of girders by reinforced concrete cement box (bridge No.141) &
Gede-Darshana (bridge No.147)
DRF 1,00
416 Howrah Division - Rehabilitation (arch bridge No.208) (Phase-I) (20 spans) DRF 56,28
417 Howrah Division - Rebuilding / rehabilitation of arch bridges with reinforced concrete
cement box (15 Nos) & repair to substructure (2 bridges)
DRF 4,00,00
418 Ranaghat-Gede - Repl. of steel girder by pre-stressed concrete slabs (bridge
Nos.120 & 121)
DRF 80,00
419 Howrah Division - Reinforced concerte cement jacketting (arch bridge No.208) (20
spans) (Phase-II)
DRF 39,00
420 Nawapatra-Mathurapur - Reinforced concrete cement jacketing (bridge No.623) DRF 3,60,00
421 Mugma-Thaparnagar - Reinforced concrete cement jacketting (bridge No.34) DRF 1,50,00
422 Works costing below Rs.2.5 crore each DRF 16,66,15
TOTAL-WORKS IN PROGRESS DRF 105,98,96
423 Works costing below Rs.2.5 crore each DRF 2,00
TOTAL-NEW WORKS DRF 2,00
TOTAL-Bridge Works DRF 106,00,96
424 Dhulianganga - Repl of semaphore signal by panel interlocking with colour light
signal
DRF 95,00
425 Belanagar & Bhattanagar - Repl.of panel interlocking DRF 2,39,67
426 Sitarampur - Repl.of route relay interlocking DRF 1,02,50
427 Howrah Division - Repl of lever frames by electronic interlocking (7 stations) (E-
route)
DRF 6,61,42
428 Sujnipara & Jangipur Road - Repl of lever frames / panel interlocking with semaphore
signals by panel interlocking with colour light signals
DRF 1,42,50
429 Jamtara-Jhaja - Repl. of RE cables & quad cables (106 km) DRF 85,00
430 Naihati-Ranaghat - Automatic signalling system DF(3) 51,00
431 Sealdah Division - Dual detection by digital axle counters (66 Nos) DF(4) 9,81
432 Howrah Division - Repl. of quad cable by 6-quad cable (85 km) DRF 1,07,50
433 Barddhaman - Repl. of indoor & outdoor signalling gears by route relay interlocking DRF 68,00
434 Malda Town - Repl. of lever frames by centralised operation of points & signals DRF 60,00
DF(4) 1,00,00
BRIDGE WORKS
B - New Works
SIGNALLING AND TELECOMMUNICATION
A - Works in Progress
2.1.21
EASTERN RAILWAY
ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15
(Figures in thousand of Rupees)
Item
No.
RE 2014-15AllocationParticulars
435 Eastern Railway - Continuous track circuiting with automatic block signalling (122.66
km) (A & C-routes) (Rajdhani & Shatabdi route)
DF(4) 7,40,00
436 Malda Division - Repl. of lever frames by centralised operation of points & signals (10
stations) (B-route)
DRF 7,00
DF(4) 1,00,00
437 Bonidanga-Barharwa-Kiul - Optic fibre cable with 6-quad cable (B-route) (236 km) DRF 1,10,00
438 Asansol Division - Track circuiting from fouling mark to block section limits (straight
portion) (10 stations) and home to fouling mark (2 stations)
DF(4) 1
439 Sealdah South - Repl. of signalling gears with electronic interlocking DRF 1,69,06
440 Bally-Shaktigarh - Mobile train radio communication system (90 km) DF(3) 10,00
441 Kolkata Area - Public address system in suburban trains (141 rakes) DF(1) 1
442 Bandel - Repl.of lever frames by electronic interlocking (C-route) DRF 95,00
443 Chitpur (North Cabin) - Repl.of lever frames by panel interlocking DRF 95,00
444 Salt Gola Cabin - Repl.of lever frames by panel / electronic interlocking DRF 95,00
445 Howrah - True colour video train information display system (old complex) DF(3) 1,10,97
446 Sealdah-Howrah-Khana & Automatic Section of Sealdah & Howrah Divisions - Train
protection system (326 rkm)
DF(4) 35,00
447 Tikiapara & Howrah Goods Shed - Repl of lever frames by panel / electronic
interlocking
DRF 3,80,00
448 Sealdah Division - Train management system (30 stations) DF(3) 11,51
449 Howrah Division - Train management system (30 stations) DF(3) 7,65,00
450 Sealdah-Dum Dum-Belgharia - Upgradation of automatic signalling from 3-aspect to
4-aspect
DF(4) 2,12,50
451 Howrah & Sealdah Divisions - Train protection & warning system on balance
automatic signalling & important EMU routes (327 rkm)
DF(4) 10,00
452 Eastern Railway - Anti collision device on all broad gauge A & B-routes (828 rkm)
(excluding Sealdah-Howrah-Khana) & modification to 1100 existing ACDs on
Northeast Frontier Railway
DF(4) 1
453 Internet facility in New Delhi-Howrah Rajdhani Express (3 rakes) (pilot project) DF(1) 42,50
454 Bashirhat - Isolation & upgradation / alteration of signalling DF(4) 40,00
455 Nimtita - Repl.of semaphore signal by panel interlocking with colour light signalling DRF 47,50
456 Works costing below Rs.2.5 crore each Cap. 49,00
DRF 4,88,85
DF(3) 1,94,54
DF(4) 4,37,19
TOTAL-WORKS IN PROGRESS Cap. 49,00
DRF 30,49,00
DF(1) 42,51
DF(3) 11,43,02
DF(4) 16,84,52
SIGNALLING AND TELECOMMUNICATION
2.1.22
EASTERN RAILWAY
ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15
(Figures in thousand of Rupees)
Item
No.
RE 2014-15AllocationParticulars
457 Works costing below Rs.2.5 crore each DRF 1,00,00
DF(4) 1,00,00
TOTAL-NEW WORKS DRF 1,00,00
DF(4) 1,00,00
TOTAL-Signalling and Telecommunication Cap. 49,00
DRF 31,49,00
DF(1) 42,51
DF(3) 11,43,02
DF(4) 17,84,52
458 Sealdah Division - Repl. of high tension sub-stations (35 year old) DRF ..
459 Sahibganj - Upgradation of 11 kv sub-station to 33 kv and improvement of power
house
DF(3) ..
460 Bhagalpur - Upgradation of 11 kv substation to 33 kv & improvement of power house DF(3) ..
461 Howrah Division - Repl.of transformer, switchgear & cables etc with allied works DRF 8,25
462 Sealdah Division - Repl.of high tension sub-stations (6 locations) DRF ..
463 Howrah, Bandel, Bardhaman & Rampurhat - Repl.of oil type low tension circuit
breaker & ICTPN switches with air circuit breakers & MCCBs
DRF 2,40,00
464 Works costing below Rs.2.5 crore each Cap. ..
DRF 88,25
DF(3) 1,00,26
TOTAL-WORKS IN PROGRESS Cap. ..
DRF 3,36,50
DF(3) 1,00,26
465 Works costing below Rs.2.5 crore each Cap. ..
DRF 13,50
DF(3) 10,00
TOTAL-NEW WORKS Cap. ..
DRF 13,50
DF(3) 10,00
TOTAL-Other Electrical Works excl TRD Cap. ..
DRF 3,50,00
DF(3) 1,10,26
466 Howrah Division - Repl of winch type regulating equipment by 3-pulley type (Phase-II) DRF 55,66
467 Asansol Divisiion - Repl.of masts at critical implantations (Phase-VII) DRF 64,80
TRACTION DISTRIBUTION WORKS
A - Works in Progress
OTHER ELECTRICAL WORKS EXCL TRD
A - Works in Progress
B - New Works
SIGNALLING AND TELECOMMUNICATION
B - New Works
2.1.23
EASTERN RAILWAY
ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15
(Figures in thousand of Rupees)
Item
No.
RE 2014-15AllocationParticulars
468 Sealdah Division - Repl. of catenary wire DRF 1,00
469 Bandel-Shaktigarh - Conversion of unregulated overhead equipment to regulated one
(Phase-I)
DF(3) 15,26
470 Howrah-Bandel - Conversion of unregulated overhead equipment to regulated one
(Phase-II)
DF(3) 23,68
471 Howrah Division - Augmentation of SCADA system for addl lines DRF 4,21
472 Shaktigarh-Bardhaman - Conversion of unregulated DC system based overhead
equipment to conventional regulated AC equipment in 4-line section
DRF 12,00
473 Asansol Division - Repl.of mast at critical implantation (Phase-VI) (300 Nos) DRF 3,05,00
474 Howrah Division - Repl.of overhead equipment structures & removal of tight
implanted masts / portals
DRF 28,62
475 Howrah Division - Repl.of cantilever in yard & branch lines DRF 27,77
476 Sealdah Division - 132 kv / 25 kv single transformer traction sub-station behind
Bidhannagar sub-sectioning post near Chitpur Terminal
DF(3) 3,00,00
477 Sealdah-Naihati - Repl. of overhead equipment in industrially polluted areas (20 tkm)
(Phase-II)
DRF 2,50,00
478 Khana-Pradhankhunta - Repl of cantilever assemblies (Phase-IV) DRF 75,00
479 Sealdah Division - Repl.of traction mast of tight implantation (Phase-IV) DRF 1,00,00
480 Sealdah Division - Repl.of contact wire DRF 3,00,00
481 Works costing below Rs.2.5 crore each DRF 4,59,94
DF(3) 66,45
TOTAL-WORKS IN PROGRESS DRF 16,84,00
DF(3) 4,05,39
482 Works costing below Rs.2.5 crore each DRF 50,00
DF(3) 50,00
TOTAL-NEW WORKS DRF 50,00
DF(3) 50,00
TOTAL-Traction Distribution Works DRF 17,34,00
DF(3) 4,55,39
483 Howrah - Infrastructure development at sorting yard coaching complex (Phase-IV) DF(3) 2,00,00
484 Sahibganj - New diesel electrical multiple unit maintenance shed Cap. 81
485 Naihati - Extension of routine overhauling covered shed with other associated
facilities
Cap. 43,07
486 Asansol- Addl pit line at east marshalling yard Cap. 2,50,00
487 Halisahar & Kanchrapara - Modernisation of stores depots Cap. 1
488 Narkeldanga - Upgradation of infrastructural facilities for maintenance of 12-car rakes
at electrical multiple unit car shed (Phase-II)
Cap. 2,00,00
WORKSHOPS INCLUDING PRODUCTION UNITS
A - Works in Progress
TRACTION DISTRIBUTION WORKS
B - New Works
2.1.24
EASTERN RAILWAY
ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15
(Figures in thousand of Rupees)
Item
No.
RE 2014-15AllocationParticulars
489 Barasat (Car Shed) - Addl maintenance infrastructure to enhance capacity from 24 to
36 rakes (Phase-II)
Cap. 1
490 Bandel - Addl maintenance facilities at electrical multiple unit car shed for running of
12-coach rakes (Phase-III)
Cap. 1
491 Howrah - Capital store at electric loco shed DF(3) 59,35
492 Kolkata Terminal - Extension of coaching sick line DF(3) 1
493 Asansol (Electric Loco Shed) - Augmentation of shed to improve facilitiy for
maintenance of locomotives
DF(3) 73
494 Kanchrapara - New central periodic overhauling depot for track machines DF(3) 29,59
495 Ranaghat - Electrical multiple unit car shed Cap. 29,12
496 Kanchrapara Workshop - Enhancement of capacity to undertake periodic overhauling
of 26 motor & 52 trailer coaches
Cap. 13,60
497 Jamalpur Workshop - Extension of GIF & SF towards North side DF(3) 1
498 Chitpur - Upgradation of routine overhauling depot relocated at Naihati Cap. 95,00
499 Liluah Workshop - Facilities for overhauling of new generation coaches incl. upto 26
m long coaches
Cap. 80,00
DF(3) 6,86
500 Tikiapara - Remodelling of coaching yard DF(3) 21,00
501 Naihati - Upgradation of maintenance facilities in freight sick line to A-category DF(3) 46,00
502 Malda (Coaching Depot) - Infrastructure development DF(3) 2,47,79
503 Asansol (Coaching Depot) - Infrastructure development DF(3) 2,70
504 Bardhaman - Development of infrastructure facilities for coach maintenance DF(3) 36,20
505 Howrah & Bandel Car Sheds - Addl. maintenance facilities for running of 12-coach
electrical multiple unit trains
Cap. 30,00
506 Narkeldanga Car Shed - Addl. pit on line No.4 & shed on line No.3 & 4 for 12-coach
rakes formation
DF(3) 16
507 Sealdah (New Coaching Complex) - Improvement of sick line with provision of EOT
crane, wheel lathe etc
DF(3) 18,67
508 Pakur - Infrastructure facilities to enhance intensive examination of CC rakes of
freight trains
DF(3) 50,00
509 Malda - Upgradation of freight train examination yard & sick line facilities to A-
category
DF(3) 1,00,00
510 Kanchrapara - Augmentation of capacity for periodical overhauling of electric
locomotives from 72 to 96 per year
DF(3) 13,44
511 Andal (Durgapur Steel Exchange Yard) - Upgradation of infrastructural facilities for
freight train examination to A-category
DF(3) 5,85
512 Liluah - Modernisation of workshop Cap. 1,00,00
DRF 22,96
DF(3) 3,73,79
513 Jamalpur - Modernisation of workshop Cap. 3,00,00
DRF 10,00
WORKSHOPS INCLUDING PRODUCTION UNITS
2.1.25
EASTERN RAILWAY
ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15
(Figures in thousand of Rupees)
Item
No.
RE 2014-15AllocationParticulars
514 Sealdah (New Coaching Complex) - Upgradation & improvement of sick line DF(3) 2,05,15
515 Andal - Extension for homing 120 diesel locomotives with other infrastructural
improvements
Cap. 49,62
516 Kanchrapara Workshop - Augmentation of capacity for periodical overhauling of 40
motor & 80 trailer coaches per month
Cap. 3,72,53
517 Dankuni - Setting up of factory for manufacture of components & sub assemblies for
EMD locos and institute for training
Cap. 33,92,35
518 Howrah - Remodelling of diesel shed DRF 9,00
DF(3) 42,37
519 Howrah & Bandel - Addl. maintenance facilities at car sheds for running of 12-coach
electrical multiple unit trains (Phase-II)
Cap. 58,37
520 Barasat Car Shed - Extension of inspection pits & shed (line No.3 & 4) for
maintenance of 12-coach electrical multiple unit rakes
DF(3) 61,13
521 Sonarpur Car Shed - Extension of shed over pit line No.3, 4, 5 & 6; independent
shunting neck, addl cat-walk, stabling line etc for 12 coach trains
Cap. 55,27
522 Andal (Up Sick Line) - Extension of heavy duty covered shed with EOT crane gantry DF(3) 9,15
523 Jamalpur (Diesel Shed) - Basic infrastructure for maintenance of diesel electrical
multiple units
DF(3) 1,31,00
524 Beliaghata (Diesel Shed) - Upgradation of maintenance facilities for WDS6 / WDM2
locos
DF(3) 15
525 Tikiapara - Remodelling of coaching yard (Phase-II) DF(3) 80,00
526 Sealdah - Development of coaching maintenance infrastructure DF(3) 3,00,00
527 Kanchrapara - New rail coach manufacturing unit Cap. 2,12,21
EBR ..
528a Naopara - Construction of repair workshop for undertaking mid-life rehabilitation of
coaches (300 coaches per annum)
Cap. ..
528 Liluah - Augmentation of periodical / intermediate overhauling of LHB coaches from
10 to 30 coaches per month
Cap. 1
DRF 1
DF(3) 1
529 Works costing below Rs.2.5 crore each Cap. 2,18,00
DRF 3,99,03
DF(3) 3,34,68
TOTAL-WORKS IN PROGRESS Cap. 54,99,99
DRF 4,41,00
DF(3) 23,75,79
530 Works costing below Rs.2.5 crore each Cap. 1
DRF 1
DF(3) 1
TOTAL-NEW WORKS Cap. 1
DRF 1
DF(3) 1
TOTAL-Workshops including Production Units Cap. 55,00,00
DRF 4,41,01
DF(3) 23,75,80
B - New Works
WORKSHOPS INCLUDING PRODUCTION UNITS
2.1.26
EASTERN RAILWAY
ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15
(Figures in thousand of Rupees)
Item
No.
RE 2014-15AllocationParticulars
531 Andal - Repl.of quarters, type-I - 28, type-II - 50, type-III - 8 & type-IV - 4 units DRF 1
532 Sealdah Division - Repl. of quarters, type-I - 16, type-II - 42, type-III - 15 & type-IV - 2
units
DRF 10,00
533 Howrah Division - Repl.of quarters, type-II - 230, type-III - 35 & type-IV - 20 units DRF 1,25,00
534 Howrah Division - Rebuilding of quarters, type-I - 100 units DRF 20,00
535 Sealdah Division - Repl.of quarters, type-II - 58, type-III - 15 & type-IV - 2 units in
Kaizer Street & Guard Colony
DRF 1,00,00
536 Andal - Repl.of quarters, type-II - 100 units in different colonies DRF 97,25
537 Sealdah - Type-V - 16 units Cap. 1,12,80
538 Sealdah - Repl. of quarter, type-I - 152, type-II - 32, type-III - 12 & type-IV - 4 units by
type-II - 184, type-III - 12 & type-IV - 4 units
DRF 3,00,00
539 Madhupur & Sitarampur - Repl of jack arch roof type quarters, type-II - 50 units DRF 1
540 Works costing below Rs.2.5 crore each Cap. 87,37
DRF 2,47,73
TOTAL-WORKS IN PROGRESS Cap. 2,00,17
DRF 9,00,00
541 Works costing below Rs.2.5 crore each Cap. ..
DRF ..
TOTAL-NEW WORKS Cap. ..
DRF ..
TOTAL-Staff Quarters Cap. 2,00,17
DRF 9,00,00
542 Malda - Opening of nursing college DF(2) 1
543 BR Singh Hospital - Improvement DF(2) 2,50,00
544 Bamangachi - Design, construction & commissioning of effluent treatment plant with
ancillary works at Railway colony
DF(2) 1
545 Malda - Upgradation / renovation of railway hospital with modern facilities DF(2) 1,00
546 Howrah Division - Rewiring of quarters (type-I - 1200, type-II - 680, type-III - 100 &
type-IV - 20 units)
DRF 1
547 Jamalpur - Improvement of Rampur & Daulatpur colonies as model colonies DRF 50,00
548 Jamalpur - Improvement of staff quarters with treatment of leaky roofs (East & West
colony)
DF(2) 40,00
549 Kanchrapara - Improvement to officers & foremen colonies and road DF(2) 12,75
550 Howrah - Central air-conditioning plant at orthopaedic hospital DF(2) 1
551 Bardhaman - Extensive repairs to staff quarters in railway colony DF(2) 1,00,00
AMENITIES FOR STAFF
A - Works in Progress
A - Works in Progress
B - New Works
STAFF QUARTERS
2.1.27
EASTERN RAILWAY
ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15
(Figures in thousand of Rupees)
Item
No.
RE 2014-15AllocationParticulars
552 Asansol Division - Repl. of jack arch / asbestos roofs, doors, windows, water supply
distribution pipes (type-I - 100 & type-II - 150 units)
DF(2) 40,00
553 Kolkata - Construction of auditorium at New Koilaghat DF(2) 1
554 Belur - Multi speciality hospital under Howrah division DF(2) 1
555 Majerhat - Construction of nursing college & hostel DF(2) 1,00,00
556 Krishnanagar Jn Railway Colony - Construction of Dwijendra Lal Roy auditorium (250
persons)
DF(2) 1
557 Kanchrapara - Repl.of pipeline at Dangapara colony, renovation of filter house,
provision of boundary wall, renovation of roads etc
DRF 10
558 Works costing below Rs.2.5 crore each Cap. 13,80
DRF 8,52,10
DF(2) 7,08,65
DF(3) 21,09
TOTAL-WORKS IN PROGRESS Cap. 13,80
DRF 9,02,21
DF(2) 12,52,46
DF(3) 21,09
559 Works costing below Rs.2.5 crore each Cap. 2,00
DRF 79
DF(2) 1,00
TOTAL-NEW WORKS Cap. 2,00
DRF 79
DF(2) 1,00
TOTAL-Amenities for Staff Cap. 15,80
DRF 9,03,00
DF(2) 12,53,46
DF(3) 21,09
560 Howrah Division - Optic fibre cable connectivity to all flag stations (40 station) DF(1) 10,00
561 Sealdah Division - Optic fibre cable connectivity to all flag stations (45 stations) DF(1) 5,00
562 Howrah - Drinking water facilities for Pakur command area DF(1) 10,00
563 Liluah - Augmentation of 1.4 mgd water treatment plant DF(1) 1,90,00
564 Howrah Division - Improvement to suburban stations on HBC section, Howrah-
Bardhman main line & BB loop
DF(1) 10,00
565 Sealdah Division - Improvement of suburban stations on North, main & South
sections
DF(1) 1,00
566 Agarpara - 3m wide pedestrian sub-way & foot over bridge DF(1) 2,50,00
567 Singur - Reinforced concrete cement box subway DF(1) 1,00
568 Howrah - 6.1 m wide foot over bridge connecting platform No.1 to 14 of old complex
with provision of single way escalator
DF(1) 1
PASSENGER AMENITIES
A - Works in Progress
B - New Works
AMENITIES FOR STAFF
2.1.28
EASTERN RAILWAY
ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15
(Figures in thousand of Rupees)
Item
No.
RE 2014-15AllocationParticulars
569 Dankuni - Improvement of circulating area & widening of approach road DF(4) 80,00
570 Howrah Division - Improvement of suburban stations (main line, chord line & BB
loop)
DF(1) 10,00
571 Majerhat - Balance work for station building as phase-II and other ancillary works DF(1) 1,88,00
572 Sealdah - Improvement & development of circular railway DF(1) 10,00
573 Eastern Railway - Improvement of model stations (19 Nos) DF(1) 1,00
574 Howrah Division - Renovation of low level & rail level platforms (3 stations) and
raising of platforms (19 stations)
DF(1) 1,00
575 Asansol Division - Making / extension & raising of platforms to rail level (10 stations) DF(1) 1,00
576 Bandel-Katwa - Raising of platforms DF(1) 1,00
577 Durgapur - Remodelling of station building DF(1) 1,00
578 Malda Division - High level platform, platform shed, foot over bridge, new station
building, water supply & benches (6 stations)
DF(1) 25,00
579 Bhagalpur - Extension of platform No.2 & 3 for 24 coaches with yard remodelling,
provision of addl shed, 3rd foot over bridge etc
DF(1) 1,28,00
580 Eastern Railway - Escalators at major stations (4 Nos) (2 stations) DF(1) 38,00
581 Asansol Division - Extension of platforms to accommodate 16-coach trains, with foot
over bridges (6 stations)
DF(1) 70,00
582 General improvement in passenger amenities at various important stations (incl.
Majerhat)
DF(1) 57,00
583 Naihati - Pedestrian subway DF(1) 4,17,00
584 Ranaghat - Pedestrian subway DF(1) 3,70,00
585 Howrah Division - Raising of platforms from rail / low level to high level and
improvement to platform surfaces (21 stations)
DF(1) 1,50,00
586 Howrah - Extension of shed (platform Nos.15, 17, 18, 19, 20, 21, 22 & 23) DF(1) 65,00
587 Azimganj - Drinking water facilities DF(1) 10,00
588 Sainthia - Coach watering facilities DF(1) 2,00,00
589 Jasidih - Water supply arrangement from Ajoy river DF(1) 10
590 Sealdah Division - Digital public address & emergency sound system for centralised
digital announcement system (18 stations)
DF(1) 56,00
591 Sealdah Division - Full shelter to cover 12/24-coach length at various stations DF(1) 2,50,00
592 Naihati, Ranaghat, Krishnanagar & Behrampur Court - Foot over bridge (6 m wide) DF(1) 64,81
593 Sealdah Division - Platform shelter (30 stations) DF(1) 1,50,00
594 Howrah Division - Platform shelter (40 C-class stations) DF(1) 2,54,19
595 Sodepur - Pedestrian subway DF(1) 1,50,00
596 Durgapur - Improvement to platform shed roofing, reinforced concrete cement
overhead tank etc for development as model station
DF(1) 5,00
597 Srirampur - Twin reinforced concrete cement box subway DF(1) 30,00
PASSENGER AMENITIES
2.1.29
EASTERN RAILWAY
ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15
(Figures in thousand of Rupees)
Item
No.
RE 2014-15AllocationParticulars
598 Sealdah - True colour display board for passenger information system by replacing
text board
DRF 82,00
599 Kolkata Terminal - True colour display board for passenger information system by
replacing text board
DRF 73,00
600 Sealdah Division - Repl. of dilapidated station buildings (6 stations) DRF 57,00
601 Baranagar Road, Dakshineswar & Ballyghat - Repl. of standard platform DRF 21,00
602 Behrampur Court, Lalgola, Krishnanagar City, Ranaghat & Gede - Piped water
supply
DF(1) 37,00
603 Mathurapur Road, Gocharn, Majhdia & Joynagar Majilpur - 2nd foot over bridge and
Ranaghat - 3rd foot over bridge
DF(1) 3,00
604 Bardhaman - Extension of shed to cover entire platform area (platform No.1, 2/3, 4/5
& 6/7)
DF(1) 1,00
605 Krishnanagar City-Lalgola & Ranaghat-Shantipur - Platform shed for Adarsh stations
Muragacha, Bethuadahari, Debgram, Pagla Chandi & Habibpur
DF(1) 30,00
606 Howrah Division - Raising of platform from rail & low level to high level and extension
of length with improvement to platform surface (13 stations)
DF(1) 1,20,00
607 Tikiapara - Water treatment plant (2.5 mgd capacity) incl. pipeline etc for water
supply to coaching complex
DF(1) 40,00
608 Howrah Division - Piped water supply with deep tubewell (21 stations) DF(1) 27,00
609 Asansol Division - Additional DI pipeline from Barakar pump house to Asansol filter
house
DF(1) 5,00
610 Bolpur, Sainthia & Nalhati - Repl.of foot over bridges DRF 1,40,00
611 Asansol, Durgapur, Howrah, Bolpur, Rampurhat, Malda & Bhagalpur - Escalators (2
each) (14 Nos)
DF(1) 2,00,00
612 Belgharia - 6 m wide pedestrian subway & 3.65 m wide foot over bridge DF(1) 2,40,00
613 Ballygunge - New station building DF(1) 1,00
614 Howrah Division - Train indication boards at all remaining suburban stations DF(1) 30,00
615 Kolkata - New approach road from Belgachia road over bridge via Ultadanga railway
colony
DF(1) 4,00,00
616 Howrah - Development of station incl. segregation of arrival / departure & other
amenities
DF(1) 10,00
617 Howrah - 6.1 m wide foot over bridge connecting old & new complexes (platform
No.14 & 17)
DF(1) 1,00
618 Eastern Railway - Escalators at various stations (16 Nos) (8 stations) DF(1) 1,00
619 Sealdah Division - Raising of platform (36 stations) DF(1) 5,96,00
620 Tarapith & Tarakeshwar - Joint development of stations in association with Ministry of
Tourism (PB 781/2012-13/NR)
DF(1) 1,00
EBR ..
621 Works costing below Rs.2.5 crore each DRF 6,49,00
DF(1) 26,49,25
DF(2) 4,00
DF(3) 13,37
PASSENGER AMENITIES
2.1.30
EASTERN RAILWAY
ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15
(Figures in thousand of Rupees)
Item
No.
RE 2014-15AllocationParticulars
TOTAL-WORKS IN PROGRESS DRF 10,22,00
DF(1) 75,72,36
DF(2) 4,00
DF(3) 13,37
DF(4) 80,00
622 Works costing below Rs.2.5 crore each DRF 2,50,00
DF(1) 2,00,00
TOTAL-NEW WORKS DRF 2,50,00
DF(1) 2,00,00
TOTAL-Passenger Amenities DRF 12,72,00
DF(1) 77,72,36
DF(2) 4,00
DF(3) 13,37
DF(4) 80,00
623 Howrah - Setting up of Archery academy at Eastern side of electrical multiple unit car
shed
DF(3) 1
624 Howrah - Development of Eco Part at Ramkrishtopur Ghat DF(3) 1
625 Howrah - Repl of tilted retaining wall at riverside of Riviera DF(1) 5,00
626 Howrah - 75-bedded barrack at Golmohor barrack complex DF(3) 10
627 Jamalpur (IRIMEE) - Improvement for training of in-service officers DF(3) 1,00
628 Bhuli - Upgradation of training facilities at zonal railway training institute DF(3) 1
SRSF ..
629 Jamalpur (IRIMEE) - New auditorium DF(3) 40,00
630 Malda Division - Flood protection work DF(3) 1,15
631 Jamalpur (IRIMEE) - Comprehensive plan for upgradation of infrastructure and
training facilties
DRF 1
DF(3) 40,00
632 Jamalpur - Improvement / augmentation of Pilot training school DF(3) 90,00
633 Kolkata (East) - Development of rail museum (Phase-II) DF(3) 10
634 Howrah (Rail Museum) - New auditorium DF(3) 1
635 Sealdah - Bank protection / treatment with side slopes by rail piling, bullah piling,
reinforced concrete cement retaining wall, boulder pitching etc
DF(3) 20,00
636 Reginagar-Beldanga - Bad bank treatment with slopes DF(3) 1,27,02
637 Kolkata Area - Integrated security system (7 stations) Cap. 1,00
638 Eastern Railway - Integrated security system (4 stations) Cap. 1,00
639 Bongaon - New indoor stadium DF(3) 1
640 Gholshapur (Behala) - New indoor sports complex DF(3) 5,00,00
641 Howrah - Running room for drivers, guards, motormen, travelling ticket examiners etc DF(3) 1,00
642 Howrah - New divisional railway manager's office building DRF 1,00
643 Asansol Division - Track drain on cutting, dwarf wall at pedestrian crossing locations DF(4) 4,40
644 Asansol - Development of campus for raising of Railway Protection Special Force
ladies battalion
DF(3) 1,43,45
OTHER SPECIFIED WORKS
A - Works in Progress
B - New Works
2.1.31
EASTERN RAILWAY
ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15
(Figures in thousand of Rupees)
Item
No.
RE 2014-15AllocationParticulars
645 Canning - Raising of Railway Protection Force commando training centre DF(3) 1,00
646 Kolkata - Development of headquarters offices at Fairlie Place DF(3) 20,00
647 Bolpur - Construction of rail museum DF(3) 10,00
648 Sealdah - Improvement to Netaji Subhash Institute auditorium DRF 1
649 Sealdah - Improvement of Dr. B.C. Roy institute auditorium DRF 1
650 Howrah - Development of Rabindra rail museum in front of new station complex DF(3) 1
651 Beliaghata - Advanced track training centre DF(3) 5,00
652 Malda - Multi-disciplinary training centre DF(3) 1
653 Howrah - Sambhu Mitra cultural complex DF(3) 1
654 Gholsapur - Full covered shed with gallery, balance works, warm up pool and 1.5 m
deep swimming pool
DF(3) 1
655 Gholsapur - Provision of 60-bed 4-storied sports hostel with lift DF(3) 1
656 Kanchrapara - Provision of gallary, roofing etc. incl. development of playground at
railway sports complex
DF(3) 2,00,00
657 Sealdah Division - Reconstruction of divisional railway manager office building DRF 1,00
658 Howrah Division - Improvement of drainage system of Howrah car shed, Jheel siding
& Golmohor railway colony
DF(3) 5,00
659 Dankuni - Setting up of skill development instutute DF(3) 1
660 Eastern Railway - Boundary wall / fencing to prevent encroachment on railway land
(PB 821/2012-13/NR)
DF(3) 1
661 Sealdah Division - Railway protection force office cum barracks DF(3) 15,00
662 Works costing below Rs.2.5 crore each Cap. 43,00
DRF 4,19,97
DF(2) 94,01
DF(3) 6,38,24
DF(4) 55,56
TOTAL-WORKS IN PROGRESS Cap. 45,00
DRF 4,22,00
DF(1) 5,00
DF(2) 94,01
DF(3) 18,58,18
DF(4) 59,96
663 Works costing below Rs.2.5 crore each Cap. 5,00
DRF 10,00
DF(3) 30,00
TOTAL-NEW WORKS Cap. 5,00
DRF 10,00
DF(3) 30,00
OTHER SPECIFIED WORKS
B - New Works
2.1.32
EASTERN RAILWAY
ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15
(Figures in thousand of Rupees)
Item
No.
RE 2014-15AllocationParticulars
TOTAL-Other Specified Works Cap. 50,00
DRF 4,32,00
DF(1) 5,00
DF(2) 94,01
DF(3) 18,88,18
DF(4) 59,96
TOTAL-WORKS IN PROGRESS Cap. 848,06,96
C.Fund 403,83,00
DRF 531,20,88
DF(1) 77,24,86
DF(2) 13,50,47
DF(3) 84,51,72
DF(4) 18,65,48
S.Fund 87,23,96
EBR 86,07,98
TOTAL - NEW WORKS Cap. 57,01
DRF 40,39,64
DF(1) 3,19,51
DF(2) 6,00
DF(3) 1,46,71
DF(4) 1,00,00
S.Fund 5,41,65
GRAND TOTAL Cap. 848,63,97
C.Fund 403,83,00
DRF 571,60,52
DF(1) 80,44,37
DF(2) 13,56,47
DF(3) 85,98,43
DF(4) 19,65,48
S.Fund 92,65,61
EBR 86,07,98
2.2.1
EASTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2014-15
(Figures in thousand of Rupees)
Item
No.
RE 2014-15
664 Asansol - Simulator (electric - EMU / MEMU) Cap. ..
665 Sealdah- Under-floor wheel lathes (broad gauge) DRF 40
666 Digitised flat detector angio cath system with accessories DF(2) 42,45
667 Sealdah/Tarsarai - Underfloor wheel lathes (broad & metre gauge) Cap. 45
668 System of Online Monitoring of Rolling Stock (OMRS) (2 nos) DF(3) ..
669 Liluah - CNC hydraulic press brake (capacity 400 ton) Cap. 1,00
670 Asansol - CNC under floor wheel lathe DRF 45,10
671 Andal Diesel Shed - CNC under floor wheel lathe Cap. 53,40
672 Howrah - Underfloor wheel lathe (broad gauge) (electrical) DRF 44,05
673 Asansol - CNC surface wheel lathe DRF ..
674 Burdwan - CNC underfloor wheel lathe (broad gauge) DRF 40
675 Kacharapada - CNC surface wheel lathe (broad gauge) DRF 3,56,05
676 Modernisation of general printing press DRF 15,11,00
677 Asansol - Upgradation of loco simulator with additional features DF(3) ..
678 Jamalpur - Diesel generator set (2400 kw) DRF ..
679 Kacharapada Workshop - Wheel press (capacity 500 ton) (broad gauge) DRF ..
680 Liluah Workshop - Wheel press (capacity 500 ton) (broad & metre gauge) DRF ..
681 Liluah - CNC Surface Wheel Lathe(BG) DRF 2,79,73
682 Jamalpur - Bearing Cleaning Plant Cap. ..
683 Jamalpur - Diesel Hydraulic Bulldozer-75T Cap. ..
684 Jamalpur - Diesel Hyd. Road Mobile Crane-40T(Full slew) Cap. 1,96,73
685 CNC Vertical Turret Lathe, Table dia 1200mm for Wheel Cap. ..
686 CNC Surface Wheel Lathe DRF ..
687 Tup Hammer Blow Energy-7300Kg Cap. ..
688 CNC Bed Type Milling Machine (Travelling Type Column Work Table-1000x 4500mm
Long Travel 4000 MM)
Cap. ..
689 Works costing below Rs.2.5 crore each Cap. 2,10,73
DRF 4,90,40
DF(2) 1,55,50
DF(3) 1,64,41
DF(4) ..
TOTAL-PROGRAMMED DELIVERIES Cap. 4,62,31
DRF 27,27,13
DF(2) 1,97,95
DF(3) 1,64,41
DF(4) ..
690 Jamalpur Workshop - Non CNC Vertical Turret Lathe For Wheel Machining Table
Dia 1400 Mm
DRF ..
B - NEW ACQUISITION
AllocationParticulars
A - PROGRAMMED DELIVERIES
2.2.2
EASTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2014-15
(Figures in thousand of Rupees)
Item
No.
RE 2014-15AllocationParticulars
691 Works costing below Rs.2.5 crore each Cap. ..
DRF ..
DF(2) ..
DF(3) ..
TOTAL-NEW ACQUISITION Cap. ..
DRF ..
DF(2) ..
DF(3) ..
TOTAL-Machinery & Plant Cap. 4,62,31
DRF 27,27,13
DF(2) 1,97,95
DF(3) 1,64,41
DF(4) ..
B - NEW ACQUISITION