PCI Big Beam Contest. New Oriental Junfeng Qian Shiyu Wang Qi Wang. Presentation Outline. Background Contest Rules Project Constrains Scope of Service Timeline . Background. Sponsored by PCI and Sika Corporation PCI- Precast/ Prestressed Concrete Institute - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: PCI Big Beam Contest](https://reader036.vdocuments.us/reader036/viewer/2022062315/56816336550346895dd3c488/html5/thumbnails/1.jpg)
PCI Big Beam Contest
New Oriental
Junfeng QianShiyu WangQi Wang
![Page 2: PCI Big Beam Contest](https://reader036.vdocuments.us/reader036/viewer/2022062315/56816336550346895dd3c488/html5/thumbnails/2.jpg)
Presentation Outline• Background
• Contest Rules
• Project Constrains
• Scope of Service
• Timeline
![Page 3: PCI Big Beam Contest](https://reader036.vdocuments.us/reader036/viewer/2022062315/56816336550346895dd3c488/html5/thumbnails/3.jpg)
Background• Sponsored by PCI and Sika Corporation
• PCI- Precast/Prestressed Concrete Institute
• Contest Period: 8/15/2012 -6/15/2013.
![Page 4: PCI Big Beam Contest](https://reader036.vdocuments.us/reader036/viewer/2022062315/56816336550346895dd3c488/html5/thumbnails/4.jpg)
Background Cont.• Judging Criteria
– Design accuracy
– Lowest cost
– Lowest weight
– Largest measured deflection at maximum total applied load
– Report quality
– Video
![Page 5: PCI Big Beam Contest](https://reader036.vdocuments.us/reader036/viewer/2022062315/56816336550346895dd3c488/html5/thumbnails/5.jpg)
Contest Rules• The beam must no longer than 20 feet and must be tested as a simply
supported span of 18 feet
• The beam shall be designed for dead load plus two applied service live loads of 10 kips
![Page 6: PCI Big Beam Contest](https://reader036.vdocuments.us/reader036/viewer/2022062315/56816336550346895dd3c488/html5/thumbnails/6.jpg)
Contest Rules Cont.• All unit cost of available
materials are provided by PCI
• All entries must meet the provisions of ACI-318-08 or the 7th Edition of the PCI Design Handbook
![Page 7: PCI Big Beam Contest](https://reader036.vdocuments.us/reader036/viewer/2022062315/56816336550346895dd3c488/html5/thumbnails/7.jpg)
Scope of Service • Project Management
• Background and Literature Search
• Preliminary Analysis & Design
• Final Analysis & Design
• Testing Instrumentation Setting Up
• Service During Fabrication
• Beam Test
• Design Report
![Page 8: PCI Big Beam Contest](https://reader036.vdocuments.us/reader036/viewer/2022062315/56816336550346895dd3c488/html5/thumbnails/8.jpg)
Scope Of Service Task 1-Project Management
• Weekly Team Meeting– Update Design– Comments
• Technical Coordination Meeting– Workshop– Meet with Project Manager of Sponsor Company
![Page 9: PCI Big Beam Contest](https://reader036.vdocuments.us/reader036/viewer/2022062315/56816336550346895dd3c488/html5/thumbnails/9.jpg)
Scope of Service Cont.Task 2-Literature Search
• ACI-318-08
• PCI Design Handbook, 7th Edition
![Page 10: PCI Big Beam Contest](https://reader036.vdocuments.us/reader036/viewer/2022062315/56816336550346895dd3c488/html5/thumbnails/10.jpg)
Scope of Service Cont.Task 3-Preliminary Analysis & Design
• Material Selection– Concrete Mix• Lightweight Self Consolidating
Concrete• Normal Self Consolidating
Concrete– Reinforcement Bar• ASTM Standard #4 or #5
• Design Spreadsheet
• Design Matrix – Six to Eight Options
![Page 11: PCI Big Beam Contest](https://reader036.vdocuments.us/reader036/viewer/2022062315/56816336550346895dd3c488/html5/thumbnails/11.jpg)
Scope of Service Cont.Task 4-Final Analysis & Design
• Final Option
• Design Verification– Response 2000
• Auto CAD Drawing – Cross Section View– Side View
![Page 12: PCI Big Beam Contest](https://reader036.vdocuments.us/reader036/viewer/2022062315/56816336550346895dd3c488/html5/thumbnails/12.jpg)
Scope of Service Cont.Task 5-Testing Instrumentation Setting Up
Task 6-Service during Fabrication– Troubleshooting
Task 7-Beam Test – Test Results – Video
Task 8-Design Report
![Page 13: PCI Big Beam Contest](https://reader036.vdocuments.us/reader036/viewer/2022062315/56816336550346895dd3c488/html5/thumbnails/13.jpg)
Timeline
10-S
ep
12-S
ep
15-S
ep
18-S
ep
23-S
ep
28-S
ep
1-O
ct
5-O
ct
10-O
ct
15-O
ct
20-O
ct
25-O
ct
30-O
ct
1-N
ov
5-N
ov
10-N
ov
15-N
ov
20-N
ov
25-N
ov
30-N
ov
1-De
c
5-De
c
10-D
ec
15-D
ec
20-D
ec
25-D
ec
30-D
ec
14-Ja
n
25-Ja
n
28-Ja
n
1-Fe
b
4-Fe
b
8-Fe
b
11-F
eb
12-F
eb
15-F
eb
18-F
eb
22-F
eb
25-F
eb
1-M
ar
4-M
ar
8-M
ar
11-M
ar
22-M
ar
25-M
ar
27-M
ar
28-M
ar
29-M
ar
1-Ap
r
5-Ap
r
8-Ap
r
9-Ap
r
30-A
pr
9-M
ay
1 Research1.1 Read Contest Poster 1.2 Gather design criteria1.3 Prepare a checklist of tasks2 Literature Search2.1 Read ACI code and PCI handbook manual3 Engineering Study3.3 Material selection3.4 Cross section selection4 Preliminary Design and Analysis4.1 Design spreadsheet4.2 Design matrix5 Final Design and Analysis5.1 Design Verification 5.2 Auto CAD 6 Service during Fabrication7 Install test instrumentation8 Beam Test8.1 Record video and results9 Submit the design report
Schedule
![Page 14: PCI Big Beam Contest](https://reader036.vdocuments.us/reader036/viewer/2022062315/56816336550346895dd3c488/html5/thumbnails/14.jpg)
Reference
• Technical Advisor: Dr. Tuchscherer
• Project Manager: David L. Chapin
• Sponsor: Tpac Company
Acknowledge
• ACI Code 318-08
• The 7th Edition of the PCI Design Handbook