pbd 4 · 2013. 10. 28. · 7 8 2009 1 e 5mn/m2 2 e 90mn/m2( ) 3 e 90mn/m2 9 2009 2010 fem (1) ( )...
TRANSCRIPT
1
2009
20101),2)
PBD 3)
1
2 2009 40m×60m 20m×20m
2010 50m×200m3 2009
2010 5m
PBD 4
PBD PBD 94mm× 3.9mm
39mm
8 10 PBD 1
200m 1
3
Asc Ac2
PBD 1.0m
2010 200m
4 4 -60kN/m2
Execution for volume reduction of soft ground using both snow weight and vacuum (Part.1):
H.Shinsha & S. Shiraga (Vacuum Consolidation Drain Association)
50m
5m
PBD(50 200m)
30m1 1
40m
50m
5m
PBD(40 60m)
1 1
20102009
Ap
AsAsc
Ac2
3.1m1.0m1.8m
11.4m
6.0m
10.5m
Ac1,Ap1
As1-2
Asc
Ac2
2.0m
1.8m
1.9m
8.0m
5.1m
7.4m
2
2009 5m
0.6m 33kN/m2
1 2
0.55g/cm3 0.30g/cm3
0.48 0.55 g/cm3
1 0.6m 2
0.5m 10 5m
0.5m
0.72g/cm3 0.104 g/cm3
1 1 3
2010 0.60 g/cm3 0.7m3
1 1m D65
62kN/m2
2009
4
(1)
(2) 2009 1 0.6
2 2009
0.72g/cm3 2010
0.60 g/cm3
1)
Vol.6,No.3 pp.427 438 2011. 2) 1
2 67 pp.303 306 2012. 3) 2010.
t g/cm3
0.2990.4840.5520.6030.525
2 0.548 70cm 60cm4 0.550 60cm 55cm6 0.5518 0.550
-1-2
+
2009 2010
(Ap)
(Ac2) 5m 1 2009
( 40m×60m)1) 2010
( 50m×200m)
PBD 1.0m
-60kN/m2 FEM (
Dacsar)
12)
2009 2010
2 2009 6.0m
10.5m 2010
5.1m 7.4m
ASC Ac2
2009 2010 FEM
3 4
1 2009 Ap
Ac2 Cam -Clay As Asc
As
-5 -15
25cm
0 2010 Ap1 Ac1
Asc Ac2 ( ) As1-2
2009 t 7.0kN/m3
(JIS A 1106) E=90KN/m2 2010 t=6.0kN/m3
E=7KN/m2
(2) 2009 5 2010 6
2009 79.0cm 2010 56.2cm 5 6
2009 7 2010 8
50m
5m
PBD(50 200m)
30m1 1
40m
50m
5m
PBD(40 60m)
1 1
G.L.-16.5m )50.0m
(25cm)
40.0m
Ap (3.1m)
Ac2 (11.4m)
As (2.8m)
Execution for volume reduction of soft ground using both snow weight and vacuum (Part.2), H. Shinsha & S. Shiraga
(Vacuum Consolidation Drain Association)
2009
Ap
AsAsc
Ac2
3.1m1.0m1.8m
11.4m
6.0m
10.5m
2010
Ac1,Ap1
As1-2
Asc
Ac2
2.0m
1.8m
1.9m
8.0m
5.1m
7.4m
Ac2 (8.0m) Asc (1.9m)40.0m G.L.-12.5m
As1-2 (1.8m) Ap1,Ac1 (2.0m)
7 8
2009
1 E 5MN/m2 2
E 90MN/m2( ) 3 E
90MN/m2 9
2009 2010
FEM
(1) ( ) FEM
(2)1) Vol.6 No.3 pp.427 438 2011. 2)
( 1) 53
-0.2
0.0
0.2
0.4
0.6
0.8
1.0
1.2
-80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40
L m
FEM
0.0
0.2
0.4
0.6
0.8
1.0
0 10 20 30 40 50 60 70 80 90
S(m
t day
FEM
92
2009
e t(kN/m2) k(m/sec)
Ap-1 8.77 9.0 2.04 0.204 1.8 1 10-3
Ap-2 7.47 11.0 1.81 0.181 1.8 1 10-3
As - 18.0 1 10-3
Ac2-1 1.59 16.0 0.26 0.026 1.2 1 10-5
Ac2-2 1.94 16.0 0.36 0.036 1.2 1 10-6
Ac2-3 1.78 16.0 0.41 0.041 1.2 1 10-6
11.0 1 10-3
7.0 1 10-3
E(MN/m2)=2.8
E(MN/m2)=90.0
0.333
E(MN/m2)=90.0
0.0
0.2
0.4
0.6
0.8
1.0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140t day
FEM
140
-0.2
0.0
0.2
0.4
0.6
0.8
1.0
1.2
-80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40
FEM
L (m)
2010
e t(kN/m2) k (m/sec)
Ac-1,Ap-1 2.305 14.5 0.29 0.029 1.2 1.27×10-8
As1-1 - 18.0 1 10-6
Asc 1.177 17.6 0.15 0.015 1.2 2.61×10-8
Ac2 1.775 16.0 0.36 0.036 1.2 5.73×10-10
- 6.0 1 10-6
0.33
E(MN/m2)=16.0
E(MN/m2)=7.0
-2.5
-2.0
-1.5
-1.0
-0.5
0.0
0.5 30 45 60 75 90 105 120
Sm
123
L m