pcrs waste calculator v1.1
TRANSCRIPT
-
8/3/2019 PCRS Waste Calculator v1.1
1/8
Estidama Community Waste Calculator v1.1
Report a Template Bug :
Project Details Background
Construction and Demolition Waste Estimation
Operational Waste Estimation
Salvage/Reycling Capture Rates
Credit Point Summary
Construction and Demolition Waste Summary
Operational Waste Summary
Key to cell formats in the waste calculator
Input Cells that may be changed by design teams
Last Revised: 1st November 2010
Home Step 1 Step 2 Step 3 Step 4 Summary 1 Summary 2 Summary 3
Step 1
Design teams are required to proceed through the worksheets Steps 1 to 4 in order. All Input Cellsmust be completed in order to display results correctly within the Summary worksheets.The results are presented in the Summary worksheets, but please do not proceed to next step if thereare any warning messages in any of the Steps.
Instructions:* Design teams are required to enter information in all light blue input cells not greyed out to displaythe results in the Results worksheet. Please do not proceed if there are any warning messages in anyof the Steps.* For construction rating submissions, select "Construction" as the Pearl Rating Stage and override
default values with actual data from construction and, if applicable, demolition
Note: This tool is for use with the Pearl Rating System only and to demonstrate compliance with thePearl Rating requirements. It is not a design tool.
Step 2
Step 3
Step 4
Summary 1
Summary 2
Summary 3
Next
mailto:[email protected]?subject=Pearl%20Community%20Waste%20Calculator%20Bug%20Reportmailto:[email protected]?subject=Pearl%20Community%20Waste%20Calculator%20Bug%20Report -
8/3/2019 PCRS Waste Calculator v1.1
2/8
Step 1 - Project Details
Project Details Client Details
Community/Project Name Client Name
Location Client Contact
Client Address
Warning: Please fill all fields above. Warning: Please fill all fields above.
Rating System Details
Project ID
Pearl Rating System Community
Pearl Rating Stage
Warning: Please fill all fields above. Design Team Details
Architect
Developer
Pearl QP Details Mechanical Engineer
Pearl QP Name Electrical Engineer
Pearl QP Number Structural Engineer
Warning: Please fill all fields above. Ecologist
Landscape Architect
Other
Waste Calculator Other
Person Responsible Other
Company Other
Date of Issue Other
Warning: Please fill all fields above.
Home Step 1 Step 2 Step 3 Step 4 Summary 1 Summary 2 Summary 3
Total building GFA, m2
Previous Home Next
-
8/3/2019 PCRS Waste Calculator v1.1
3/8
Step 2 - Construction and Demolition Waste Estimation
Details of existing buildings and infrastructure to be demolished
Are there any existing building(s) within the community? No
Is there any existing public realm infrastructure within the community? No
Existing building(s) Override default demolition waste values? No
Attribute Unit Value Demolition waste generated in m3 per 100 m2 of building: 50.0
Total gross floor area sqm Please write the source reference of this figure:
Existing public realm infrastructure
Attribute Unit Value Demolition waste generated in tonnes per 100 m2 of public realm infrastructure:
Total area sqm Please write the source reference of this figure:
Proposed Community Details
Proposed public realm/common elements in the community
Attribute Unit Value
Street/Roads/Highways m2 Construction waste generated in tonnes per 100 m2 of Street/Roads/Highways
Please insert the source reference for the value used:
Infrastructure buildings, e.g. district cooling centres m2 Construction waste generated in tonnes per 100 m2 of Infrastructure buildings, e.g. district cooling centres
Please insert the source reference for the value used:
Utility corridors m2 Construction waste generated in tonnes per 100 m2 of Utility corridors
Please insert the source reference for the value used:
Parks / landscape with vegetation m2 Construction waste generated in tonnes per 100 m2 of Parks / landscape with vegetation
Please insert the source reference for the value used:
Waterfront features m2 Construction waste generated in tonnes per 100 m2 of Waterfront features
Please insert the source reference for the value used:
Other m2 Construction waste generated in tonnes per 100 m2 of Other
Home Step 1 Step 2 Step 3 Step 4 Summary 1 Summary 2 Summary 3
Note: Only include public realm infrastructure or buildings that will be demolished in preparation ofpublic realm/infrastructure work. Do not include buildings that will be part of individual plots andthat will be considered by the Building or Villa rating systems
Note: Please fill in all areas of public realm/common elements of the communitywith their respective construction waste rates as no default benchmarks areprovided.
Note: Earthworks are not included in the construction waste calculations. Nonetheless, balancingfilling and excavation volumes within the community site is best practice.
-
8/3/2019 PCRS Waste Calculator v1.1
4/8
Step 3 - Operational Waste Estimation
Proposed Community Details
Office Office Non-default waste composition and generation for Offices
Attribute Unit Value Paper/Cardboard Metal Glass Plastic Organic Other non-haz.
Office Gross Floor Area sqm 0 59.0% 1.0% 2.0% 9.0% 19.0% 10.0%
Office Net Floor Area sqm Quantity 80.0 kg/m2/year
Override default operational waste values for offices? No Please insert the source reference for the value used:
Retail Retail Non-default waste composition and generation for Retail
Attribute Unit Value Paper/Cardboard Metal Glass Plastic Organic Other non-haz.
Retail Gross Floor Area sqm 0 62.0% 1.5% 0.0% 28.0% 3.5% 5.0%
Retail Net Floor Area sqm Quantity 40.0 kg/m2/year
Override default waste values for retail? No Please insert the source reference for the value used:
School School Non-default waste composition and generation for School
Attribute Unit Value Paper/Cardboard Metal Glass Plastic Organic Other non-haz.
School Gross Floor Area sqm 0 55.0% 2.0% 4.0% 17.0% 18.0% 4.0%
Number of students students Quantity 70.0 kg/student/year
Override default waste values for schools? No Please insert the source reference for the value used:
Residential Residential Non-default waste composition and generation for Residential
Attribute Unit Value Paper/Cardboard Metal Glass Plastic Organic Other non-haz.
Residential Gross Floor Area sqm 0 15.0% 5.0% 5.0% 15.0% 50.0% 10.0%
Total number of residents person Quantity 532.9 kg/person/year
Override default operational waste values for Residential? No Please insert the source reference for the value used:
Other building types: Hotel Non-default waste composition and generation for Other - Hotel
Attribute Unit Value Paper/Cardboard Metal Glass Plastic Organic Other non-haz.
Home Step 1 Step 2 Step 3 Step 4 Summary 1 Summary 2 Summary 3
-
8/3/2019 PCRS Waste Calculator v1.1
5/8
Step 4 - Salvage/Reycling Capture Rates
Construction and Demolition waste recycling and salvage rates
Salvage and recycling of Construction and Demolition waste
Non-technical factorsWill a construction and demolition waste management plan be written? (Required SM-R2) No
Will waste education be provided to construction contractors? No
Will waste education be provided to demolition contractors? No
Will waste be adequately segregated and temporarily stored on-site during construction? No
Will waste be adequately segregated and temporarily stored on-site during demolition? No
Will there be a person responsible of C&D waste management? No Construction Demolition
Salvage rate - 0%
Technical factors Non-technical capture rate 0% 0%
What percentage of material from existing community elements/buildings will be reused in the new one? 0% Technical capture rate 0% 0%
List of items reused: Overal capture rate 0% 0%
Will construction waste be segregated in a recycling plant? No
Which plant(s)?
Will demolition waste be segregated in a recycling plant? No
Which plant(s)?
NoConstruction Demolition Please insert the source reference for these figures:
0% 0%
Operational waste diversion from landfill rates
General
Will an operational waste management plan be written? (Required SM-R3) No
Will adequate access be provided for refuse collection vehicles? (Required SM-R3) No
Home Step 1 Step 2 Step 3 Step 4 Summary 1 Summary 2 Summary 3
NOTE:Capture rates represent the expected salvage/recycling rates of the project for
construction and demolition waste at the design stage or those achieved duringthe construction stage.They are not the final salvage/recycling rates that will be achieved in theprojects. These which are shown in the Summary 2 worksheet.Capture rates are always
-
8/3/2019 PCRS Waste Calculator v1.1
6/8
Summary 1 - Credit Point Summary
0
Building Construction and Demolition Waste SM-R2: Basic construction waste management
Estimated demolition waste generated in tonnes 0 Pre-requisite Achieved? NoEstimated construction waste generated in tonnes 0
Estimated total C&D waste generated in tonnes 0
Quantity landfilled in tonnes 0 SM-R3: Basic operational waste management strategy
Estimated construction and demolition waste salvaged/recycled in % 0.0% Pre-requisite Achieved? No
Building Operational Waste
Estimated operational waste generated in tonnes per annum 0 SM-5: Improved construction waste management
Estimated operational waste landfilled in tonnes per annum 0 Credit Points Awarded 0Estimated operational waste diverted in tonnes per annum 0
Estimated operational waste diverted in % 0.0%
SM-6: Improved operational waste management
Credit Points Awarded 0
SM-7: Organic waste management
Credit Points Awarded 0
SM-8: Hazardous waste management
Credit Points Awarded 0
Home Step 1 Step 2 Step 3 Step 4 Summary 1 Summary 2 Summary 3
Previous Home Next
-
8/3/2019 PCRS Waste Calculator v1.1
7/8
Summary 2 - Construction and Demolition Waste Summary
Generated Landfilled
Tonnes Tonnes Tonnes %
Demolition waste 0 0 0 0.0%
Construction waste 0 0 0 0.0%
Total waste 0 0 0
Percentage of Construction and Demolition waste recycled/salvaged 0.0%
Construction and Demolition Waste: 0 tonnes
Home Step 1 Step 2 Step 3 Step 4 Summary 1 Summary 2 Summary 3
EstimatedConstruction and Demolition waste
Salvaged/Recycled
Salvaged/Recycled
Previous Home Next
Demolition waste Construction waste
0
0
0
0
0
0
1
1
1
1
1
Construction and Demolition Waste: 0 tonnes
Salvaged/Recycled
Landfilled
Tonnes
Construction and Demolition Waste: 0 tonnes
Landfil led Salvaged/Recycled
-
8/3/2019 PCRS Waste Calculator v1.1
8/8
Summary 3 - Operational Waste Summary
Estimated Operational wasteGenerated Landfilled
tpa tpa tpa %
Paper/Cardboard 0 0 0 0.0%
Metal 0 0 0 0.0%
Glass 0 0 0 0.0%
Plastic 0 0 0 0.0%
Organic 0 0 0 0.0%
Other non-hazardous 0 0 0 0.0%
Total operational waste generated in tonnes per annum 0 0 0
Percentage of operational waste recycled/composted/treated 0.0%
Operational Waste: 0 Tonnes per annum
Reference
http://www.beeah-uae.com/en/whatyoucando/industry/did-you-know-industry
Home Step 1 Step 2 Step 3 Step 4 Summary 1 Summary 2 Summary 3
Recycled/Composted/
Treated
Recycled/
Treated
NOTE: tpa: tonnes per annum
Previous Home
Paper/Cardboard Metal Glass Plastic Organic Other non-hazardous0
0
0
0
0
0
1
1
1
1
1
Operational Waste: 0 Tonnes per annum
Recycled/Composted/Treated
Landfilled
Tonnespera
nnum
Operational Waste: 0 Tonnes per annum
Landfilled Recycled/Composted/Treated