pbn plan development aviation industry forum 18 november 2009
TRANSCRIPT
![Page 1: PBN Plan Development Aviation Industry Forum 18 November 2009](https://reader035.vdocuments.us/reader035/viewer/2022072005/56649ce25503460f949ada2f/html5/thumbnails/1.jpg)
PBN Plan DevelopmentPBN Plan Development
Aviation Industry Forum
18 November 2009
![Page 2: PBN Plan Development Aviation Industry Forum 18 November 2009](https://reader035.vdocuments.us/reader035/viewer/2022072005/56649ce25503460f949ada2f/html5/thumbnails/2.jpg)
Current StateCurrent State
RNAV & RNP Operations in NZ Airspace RNAV 10 and RNP 4 in Oceanic Airspace RNAV 1 SIDs and STARs at Auckland, Wellington
and Christchurch RNAV(GNSS) Approach / Departure procedures @ 57
locations. APV @ 16 runway ends. RNP AR @ Queenstown.
18 November 2009 PBN Industry Forum
![Page 3: PBN Plan Development Aviation Industry Forum 18 November 2009](https://reader035.vdocuments.us/reader035/viewer/2022072005/56649ce25503460f949ada2f/html5/thumbnails/3.jpg)
Long Term Goals (+2018)Long Term Goals (+2018)
Safety (precise trajectory management, CDA) Predictability Efficiency (min air distance / optimum aircraft determined
profile) Minimise environmental impact (CO2 NOX & noise) Maximise Capacity utilisation (aerodrome & airspace) High aircraft utilisation (sectors per day) Schedule reliability Cost effective investment Minimised quantity of CTA and optimise design
18 November 2009 PBN Industry Forum
![Page 4: PBN Plan Development Aviation Industry Forum 18 November 2009](https://reader035.vdocuments.us/reader035/viewer/2022072005/56649ce25503460f949ada2f/html5/thumbnails/4.jpg)
Performance Specifications for Performance Specifications for Phase 3 – Aeroplane & HelicopterPhase 3 – Aeroplane & Helicopter
Oceanic – RNP 4 Exclusive?(with CPDLC) in OCA CTA. Query Class G airspace below OCA CTA??
Domestic Enroute – RNP 1 above F145 Terminal CTA – Advanced RNP 1 Approach Procedures – RNP APCH Transition Timetable (2018+)
18 November 2009 PBN Industry Forum
![Page 5: PBN Plan Development Aviation Industry Forum 18 November 2009](https://reader035.vdocuments.us/reader035/viewer/2022072005/56649ce25503460f949ada2f/html5/thumbnails/5.jpg)
Performance SpecificationsPerformance Specifications for Long Term Goal (1) for Long Term Goal (1)
Controlled Time of Arrival: 10 - 15 sec ETA accuracy for crossing points Enablers
4DT / AMAN/ DMAN/ CAM IIContinuous Surveillance (updating progress)CPDLC Comms / Domestic Datalink?Advanced MET ModellingAdvanced FMS capability
18 November 2009 PBN Industry Forum
![Page 6: PBN Plan Development Aviation Industry Forum 18 November 2009](https://reader035.vdocuments.us/reader035/viewer/2022072005/56649ce25503460f949ada2f/html5/thumbnails/6.jpg)
Performance SpecificationsPerformance SpecificationsLong Term (2)Long Term (2) Optimised air route design
Features Enroute track centreline spacing SIDs & STARs de-conflicted
Enablers Airways PBN routes design work (PBN Implementation Project). Part 173
18 November 2009 PBN Industry Forum
![Page 7: PBN Plan Development Aviation Industry Forum 18 November 2009](https://reader035.vdocuments.us/reader035/viewer/2022072005/56649ce25503460f949ada2f/html5/thumbnails/7.jpg)
Performance Specifications for Performance Specifications for Phase 1 – Aeroplane & HelicopterPhase 1 – Aeroplane & Helicopter
Oceanic – Retain RNAV 10 and RNP 4 for Phase 1. Domestic Enroute – RNAV 1/2 for all promulgated
routes above F145/ 245 in domestic CTA. Terminal Operations – RNAV 1 for all Terminal
routes with Surveillance services Approach Procedures – Mix of Conventional & RNP
APCH and RNP AR APCH No Change for Helicopter Ops Transition Timetable (2008 - 2013)
18 November 2009 PBN Industry Forum
![Page 8: PBN Plan Development Aviation Industry Forum 18 November 2009](https://reader035.vdocuments.us/reader035/viewer/2022072005/56649ce25503460f949ada2f/html5/thumbnails/8.jpg)
Phase 1 – Action Items: Phase 1 – Action Items: Aeroplane & HelicopterAeroplane & Helicopter Evaluation of DME/DME coverage to support RNAV 1
all routes (Enroute and TMA)*. Completing task 1 March 2010 (Airways & CAA)
GNSS IFR AC and associated Part 19 D exemption. Completing AC task by 1 March 2010 (CAA)• Part 19 D Rule plus related Rules changes Completed by 1 July 2011 (MOT & CAA).*Note VOR /DME updating does not support RNAV 1
specifications.
What do aircraft operators need to do?
18 November 2009 PBN Industry Forum
![Page 9: PBN Plan Development Aviation Industry Forum 18 November 2009](https://reader035.vdocuments.us/reader035/viewer/2022072005/56649ce25503460f949ada2f/html5/thumbnails/9.jpg)
Performance Specifications for Performance Specifications for
Phase 2 - AeroplanePhase 2 - Aeroplane Oceanic – RNP 4 Exclusive?(with CPDLC) in OCA CTA. Query Class G airspace below OCA CTA??
Domestic Enroute – RNP 2 or 1 above FL145 Domestic Enroute – RNP 2 below FL145 Terminal CTA – Advanced RNP 1 (RF Legs) Approach Procedures – RNP APCH
Transition away from Conventional approaches. Transition Timetable (2013 – 2018)
18 November 2009 PBN Industry Forum
![Page 10: PBN Plan Development Aviation Industry Forum 18 November 2009](https://reader035.vdocuments.us/reader035/viewer/2022072005/56649ce25503460f949ada2f/html5/thumbnails/10.jpg)
Phase 2 – Action Items: AeroplanePhase 2 – Action Items: Aeroplane
Determine drivers for changing performance specifications in OCA. GNSS Nav, ADS – C Surveillance and CPDLC
Comms .
GNSS Primary Navigation assumes enabling Rules amendments are in place
18 November 2009 PBN Industry Forum
What do aircraft operators need to do?
![Page 11: PBN Plan Development Aviation Industry Forum 18 November 2009](https://reader035.vdocuments.us/reader035/viewer/2022072005/56649ce25503460f949ada2f/html5/thumbnails/11.jpg)
Performance Specifications for Performance Specifications for Phase 2 - HelicopterPhase 2 - Helicopter
Oceanic – RNP 4 Exclusive?(with CPDLC) in OCA CTA. Query: Class G airspace below OCA CTA??
Domestic Enroute – RNP 2 (RNP 0.3 Special procedures / routes)
Terminal CTA – Advanced RNP 1 Approach Procedures – RNP APCH
Transition away from Conventional approaches. Point in Space arrivals and departures
Transition Timetable (2013 - 2018)
18 November 2009 PBN Industry Forum
![Page 12: PBN Plan Development Aviation Industry Forum 18 November 2009](https://reader035.vdocuments.us/reader035/viewer/2022072005/56649ce25503460f949ada2f/html5/thumbnails/12.jpg)
Phase 2– Action Items HelicopterPhase 2– Action Items Helicopter
Awaiting PBN Manual amendment – due 2011 PANS OPS Design criteria being updated – due 2010.
18 November 2009 PBN Industry Forum