STORMWATER REPORT
To:
AUCKLAND COUNCIL
On behalf of: COUNTIES RACING CLUB INC.
Manukau Road
Pukekohe
28 FEBRUARY 2019
BSL REF: 4204
REVISION C
Counties Racing Club BSL Ref: 4204 Rev A Manukau Road, Pukekohe Page 1 of 9
BIRCH SURVEYORS LTD
Property House
2A Wesley Street, Pukekohe
PO Box 475, Pukekohe 2340, New Zealand
Telephone: 64 9 237 1111 Facsimile: 64 9 238 0033
Website: www.birchsurveyors.co.nz Email: [email protected]
© BIRCH SURVEYORS LTD 2019 This document is and shall remain the property of Birch Surveyors Ltd. The document may only be used for the purposes for which it was commissioned and in accordance with the Terms of Engagement for the commission. Unauthorised use of this document in any form whatsoever is prohibited.
REPORT PREPARED BY REPORT REVIEWED BY REPORT AUTHORISED BY
KELLY BOSGRA SIR WILLIAM BIRCH SIR WILLIAM BIRCH
REGISTERED PROFESSIONAL
SURVEYOR
REGISTERED PROFESSIONAL
SURVEYOR
DATE: 01 MARCH 2019
Counties Racing Club BSL Ref: 4204 Rev A Manukau Road, Pukekohe Page 2 of 9
CONTENTS
1 INTRODUCTION......................................................................................................................... 3
1.1 PROJECT ................................................................................................................................... 3 1.2 LEGAL DESCRIPTION ................................................................................................................... 3 1.3 SITE DESCRIPTION ..................................................................................................................... 3 1.4 BACKGROUND ........................................................................................................................... 3 1.5 PROPOSED DEVELOPMENT .......................................................................................................... 4 1.6 PLAN CHANGE REQUEST ............................................................................................................. 4
2 STORMWATER REPORT .............................................................................................................. 5
2.1 STORMWATER DISPOSAL ............................................................................................................. 5 2.2 OVERLAND FLOW ....................................................................................................................... 6
3 CONCLUSIONS ........................................................................................................................... 9
APPENDICES
APPENDIX A: PLANS: STORMWATER AND DEVICE TYPICAL DETAILS
APPENDIX B: CALCULATIONS: DETENTION, SWALE, HYDROLOGY (TP108), CULVERT (HY-8) AND SUPPORTING
INFORMATION FROM CMP
Counties Racing Club BSL Ref: 4204 Rev A Manukau Road, Pukekohe Page 3 of 9
1 INTRODUCTION
1.1 PROJECT
The report comprises a Stormwater Assessment to support a proposed plan change for the use land
located at the north-western portion of 242 Manukau Road, Pukekohe. This site is currently zoned as
“Special Purpose” under the Auckland Unitary Plan and will be subject to a proposed plan change to
General Business Zone, to allow subdivision for commercial and retail activities at the site.
1.2 LEGAL DESCRIPTION
The legal description of the Land parcel is as follows-
Appellation: Part of Lot 2 DP 337473
Title Reference: Part of 153789
Plan Change Area: 5.8393Ha
1.3 SITE DESCRIPTION
The site is located adjacent to existing Commercial activities at the southern end of Manukau Road,
Pukekohe, and has multiple access points to both Manukau and Buckland Roads. It is bordered by
existing Commercial areas to the north and west, and existing rural (future urban and commercial)
activities to the south.
The land is generally falling from Southeast to the Northwest, with the receiving area being Peat
Land located on the Flood Plain of the Tutaenui Stream. This stream is located on the western side
of the Plan Change Area. This stream is highly modified and it is appears from historic images that
the current alignment was excavated in the 1940’s to facilitate the drainage of the low lying area that
is Manukau Road. The property is generally in grass and has direct road frontage onto Manukau
Road. The Area also contains a number of existing buildings totalling 655m² being one house of
approx 140m² and some Commercial Retail Space of that is currently occupied by Kia and Versatile
of approx 335m² and a shed used by Counties Racing of Homes of approx 180m². There are also
existing hardstand areas totalling 1.03Ha associated with access, parking and remains of the original
Formula 1 Track. This area is drained by the Tutaenui Stream, which flows into the Whakapipi
Stream, into the Waikato River and eventually to the Tasman Sea.
1.4 BACKGROUND
The site is situated near the bottom end of a small Stormwater Catchment with approximately
27.3Ha of upstream Catchment that is generally bounded by Webb Street to the South, the Old
Buckland Road Alignment to the East and the edge of a Gully to the West and as shown.
Counties Racing Club BSL Ref: 4204 Rev A Manukau Road, Pukekohe Page 4 of 9
Most of the upstream Catchment is Future
Urban/Business with an underlying rural zone.
The existing landcover of the catchment is a
mix of Cropping and grazing.
This area does not contain any Public
Stormwater Infrastructure and is serviced by
open drains, culverts and historic private pipes
that directs surface water westward to the
Stream.
The proposal and its immediate Catchment
area fall within the area contained in the
Pukekohe South Stormwater Network
Discharge Consent (NDC), which regulates the
Stormwater Treatment and Disposal. The Pukekohe South Stormwater Catchment Management
Plan (CMP) is the Document that the NDC refers to in regards to Stormwater Modelling &
Calculations and Capital Works Required. We note that the CMP does not include a Climate Change
Factor and confirm that all values quoted from the CMP have been increased by the required
Climate Change Factor for a 2.1° increase in Temperature in line with MfE Guidelines. These being:
ARI →
Duration ↓ 2 Years 5 Years 10 Years 50 Years 100 Years
24 Hour +9% +11.3% +13.2% +16.8% +16.8%
To bring the proposal into context with the CMP Modelling, proposed Lots 1, 2 & 5 are contained in
the western portion of Catchment NW-b and Lots 3 & 4 are contained in the northern (lowest)
portion of Catchment NW-a.
The upstream Stormwater Network and Overland Flowpaths are a complicated affair, with the
Roading Network diverting Overland Flows into different catchments. The proposal is subject to
such a diversion which complicates the management of Overland Flows and this is addressed in
detail in Section 2.2.
1.5 PROPOSED DEVELOPMENT
The Proposal is to change the Underlying Zone from Special Purpose to General Business to allow a
Commercial Development of approximately 5.84Ha in the north western corner of Lot 2 DP 337473
abutting existing Commercial development within the neighbouring property.
1.6 PLAN CHANGE REQUEST
A Plan Change request is being sought from Auckland Council and this assessment supports that
application.
Counties Racing Club BSL Ref: 4204 Rev A Manukau Road, Pukekohe Page 5 of 9
2 STORMWATER REPORT
2.1 STORMWATER DISPOSAL
In determining the appropriate Stormwater Treatment and Disposal for the proposed Activity, we
have designed a system to ensure compliance with the CMP and Condition 21 of the NDC. This sets
out the required Stormwater Management and for this site will require the treatment of runoff from
impervious surfaces to remove 75% TSS loads in accordance with TP10; to minimise changes to the
pre-development hydrological regime by attenuating runoff for the 2 and 10 year storm events, and
to detain the 34.5mm storm event and release over 24 hours (ED) when discharging to a Category 1
Watercourse (Permanently Flowing)
The proposal is to treat Carpark runoff in Bioretention Swales to suitable treat the runoff and
designed with sufficient Detention capacity to provide ED and attenuate runoff up to the 10yr ARI
Storm event. The roofs of any buildings will be constructed from inert materials, so the roof runoff
will be considered clean. This will be attenuated via stormwater cells under the floor slab to provide
ED and volumetric control for storm events up to the 10yr ARI.
TP108 was used as the basis for Stormwater Calculations and the results of these are attached in
Appendix B. The Hydrology of the rezoning to General Business will allow almost full impervious
coverage, and we have allowed for a Post Development Hydrology for 95% impervious, allowing 5%
pervious area for soft landscaping within the lots. The Curve Numbers used in the TP108
Calculations are Group B (Alluvial), consistent with the Geological description in the Geotechnical
Report.
The TP108 assessment shows that the proposal will increase both Peak Flows and Volumes for all
Storm Events. These will be attenuated to provide the Required Treatment as required by the NDC.
It is proposed to utilise Detention in the form of Stormwater Cells under the floor Slab for the
buildings, with strategically located outlets to achieve the desired Stormwater Controls. The Cells
are proposed to be single layer and will have a treatment area of 220m² for every 2000m² roof area.
Refer to Appendix B for Calculation Details. The future building sizes are unknown, and the size of
the Stormwater Management Device can be determined at the time of Building Consent on a pro-
rata basis. The Tanks afford 100m³ storage with 60m³ used to capture the 34.5mm Rainfall event
and releasing it over 24hours, and the remaining 40m³ as Detention for the 2-, 5- & 10-year storm
events to be released via orifice or weir at flowrates not exceeding the pre-development flowrates.
The same type of system is proposed to manage the Stormwater runoff from the sealed carpark and
access, except the surface water will be directed to vegetated swales to treat the water before
flowing into the stormwater cells. Swale Calculations are attached in Appendix B. It is anticipated
that for a vegetated swale of 3m wide, a length of 30m is required to treat the stormwater for a
2000m² Carpark/access. Refer to drawing Draft Stormwater, Flood and Overland Flow Paths. The
Counties Racing Club BSL Ref: 4204 Rev A Manukau Road, Pukekohe Page 6 of 9
treated runoff will be directed to Stormwater Cells or similar under the carpark to ensure the
required Flow Regime is achieved.
The devices will be connected to a new internal Stormwater Network designed to convey the
attenuated 10% AEP flows to the Tutaenui Stream.
Any new Stormwater Infrastructure will need to convey the anticipated flows from all upstream
catchments, and there is allowance in the concept design to convey the runoff from the remainder
of catchment NW-a to the south. The NDC identifies that developments must maintain flows to the
pre-development rates. Therefore, the design criteria for any new Public Stormwater Network will
be to convey the existing 10% AEP runoff from all directly contributing catchments. Conceptual
Plans showing the layout and detail of the Stormwater Devices are attached in Appendix A. and the
anticipated flows are derived from the CMP calculations.
The combination of the Swales and controlled release underground storage will ensure the runoff
from any proposed buildings and associated parking and access are appropriately treated and the
flow rates are mitigated to pre-development conditions.
2.2 OVERLAND FLOW
In assessing the proposed Activity, Council must be satisfied that the locations of proposed new
buildings and access are safe & stable and not prone to be inundated. There has been a number of
Stormwater and Flooding Assessments for the Tutaenui Stream undertaken in the vicinity of the
proposal, and Council have undertaken most, if not all, the Capital Upgrade Works required in the
NDC and CMP. Synergine has completed a Flood Assessment for the Mega Centre Development
immediately adjacent to the proposal, and this part of the Stormwater Report (Overland Flow) draws
on those results, findings and recommendations of that report.
In terms of the Tutaenui Stream, we have undertaken a HY-8 Culvert Analysis of the Culvert under
Float Road, being node 7 RC culv u/s in the HEC-HMS analysis in the CMP. We have adjusted the
values for the 2.1° Climate Change Factor (CCF). This calculates that the maximum headwater level
required to convey the 1% AEP Storm with CCF is 53.65m. The CMP identified the Design 1% AEP
Flood Level for this culvert (before construction) at 53.70m and it has also been used as the
maximum flood level in the Synergine Flood Report for the Mega Centre.
This correlation enables us to use the CMP Flood Modelling levels as the target flood levels for
developing this site, even allowing CCF. The CMP identified 1% AEP Flood Level ranges from 53.7m
at the northern end of Lot 5 to 53.6m at the southern end of Lot 5. Lots 1, 2 & 5 range in elevation
from 54m to 53m, meaning these Lots will be inundated with up to 700mm flood water.
The Mega Centre has undertaken widening of the Stream profile above the base flow and filling in
the Flood Plain to convey the anticipated 1% AEP Flood Flows within the banks of the stream. This
was undertaken in accordance with the Synergine Report. Council has also recently completed
Counties Racing Club BSL Ref: 4204 Rev A Manukau Road, Pukekohe Page 7 of 9
stream works just upstream of the development and we propose to undertake a similar widening,
increasing the width of the stream up to 35m wide for the 95m stretch of stream along the western
boundary of Lot 5, filling Lots 1, 2 & 5 to be above the 1% AEP Flood Level and maintaining the Flood
Level at its existing height.
We note that due the proximity of the RC Culvert and the RT Culvert (as identified on the HEC-HMS
modelling) the scope of the widening may not need to be 35m and may in fact be a lesser value as
the backwater effects of the downstream culvert may not require such a wide channel as a narrower
channel can allow the two culverts to act as a single entity in terms of flooded levels. This will be
modelled at Subdivision Engineering to determine the exact width of channel works required.
The current modelling determines the 1% AEP Flood Level at 53.7m and the maximum widening of
the stream along Lot 5 will be 35m.
This will allow Lots 1,2 & 5 to have fill placed to lift these properties to and above an elevation of
53.8m. Minimum Floor Levels of 54.4m are proposed for future Buildings on these Lots.
Comparing the CMP with Council’s GIS and the Ground profile, it is apparent that the site is subject
to a number overland flowpaths, these originate from upstream catchments and diversions from
other catchments.
The CMP modelling does not correctly identify these overland flows, and the modelling shows
overland flows from Kitchener Road being directed up Manukau Road. This is seen on the map of
the model as component J-3 K’Road (flows down Kitchener Road) is connected to node 8 MR culv u/s
(culvert under Manukau Road). The GIS above shows flows down Kitchener Road as flowing across
Counties Racing Club BSL Ref: 4204 Rev A Manukau Road, Pukekohe Page 8 of 9
the proposed site. This effectively changes the designed flow regime and connects J-3 K’Road to
node 7 RC culv u/s. Using the Flows as calculated in the CMP, the overland flow is estimated to be in
the order of 12m³/s from Catchments RS, Y and NW-a. The latter being the only upstream
catchment. This flow will be conveyed along access roads to the Stream and is depicted as
Flowpath A. Presuming this is designed to convey the full overland flow, mannings calculation for
open channel flow determines that for a channel or road grade of 1:250, the anticipated flow depth
for 12m³/s is 400mm in an 11m wide flowpath.
With detailed Intersection Design AT Subdivision Engineering, some of this flow may be able to be
directed down Manukau Road, and down Float Road utilising the existing Flowpath Z.
Counties Racing Club BSL Ref: 4204 Rev A Manukau Road, Pukekohe Page 9 of 9
3 CONCLUSIONS
Areas of the site are currently subject to flooding in the 1% AEP Storm event and engineering works
are required to manage the stormwater flows. Overland Flowpaths are required to be formalised
and enlarged to convey excess surface flows through and past the site as outlined in this report. In
order to adequately protect future buildings, the site will be filled above the 1% AEP Flood Levels
and it will be necessary to impose Minimum Floor Levels of 54.4m to provide a minimum of 500mm
freeboard above Tutaenui Stream and 300mm above on site Overland Flowpaths.
The combination of the Storage and the Stormwater Treatment Swale will ensure the runoff from
the proposed buildings and yard are treated in accordance with TP10 to capture 75% of sediments
and that runoff flowrates are mitigated to pre-development rates up to the 10% AEP Storm.
If further information is required please contact, Kelly Bosgra on 09 237 0781 or by email
Counties Racing Club BSL Ref: 4204 Rev A Manukau Road, Pukekohe
APPENDIX A
CATCHMENT PLAN
TYPICAL DEVICE DETAIL PLAN
Hz: 1:2000 @ A3
Project No.
Scale
4204
Drawn
Designed
Date
Approved
Date
Date
Surveyed Date
-
-
PROJECT MANAGER
-
-
TITLE
Rev.E
Drawing NameF:\..\CAD\SW 3054 E.dwg /
Rev.
PROJECT NAME
COUNTIES RACING CLUB
222 - 244 & 246 - 250 MANUKAU ROAD
PUKEKOHE
DRAFT STORMWATER, FLOOD AND OVERLAND
FLOWPATHS
PLANNING MAP
ZONING
COMPRISED IN
ACTIVITY
TOTAL AREA
REGISTERED OWNERS
LOCAL AUTHORITY AUCKLAND COUNCIL
SPECIAL PURPOSE - MAJOR RECREATION FACILITY ZONE
CFR 153788, 153789, NA54C/889
72.5221 ha
THE COUNTIES RACING CLUB INC
-
-
SUBJECT TO FINAL SURVEY
REV. BYDATE
COMMENT
ESS
12/18INITIAL DRAFT
QualityISO 9001
N
Birch
surveyors
Property House
2A Wesley Street, Pukekohe
PO Box 475,
Pukekohe 2340
Ph: 09 237 1111
Fax: 09 238 0033
www.birchsurveyors.co.nz
S.Shuker 12/2018
SUBDIVISION
Hz: 1:20 @ A3
Project No.
Scale
3054
Drawn
Designed
Date
Approved
Date
Date
Surveyed Date
TITLE
Rev.E
Drawing NameF:\..\CAD\SW 3054 E.dwg /
Rev.
PROJECT NAME
COUNTIES RACING CLUB
222 - 244 & 246 - 250 MANUKAU ROAD
PUKEKOHE
TYPICAL DEVICE DETAILS
PLANNING MAP
ZONING
COMPRISED IN
ACTIVITY
TOTAL AREA
REGISTERED OWNERS
LOCAL AUTHORITY
CFR 153788, 153789 & NA54C/889
72.5221 ha
-
SUBJECT TO FINAL SURVEY
REV. BYDATE
COMMENT
EKB
03/19RELEASE
QualityISO 9001
Birch
surveyors
Property House
2A Wesley Street, Pukekohe
PO Box 475,
Pukekohe 2340
Ph: 09 237 1111
Fax: 09 238 0033
www.birchsurveyors.co.nz
-
WB
KB
Project Manager
02/19
03/19
03/19
The Counties Racing Club Inc
SPECIAL PURPOSE
AUCKLAND COUNCIL
Counties Racing Club BSL Ref: 4204 Rev A Manukau Road, Pukekohe
APPENDIX B
SWALE CALCULATIONS
DETENTION TANK CALCULATIONS
HYDROLOGY CALCULATIONS (TP108)
CULVERT CALCULATIONS (HY-8)
SUPPORTING INFORMATION FROM CMP
2a Wesley Street
PO Box 475
Pukekohe 2340
BIRCH SURVEYORS LTDLand Surveyors • Resource Consultants • Planners
ph: 09 237 1111
fax 09 238 0033
Hydrological Soil Group Group_B
CN Area Product
Grassed 61 4.7438 289.3718
totals 4.7438 289.3718
% Impervious 0.00%
CN weighted 61.0000
la weighted 5.0000
Channelisation factor (C) 0.8000 ########
Catchment Length (l) 0.3290 km ########
Catchment Slope (Sc) 0.0073 m/m ########
Runoff Factor 0.4388 Group_A Group_B Group_C Group_D
Time of Concentration (tc) 0.3701 hrs 22.2 min 30 55 70 78
Use (tc) 0.3701 hrs 22.2 min 39 61 74 80
Catchment Area 0.0474 km² 72 81 88 90
CN 61.0000 76 85 89 91
Storage (S) 162.3934 mm 98 98 98 98
Group_A_ImperviousGroup_B_ImperviousGroup_C_ImperviousGroup_D_Impervious
WQV Ex. Det. 50% AEP 20% AEP 10% AEP 5% AEP 2% AEP 1% AEP1/3 2yr 2yr ARI 5yr ARI 10yr ARI 20yr ARI 50yr ARI 100yr ARI
24 hour rainfall depth (P24) mm 23.3333 34.50 70 100 120 140 160 180
c* 0.0394 0.0701 0.1559 0.2170 0.2530 0.2858 0.3159 0.3436
q* from ARC Approx 0.024 0.024 0.039 0.053 0.060 0.065 0.070 0.074
Peak Flowrate (qp) cumecs 0.0269 0.0397 0.1290 0.2501 0.3393 0.4334 0.5312 0.6320
Peak Flowrate (qp) l/s 27 40 129 250 339 433 531 632
24 hour Runoff Depth (Q24) mm 1.86 4.54 18.58 35.06 47.68 61.28 75.69 90.77
24 hour Runoff Volume (V24) cu mtr 88 215 881 1663 2262 2907 3591 4306
Hydrological Soil Group
CN Area Product
Building 98 0.0655 6.4190
Seal 98 1.0300 100.9400
totals 1.0955 107.3590
% Impervious 100.00%
CN weighted 98.0000
la weighted 0.0000
Channelisation factor (C) 0.8000
Catchment Length (l) 0.3290 km
Catchment Slope (Sc) 0.0073 m/m
Runoff Factor 0.9608
Time of Concentration (tc) 0.2405 hrs 14.4 min
Use (tc) 0.2405 hrs 14.4 min
Catchment Area 0.0110 km²
CN 98.0000
Storage (S) 5.1837 mm
WQV Ex. Det. 50% AEP 20% AEP 10% AEP 5% AEP 2% AEP 1% AEP1/3 2yr 2yr ARI 5yr ARI 10yr ARI 20yr ARI 50yr ARI 100yr ARI
24 hour rainfall depth (P24) mm 23.3333 34.50 70 100 120 140 160 180
c* 0.6924 0.7689 0.8710 0.9061 0.9205 0.9311 0.9391 0.9455
q* from ARC Approx 0.128 0.134 0.142 0.145 0.146 0.146 0.147 0.147
Peak Flowrate (qp) cumecs 0.0327 0.0507 0.1089 0.1584 0.1914 0.2244 0.2574 0.2904
Peak Flowrate (qp) l/s 33 51 109 158 191 224 257 290
24 hour Runoff Depth (Q24) mm 19.09 29.99 65.17 95.07 115.03 135.00 154.98 174.96
24 hour Runoff Volume (V24) cu mtr 209 329 714 1042 1260 1479 1698 1917
WQV Ex. Det. 50% AEP 20% AEP 10% AEP 5% AEP 2% AEP 1% AEP1/3 2yr 2yr ARI 5yr ARI 10yr ARI 20yr ARI 50yr ARI 100yr ARI
24 hour rainfall depth (P24) mm 23.3333 34.50 70 100 120 140 160 180
Peak Flowrate (qp) cumecs 0.0595 0.0905 0.2380 0.4084 0.5307 0.6577 0.7886 0.9224
Peak Flowrate (qp) l/s 60 90 238 408 531 658 789 922
24 hour Runoff Volume (V24) cu mtr 297 544 1595 2705 3522 4386 5289 6223
Existing Flows
Group_B_Impervious
Counties Racing Club Zone Change
STORMWATER FLOWS - Site CatchmentExisting Pervious Area
STORMWATER FLOWS - Site CatchmentExisting Impervious
1
2a Wesley Street
PO Box 475
Pukekohe 2340
BIRCH SURVEYORS LTDLand Surveyors • Resource Consultants • Planners
ph: 09 237 1111
fax 09 238 0033
Hydrological Soil Group Group_B
CN Area Product
Grass 61 0.2920 17.8120
totals 0.2920 17.8120
% Impervious 0.00%
CN weighted 61.0000
la weighted 5.0000
Channelisation factor (C) 0.6000 ########
Catchment Length (l) 0.3290 km ########
Catchment Slope (Sc) 0.0073 m/m ########
Runoff Factor 0.4388 Group_A Group_B Group_C Group_D
Time of Concentration (tc) 0.2776 hrs 16.7 min 30 55 70 78
Use (tc) 0.2776 hrs 16.7 min 39 61 74 80
Catchment Area 0.0029 km² 72 81 88 90
CN 61.0000 76 85 89 91
Storage (S) 162.3934 mm 98 98 98 98
Group_A_ImperviousGroup_B_ImperviousGroup_C_ImperviousGroup_D_Impervious
WQV Ex. Det. 50% AEP 20% AEP 10% AEP 5% AEP 2% AEP 1% AEP1/3 2yr 2yr ARI 5yr ARI 10yr ARI 20yr ARI 50yr ARI 100yr ARI
24 hour rainfall depth (P24) mm 25.3333 34.50 76 111 136 163 187 210
c* 0.0451 0.0701 0.1689 0.2372 0.2795 0.3202 0.3527 0.3811
q* from ARC Approx 0.027 0.027 0.047 0.063 0.071 0.078 0.084 0.088
Peak Flowrate (qp) cumecs 0.0020 0.0027 0.0104 0.0204 0.0283 0.0373 0.0457 0.0538
Peak Flowrate (qp) l/s 2 3 10 20 28 37 46 54
24 hour Runoff Depth (Q24) mm 2.26 4.54 21.60 41.86 58.49 77.92 96.18 114.39
24 hour Runoff Volume (V24) cu mtr 7 13 63 122 171 228 281 334
Hydrological Soil Group
CN Area Product
Building 98 2.7737 271.8226
Roads 98 2.7737 271.8226
totals 5.5474 543.6452
% Impervious 100.00%
CN weighted 98.0000
la weighted 0.0000
Channelisation factor (C) 0.6000
Catchment Length (l) 0.3290 km
Catchment Slope (Sc) 0.0073 m/m
Runoff Factor 0.9608
Time of Concentration (tc) 0.1804 hrs 10.8 min
Use (tc) 0.1804 hrs 10.8 min
Catchment Area 0.0555 km²
CN 98.0000
Storage (S) 5.1837 mm
WQV Ex. Det. 50% AEP 20% AEP 10% AEP 5% AEP 2% AEP 1% AEP1/3 2yr 2yr ARI 5yr ARI 10yr ARI 20yr ARI 50yr ARI 100yr ARI
24 hour rainfall depth (P24) mm 25.3333 34.50 76 111 136 163 187 210
c* 0.7096 0.7689 0.8800 0.9146 0.9292 0.9402 0.9475 0.9530
q* from ARC Approx 0.142 0.147 0.156 0.159 0.160 0.161 0.161 0.162
Peak Flowrate (qp) cumecs 0.1989 0.2813 0.6587 0.9785 1.2072 1.4543 1.6740 1.8845
Peak Flowrate (qp) l/s 199 281 659 979 1207 1454 1674 1885
24 hour Runoff Depth (Q24) mm 21.03 29.99 71.15 106.05 131.01 157.98 181.96 204.94
24 hour Runoff Volume (V24) cu mtr 1167 1664 3947 5883 7267 8764 10094 11369
WQV Ex. Det. 50% AEP 20% AEP 10% AEP 5% AEP 2% AEP 1% AEP1/3 2yr 2yr ARI 5yr ARI 10yr ARI 20yr ARI 50yr ARI 100yr ARI
24 hour rainfall depth (P24) mm 25.3333 34.50 76 111 136 163 187 210
Peak Flowrate (qp) cumecs 0.2009 0.2840 0.6691 0.9989 1.2355 1.4916 1.7196 1.9384
Peak Flowrate (qp) l/s 201 284 669 999 1236 1492 1720 1938
24 hour Runoff Volume (V24) cu mtr 1173 1677 4010 6005 7438 8991 10375 11703
Post Development Flows
Counties Racing Club Zone Change
STORMWATER FLOWS - Site CatchmentPost Development Pervious
STORMWATER FLOWS - Site CatchmentPost Development Impervious
Group_B_Impervious
2
Client Counties Racing Analysis Date
Address
Project Number 4254 10% AEP Flood Mitigation Required Yes
Extended Detention and Runoff Flow Mitigation
Site Data
New and Redeveloped Impervious Area 2000 m² Total Site Area 2000 m²
Percentage of Total Site Area 100% Total Site Post Development Impervious Area 2000 m²
Hydrographical Soil Group Group_B Impervious Area required to be Mitigated 2000 m²
34.5 mm Pervious Area required to be Mitigated 0 m²
Pre Development
Pre Developed Area to be Mitigated 2000 m²
Curve Number (CN) 74
Initial Abstraction (Ia) 5 mm
Storage (S) 89.24 mm
ARI
24 Hr Rainfall depth (P24) 34.5 mm
Runoff Depth (Q24) 7.33 mm
Runoff Volume (V24) 14.66 m³
Post Development
Area (m²) CN Product
Total Impervious Area to be Mitigated 2000 98 196000
Total Pervious Area to be mitigated 0 74 0
Total 2000 196000
% Impervious 100%
CN Weighted 98.00
Initial Abstraction Weighted (Ia) 0.00 mm
Storage (S) 5.18 mm
24 Hr Rainfall depth (P24) mm
Runoff Depth (Q24) mm
Runoff Volume (V24) m³
Extended Detention Volume Requirements
Total Extended Detention Volume Required 59.99 m³ (Post Dev - Pre Dev)
Average Outflow to Detention Volume in 24 hours 0.69 l/s for Pipe Tank use 0.86 reduction in flow
Peak Orifice Outflow (2x Average Flow) 1.39 l/s 1.19 l/s
Head above Orifice 0.28 m 0.28 m
Orifice discharge coefficient 0.62 0.62
Orifice Diameter (Orifice 1) 35.0 mm 32.5 mm
TYPICAL DETENTION CALCULATIONS - For a 2000m² Building
4-Mar-19
Manukau Road, Pukekohe
Capture the 34.5mm Rainfall Event and Release over 24 Hours if Discharging to a Category 1
(Permanently Flowing) Watercourse
Extended Detention Depth
Storm Event (ARI)
34.5
29.99
59.99
Storm Event
Mitigate the Post Development Flow Rates for the 2yr and 10yr Storm Events to not exceed the
Pre-Development Flow Rates
Extended Detention
Design Storm
Extended Detention
SURVEYORS | RESOURCE CONSULTANTSLAND DEVELOPMENT ENGINEERS | PLANNERS
3
Flood Mitigation for 2yr Event
Area (m2) CN 10% AEP P24 tc c* q* Q (l/s)
Pre Development (TP108 Calcs) 2000 74 70 17 0.2516 0.065 9.16
Peak Orifice Outflow (2yr Storm - Ex Det Storm) 7.8 l/s Imp Area 2000 0.95 1900 m²
Average Orifice Outflow (2yr Storm - Orifice 2) 3.9 l/s Per Area 0 0.4 0 m²
Reduced Area 1900 m²
Detention Tank Calcs (2yr storm with CC Factor)
Time Duration
(min)
Intensity
(mm/hr)
Reduced
Area
(m²)
Flow
(l/s)
Time to Fill
SMAF
(min)
Tank
Inflow
(m³)
Outflow
Orifice 1
(m³)
Outflow
Orifice 2
(m³)
50% AEP
Storage
(m³)
10 50.16 1900 26.5 37.8 0.00 0.42 0.00 -0.42
20 38.76 1900 20.5 48.9 0.00 0.83 0.00 -0.83
30 29.4 1900 15.5 64.4 0.00 1.25 0.00 -1.25
60 22.8 1900 12.0 83.1 0.00 2.50 0.00 -2.50
120 15.58 1900 8.2 121.6 0.00 5.00 0.00 -5.00
360 6.08 1900 3.2 311.6 9.33 17.01 11.29 -18.98
720 3.99 1900 2.1 474.8 30.99 40.21 57.19 -66.41
Minimum Detention Storage Required for 2yr Storm Event -0.42 m3
Flood Mitigation for 10yr Event
Area (m2) CN 10% AEP P24 tc c* q* Q (l/s)
Pre Development (TP108 Calcs) 2000 74 120 17 0.3813 0.087 20.93
Peak Orifice Outflow (10 yr Storm - SMAF Storm) 19.5 l/s Imp Area 2000 0.95 1900 m²
Average Orifice Outflow (10yr Storm - Orifice 3) 9.8 l/s Per Area 0 0.4 0 m²
Reduced Area 1900 m²
Detention Tank Calcs (10yr storm with CC Factor)
Time Duration
(min)
Intensity
(mm/hr)
Reduced
Area
(m²)
Flow
(l/s)
Time to Fill
SMAF
(min)
Tank
Inflow
(m³)
Outflow
Orifice 1
(m³)
Outflow
Orifice 3
(m³)
10% AEP
Storage
(m³)
10 89.76 1900 47.4 21.1 0.00 0.42 0.00 -0.42
20 69.36 1900 36.6 27.3 0.00 0.83 0.00 -0.83
30 50.4 1900 26.6 37.6 0.00 1.25 0.00 -1.25
60 40.8 1900 21.5 46.4 17.53 3.06 7.96 6.51
120 27.88 1900 14.7 67.9 45.96 7.17 30.52 8.27
360 10.88 1900 5.7 174.1 64.05 22.74 108.98 -67.68
720 7.14 1900 3.8 265.3 102.81 48.93 266.57 -212.70
Minimum Detention Storage Required for 10yr Storm Event 8.27 m3
for Pipe Tank use 0.86 reduction in flow
Peak Weir Outflow (10 yr Storm) 19.5 l/s 16.8 l/s
Head above Weir 0.10 m 0.10 m
Weir discharge coefficient 1.69 1.69
Weir Length 0.4 m 157.2 mm
Detention Tank Square Versitank
Tank Length L 12.00 m Tank Area 219.00 m²
Tank Width W 18.25 m Volume 98.55 m³ total
Tank Height h 0.45 m
Number of Tanks n 1
Number of Orifice Holes 2 total
Outlet Orifice Diameter d1 35.0 mm
Orifice 3 Diameter d3 0.4 mm
Orifice Discharge Coefficient 0.62
Consecutive
4
2a Wesley Street
PO Box 475
Pukekohe 2340
BIRCH SURVEYORS LTDLand Surveyors • Resource Consultants • Planners
ph: 09 237 1111
fax 09 238 0033
WQV 50% AEP 20% AEP 10% AEP 5% AEP 2% AEP 1% AEP1/3 2yr 2yr ARI 5yr ARI 10yr ARI 20yr ARI 50yr ARI 100yr ARI
Area Pervious ha 0.0000 0 0 0 0 0 0
Hydrological Soil Group Group_B Group_B Group_B Group_B Group_B Group_B Group_B
CN 61 61 61 61 61 61 61
P24 mm 25.3333 76 111 136 163 187 210
Peak Rainfall mm 17.1 51.3 74.9 91.8 110.0 126.2 141.8
Ia 5 5 5 5 5 5 5
S 162.39 162.39 162.39 162.39 162.39 162.39 162.39
c* 0.0881 0.3093 0.4181 0.4809 0.5379 0.5811 0.6170
Peak Runoff m³/s 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Peak Runoff l/s 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Area Impervious ha 0.2000 0.2 0.2 0.2 0.2 0.2 0.2
CN 98 98 98 98 98 98 98
P24 mm 25.3333 76 111 136 163 187 210
Peak Rainfall mm 17.1 51.3 74.9 91.8 110.0 126.2 141.8
Ia 0 0 0 0 0 0 0
S 5.18 5.18 5.18 5.18 5.18 5.18 5.18
c* 0.9157 0.9856 0.9927 0.9950 0.9964 0.9972 0.9978
Peak Runoff m³/s 0.0087 0.0281 0.0413 0.0507 0.0609 0.0699 0.0786
Peak Runoff l/s 8.70 28.09 41.32 50.74 60.91 69.93 78.58
Combined Runoff l/s 8.70 28.09 41.32 50.74 60.91 69.93 78.58
Peak Flow in Swale l/s 7.74 25.00 36.78 45.16 54.21 62.24 69.93
Swale Channel Slope s m/m 0.005 0.005 0.005 0.005 0.005 0.005 0.005
length of Grass mm 75 75 75 75 75 75 75
Depth of Flow d m 0.077 0.115 0.132 0.141 0.150 0.157 0.164
manning n n 0.32 0.20 0.17 0.16 0.14 0.14 0.13
Flowrate Q m³/s 0.008 0.025 0.037 0.045 0.054 0.062 0.070
Side Slope Z 1/ 1 1 1 1 1 1 1
Bottom Width b m 2.50 2.50 2.50 2.50 2.50 2.50 2.50
Top width T m 2.65 2.73 2.76 2.78 2.80 2.81 2.83
cross sectional Area m² 0.1984 0.3007 0.3460 0.3724 0.3975 0.4171 0.4355
flow Velocity v m/s 0.04 0.08 0.11 0.12 0.14 0.15 0.16
WQ Event Velocity Check
Ultimate Velocity Check
time of flow t min 12
swale Length l m 28.09
maximum available swale length m 30.00
Design Top width T1 m 3.00 3.00 3.00 3.00 3.00 3.00 3.00
Design Depth of Swale d1 mm 250 250 250 250 250 250 250
Freeboard mm 173 135 119 109 100 93 87
SWALE DESIGN TO GD04 GUIDELINES (ARC TP10) - Typical Catchment 2000m²
Pervious Catchment
Impervious Catchment
STORMWATER SWALE
5
Client Counties Racing Analysis Date
Address
Project Number 4254 10% AEP Flood Mitigation Required Yes
Extended Detention and Runoff Flow Mitigation
Site Data
New and Redeveloped Impervious Area 2000 m² Total Site Area 2000 m²
Percentage of Total Site Area 100% Total Site Post Development Impervious Area 2000 m²
Hydrographical Soil Group Group_B Impervious Area required to be Mitigated 2000 m²
34.5 mm Pervious Area required to be Mitigated 0 m²
Pre Development
Pre Developed Area to be Mitigated 2000 m²
Curve Number (CN) 74
Initial Abstraction (Ia) 5 mm
Storage (S) 89.24 mm
ARI
24 Hr Rainfall depth (P24) 34.5 mm
Runoff Depth (Q24) 7.33 mm
Runoff Volume (V24) 14.66 m³
Post Development
Area (m²) CN Product
Total Impervious Area to be Mitigated 2000 98 196000
Total Pervious Area to be mitigated 0 74 0
Total 2000 196000
% Impervious 100%
CN Weighted 98.00
Initial Abstraction Weighted (Ia) 0.00 mm
Storage (S) 5.18 mm
24 Hr Rainfall depth (P24) mm
Runoff Depth (Q24) mm
Runoff Volume (V24) m³
Extended Detention Volume Requirements
Total Extended Detention Volume Required 59.99 m³ (Post Dev - Pre Dev)
Average Outflow to Detention Volume in 24 hours 0.69 l/s for Pipe Tank use 0.86 reduction in flow
Peak Orifice Outflow (2x Average Flow) 1.39 l/s 1.19 l/s
Head above Orifice 0.28 m 0.28 m
Orifice discharge coefficient 0.62 0.62
Orifice Diameter (Orifice 1) 35.0 mm 32.5 mm
Mitigate the Post Development Flow Rates for the 2yr and 10yr Storm Events to not exceed the
Pre-Development Flow Rates
Extended Detention
Design Storm
Extended Detention
29.99
59.99
Storm Event
TYPICAL DETENTION CALCULATIONS - For a 2000m² Parking/Sealed Area
4-Mar-19
Manukau Road, Pukekohe
Capture the 34.5mm Rainfall Event and Release over 24 Hours if Discharging to a Category 1
(Permanently Flowing) Watercourse
Extended Detention Depth
Storm Event (ARI)
34.5
SURVEYORS | RESOURCE CONSULTANTSLAND DEVELOPMENT ENGINEERS | PLANNERS
6
Flood Mitigation for 2yr Event
Area (m2) CN 10% AEP P24 tc c* q* Q (l/s)
Pre Development (TP108 Calcs) 2000 74 70 17 0.2516 0.065 9.16
Peak Orifice Outflow (2yr Storm - Ex Det Storm) 7.8 l/s Imp Area 2000 0.95 1900 m²
Average Orifice Outflow (2yr Storm - Orifice 2) 3.9 l/s Per Area 0 0.4 0 m²
Reduced Area 1900 m²
Detention Tank Calcs (2yr storm with CC Factor)
Time Duration
(min)
Intensity
(mm/hr)
Reduced
Area
(m²)
Flow
(l/s)
Time to Fill
SMAF
(min)
Tank
Inflow
(m³)
Outflow
Orifice 1
(m³)
Outflow
Orifice 2
(m³)
50% AEP
Storage
(m³)
10 50.16 1900 26.5 37.8 0.00 0.42 0.00 -0.42
20 38.76 1900 20.5 48.9 0.00 0.83 0.00 -0.83
30 29.4 1900 15.5 64.4 0.00 1.25 0.00 -1.25
60 22.8 1900 12.0 83.1 0.00 2.50 0.00 -2.50
120 15.58 1900 8.2 121.6 0.00 5.00 0.00 -5.00
360 6.08 1900 3.2 311.6 9.33 17.01 11.29 -18.98
720 3.99 1900 2.1 474.8 30.99 40.21 57.19 -66.41
Minimum Detention Storage Required for 2yr Storm Event -0.42 m3
Flood Mitigation for 10yr Event
Area (m2) CN 10% AEP P24 tc c* q* Q (l/s)
Pre Development (TP108 Calcs) 2000 74 120 17 0.3813 0.087 20.93
Peak Orifice Outflow (10 yr Storm - SMAF Storm) 19.5 l/s Imp Area 2000 0.95 1900 m²
Average Orifice Outflow (10yr Storm - Orifice 3) 9.8 l/s Per Area 0 0.4 0 m²
Reduced Area 1900 m²
Detention Tank Calcs (10yr storm with CC Factor)
Time Duration
(min)
Intensity
(mm/hr)
Reduced
Area
(m²)
Flow
(l/s)
Time to Fill
SMAF
(min)
Tank
Inflow
(m³)
Outflow
Orifice 1
(m³)
Outflow
Orifice 3
(m³)
10% AEP
Storage
(m³)
10 89.76 1900 47.4 21.1 0.00 0.42 0.00 -0.42
20 69.36 1900 36.6 27.3 0.00 0.83 0.00 -0.83
30 50.4 1900 26.6 37.6 0.00 1.25 0.00 -1.25
60 40.8 1900 21.5 46.4 17.53 3.06 7.96 6.51
120 27.88 1900 14.7 67.9 45.96 7.17 30.52 8.27
360 10.88 1900 5.7 174.1 64.05 22.74 108.98 -67.68
720 7.14 1900 3.8 265.3 102.81 48.93 266.57 -212.70
Minimum Detention Storage Required for 10yr Storm Event 8.27 m3
for Pipe Tank use 0.86 reduction in flow
Peak Weir Outflow (10 yr Storm) 19.5 l/s 16.8 l/s
Head above Weir 0.10 m 0.10 m
Weir discharge coefficient 1.69 1.69
Weir Length 0.4 m 157.2 mm
Detention Tank Square Versitank
Tank Length L 18.25 m Tank Area 219.00 m²
Tank Width W 12.00 m Volume 98.55 m³ total
Tank Height h 0.45 m
Number of Tanks n 1
Number of Orifice Holes 2 total
Outlet Orifice Diameter d1 35.0 mm
Orifice 3 Diameter d3 0.4 mm
Orifice Discharge Coefficient 0.62
Consecutive
7
HY-8 Culvert Analysis Report Float Road
node 7 RC culv u/s
Crossing Discharge Data
Discharge Selection Method: Specify Minimum, Design, and Maximum Flow
Minimum Flow: 7.50 cms
Design Flow: 37.50cms
Maximum Flow: 66.60cms
8
Table 1 - Summary of Culvert Flows at Crossing: CRC
Rating Curve Plot for Crossing: CRC
Headwater Elevation (m)
Total Discharge (cms) RC Discharge (cms) Roadway Discharge
(cms) Iterations
50.91 7.50 7.50 0.00 1 51.43 13.41 13.41 0.00 1 51.87 19.32 19.32 0.00 1 52.31 25.23 25.23 0.00 1 52.80 31.14 31.14 0.00 1 53.13 37.00 34.69 2.30 5 53.26 42.96 36.13 6.82 4 53.37 48.87 37.50 11.37 4 53.47 54.78 38.34 16.44 4 53.57 60.69 39.24 21.45 4 53.65 66.60 40.10 26.50 4 53.00 33.32 33.32 0.00 Overtopping
9
Table 2 - Culvert Summary Table: RC
********************************************************************************
Straight Culvert
Inlet Elevation (invert): 49.60 m, Outlet Elevation (invert): 49.55 m
Culvert Length: 22.10 m, Culvert Slope: 0.0023
********************************************************************************
Culvert Performance Curve Plot: RC
Total Discharge
(cms)
Culvert Discharge
(cms)
Headwater Elevation
(m)
Inlet Control
Depth (m)
Outlet Control
Depth (m) Flow Type
Normal Depth
(m)
Critical Depth
(m)
Outlet Depth
(m)
Tailwater Depth
(m)
Outlet Velocity
(m/s)
Tailwater Velocity
(m/s)
7.50 7.50 50.91 1.182 1.312 3-M1t 0.926 0.863 1.160 1.487 1.681 0.259 13.41 13.41 51.43 1.652 1.825 3-M1t 1.288 1.170 1.591 2.034 2.034 0.320 19.32 19.32 51.87 2.033 2.274 3-M1t 1.634 1.415 1.949 2.488 2.352 0.363 25.23 25.23 52.31 2.385 2.711 3-M2t 2.500 1.625 2.266 2.887 2.698 0.398 31.14 31.14 52.80 2.755 3.199 4-FFf 2.500 1.810 2.500 3.250 3.172 0.427 37.00 34.69 53.13 2.999 3.630 4-FFf 2.500 1.909 2.500 3.582 3.534 0.452 42.96 36.13 53.26 3.103 3.954 4-FFf 2.500 1.946 2.500 3.898 3.680 0.474 48.87 37.50 53.37 3.206 4.261 4-FFf 2.500 1.981 2.500 4.193 3.819 0.494 54.78 38.34 53.47 3.271 4.530 4-FFf 2.500 2.001 2.500 4.473 3.905 0.513 60.69 39.24 53.57 3.343 4.793 4-FFf 2.500 2.022 2.500 4.740 3.997 0.529 66.60 40.10 53.65 3.413 5.047 4-FFf 2.500 2.042 2.500 4.996 4.085 0.545
10
Water Surface Profile Plot for Culvert: RC
Site Data - RC
Site Data Option: Culvert Invert Data
Inlet Station: 0.00 m
Inlet Elevation: 49.60 m
Outlet Station: 22.10 m
Outlet Elevation: 49.55 m
Number of Barrels: 2
Culvert Data Summary - RC
Barrel Shape: Circular
Barrel Diameter: 2500.00 mm
Barrel Material:
Embedment: 0.00 mm
Barrel Manning's n: 0.0140
Culvert Type: Straight
Inlet Configuration: Grooved End in Headwall
Inlet Depression: None
11
Table 3 - Downstream Channel Rating Curve (Crossing: CRC)
Tailwater Channel Data - CRC
Tailwater Channel Option: Irregular Channel
Channel Slope: 0.0003
User Defined Channel Cross-Section:
Coord No. Station (m) Elevation (m) Manning's n
1 0.00 54.60 0.0500
2 4.70 49.50 0.0500
3 12.70 49.50 0.0500
4 13.00 49.80 0.0500
5 25.60 49.80 0.0500
6 30.00 54.60 0.0000
Roadway Data for Crossing: CRC
Roadway Profile Shape: Constant Roadway Elevation
Crest Length: 30.00 m
Crest Elevation: 53.00 m
Roadway Surface: Paved
Roadway Top Width: 21.00 m
Flow (cms)
Water Surface Elev (m)
Depth (m)
Velocity (m/s)
Shear (Pa)
Froude Number
7.50 50.71 1.21 0.33 3.56 0.11 13.41 51.14 1.64 0.41 4.83 0.11 19.32 51.50 2.00 0.47 5.88 0.12 25.23 51.82 2.32 0.52 6.81 0.12 31.14 52.10 2.60 0.55 7.65 0.12 37.00 52.37 2.87 0.59 8.43 0.12 42.96 52.62 3.12 0.62 9.17 0.12 48.87 52.85 3.35 0.65 9.86 0.12 54.78 53.07 3.57 0.67 10.51 0.12 60.69 53.29 3.79 0.69 11.14 0.12 66.60 53.49 3.99 0.71 11.74 0.12