pce working group meeting ietf-72, july 2008, dublin
DESCRIPTION
PCE Working Group Meeting IETF-72, July 2008, Dublin. Online Agenda and Slides at: https://datatracker.ietf.org/cgi-bin/wg/wg_proceedings.cgi Co-chairs: JP Vasseur/Adrian Farrel ADs: Ross Callon/Dave Ward. Administrivia (Chairs) 5 minutes (5/150) WG status (Chairs) 15 minutes (20/150) - PowerPoint PPT PresentationTRANSCRIPT
72th IETF, Dublin, July 2008
PCE Working Group MeetingIETF-72, July 2008, Dublin
Online Agenda and Slides at:
https://datatracker.ietf.org/cgi-bin/wg/wg_proceedings.cgi
Co-chairs: JP Vasseur/Adrian FarrelADs: Ross Callon/Dave Ward
Agenda - PCE Working Group Meeting - IETF-72 - Dublin - July 2008
• Administrivia (Chairs) 5 minutes (5/150)• WG status (Chairs) 15 minutes (20/150)• Inter-layer Framework and Requirements: Tomonori Takeda and Adrian Farrel 10 minutes(30/150)
draft-ietf-pce-inter-layer-frwk-07.txt
draft-ietf-pce-inter-layer-req-07.txt
• Inter-layer PCEP extensions: Tomonori Takeda 10 minutes (40/150)d
raft-ietf-pce-inter-layer-ext-01.txt
• PCE application to GMPLS: Tomohiro Otani 10 minutes (50/150)d
raft-otani-pce-gmpls-aps-req-02.txt
• P2MP PCEP Applicability Requirements: Tomonori Takeda and Adrian Farrel10 minutes (60/150)d
raft-yasukawa-pce-p2mp-app-02.txt
draft-yasukawa-pce-p2mp-req-05.txt
• P2MP PCEP extensions: Fabien Verhaeghe 15 minutes (75/150)d
raft-zhao-pcep-p2mp-extension-00.txt
• Global Concurrent Optimization: Young Lee 10 minutes (85/150)d
raft-ietf-pce-global-concurrent-optimization-04.txt
• SVEC List For Synchronized Dependent Computations: Itaru Nishioka 10 minutes (95/150)
draft-nishioka-pce-sve-list-02.txt
• Performance Evaluation of PCE for WSON: Greg Bernstein 10 minutes (105/150)d
raft-bernstein-pce-WSON-evaluation-00.txt
• PCEP Requirements and Extensions for WSON: Young Lee 10 minutes (115/150)d
raft-lee-pce-wson-routing-wavelength-02.txt
• Vendor Constraints: Adrian Farrel 10 minutes (125/150)d
raft-farrel-pce-vendor-constraints-01.txt
• Applicability of PCE to VPNs: Adrian Farrel 5 minutes (130/150)d
raft-yasukawa-pce-vpn-req-04.txt
• PCEP Extensions for L3VPNs: Kenji Kumaki 10 minutes (140/150)d
raft-kumaki-murai-pce-pcep-extension-l3vpn-00.txt
• Discovering PCEs in other ASes: Kenji Kumaki10 minutes (150/150)d
raft-kumaki-pce-bgp-disco-attribute-01.txt
72th IETF, Dublin, July 2008
PCE WG RecharteredDone Submit first draft of PCE architecture document
Done Submit first draft of PCE discovery requirements and protocol extensions documents
Done Submit first draft of the PCE communication protocol requirements
Done Submit first draft of the definition of objective metrics
Done Submit first draft of the PCE communication protocol specification
Done Submit PCE architecture specification to the IESG to be considered as Informational RFC
Done Submit first draft of the MIB module for the PCE protocol
Done Submit PCE communication protocol requirements to the IESG to be considered as an Informational RFC
Done Submit PCE discovery protocol extensions specifications to the IESG to be considered as a Proposed Std
Done Submit PCE communication protocol specification to the IESG to be considered as a Proposed Standard
Jun 2008 Submit first draft of applicability statement (describing the processes and procedures for the use of the PCE architecture, protocols and protocol extensions for inter-area MPLS and GMPLS Traffic Engineering)
Jun 2008 Submit first draft of the PCE P2MP communication requirements
Jul 2008 Submit first draft of the PCE P2MP PCEP protocol extensions
Sep 2008 Submit PCE P2MP communication requirements to the IESG to be considered as an Informational RFC
Nov 2008 Submit applicability statement to the IESG as informational RFC
Dec 2008 Submit PCE P2MP PCEP protocol extensions to the IESG to be considered as an Proposed Std RFC
Feb 2009 Submit applicability and metrics documents to the IESG
Feb 2009 Submit the PCE MIB Internet-Draft to the IESG for consideration as Proposed Standard
Feb 2009 Evaluate WG progress, recharter or close
72th IETF, Dublin, July 2008
Working Group Update
• BRPC on RFC Ed Queue (JP) • PCEP status (JP) in revised ID needed• Path Key (JP): in publication request• Policy enabled path comp (Lou/Igor) in revised ID needed• XRO (Adrian) in IESG evaluation : AD follow-up• Inter-AS requirements (Adrian) in IESG LC• MIB progress (Emile/Kiran/Adrian)• PCEP DSTE status (Siva/Kenji)• PCEP Objective Functions status (Jean-Louis/JP) Stable – ready for LC• PCE monitoring tools status (JP) Stable – ready for LC