  • 8/3/2019 PAW Drill Results Sept 2011

    1/7

    Figure 1: Location of Drilling and Geological Mapping

  • 8/3/2019 PAW Drill Results Sept 2011

    2/7

    Figure 2: Diamond Drilling Results for Nb2O5

  • 8/3/2019 PAW Drill Results Sept 2011

    3/7

    Figure 3: Diamond Drilling Results for REO

    *Note that the potential quantities and grades of the above REO estimates are conceptual in nature, and there is insufficientexploration to date to define a current mineral resource and therefore it is uncertain if further exploration will result in the target beingdelineated as a current mineral resource. A qualified person as defined under National Instrument 43-101 has not completedsufficient work to classify the above mentioned historical estimate as a current mineral resource. The Company is not treating thehistorical estimate as a current mineral resource. The historical estimate is not compliant with NI 43-101 and should not be reliedupon.

  • 8/3/2019 PAW Drill Results Sept 2011

    4/7

    Figure 4: Cross Section A-A Showing Niobium Intersections

    Figure 5: Cross Section B-B Showing REO Intersections

    *Note that the potential quantities and grades of the above REO estimates are conceptual in nature, and there is insufficient

    exploration to date to define a current mineral resource and therefore it is uncertain if further exploration will result in the target being

    delineated as a current mineral resource. A qualified person as defined under National Instrument 43-101 has not completed

    sufficient work to classify the above mentioned historical estimate as a current mineral resource. The Company is not treating the

    historical estimate as a current mineral resource. The historical estimate is not compliant with NI 43-101 and should not be relied

    upon.

  • 8/3/2019 PAW Drill Results Sept 2011

    5/7

  • 8/3/2019 PAW Drill Results Sept 2011

    6/7

    Table 2: Individual REO as a Percentage to Total REO (Diamond Core Assays to Date)

    REOLIGHT=87.68% REOHEAVY= 5.50%

    La2O3 Ce2O3 Pr2O3 Nd2O3 Sm2O3 Eu2O3 Gd2O3 Tb2O3 Dy2O3 Ho2O3 Er2O3 Tm2O3

    23.67 41.70 4.42 15.44 2.45 0.73 1.99 0.25 1.23 0.22 0.58 0.07

    Notes:1. Average relative REO components are calculated using individual Rare Earth grades in intersections using a 1% REO lower cut for all diamond

  • 8/3/2019 PAW Drill Results Sept 2011

    7/7

    Table 3: Mrima Hill Diamond Drill Results, +0.20% Niobium

    East N orth T otalDepth Azimuth Dip From To Interval Recovery Nb2O5 MnO2 U Th

    m m m m m m % % % ppm ppm

    90 0. 00 14.65 14. 65

    14.65 35.65 21.00 52.4 0.75 18.7 3 643

    35.65 38.65 3.00

    38.65 41.65 3.00 61.7 1.35 16.4 9 512

    and 45.00 46.00 1.00 95.0 0.29 6.7 1 145

    and 49.00 50.00 1.00 88.0 0.49 3.6 0 100

    and 53.20 56.75 3.55 56.3 0.15 6.3 5 236

    90 0.00 7.20 7.20

    14.70 16.70 2.00 45.0 0.28 3.1 13 194

    and 19.20 31.20 12.00 87.3 0.55 2.9 35 544

    31.20 36.45 5.25

    36.45 65.70 29.25 78.6 1.14 5.8 76 1426

    including 47.70 53.70 6.00 93.0 1.83 4.2 88 1443

    and 65.70 67.20 1.50

    and 67.20 134.70 67.50 81.5 0.47 8.5 41 518

    60 0.00 8.20 8.20

    8.20 17.00 8.80 45.1 0.45 17.1 36 510

    17.00 23.00 6.00

    23.00 35.00 12.00 48.0 0.91 8.6 23 547

    35.00 42.50 7.50

    42.50 45.50 3.00 33.3 0.30 18.4 11 270

    45.50 51.50 6.00

    51.50 54.50 3.00 33.3 0.56 11.1 22 392

    54.50 62.00 7.50

    62.00 63.50 1.50 60.0 0.74 10.8 10 243

    63.50 66.50 3.00

    66.50 69.50 3.00 49.3 1.02 7.3 18 403

    69.50 70.50 1.00

    70.50 82.00 11.50 64.7 1.05 6.9 17 537

    and 84.50 89.10 4.60 71.1 0.97 0.8 20 670

    90 0.00 40.15 40.15 75.9 0.75 9.0 20 209and 49.60 86.65 37.05 66.8 0.90 11.5 40 304

    and 97.15 98.15 1.00 60.0 0.22 10.7 10 149

    60 0.00 8.15 8.15 46.6 1.05 8.1 43 545

    8.15 11.15 3.00

    11.15 12.65 1.50 63.3 0.44 25.5 40 266

    12.65 23.40 10.75

    23.40 63.00 39.60 73.0 1.70 13.9 33 509

    including 34.40 54.65 20.25 73.3 2.29 15.1 38 591

    IS

    IS

    IS

    IS

    IS

    IS

    IS

    IS

    IS

    IS

    IS

    IS

    IS

    INTERCEPTSHOLEID COORDINATES

    13563.09504570528952PAWDD005

    0100.29503771528686PAWDD004

    32589.1

    IS

    9503710528595PAWDD003

    0134.79504240529085PAWDD002

    056.759504075529110PAWDD001

    Notes:1. Coordinate system UTM Zone 37S WGS84.

    2. Hole PAWDD005 has only been partially sampled, with a final drill depth of 146m.

    3. 1m assay undertaken by Genalysis assay labs in Perth Western Australia by peroxide fusion sample dissolution followed

    by ICPMS.

    4. Intersections calculated using a 0.20% Nb2O5 lower cut with a maximum 2m internal dilution.

    5. IS = Recovery fell below 30% and therefore results not reported