Overview of theEmbankment Remediation
Project
May 2015
Perris Dam Remediation Project
![Page 2: Embankment Remediation Project - California … Dam Remediation Project Slide 3 Local Faults Could Produce Large Motion That Affects Dam Design Earthquake - San Jacinto Fault Zone](https://reader031.vdocuments.us/reader031/viewer/2022021817/5a9fda197f8b9a62178d45c9/html5/thumbnails/2.jpg)
Location of Perris Dam and Lake
Perris Dam Remediation Project Slide 2
State Water Project
![Page 3: Embankment Remediation Project - California … Dam Remediation Project Slide 3 Local Faults Could Produce Large Motion That Affects Dam Design Earthquake - San Jacinto Fault Zone](https://reader031.vdocuments.us/reader031/viewer/2022021817/5a9fda197f8b9a62178d45c9/html5/thumbnails/3.jpg)
Perris Dam Remediation Project Slide 3
Local Faults Could Produce Large Motion That Affects Dam
Design Earthquake - San Jacinto Fault ZoneMagnitude Mw7.5 @ 5 miles from Dam
![Page 4: Embankment Remediation Project - California … Dam Remediation Project Slide 3 Local Faults Could Produce Large Motion That Affects Dam Design Earthquake - San Jacinto Fault Zone](https://reader031.vdocuments.us/reader031/viewer/2022021817/5a9fda197f8b9a62178d45c9/html5/thumbnails/4.jpg)
Dam Features
• Construction 1970 – 1972• Type of Dam – Earthfill• Dam Height – 126 feet• Dam Length – 2.2 Miles
Perris Dam Remediation Project Slide 4
![Page 5: Embankment Remediation Project - California … Dam Remediation Project Slide 3 Local Faults Could Produce Large Motion That Affects Dam Design Earthquake - San Jacinto Fault Zone](https://reader031.vdocuments.us/reader031/viewer/2022021817/5a9fda197f8b9a62178d45c9/html5/thumbnails/5.jpg)
Embankment Design and Construction
• Embankment Section– Primarily Silty Sand– Inclined Sandy Clay Core– Compaction Requirements
• DWR Standard– (20,000 ft-lb/ft3)
ZoneSpec.70-25
AverageAs-Placed
1 97% 98%2 97% 101%
Zone 1
Zone 3Zone 4
Zone 2Zone 2
Crest El. = 1600 ft
Toe El. = 1480 ft
41 3.2
1
31
11
0.51
Zone 2
10' Riprap
Dam Axis
Bench
Perris Dam Remediation Project Slide 5
![Page 6: Embankment Remediation Project - California … Dam Remediation Project Slide 3 Local Faults Could Produce Large Motion That Affects Dam Design Earthquake - San Jacinto Fault Zone](https://reader031.vdocuments.us/reader031/viewer/2022021817/5a9fda197f8b9a62178d45c9/html5/thumbnails/6.jpg)
Embankment Design and Construction
• Foundation Preparation– 3 ft excavation beneath Zone 2
• Remove organic material & loose surface sands
– 6 ft excavation beneath Zone 1 (core)• 10-25 ft Core Trench
Perris Dam Remediation Project Slide 6
![Page 7: Embankment Remediation Project - California … Dam Remediation Project Slide 3 Local Faults Could Produce Large Motion That Affects Dam Design Earthquake - San Jacinto Fault Zone](https://reader031.vdocuments.us/reader031/viewer/2022021817/5a9fda197f8b9a62178d45c9/html5/thumbnails/7.jpg)
Example of Cross Section Evaluation
Perris Dam Remediation Project Slide 7
Material moist (pcf) sat (pcf) K2,max ' (deg) c' (psf) (deg) c (psf) Kh (ft/day) Kh / KvZone 1 128 134 0.35 100 22 600 14 1000 0.01 10Zone 2 134 139 0.35 100 33 0 13 1800 0.1 10Zone 3 134 139 0.35 100 40 0 40 0 5 1Zone 4 134 139 0.35 100 40 0 40 0 5 1
Shallow Alluvium 129.5 136 0.35 160 35.5 0 23 500 0.5 10Deep Alluvium 129.5 136 0.35 160 35.5 0 14 2300 0.5 10Weathered Rock 145 145 0.32 N/A N/A N/A N/A N/A 0.5 10
Bedrock 165 165 0.28 N/A N/A N/A N/A N/A 0.01 10
Summary of Field ExplorationSPT Drill Holes = 120
SPT’s = 1,318CPT Drill Holes = 139
Red Areas Indicate Problem Soils
![Page 8: Embankment Remediation Project - California … Dam Remediation Project Slide 3 Local Faults Could Produce Large Motion That Affects Dam Design Earthquake - San Jacinto Fault Zone](https://reader031.vdocuments.us/reader031/viewer/2022021817/5a9fda197f8b9a62178d45c9/html5/thumbnails/8.jpg)
Design Evaluated with FLAC
Perris Dam Remediation Project Slide 8
![Page 9: Embankment Remediation Project - California … Dam Remediation Project Slide 3 Local Faults Could Produce Large Motion That Affects Dam Design Earthquake - San Jacinto Fault Zone](https://reader031.vdocuments.us/reader031/viewer/2022021817/5a9fda197f8b9a62178d45c9/html5/thumbnails/9.jpg)
RemediationZone
RemediationZone
Perris Dam and Lake
Perris Dam Remediation Project Slide 9
![Page 10: Embankment Remediation Project - California … Dam Remediation Project Slide 3 Local Faults Could Produce Large Motion That Affects Dam Design Earthquake - San Jacinto Fault Zone](https://reader031.vdocuments.us/reader031/viewer/2022021817/5a9fda197f8b9a62178d45c9/html5/thumbnails/10.jpg)
Design and Review
• Division Of EngineeringResponsible for design, development of plans and specifications, administration and inspection of construction contract
• Division of Safety of Dams (DSOD)As dam regulator, ensures a safe design
Approves design analysis, plans, and specifications
Oversees the construction in accordance with the approved designs
• Board of Consultants (BOC)Appointed by the Director of DWR
Comprised of a group of experts
Performs independent review of the dam design
Approves design work for construction
Perris Dam Remediation Project Slide 10
![Page 11: Embankment Remediation Project - California … Dam Remediation Project Slide 3 Local Faults Could Produce Large Motion That Affects Dam Design Earthquake - San Jacinto Fault Zone](https://reader031.vdocuments.us/reader031/viewer/2022021817/5a9fda197f8b9a62178d45c9/html5/thumbnails/11.jpg)
Design Concept
• Remove and replace loose shallow soils
• Improve the deeper foundation soils by CementDeep Soil Mixing (CDSM)
• Construct a stability berm on the downstream sideof the dam and include drainage features
Perris Dam Remediation Project Slide 11
![Page 12: Embankment Remediation Project - California … Dam Remediation Project Slide 3 Local Faults Could Produce Large Motion That Affects Dam Design Earthquake - San Jacinto Fault Zone](https://reader031.vdocuments.us/reader031/viewer/2022021817/5a9fda197f8b9a62178d45c9/html5/thumbnails/12.jpg)
Perris Dam Remediation Project Slide 12
• Clearing and Grubbing• Lake Bed Haul Roads• Sitework• Production Blasting• Controlled Blasting• Rock Processing and Stockpiling (Filter and Drain)• Dewatering at Dam Toe and Borrow Area• Seepage Collection System (Remove and Replace)• Relief Well System (Remove and Replace)• Cement Deep Soil Mixing (CDSM)• Stability Berm• Right Abutment Dam Repair
Construction ContractScope of Work
![Page 13: Embankment Remediation Project - California … Dam Remediation Project Slide 3 Local Faults Could Produce Large Motion That Affects Dam Design Earthquake - San Jacinto Fault Zone](https://reader031.vdocuments.us/reader031/viewer/2022021817/5a9fda197f8b9a62178d45c9/html5/thumbnails/13.jpg)
Perris Dam Remediation Project Slide 13
Project Overview
![Page 14: Embankment Remediation Project - California … Dam Remediation Project Slide 3 Local Faults Could Produce Large Motion That Affects Dam Design Earthquake - San Jacinto Fault Zone](https://reader031.vdocuments.us/reader031/viewer/2022021817/5a9fda197f8b9a62178d45c9/html5/thumbnails/14.jpg)
Foundation Treatment and Stability Berm
Perris Dam Remediation Project Slide 14
![Page 15: Embankment Remediation Project - California … Dam Remediation Project Slide 3 Local Faults Could Produce Large Motion That Affects Dam Design Earthquake - San Jacinto Fault Zone](https://reader031.vdocuments.us/reader031/viewer/2022021817/5a9fda197f8b9a62178d45c9/html5/thumbnails/15.jpg)
Perris Dam Remediation Project Slide 15
Foundation Treatment
CDSM
Berm
Removal and Replacement
![Page 16: Embankment Remediation Project - California … Dam Remediation Project Slide 3 Local Faults Could Produce Large Motion That Affects Dam Design Earthquake - San Jacinto Fault Zone](https://reader031.vdocuments.us/reader031/viewer/2022021817/5a9fda197f8b9a62178d45c9/html5/thumbnails/16.jpg)
New Haul Road
Outlet Structure
Controlled Blasting
Perris Dam Remediation Project Slide 16
![Page 17: Embankment Remediation Project - California … Dam Remediation Project Slide 3 Local Faults Could Produce Large Motion That Affects Dam Design Earthquake - San Jacinto Fault Zone](https://reader031.vdocuments.us/reader031/viewer/2022021817/5a9fda197f8b9a62178d45c9/html5/thumbnails/17.jpg)
Controlled Blasting
Perris Dam Remediation Project Slide 17
•Low ground velocity restriction
•Protect existing facilities
![Page 18: Embankment Remediation Project - California … Dam Remediation Project Slide 3 Local Faults Could Produce Large Motion That Affects Dam Design Earthquake - San Jacinto Fault Zone](https://reader031.vdocuments.us/reader031/viewer/2022021817/5a9fda197f8b9a62178d45c9/html5/thumbnails/18.jpg)
Production Blasting
Perris Dam Remediation Project Slide 18
![Page 19: Embankment Remediation Project - California … Dam Remediation Project Slide 3 Local Faults Could Produce Large Motion That Affects Dam Design Earthquake - San Jacinto Fault Zone](https://reader031.vdocuments.us/reader031/viewer/2022021817/5a9fda197f8b9a62178d45c9/html5/thumbnails/19.jpg)
Production Blasting
Perris Dam Remediation Project Slide 19
![Page 20: Embankment Remediation Project - California … Dam Remediation Project Slide 3 Local Faults Could Produce Large Motion That Affects Dam Design Earthquake - San Jacinto Fault Zone](https://reader031.vdocuments.us/reader031/viewer/2022021817/5a9fda197f8b9a62178d45c9/html5/thumbnails/20.jpg)
Rock Processing and Stockpile
Perris Dam Remediation Project Slide 20
•Rock from blasting usedfor filter and drainsystem
•Cleanness requirements
•Segregation requirements
•Limited work andstaging areas
![Page 21: Embankment Remediation Project - California … Dam Remediation Project Slide 3 Local Faults Could Produce Large Motion That Affects Dam Design Earthquake - San Jacinto Fault Zone](https://reader031.vdocuments.us/reader031/viewer/2022021817/5a9fda197f8b9a62178d45c9/html5/thumbnails/21.jpg)
Seepage Collection System
Perris Dam Remediation Project October 31, 2013 Slide 21
•Manage the existing system's flowing water
• Remove existing wells and drain system
• Construct new system at berm
![Page 22: Embankment Remediation Project - California … Dam Remediation Project Slide 3 Local Faults Could Produce Large Motion That Affects Dam Design Earthquake - San Jacinto Fault Zone](https://reader031.vdocuments.us/reader031/viewer/2022021817/5a9fda197f8b9a62178d45c9/html5/thumbnails/22.jpg)
Design Phase Test Sections
• DWR conducted testing to evaluate design andconstruction of the foundation treatment, otherconstruction features, dewatering.
• Identified potential problems• Provided confidence in the design• Refined design of foundation repairs. Resulted in final design
with shallower excavation and confirmed CDSM treatment.
Perris Dam Remediation Project Slide 22
![Page 23: Embankment Remediation Project - California … Dam Remediation Project Slide 3 Local Faults Could Produce Large Motion That Affects Dam Design Earthquake - San Jacinto Fault Zone](https://reader031.vdocuments.us/reader031/viewer/2022021817/5a9fda197f8b9a62178d45c9/html5/thumbnails/23.jpg)
Test Sections
Dewatering Test Excavation Area
CDSM Test Section Area
Perris Dam Remediation Project Slide 23
![Page 24: Embankment Remediation Project - California … Dam Remediation Project Slide 3 Local Faults Could Produce Large Motion That Affects Dam Design Earthquake - San Jacinto Fault Zone](https://reader031.vdocuments.us/reader031/viewer/2022021817/5a9fda197f8b9a62178d45c9/html5/thumbnails/24.jpg)
Test ContractPre-drilling
Perris Dam Remediation Project October 25, 2013 Slide 24
![Page 25: Embankment Remediation Project - California … Dam Remediation Project Slide 3 Local Faults Could Produce Large Motion That Affects Dam Design Earthquake - San Jacinto Fault Zone](https://reader031.vdocuments.us/reader031/viewer/2022021817/5a9fda197f8b9a62178d45c9/html5/thumbnails/25.jpg)
Test ContractSoil Mixing using Multi-Auger Method
Multi-Auger Rig
Installing CDSM Test Cells
Spoil Area
Batch Plant
Perris Dam Remediation Project Slide 25
![Page 26: Embankment Remediation Project - California … Dam Remediation Project Slide 3 Local Faults Could Produce Large Motion That Affects Dam Design Earthquake - San Jacinto Fault Zone](https://reader031.vdocuments.us/reader031/viewer/2022021817/5a9fda197f8b9a62178d45c9/html5/thumbnails/26.jpg)
Test Section Soil mixing using CSM method
Perris Dam Remediation Project Slide 26
![Page 27: Embankment Remediation Project - California … Dam Remediation Project Slide 3 Local Faults Could Produce Large Motion That Affects Dam Design Earthquake - San Jacinto Fault Zone](https://reader031.vdocuments.us/reader031/viewer/2022021817/5a9fda197f8b9a62178d45c9/html5/thumbnails/27.jpg)
CDSM Spoils
Spoil Trench
Test Section - Soil Mixing Operation
Multi-Auger Method CSM Method
CSM Spoils
Spoil Trench
Perris Dam Remediation Project Slide 27
![Page 28: Embankment Remediation Project - California … Dam Remediation Project Slide 3 Local Faults Could Produce Large Motion That Affects Dam Design Earthquake - San Jacinto Fault Zone](https://reader031.vdocuments.us/reader031/viewer/2022021817/5a9fda197f8b9a62178d45c9/html5/thumbnails/28.jpg)
Sheet PilesEductor Wells
Large Dewatering Wells
next view
Perris Dam Remediation Project Slide 28
Evaluated Dewatering Methods
Evaluated Excavation and Drilling Methods
Dewatering Test Excavation
![Page 29: Embankment Remediation Project - California … Dam Remediation Project Slide 3 Local Faults Could Produce Large Motion That Affects Dam Design Earthquake - San Jacinto Fault Zone](https://reader031.vdocuments.us/reader031/viewer/2022021817/5a9fda197f8b9a62178d45c9/html5/thumbnails/29.jpg)
Geologic Investigation
Large WellLarge Well
Eductor Wells
Sheet Piles
Geologic Investigation
Dewatering Test Excavation
![Page 30: Embankment Remediation Project - California … Dam Remediation Project Slide 3 Local Faults Could Produce Large Motion That Affects Dam Design Earthquake - San Jacinto Fault Zone](https://reader031.vdocuments.us/reader031/viewer/2022021817/5a9fda197f8b9a62178d45c9/html5/thumbnails/30.jpg)
http://www.water.ca.gov/lakeperris/Perris Dam Remediation Project Slide 30